CN208396699U - Modularization coiled tubing Wellhead Control System for coal underground gasifying technology - Google Patents

Modularization coiled tubing Wellhead Control System for coal underground gasifying technology Download PDF

Info

Publication number
CN208396699U
CN208396699U CN201820434185.0U CN201820434185U CN208396699U CN 208396699 U CN208396699 U CN 208396699U CN 201820434185 U CN201820434185 U CN 201820434185U CN 208396699 U CN208396699 U CN 208396699U
Authority
CN
China
Prior art keywords
coiled tubing
module
hydraulic
modular unit
modularization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820434185.0U
Other languages
Chinese (zh)
Inventor
马修·詹姆斯·迪克森
闵振华
卡斯珀·扬·亨德利克·伯格
汪原理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China (shanghai) Energy Technology Co Ltd
Original Assignee
China (shanghai) Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China (shanghai) Energy Technology Co Ltd filed Critical China (shanghai) Energy Technology Co Ltd
Priority to CN201820434185.0U priority Critical patent/CN208396699U/en
Application granted granted Critical
Publication of CN208396699U publication Critical patent/CN208396699U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a kind of modularization coiled tubing unit and Wellhead Control System for coal underground gasifying technology, the composition of the various parts is as follows: modular unit container;Hydraulic power and well head control EM equipment module;Headframe device and coiled tubing injector module, headframe device are used for the support construction as integrated coiled tubing injector and/or snubbing unit and other coiled tubings operation equipment;Process fluid is transported to underground coal gasification(UCG) region by the coiled tubing in the module by coiled tubing operation module;Downhole gauges are transported in the same well where coiled tubing by cable and public utilities module, and are equipped with additional coiled tubing operation and are supported function;Each module is individually placed in modular unit container and individually debugs, and the pipeline, electric wire and the communication line that are mounted with each modular unit container are docked and connected by erecting bed, and the tie point setting waterproof cloth and/or tent plate between each module are antifreeze with cold-resistant.

Description

Modularization coiled tubing Wellhead Control System for coal underground gasifying technology
Technical field
The utility model relates to a kind of modularization coiled tubing Wellhead Control Systems for coal underground gasifying technology, belong to In coal underground gasifying technology equipment technical field.
Background technique
Underground coal gasification(UCG) (ISC) is one by oxidant, and burning and gasification reaction by subterranean coal are straight coal Switch through the process for turning to product gas.Product gas is commonly known as synthesis gas, can be used as fuel production, Chemical Manufacture, power generation etc. The raw material of downstream process.The technical process the set complete well of shaft building, underground coal mining and coal gasification process technology have safety Well, the advantages that investing small, high efficiency, pollution less.
One drilling well for oxidant injection is known as " injection well ", another drilling well for being used to produce product gas is known as " product well ".Directed drilling and vertical drilling all can be used as injection well or product well.Underground coal gasification(UCG) (ISC) may inject It is also needed between well and product well using to one or more vertical well (such as: functional well and service well).
When having injection well, product well and horizontal channel to connect the two in coal seam, this construction is referred to as a coal Charcoal underground gasification (ISC) unit or well pair.ISC unit includes combustion zone, gasification zone and pyrolysis zone.Wherein, combustion zone is in coal seam Near middle oxidant decanting point;Gasification zone is centered around around combustion zone or in combustion zone downstream in the form of radial, and coal exists Gasification zone is gasified, is partially oxidized, to generate product gas;Pyrolysis zone generally exists in gasification zone downstream, the pyrolytic reaction of coal Here occur.The product gas of high temperature is finally transported to ground from product well well head from gasification zone toward downstream flow.In coal combustion Or while gasification, the ISC burned out area in coal seam, which can be grown, to become larger.
Synthesis gas (CO, CO are usually contained by the product gas (crude synthesis gas) that underground coal gasification(UCG) generates2, H2, CH4And The mixture of other gases) and other compositions (solid particle, water, coal tar, hydrocarbon vapours, other microcomponents include H2S, NH4, COS etc.).Its complicated component degree depend on many aspects: oxidant used in underground coal gasification(UCG) (air or Other oxidants, such as oxygen, oxygen-enriched air or vapour mixture), the inherent water in coal seam or surrounding formations penetrate into coal seam Water, coal quality and coal underground gasifying technology operating parameter, including temperature, pressure etc..
According to existing patent document, the particular problem that current existing coal underground gasification technology faces includes:
1) the coiled tubing oxidant delivery system (including well head controls equipment) that most of underground coal gasification(UCG)s use exists It is all sufficiently complex in design and operation, it is connected with each other with many independent systems.Such as: action pane needs an independent behaviour Continuous oil pipe device is assembled and installed as platform.
2) it is time-consuming to all suffer from bulky, transport difficult, on-site assembly for most of underground coal gasification(UCG) coiled tubing systems The problems such as very long.And goliath and other large-scale ancillary equipments are usually required to be installed and be debugged.It in this way will very Mobilization and the return time for extending the project implementation in big degree, lead to the increase of project cost.
3) most of underground coal gasification(UCG) coiled tubings and Wellhead Control System are all only absorbed in demonstrative project scale, without It is final to commercially produce and running.It is different according to the stock number in gasification furnace, it commercially produces and operation is needed equipment With the frequency shifts of 1-5 to new gasification furnace.When commercially producing up to postpartum, several hundred gasifications need to be operated and run simultaneously Furnace.
4) module of (CN206737863U, US7073592B2, US6554075B2, US6763890B2) in the prior art Change/containerized design disadvantage is that their internal components require at the scene using a large amount of large-scale ancillary equipments come complete The assembling of integral system.When live one module/container of every delivery, most components all assemble removal, And module/container itself can only be used as storage container.
Utility model content
Utility model aims to solve the deficiencies in the prior art, provide a kind of for coal underground gasifying technology Modularization coiled tubing Wellhead Control System.The modularization coiled tubing and Wellhead Control System of the utility model advantageously improve Existing coal underground gasification technology.When project reaches and runs at full capacity, project implementation progress will be greatly improved, quality control and Cost control;In addition, modularization coiled tubing and Wellhead Control System will be improved and given birth to when building ISC equipment in remote districts Efficiency is produced, cost is reduced;During runing at the scene, modularization coiled tubing and Wellhead Control System make in new coal underground Gasification well, which reuses position, to be become to be more easier, is convenient.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
For the modularization coiled tubing Wellhead Control System of coal underground gasifying technology, the modularization coiled tubing and Each component of Wellhead Control System constitutes as follows:
Modular unit container with certain built-in space, mobility and structural strength, such as ISO container (3m/20ft Or the standard-sized container of 6m/40ft), or with ISO container there is the high modularization unit of Similar size can be used as mould Block single-unit container;
Hydraulic power and well head control EM equipment module, the modular unit for the hydraulic operation for coiled tubing control service Hydraulic oil is provided with modular unit container;
Headframe device and coiled tubing injector module, headframe device are used to be used as integrated coiled tubing injector And/or the support construction of snubbing unit and other coiled tubings operation equipment;
Coiled tubing operation module, by the coiled tubing in the module by process fluid (oxygen, empty gas and water and/or two Carbonoxide etc.) it is transported to underground coal gasification(UCG) region;
Downhole gauges are transported in the same well where coiled tubing, and are equipped with volume by cable and public utilities module Function is supported in outer coiled tubing operation;
Each module is individually placed in modular unit container and individually debugs, and erecting bed will be mounted with each modularization list Pipeline, electric wire and the communication line of first container are docked and connected, tie point between each module setting waterproof cloth and/or tent plate with Cold-resistant is antifreeze.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the schematic diagram of hydraulic power and well head control EM equipment module.
Fig. 2 is the schematic diagram of headframe device and coiled tubing injector module.
Fig. 3 is the schematic diagram of coiled tubing operation module.
Fig. 4 is the schematic diagram of cable and public utilities module.
Fig. 5 be in production process all modules in the connection schematic diagram of well head.
In figure: 1, scalable canvas bracket, 2, choke manifold mechanism, 3, hydraulic power unit (HPPU), 4, preventer (BOP), 5, by blowout preventer moving to the fluid pressure drive device of well head overcentre, 6, coiled tubing gooseneck, 7, coiled tubing note Enter device and/or snubbing unit, 8, hydraulic-driven position derrick geometry, 9, action pane/lubricator, 10, by operation window Mouth/lubricator is moved to the fluid pressure drive device of well head overcentre, 11, bottom/workbenches of modular containers, 12, Operating room/room on duty, 13, coiled tubing reel, 14, liftable operating room/room on duty fluid pressure drive device, 15, cable Reel, 16, public utilities and equipment storage, 17, coiled tubing tubing string, 18, instrument cable, 19, ISC injection well well head, 20, well Rack device and coiled tubing injector module, 21, in production process derrick starting direction, 22, in production process gooseneck rotation Turn direction, 23, hydraulic power and well head control EM equipment module, 24, coiled tubing operation module, 25, cable and public utilities mould Block, 26, operating room/room on duty starting direction in production process.
Specific embodiment
Below by specific embodiment, and in conjunction with attached drawing, the technical solution of the utility model is made further specifically It is bright.
Embodiment:
The system is using ISO container (3m/20ft the or 6m/40ft collection with calibrated altitude with high mobility Vanning) or container with identical size as modular unit container.Using ISO container be convenient for use truck, train and Modularization coolant injection system is transported to scene by ship, can provide the function of required process system when they are fitted together Energy.Since coolant injection device can be directly disposed inside it by the higher structural strength of ISO container itself.Meanwhile it can According to the requirement of live weather and environmental condition, in advance to the pipeline installation heat preserving and insulating material of equipment or to corresponding ISO collection Vanning installation heat-preserving equipment etc., so as to the scene of reducing required civil engineering and capital construction work amount.It is being transported to remote scene Before, all mechanical engineerings, electrical and instrumentation engineering installation and debugging work can be previously-completed, the installation tune at remote scene is reduced Try workload.Each container modular unit is by quickly connecting hose, pipeline axis, electrical and instrument connector and mechanical branch Frame/connector is connected to each other, quickly and easily to carry out assembly and disassembly to the system when being moved to new position.
Hydraulic power as shown in Figure 1 and well head control EM equipment module 23, including with lower component:
1) telescopic canvas bracket 1 for entering the channel of operation relevant device inside modular unit, and can guarantee Air circulation in modular unit.
2) choke manifold mechanism 2 is controlled for well head.The choke manifold mechanism is fixed on fluid pressure drive device, To allow the movement of choke manifold mechanism in all directions in actual mechanical process, to reach required predetermined position.
3) hydraulic power unit (HPPU) 3 is entire modularization coiled tubing and Wellhead Control System (such as headframe device With coiled tubing injector module 20, coiled tubing operation module 24 etc.) hydraulic power and energy are provided.Hydraulic power dress It sets and is fixed on fluid pressure drive device, to allow the shifting of hydraulic power unit in all directions in actual mechanical process It is dynamic, to reach required predetermined position.
4) preventer (BOP) 4, is directly installed in standard ISO container, is fixed on a fluid pressure drive device 5, with Just allow the movement in 4 all directions of preventer in actual mechanical process, it is ensured that its center for reaching 19 top of well head.
5) anti-frost protection equipment (such as hurricane globe, the waterproof cloth of module junction, the heating system in module), for Prevent hydraulic system and/or other systems for needing to start hot vehicle from freezing.Headframe device as shown in Figure 2 and coiled tubing injection Device module 20, including with lower component:
1) coiled tubing gooseneck 6 is mounted on hydraulic-driven positioning derrick geometry 8.The coiled tubing gooseneck 6 installation is fixed On fluid pressure drive device, to allow the movement and rotation of coiled tubing gooseneck 6 in all directions in actual mechanical process, To reach required predetermined position.When derrick geometry 8 starts to production position 21, hydraulic device drives coiled tubing simultaneously Gooseneck 6 starts to production position 22.
2) coiled tubing injector and/or snubbing unit 7, are integrated with slip system and blowout prevention box, are mounted on liquid On pressure driving positioning derrick geometry 8.The coiled tubing injector and/or snubbing unit 7 are fixed on a hydraulic-driven On device, to allow coiled tubing injector and/or snubbing unit 7 in actual mechanical process in all directions It is mobile, it is ensured that its center for reaching 19 top of well head.
3) action pane/lubricator 9 is fixed on a fluid pressure drive device 10, to allow in actual mechanical process The movement of action pane/lubricator 9 in all directions, it is ensured that its center for reaching 19 top of well head.Action pane/anti- Jet pipe 9 is further equipped with Y tube road, cable injector and double blowout prevention boxes, for operating cable in coiled tubing transfer passage.
4) hydraulic-driven positions derrick geometry 8, is directly installed in ISO container.When derrick geometry 8 from horizontal direction Into when upright position (production position) 21, hydraulic device can be promoted to different operation task and project scene is required Working depth (vertical direction).
5) ISO container reach production position after, bottom be used as workbench and channel 11, for action pane/prevent The no killing well of jet pipe 9 operates, as 17 top of Coiled Tubing is attached or removes downhole tool/bottom hole assembly.
6) anti-frost protection equipment (such as hurricane globe, the waterproof cloth of module junction, the heating system in module), for Prevent hydraulic system and/or other systems for needing to start hot vehicle from freezing.
Coiled tubing operation module 24 as shown in Figure 3, including with lower component:
1) coiled tubing reel 13 is wrapped coiled tubing tubing string 17 on the reel and by hydraulic connecting in coiled tubing Drum center axis and rotary joint guarantee that process fluid can also be transported to coiled tubing pipe when coiled tubing reel 13 rotates In column 17.The coiled tubing reel 13 is fixed on fluid pressure drive device, to allow continuous oil in actual mechanical process The movement of pipe reel in a plurality of directions, to reach required predetermined position.In addition, coiled tubing reel 13 can operate list The concentric tube bank of a coiled tubing tubing string, multiple coiled tubing tubing strings composition, the eccentric tube bank of multiple coiled tubing tubing string compositions.
2) operating room/room on duty 12, is fixed in Liftable hydraulic driving device 14.It is driven by Liftable hydraulic Device 14, operating room/room on duty 12 is raised and lowered according to operational requirements for realization, so as to coiled tubing reel 13 and its His operating device carries out the monitoring of different perspectives.
3) anti-frost protection equipment (such as hurricane globe, the waterproof cloth of module junction, the heating system in module), for Prevent the process fluid in hydraulic system and coiled tubing from freezing.
Cable and public utilities module 25 as shown in Figure 4, including with lower component:
1) cable drum 15 can meet and individually dispose wired monitoring device and instrument cable 18, and/or and coiled tubing Downhole tool assembly connection.The instrument conveyed together with coiled tubing can be used for temperature, pressure and distance (Time Domain Reflectometry) and monitor.
2) public utilities and equipment storage 16, including single or multiple generator, meet all electric power need of whole system Ask (such as operating room, light, heating);The data record and transmitting device of concentration;Control system;Safety and alarm system;With/ Or the work basket of storing tools and equipment.
3) anti-frost protection equipment (such as hurricane globe, the waterproof cloth of module junction, the heating system in module), for Prevent hydraulic system and/or other systems for needing to start hot vehicle from freezing.
The operation schematic diagram of modularization coiled tubing and Wellhead Control System is as shown in figure 5, hydraulic power and well head control EM equipment module 23 is directly installed on well head 19, it is ensured that preventer 4 is accurately positioned in the top at well head center.Headframe device and company Continuous tubing injector module 20 is mounted on the top of above-mentioned apparatus 23.Derrick geometry 8 from horizontal transportation position hydraulic-driven to hang down Growing straight presentation sets 21.Similarly, coiled tubing gooseneck 6 also drives to it and produces position 22.Coiled tubing operation module 24 disposes In on well pad, 180 degree alinement can be pressed with module 23 and 20,90 can also be arranged as according to the spacing and module 23 and 20 of well pad Degree.Coiled tubing tubing string 17 extends since coiled tubing reel 13, by the gooseneck 6 and continuous oil that are mounted on 20 top of module After pipe injector and/or snubbing unit 7, into action pane/lubricator 9 and preventer 4.Later, into well head into Row downhole operations.Wherein, downhole tool is connected before action pane/lubricator 9 enters underground for coiled tubing tubing string and is set Standby (such as underground firing tools, underground oxygen supply tool etc.).Instrument cable 18 extends to from cable drum 15 and is mounted on module 20 The coiled tubing injector and/or snubbing unit 7 at top, instrument cable 18 can be with coiled tubing tubing string 17 together later Downhole operations are carried out into well head.
The utility model provides a kind of modularization coiled tubing Wellhead Control System for coal underground gasifying technology, It is more convenient to transport, and efficiently reduces the mobilization of every 1-5 mobile device and return time in the project implementation process, whole to reduce The coiled tubing operating cost of ISC.The module connection points of all above systems require collocation waterproof cloth/tent plate and have met zero The cold-resistant deicing requirements of working environment below spending.The system only needs crane and/or van container fork truck can be by each mould Block is placed in predetermined position, can be to avoid as mechanical equipment fault and as caused by geographical location is remote or bad weather Special machine equipment delay issue.Each module of the system can individually guarantee that each complete well component accurately finds well head top Center, thus mitigate/minimize due to component misplaces and the problem of well integrality may be destroyed, the problem is in coal It is particularly acute in lower gasification process.
The above is only the preferred embodiment of the present invention, not limits the utility model.This skill to this field It is understandable for art personnel, and various changes and modification can be made in the present invention.In the concept of the utility model All modifications, replacement, improvement etc. in principle, should be included within the scope of protection of this utility model.

Claims (5)

1. being used for the modularization coiled tubing Wellhead Control System of coal underground gasifying technology, it is characterised in that: the system is each The composition of component is as follows:
Modular unit container with certain built-in space, mobility and structural strength;
Hydraulic power and well head control EM equipment module, for the hydraulic operation for coiled tubing control service modular unit with/ Or modular unit container provides hydraulic oil;
Headframe device and coiled tubing injector module, headframe device are used to be used as support construction;
Process fluid is transported to underground coal gasification(UCG) region by the coiled tubing in the module by coiled tubing operation module;
Downhole gauges are transported in the same well where coiled tubing by cable and public utilities module, and are equipped with additional Function is supported in coiled tubing operation;
Each module is individually placed in modular unit container and individually debugs, and erecting bed will be mounted with each modular unit and hold Pipeline, electric wire and the communication line of device are docked and connected, and the tie point setting waterproof cloth and/or tent plate between each module are with cold-resistant It is antifreeze.
2. the modularization coiled tubing Wellhead Control System according to claim 1 for coal underground gasifying technology, Be characterized in that: the hydraulic power and well head control EM equipment module include with lower component:
Telescopic canvas bracket for entering the channel of operation relevant device inside modular unit container, and can guarantee Air circulation in modular unit container;
Choke manifold mechanism is controlled for well head, and the choke manifold mechanism is fixed on fluid pressure drive device, practical to grasp Choke manifold mechanism can move in all directions during work, to reach required predetermined position;
Hydraulic power unit is entire modularization coiled tubing unit and Wellhead Control System, including headframe device and continuous oil Pipe injector module and coiled tubing operation module provide hydraulic power, and the hydraulic power unit is fixed on hydraulic drive On dynamic device, hydraulic power unit can move in all directions in operating process, to reach required predetermined position;
Preventer is directly installed in modular unit container, is fixed on a fluid pressure drive device, blowout prevention in operating process Device can move in all directions, it is ensured that reach the center above well head;
Anti-frost protection equipment, hurricane globe and internal heating device including being set to modular unit external container.
3. the modularization coiled tubing Wellhead Control System according to claim 1 for coal underground gasifying technology, Be characterized in that: the headframe device and coiled tubing injector module include with lower component:
Coiled tubing gooseneck is located on hydraulic-driven positioning derrick geometry, and the coiled tubing gooseneck is fixed on hydraulic drive On dynamic device, allow coiled tubing gooseneck to move and rotate in all directions in operating process, makes a reservation for reach required Position, when hydraulic-driven positioning derrick geometry starts to production position, fluid pressure drive device drives coiled tubing gooseneck simultaneously Start to production position;
Coiled tubing injector and/or snubbing unit, are integrated with slip system and blowout prevention box, are located at hydraulic-driven and position On derrick geometry, the coiled tubing injector and/or snubbing unit are fixed on a fluid pressure drive device, practical Allow the movement of coiled tubing injector and/or snubbing unit in all directions in operating process, it is ensured that it reaches Center above well head;
Action pane or lubricator are fixed on a fluid pressure drive device, action pane or lubricator in actual mechanical process It can move in all directions, it is ensured that it reaches the center above well head, and the action pane or lubricator are further equipped with Y Shape pipeline, cable injector and double blowout prevention boxes, for operating cable in coiled tubing transfer passage;
Hydraulic-driven position derrick geometry, be directly installed in modularization mobile unit, when hydraulic-driven position derrick geometry from When horizontal direction enters upright position, fluid pressure drive device can be promoted to different operation task and the live required work of project Make height;
Anti-frost protection equipment, hurricane globe and internal heating device including being set to modular unit external container.
4. the modularization coiled tubing Wellhead Control System according to claim 1 for coal underground gasifying technology, Be characterized in that: the coiled tubing operation module includes with lower component:
Coiled tubing reel is wrapped coiled tubing tubing string on the reel and by hydraulic connecting in coiled tubing drum center Axis and rotary joint guarantee that process fluid can be transported in coiled tubing tubing string when coiled tubing reel rotates, the company Continuous oil pipe reel is fixed on fluid pressure drive device, allows coiled tubing reel in a plurality of directions in actual mechanical process Movement, to reach required predetermined position, the coiled tubing reel can also operate single coiled tubing tubing string, multiple The concentric tube bank of coiled tubing tubing string composition and the eccentric tube bank of multiple coiled tubing tubing strings composition;
Operating room or room on duty, are fixed in Liftable hydraulic driving device, by Liftable hydraulic driving device, realize Operating room/room on duty is raised and lowered, according to operational requirements to carry out not to coiled tubing reel and other operating devices With the monitoring at visual angle;
Anti-frost protection equipment, hurricane globe and internal heating device including being set to modular unit external container.
5. the modularization coiled tubing Wellhead Control System according to claim 1 for coal underground gasifying technology, Be characterized in that: the cable and public utilities module include with lower component:
Cable drum;
Public utilities and equipment mechanism, including single or multiple generator, the data record of concentration and transmitting device, control system The work basket of system, safety and alarm system and/or storing tools and equipment;
Anti-frost protection equipment, hurricane globe and internal heating device including being set to modular unit external container.
CN201820434185.0U 2018-03-29 2018-03-29 Modularization coiled tubing Wellhead Control System for coal underground gasifying technology Active CN208396699U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820434185.0U CN208396699U (en) 2018-03-29 2018-03-29 Modularization coiled tubing Wellhead Control System for coal underground gasifying technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820434185.0U CN208396699U (en) 2018-03-29 2018-03-29 Modularization coiled tubing Wellhead Control System for coal underground gasifying technology

Publications (1)

Publication Number Publication Date
CN208396699U true CN208396699U (en) 2019-01-18

Family

ID=65064230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820434185.0U Active CN208396699U (en) 2018-03-29 2018-03-29 Modularization coiled tubing Wellhead Control System for coal underground gasifying technology

Country Status (1)

Country Link
CN (1) CN208396699U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566173A (en) * 2019-09-12 2019-12-13 杰瑞能源服务有限公司 Fracturing system with antifreezing performance
WO2024062290A1 (en) * 2022-09-20 2024-03-28 Ergo Exergy Technologies Inc. Quenching and/or sequestering process fluids within underground carbonaceous formations, and associated systems and methods

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566173A (en) * 2019-09-12 2019-12-13 杰瑞能源服务有限公司 Fracturing system with antifreezing performance
CN110566173B (en) * 2019-09-12 2021-11-12 杰瑞能源服务有限公司 Fracturing system with antifreezing performance
WO2024062290A1 (en) * 2022-09-20 2024-03-28 Ergo Exergy Technologies Inc. Quenching and/or sequestering process fluids within underground carbonaceous formations, and associated systems and methods

Similar Documents

Publication Publication Date Title
CN108868706B (en) Method for exploiting natural gas hydrate by directional drilling supercritical carbon dioxide fracturing and displacement
US20080078552A1 (en) Method of heating hydrocarbons
CA2584627C (en) System and method for steam-assisted gravity drainage (sagd)-based heavy oil well production
CN208396699U (en) Modularization coiled tubing Wellhead Control System for coal underground gasifying technology
CN103717831A (en) Apparatus and methods for recovery of hydrocarbons
CN106939780A (en) A kind of non-diagenesis gas hydrates solid state fluidizing quarrying apparatus of sea-bottom shallow and method
CN105041271A (en) Decompression marine natural gas hydrate mining method and submarine mining system
CN105626108A (en) Side bolt drilling machine and side bolt drilling carriage with same
BR122020025348B1 (en) METHOD OF DELIVERY OF A FRACTURING FLUID TO A WELL HOLE, METHOD OF SUPPLYING ELECTRICAL POWER FOR AT LEAST ONE FRACTURING SYSTEM IN A WELL HOLE AND SYSTEM FOR USE IN DELIVERY OF PRESSURIZED FLUID TO A WELL HOLE
CN201778687U (en) Workover rig under pressure for wellhead
CN103676861A (en) Underground coal mine hydraulic anti-reflection operation remote monitoring and control system
CN104948143A (en) Method and device for exploiting seabed surface layer natural gas hydrate
CN103883304A (en) Method for underground coal gasification for gasifier channel establishment
CN106304446A (en) A kind of borehole fluid electric heater
CN201221659Y (en) Gas non-stop transporting first-aid repairing apparatus with gas of steel plastic composite pipeline
CN107288584B (en) Combustible ice rotary-spraying pressure-relief fluidization mining method
CN105089552A (en) Fully intelligent well completion method of oil (gas) field production well
CN209163745U (en) One kind being used for engineering geologic investigation drilling equipment
CN106382114B (en) Modular device system for coal underground gasifying technology
CN202789517U (en) Oil-producing control device of screw pump on basis of underground multi-parameter real-time monitoring
RU2385411C1 (en) Underground gas generator
CN105822265A (en) External buoyancy tank multilayer electric heating bracket subsea natural gas collection device and method
US20140262219A1 (en) Dual underground tunnel system for hydrocarbon exploitation
CN107558983A (en) Underground coal gasification(UCG) coaxial pipes device and its gasification process
CN206458447U (en) Modularization oxidative agent injection system for coal underground gasifying technology

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant