CN208386075U - A kind of power pipe gap bridge fixing device for installing - Google Patents

A kind of power pipe gap bridge fixing device for installing Download PDF

Info

Publication number
CN208386075U
CN208386075U CN201820922471.1U CN201820922471U CN208386075U CN 208386075 U CN208386075 U CN 208386075U CN 201820922471 U CN201820922471 U CN 201820922471U CN 208386075 U CN208386075 U CN 208386075U
Authority
CN
China
Prior art keywords
power pipe
bolt
fixing device
installing
gap bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820922471.1U
Other languages
Chinese (zh)
Inventor
钱凌琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201820922471.1U priority Critical patent/CN208386075U/en
Application granted granted Critical
Publication of CN208386075U publication Critical patent/CN208386075U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of power pipe gap bridge fixing device for installing, two including installing on Bridge Beam wall are in the triangle steel bracket being arranged symmetrically up and down, light section pipeline is installed between two triangle steel brackets, power pipe is installed in the light section pipeline, the triangle steel bracket is fixed by short fixing bolt and light section pipeline, is located on the outside of light section pipeline between two triangle steel brackets and is equipped with long fixing bolt.The utility model is easy to operate, installs rapid and convenient and securely, can cross construction section while construct, reduce difficulty of construction, the saving construction period, advantageously reduce construction cost.

Description

A kind of power pipe gap bridge fixing device for installing
Technical field
The utility model relates to municipal power pipe technical field of construction, pass a bridge to install more particularly to a kind of power pipe and fix Device.
Background technique
It is generally crossed in bridge construction in power pipe, is utilized in river mostly and does reinforced concrete column support power pipe, into Row power pipe crosses bridge construction, and the construction period is long and operation difficulty is larger.
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of power pipe gap bridge fixing device for installing, operation letters It is single, rapid and convenient and securely is installed, construction section can be crossed while being constructed, reduces difficulty of construction, the saving construction period, favorably In reduction construction cost.
The technical scheme adopted by the utility model to solve the technical problem is as follows: providing a kind of power pipe gap bridge installation fixation Device, two including installing on Bridge Beam wall are in the triangle steel bracket being arranged symmetrically up and down, are pacified between two triangle steel brackets Equipped with light section pipeline, power pipe is installed, the triangle steel bracket is by short fixing bolt and gently in the light section pipeline Fashioned iron pipeline is fixed, and is located on the outside of light section pipeline between two triangle steel brackets and is equipped with long fixing bolt.
As a kind of supplement to technical solution described in the utility model, the triangle steel bracket is swollen by concrete Swollen bolt is fixed with Bridge Beam wall.
As a kind of supplement to technical solution described in the utility model, the concrete expansion bolt is by expanding screw Bolt, nut, spring washer, plain washer, casing composition.
It is solid by pipe clamp in the light section pipeline as a kind of supplement to technical solution described in the utility model Determine power pipe.
As a kind of supplement to technical solution described in the utility model, the long fixing bolt is by stay bolt, spiral shell Mother, spring washer, plain washer composition.
As a kind of supplement to technical solution described in the utility model, the short fixing bolt is by lag bolt, spiral shell Mother, spring washer, plain washer composition.
The utility model has the advantages that easy to operate, installation is quick just the utility model relates to a kind of power pipe gap bridge fixing device for installing It is prompt and secured, construction section can be crossed while being constructed, difficulty of construction is reduced, the construction period is saved, advantageously reduce and be constructed into This.
Detailed description of the invention
Fig. 1 is the right side structural representation of the utility model;
Fig. 2 is the overlooking structure diagram of the utility model;
Fig. 3 is the present invention of triangle steel bracket described in the utility model;
Fig. 4 is the structural schematic diagram of concrete expansion bolt described in the utility model;
Fig. 5 is the structural schematic diagram of short fixing bolt described in the utility model;
Fig. 6 is the structural schematic diagram of long fixing bolt described in the utility model.
Diagram: 1, triangle steel bracket, 2, concrete expansion bolt, 3, short fixing bolt, 4, long fixing bolt, 5, electric power Pipe, 6, light section pipeline, 7, bridge, 8, screw thread hole, 9, expansion bolt, 10, nut, 11, spring washer, 12, plain washer, 13, casing, 14, lag bolt, 15, lag bolt.
Specific embodiment
The present invention will be further illustrated below in conjunction with specific embodiments.It should be understood that these embodiments are merely to illustrate this Utility model rather than limitation the scope of the utility model.In addition, it should also be understood that, in the content for having read the utility model instruction Later, those skilled in the art can make various changes or modifications the utility model, and such equivalent forms equally fall within this Shen It please the appended claims limited range.
The embodiments of the present invention is related to a kind of power pipe gap bridge fixing device for installing, as shown in figures 1 to 6, including bridge Two installed on 7 Liang Bi of beam are in the triangle steel bracket 1 being arranged symmetrically up and down, are equipped between two triangle steel brackets 1 light-duty Steel conduit 6, power pipe 5 is equipped in the light section pipeline 6, and the triangle steel bracket 1 passes through short fixing bolt 3 and light section Pipeline 6 is fixed, and the outside that light section pipeline 6 is located between two triangle steel brackets 1 is equipped with long fixing bolt 4.
The triangle steel bracket 1 is fixed by concrete expansion bolt 2 and 7 Liang Bi of bridge.
The concrete expansion bolt 2 is by expansion bolt 9, nut 10, spring washer 11, plain washer 12,13 groups of casing At.
Pass through the fixed power pipe 5 of pipe clamp in the light section pipeline 6.
The long fixing bolt 4 is made of stay bolt 15, nut 10, spring washer 11, plain washer 12.
The short fixing bolt 3 is made of lag bolt 14, nut 10, spring washer 11, plain washer 12.
Embodiment
There are two the screw thread holes 8 for being used for concrete expansion bolt 2, two to be used for short fixed spiral shell for band on triangle steel bracket 1 The screw thread hole 8 of bolt 3, one is used for the screw thread hole 8 of long fixing bolt 4.
Entire fixing device for installing integrally depends on 7 Liang Bi of bridge and carries out installation fixation, by entire power pipe 5 and light-duty The weight transfer of steel conduit 6 is transferred to ground through bridge 7 to bridge 7.1 position of lower section triangle steel bracket is determined first, uses coagulation Soil expansion bolt 2 is fixed on 7 Liang Bi of bridge, is then connected and fixed with short fixing bolt 3 and lower section triangle steel bracket 1, light-duty The fixed power pipe 5 of the useful pipe clamp of 6 inner sleeve of steel conduit determines top triangle steel bracket 1 then according to the position of light section pipeline 6 Position, acknowledgement bit is postponed to be fixed on 7 Liang Bi of bridge with concrete expansion bolt 2.It is upper and lower two triangle steel brackets 1, light-duty Steel conduit 6 is attached fixation by long fixing bolt 4, forms the power pipe gap bridge fixing device for installing an of monolithic stability.
This is practical easy to operate, installs rapid and convenient and securely, can multiple construction sections construct simultaneously, reduce construction Difficulty saves the construction period, advantageously reduces construction cost.

Claims (6)

1. a kind of power pipe gap bridge fixing device for installing, two including installing on bridge (7) Liang Bi are in be arranged symmetrically up and down Triangle steel bracket (1), it is characterised in that: be equipped with light section pipeline (6), the light steel tube between two triangle steel brackets (1) It is equipped with power pipe (5) in road (6), the triangle steel bracket (1) is solid by short fixing bolt (3) and light section pipeline (6) It is fixed, it is located on the outside of light section pipeline (6) between two triangle steel brackets (1) and long fixing bolt (4) is installed.
2. a kind of power pipe gap bridge fixing device for installing according to claim 1, it is characterised in that: the triangular steel branch Frame (1) is fixed by concrete expansion bolt (2) and bridge (7) Liang Bi.
3. a kind of power pipe gap bridge fixing device for installing according to claim 2, it is characterised in that: the concrete is swollen Swollen bolt (2) is made of expansion bolt (9), nut (10), spring washer (11), plain washer (12), casing (13).
4. a kind of power pipe gap bridge fixing device for installing according to claim 1, it is characterised in that: the light steel tube It is fixed power pipe (5) by pipe clamp in road (6).
5. a kind of power pipe gap bridge fixing device for installing according to claim 1, it is characterised in that: the long fixed spiral shell Bolt (4) is made of stay bolt (15), nut (10), spring washer (11), plain washer (12).
6. a kind of power pipe gap bridge fixing device for installing according to claim 1, it is characterised in that: the short fixed spiral shell Bolt (3) is made of lag bolt (14), nut (10), spring washer (11), plain washer (12).
CN201820922471.1U 2018-06-14 2018-06-14 A kind of power pipe gap bridge fixing device for installing Active CN208386075U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820922471.1U CN208386075U (en) 2018-06-14 2018-06-14 A kind of power pipe gap bridge fixing device for installing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820922471.1U CN208386075U (en) 2018-06-14 2018-06-14 A kind of power pipe gap bridge fixing device for installing

Publications (1)

Publication Number Publication Date
CN208386075U true CN208386075U (en) 2019-01-15

Family

ID=64966905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820922471.1U Active CN208386075U (en) 2018-06-14 2018-06-14 A kind of power pipe gap bridge fixing device for installing

Country Status (1)

Country Link
CN (1) CN208386075U (en)

Similar Documents

Publication Publication Date Title
CN203431321U (en) Adjustable combined pipe support
CN107327097A (en) A kind of guardrail
CN208386075U (en) A kind of power pipe gap bridge fixing device for installing
CN201851791U (en) Pipeline clamp
CN210423992U (en) Building pipe for building water supply and drainage pipeline
CN206754588U (en) A kind of telescopic underground pipe gallery combined bracket
CN204401904U (en) A kind of siphon rain pipe fastening devices
CN207194036U (en) The fixing device of piping lane transmission rod
CN203374989U (en) Groove type fixing device for pipeline
CN204689709U (en) A kind of submersible water impeller
CN202390827U (en) Hot rods for supporting and fixing pipeline under ground
CN207394119U (en) A kind of adjustable vertical tube pipe clamp
CN108006324A (en) A kind of riser clamp
CN212104578U (en) Net rack main purline support node assembly
CN209164759U (en) A kind of building pipe suspended fixing component
CN210069121U (en) Pipeline flexible support and inner and outer pipeline mounting structure
CN209484060U (en) Piping shaft suspension and support and piping shaft
CN207761263U (en) The assembling type steel net type temporary support that can be had enough to meet the need
CN101710640A (en) Power supply terminal antenna erection tower
CN201246563Y (en) Water supplying and discharging connection elbow
CN207700751U (en) A kind of prefabrication supporting member
CN201318846Y (en) Structure for fixing recycled water overflow pipe
CN205678557U (en) A kind of Projecting Lamp mounting bracket of outdoor substation
CN109025331A (en) Combinable disk button prefabricated panel support construction
CN207994983U (en) A kind of strut for photovoltaic bracket system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant