CN208385559U - The automatic patch Teflon mechanism of insulating film hot melt - Google Patents

The automatic patch Teflon mechanism of insulating film hot melt Download PDF

Info

Publication number
CN208385559U
CN208385559U CN201821010030.0U CN201821010030U CN208385559U CN 208385559 U CN208385559 U CN 208385559U CN 201821010030 U CN201821010030 U CN 201821010030U CN 208385559 U CN208385559 U CN 208385559U
Authority
CN
China
Prior art keywords
teflon
heat
hot melt
adhesive tape
caching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821010030.0U
Other languages
Chinese (zh)
Inventor
杨志明
蔡连贺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Hua Ke Technology Research Institute Co Ltd
Original Assignee
Huizhou Hua Ke Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Hua Ke Technology Research Institute Co Ltd filed Critical Huizhou Hua Ke Technology Research Institute Co Ltd
Priority to CN201821010030.0U priority Critical patent/CN208385559U/en
Application granted granted Critical
Publication of CN208385559U publication Critical patent/CN208385559U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Adhesives Or Adhesive Processes (AREA)

Abstract

The utility model provides a kind of automatic patch Teflon mechanism of insulating film hot melt, including mounting plate, it is successively arranged on the transport path of mounting plate and unreels structure, buffer structure, two finger cylinders, heat-sealing structure and wind structure, two finger cylinders are located at the two sides of heat-sealing structure;Finger cylinder lives Teflon rubber belt clamping, and when caching, the Teflon adhesive tape unreeled in structure is pulled out and cached by buffer structure, and when hot melt, the heat-sealing piece of heat-sealing structure is mobile to be simultaneously attached on Teflon adhesive tape;After sealing the Teflon adhesive tape failure of on piece, finger cylinder is unclamped, and winding structure winds the Teflon adhesive tape after failure, and pulls the Teflon adhesive tape of caching, is moved to the Teflon adhesive tape not failed on the position of heat-sealing structure.The utility model does not need to have saved cost of labor compared with the prior art using manual operation during blowing, caching, hot melt and rewinding, has many advantages, such as that easy to use, production cost is low and high production efficiency.

Description

The automatic patch Teflon mechanism of insulating film hot melt
Technical field
The utility model relates to lithium ion battery production technical fields, heat automatic patch iron more particularly, to a kind of insulating film Fu Long mechanism.
Background technique
In today that science and technology is constantly progressive, the demand of new energy resource power battery is increasing, production and manufacturing process It is affected to the quality of battery, wherein the production of battery core is particularly important, in the production process of battery core, needs on its surface Insulating film is wrapped up, package quality has critically important influence to the performance and safety of battery core, so the manufacturing process of battery core In, package insulating film is one of critical process.Insulating film is generally the film-like material of thinner thickness, usually first by supporting spring and absolutely Velum hot melt, then be wrapped in battery core.It is also easy to produce wire drawing phenomenon after insulating film and spacer ring (plastics) melting, generally uses people Work pastes Teflon in heat-sealing on piece, adhesion wire drawing phenomenon is generated when preventing melting, due to being manual operation, worker holds very much It is easily tired, production efficiency is not only affected, high production cost is also added.
Utility model content
In order to overcome the above problem, the utility model provides a kind of low insulating film with high production efficiency of production cost and heats Automatic patch Teflon mechanism.
The technical solution of the utility model is: a kind of automatic patch Teflon mechanism of insulating film hot melt, including mounting plate are provided, It is successively arranged on the transport path of the mounting plate and unreels structure, buffer structure, two finger cylinders, heat-sealing structure and winding Structure, two finger cylinders are located at the two sides of the heat-sealing structure;The finger cylinder lives Teflon rubber belt clamping, delays When depositing, the Teflon adhesive tape that unreels in structure is pulled out caching by the buffer structure, when hot melt, the heat of the heat-sealing structure Mounting is mobile and is attached on Teflon adhesive tape;After the Teflon adhesive tape failure of the heat-sealing on piece, the finger cylinder is unclamped, The winding structure winds the Teflon adhesive tape after failure, and pulls the Teflon adhesive tape of caching, makes the iron not failed Fluorine dragon adhesive tape is moved on the position of the heat-sealing structure.
It further include moving structure as the improvement to the utility model, the mounting plate is arranged on the moving structure.
It further include fixing seat as the improvement to the utility model, the moving structure setting is on the fixing seat.
As the improvement to the utility model, the moving structure includes moving guide rail and mobile cylinder, the mobile gas The driving end of cylinder and the sliding block of the moving guide rail are connect with the mounting plate respectively.
As the improvement to the utility model, the buffer structure includes two the first fixed pulleys, movable pulley, caching cylinder With caching guide rail, the driving end of the caching cylinder is connect with the sliding block on the caching guide rail, the cunning on the caching guide rail Block is connect with the movable pulley, and the movable pulley is located in the space between two first fixed pulleys and within this space Move back and forth.
It further include that two the first fixing axles, two institutes are set on the mounting plate as the improvement to the utility model It states the first fixed pulley to be separately positioned in two first fixing axles, two first fixing axles are oppositely arranged.
It further include the shifting axle on the sliding block being arranged on the caching guide rail, institute as the improvement to the utility model Movable pulley is stated to be arranged on the shifting axle.
It further include several second fixed pulleys as the improvement to the utility model, several second fixed pulley settings exist On the transport path of the mounting plate.
It further include that several second fixing axles, Ruo Gansuo are set on the mounting plate as the improvement to the utility model The second fixed pulley is stated to be arranged in several second fixing axles.
As the improvement to the utility model, the heat-sealing structure includes heat seal cylinder and the heat-sealing piece, the heat-sealing Piece is connect with the driving end of the heat seal cylinder.
The utility model unreels structure, buffer structure, finger cylinder, heat-sealing structure and winding structure due to using, and delays It deposits structure and the Teflon adhesive tape unreeled in structure is pulled out into caching, heat-sealing structure carries out hot melt processing, when the iron fluorine of heat-sealing on piece After imperial adhesive tape failure, winding structure winds the Teflon adhesive tape after failure, it is possible thereby to know, in blowing, caching, heat During molten and rewinding, do not need to have saved cost of labor compared with the prior art using manual operation, have it is easy to use, The advantages that production cost is low and high production efficiency.
Detailed description of the invention
Fig. 1 is the schematic perspective view of the utility model.
Wherein: 1, mounting plate;11, moving guide rail;12, mobile cylinder;13, fixing seat;2, structure is unreeled;21, it unreels solid Dead axle;22, discharge plate;3, buffer structure;31, guide rail is cached;32, cylinder is cached;33, the first fixed pulley;34, movable pulley;41, Second fixed pulley;42, the second fixing axle;5, finger cylinder;6, heat-sealing structure;61, piece is sealed;7, structure is wound;71, winding turns Moving axis;72, rewinding disk;100, Teflon adhesive tape;200, material.
Specific embodiment
In the description of the present invention, it should be understood that "center" in term, "upper", "lower", "front", "rear", The orientation or positional relationship of the instructions such as "left", "right" is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of retouching State the utility model and simplify description, rather than the device or component of indication or suggestion meaning must have a particular orientation, with Specific orientation construction and operation, therefore should not be understood as limiting the present invention.In addition, term " first ", " second " It is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connection ", " connected " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to dismantling connection, or integrally connect It connects;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, be also possible to indirectly connected through an intermediary, It can be the connection of two component internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition Concrete meaning of the language in the utility model.
Referring to Figure 1, it is a kind of insulating film hot melt patch Teflon mechanism, including mounting plate 1 automatically that Fig. 1 is revealed, It is successively arranged on the transport path of the mounting plate 1 and unreels structure 2,3, two finger cylinders 5 of buffer structure, 6 and of heat-sealing structure Structure 7 is wound, two finger cylinders 5 are located at the two sides of the heat-sealing structure 6.The finger cylinder 5 is by Teflon adhesive tape 100 clamp, and when caching, the Teflon adhesive tape 100 unreeled in structure 2 is pulled out caching, hot melt by the buffer structure 3 When, the heat-sealing piece 61 of the heat-sealing structure 6 is mobile and is attached on Teflon adhesive tape 100.Teflon on the heat-sealing piece 61 After adhesive tape 100 fails, the finger cylinder 5 is unclamped, and the Teflon adhesive tape 100 after 7 pairs of structure failures of the winding is wound, And the Teflon adhesive tape 100 of caching is pulled, it is moved to the Teflon adhesive tape 100 not failed on the position of the heat-sealing structure 6.
It further include moving structure (not identifying) in the present embodiment, the mounting plate 1 is arranged on the moving structure.Also Including fixing seat 13, the moving structure is arranged in the fixing seat 13.The moving structure includes moving guide rail 11 and moves It takes offence cylinder 12, the driving end of the mobile cylinder 12 and the sliding block of the moving guide rail 11 are connect with the mounting plate 1 respectively.
In the present embodiment, the structure 2 that unreels includes unreeling fixing axle 21 and discharge plate 22, and the setting of discharge plate 22 exists It is described to unreel in fixing axle 21, Teflon adhesive tape 100 is wound on the discharge plate 22.When have external force pull Teflon adhesive tape When 100, the discharge plate 22 unreels rotation and blowing in fixing axle 21 described.
In the present embodiment, the winding structure 7 includes winding motor (invisible in figure), winding rotation axis 71 and rewinding disk 72, the shaft of the winding motor is connect with the winding rotation axis 71, and the rewinding disk 72 is arranged in the winding rotation axis On 71.When the winding motor drives the rewinding disk 72 rotation, the rewinding disk 72 carries out rewinding.
In the present embodiment, the buffer structure 3 is gentle including two the first fixed pulleys 33, movable pulley 34, caching cylinder 32 Guide rail 31 is deposited, the driving end of the caching cylinder 32 is connect with the sliding block on the caching guide rail 31, on the caching guide rail 31 Sliding block connect with the movable pulley 34, the movable pulley 34 be located in the space between two first fixed pulleys 33 and Move back and forth within this space.
It further include that two the first fixing axles (not identifying), two first fixed pulleys 33 are set on the mounting plate 1 It is separately positioned in two first fixing axles, two first fixing axles are oppositely arranged.It further include setting described slow The shifting axle (not identifying) on the sliding block on guide rail 31 is deposited, the movable pulley 34 is arranged on the shifting axle.Two described One fixed pulley 33 is born against on a surface of Teflon adhesive tape 100, and the movable pulley 34 is resisted against Teflon adhesive tape 100 On another surface.
It further include several second fixed pulleys 41 in the present embodiment, several second fixed pulleys 41 are arranged in the installation On the transport path of plate 1.It further include that several second fixing axles 42, several second fixed pulleys are set on the mounting plate 1 41 are arranged in several second fixing axles 42.The heat-sealing structure 6 includes heat seal cylinder (invisible in figure) and the heat Mounting 61, the heat-sealing piece 61 are connect with the driving end of the heat seal cylinder.
The utility model use process is as follows: when buffering, the finger cylinder 5 clamps Teflon adhesive tape 100, institute Stating caching cylinder 32 drives the movable pulley 34 to far from the direction movement for unreeling structure 2, and the movable pulley 34 will be described The Teflon adhesive tape 100 unreeled in structure 2 pulls out caching.
When hot melt, the finger cylinder 5 clamps Teflon adhesive tape 100, and the heat-sealing piece 61 is mobile and is attached to iron fluorine On imperial adhesive tape 100, at this moment the Teflon adhesive tape 100 between two finger cylinders 5 is tightened.Described in the moving structure is mobile Mounting plate 1, so that the Teflon adhesive tape 100 on corresponding heat-sealing 61 position of piece is resisted against the position that material 200 needs to seal On heated.
After the Teflon adhesive tape 100 on the heat-sealing piece 61 fails, the finger cylinder 5 is unclamped, the winding motor The rewinding disk 72 is driven to rotate, the rewinding disk 72 carries out rewinding, and pulls the Teflon adhesive tape 100 of caching, makes not fail Teflon adhesive tape 100 be moved on the position of the heat-sealing structure 6, recycle the above-mentioned course of work.
The utility model is due to unreeling structure, the buffer structure, the finger cylinder, heat-sealing knot using described The Teflon adhesive tape unreeled in structure is pulled out caching, the heat-sealing knot by structure and the winding structure, the buffer structure Structure carries out hot melt processing, and after the Teflon adhesive tape failure of the heat-sealing on piece, the winding structure is to the Teflon after failure Adhesive tape is wound, it is possible thereby to know, during blowing, caching, hot melt and rewinding, is not needed using manual operation, Cost of labor has been saved compared with the prior art, has many advantages, such as that easy to use, production cost is low and high production efficiency.
It should be noted that being explained in detail for the respective embodiments described above, purpose be only that the utility model into Row explain, in order to be able to preferably explanation the utility model, still, these description cannot with any explanation at be to this The limitation of utility model, in particular, each feature described in various embodiments can also mutual any combination, thus Other embodiments are formed, in addition to there is clearly opposite description, these features should be understood to can be applied to any one reality It applies in mode, and is not limited merely to described embodiment.

Claims (10)

1. a kind of automatic patch Teflon mechanism of insulating film hot melt, including mounting plate, it is characterised in that: in the conveying of the mounting plate It is successively arranged on path and unreels structure, buffer structure, two finger cylinders, heat-sealing structure and winding structure, two fingers Cylinder is located at the two sides of the heat-sealing structure;The finger cylinder lives Teflon rubber belt clamping, when caching, the buffer structure The Teflon adhesive tape that unreels in structure is pulled out into caching, when hot melt, the heat-sealing piece of the heat-sealing structure is mobile to be simultaneously attached to iron On fluorine dragon adhesive tape;After the Teflon adhesive tape failure of the heat-sealing on piece, the finger cylinder is unclamped, and the winding structure is to mistake Teflon adhesive tape after effect is wound, and pulls the Teflon adhesive tape of caching, and the Teflon adhesive tape not failed is made to be moved to institute It states on the position of heat-sealing structure.
2. the automatic patch Teflon mechanism of insulating film hot melt according to claim 1, it is characterised in that: further include mobile knot Structure, the mounting plate are arranged on the moving structure.
3. the automatic patch Teflon mechanism of insulating film hot melt according to claim 2, it is characterised in that: it further include fixing seat, The moving structure setting is on the fixing seat.
4. the automatic patch Teflon mechanism of insulating film hot melt according to claim 2, it is characterised in that: the moving structure packet Include moving guide rail and mobile cylinder, the sliding block of the driving end of the mobile cylinder and the moving guide rail respectively with the mounting plate Connection.
5. the automatic patch Teflon mechanism of insulating film hot melt according to claim 1 or 2, it is characterised in that: the caching knot Structure includes two the first fixed pulleys, movable pulley, caching cylinder and caching guide rail, the driving end for caching cylinder and the caching Sliding block connection on guide rail, the sliding block cached on guide rail are connect with the movable pulley, and the movable pulley is located at described in two Move back and forth in space between first fixed pulley and within this space.
6. the automatic patch Teflon mechanism of insulating film hot melt according to claim 5, it is characterised in that: further include being arranged in institute Two the first fixing axles on mounting plate are stated, two first fixed pulleys are separately positioned in two first fixing axles, and two A first fixing axle is oppositely arranged.
7. the automatic patch Teflon mechanism of insulating film hot melt according to claim 5, it is characterised in that: further include being arranged in institute The shifting axle on the sliding block on caching guide rail is stated, the movable pulley is arranged on the shifting axle.
8. the automatic patch Teflon mechanism of insulating film hot melt according to claim 1 or 2, it is characterised in that: further include several Second fixed pulley, several second fixed pulleys are arranged on the transport path of the mounting plate.
9. the automatic patch Teflon mechanism of insulating film hot melt according to claim 8, it is characterised in that: further include being arranged in institute Several second fixing axles on mounting plate are stated, several second fixed pulleys are arranged in several second fixing axles.
10. the automatic patch Teflon mechanism of insulating film hot melt according to claim 1 or 2, it is characterised in that: the heat-sealing knot Structure includes heat seal cylinder and the heat-sealing piece, and the heat-sealing piece is connect with the driving end of the heat seal cylinder.
CN201821010030.0U 2018-06-28 2018-06-28 The automatic patch Teflon mechanism of insulating film hot melt Active CN208385559U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821010030.0U CN208385559U (en) 2018-06-28 2018-06-28 The automatic patch Teflon mechanism of insulating film hot melt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821010030.0U CN208385559U (en) 2018-06-28 2018-06-28 The automatic patch Teflon mechanism of insulating film hot melt

Publications (1)

Publication Number Publication Date
CN208385559U true CN208385559U (en) 2019-01-15

Family

ID=64964863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821010030.0U Active CN208385559U (en) 2018-06-28 2018-06-28 The automatic patch Teflon mechanism of insulating film hot melt

Country Status (1)

Country Link
CN (1) CN208385559U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113399867A (en) * 2021-05-22 2021-09-17 宣城开盛新能源科技有限公司 Automatic device for replacing Teflon high-temperature cloth by welding mechanism

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113399867A (en) * 2021-05-22 2021-09-17 宣城开盛新能源科技有限公司 Automatic device for replacing Teflon high-temperature cloth by welding mechanism

Similar Documents

Publication Publication Date Title
CN110459796A (en) A kind of preparation method of laminated cell, laminated cell, lamination device and system
CN107645019A (en) Full-automatic lithium battery cell winding machine
CN204508356U (en) A kind of tenslator and sutomatic winding machine
CN205583074U (en) Electricity core coiling lamination machine
CN108238483A (en) Paste two-sided gluing mechanism and the two-sided gluing equipment of patch
CN207954082U (en) Pole piece die-cutting device
CN108808115B (en) Battery core winding machine
CN208385559U (en) The automatic patch Teflon mechanism of insulating film hot melt
CN101786327B (en) Method for placing in-situ cured fiber by rotary wet process and device thereof
CN102360930A (en) System for automatically controlling winding tension of transformer coil
CN101478060A (en) Square lithium ionic cell winding machine
CN207834493U (en) Full-automatic lithium battery cell winding machine
CN208478485U (en) And film device and reel system
CN105633448B (en) Laminating machine and its membrane tension control method, diaphragm blowing and tension control structure
CN205997029U (en) A kind of PVC sheet shearing device
CN208208909U (en) Electricity core winding machine
CN204173646U (en) Laminating machine and barrier film blowing thereof and tension control structure
CN201570545U (en) Adhesive tape sticking device
CN209442387U (en) Unwinding device
CN108232324A (en) Battery manufacture control system and battery manufacturing equipment
CN207883852U (en) Battery manufacture control system and battery manufacturing equipment
CN206779214U (en) A kind of elastic compression formula up- coiler for transformer iron core production
CN207183442U (en) A kind of lug glue plastering machine detent mechanism
CN111934024B (en) Turret lamination method, turret lamination device and battery pole piece thermal composite lamination system
CN213401452U (en) Battery cell film drawing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant