CN208367734U - A kind of sand dredger efficiency monitoring system - Google Patents

A kind of sand dredger efficiency monitoring system Download PDF

Info

Publication number
CN208367734U
CN208367734U CN201820975012.XU CN201820975012U CN208367734U CN 208367734 U CN208367734 U CN 208367734U CN 201820975012 U CN201820975012 U CN 201820975012U CN 208367734 U CN208367734 U CN 208367734U
Authority
CN
China
Prior art keywords
sand
sand dredger
driving motor
dredger
supply unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820975012.XU
Other languages
Chinese (zh)
Inventor
邓兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Huize Science & Technology Developing Co Ltd
Original Assignee
Chongqing Huize Science & Technology Developing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Huize Science & Technology Developing Co Ltd filed Critical Chongqing Huize Science & Technology Developing Co Ltd
Priority to CN201820975012.XU priority Critical patent/CN208367734U/en
Application granted granted Critical
Publication of CN208367734U publication Critical patent/CN208367734U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

The utility model discloses a kind of sand dredger efficiency monitoring system, sand dredger is equipped with support frame, and support frame is fixed in sand dredger, and the lower end of support frame is fixed with driving motor, and carrier bar is sequentially connected on the output shaft of driving motor, and carrier bar is equipped with sand hopper;Sand dredger is equipped with sandbox, and the top of carrier bar is located at the top of sandbox;Sand dredger is equipped with power supply unit, driving motor and power supply unit electrical connection;This system further includes frequency sensor, data processing equipment and headend equipment, the headend equipment is located in the driver's cabin of sand dredger, the power end of frequency sensor is electrically connected through transformer and the power supply unit, route between the collection terminal connection power supply unit and driving motor of frequency sensor, the output end of frequency sensor connects headend equipment through RS485 bus, and the headend equipment has display screen and wireless signal sending device.What the utility model can monitor sand dredger adopts sand efficiency, and the time of sand is adopted in cooperation, it is estimated that adopting sand amount, prevents supervision blind area.

Description

A kind of sand dredger efficiency monitoring system
Technical field
The utility model relates to a kind of sand dredger efficiency monitoring systems, belong to and adopt sand equipment technical field.
Background technique
Sand is excellent construction material, the huge market demand, therefore adopts the economic benefit that sand has great number.It is existing to adopting sand Ship Production rate mainly passes through micro-judgment, or by actually adopting sand value fuzzy estimate, but does not have measured data conduct Support calculates accurate real-time yield, or adopts sand total amount.Supervision department can not grasp the practical exploitation value of sand dredger, Supervision just will appear supervision blind area.
Utility model content
The purpose of the utility model is to provide a kind of sand dredger efficiency monitoring systems, and can monitor sand dredger adopts sand The time of sand is adopted in efficiency, cooperation, it is estimated that adopting sand amount, prevents supervision blind area.
In order to solve the above technical problems, the utility model adopts the following technical solutions:
A kind of sand dredger efficiency monitoring system, sand dredger are equipped with support frame, and support frame is fixed in sand dredger, support frame Lower end be fixed with driving motor, be sequentially connected with carrier bar on the output shaft of driving motor, carrier bar is equipped with sand hopper;In sand dredger Equipped with sandbox, the top of carrier bar is located at the top of sandbox;Sand dredger is equipped with power supply unit, driving motor and the power supply Device electrical connection;This system further includes frequency sensor, data processing equipment and headend equipment, and the headend equipment, which is located at, adopts sand In the driver's cabin of ship, the power end of frequency sensor is electrically connected through transformer and the power supply unit, the acquisition of frequency sensor The output end of route between end connection power supply unit and driving motor, frequency sensor connects headend equipment through RS485 bus, The headend equipment has display screen and wireless signal sending device.Headend equipment is similar to controller, can show monitoring shape State, and there is signal sending function, status information can be issued.
It further include bank base monitoring device in a kind of sand dredger efficiency monitoring system above-mentioned, bank base monitoring device has aobvious Show that device and wireless signal receiver, wireless signal receiver are connected with the wireless signal sending device wireless telecommunications.
In a kind of sand dredger efficiency monitoring system above-mentioned, the driving motor is three-phase motor.
Compared with prior art, what the utility model can monitor sand dredger adopts sand efficiency, and the time of sand is adopted in cooperation, can be with It estimates and adopts sand amount, prevent supervision blind area.When sand dredger carries out adopting sand operation, driving motor drives the sand hopper for transporting sandstone Operating, therefore the revolving speed of motor directly affects hopper speed.The three-phase alternating current of sand dredger output, after frequency converter frequency conversion, It is transported to threephase asynchronous machine.
This programme obtains power frequency by Fourier transformation by acquisition three-phase motor electric current.By power frequency with Motor speed relationship calculates controlling rotation speed of main shaft of motor, and hopper and electric machine main shaft transmission are than calculating the discharge bucket speed of mainshaft.According to material The Connection Density of bucket can calculate the running speed of hopper.The valid data such as yield, efficiency are estimated according to hopper volume, and It is sent to headend equipment.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of an embodiment of the present invention;
Fig. 2 is the circuit system schematic illustration of the utility model.
Appended drawing reference: 1- support frame, 2- sand dredger, 3- carrier bar, 4- driving motor, 5- sandbox, 6- sand hopper, 7- is for Denso It sets, 8- transformer, 9- data processing equipment, 10- display screen, 11- headend equipment, 12- frequency sensor, 13- wireless signal hair Send device, 14- bank base monitoring device, 15- display, 16- wireless signal receiver.
The utility model is further described with reference to the accompanying drawings and detailed description.
Specific embodiment
Embodiment 1 of the present utility model:as shown in FIG. 1 and FIG. 2, a kind of 2 efficiency monitoring system of sand dredger, in sand dredger 2 Equipped with support frame 1, support frame 1 is fixed in sand dredger 2, and the lower end of support frame 1 is fixed with driving motor 4, driving motor 4 it is defeated Carrier bar 3 is sequentially connected on shaft, carrier bar 3 is equipped with sand hopper 6;Sand dredger 2 is equipped with sandbox 5, and the top of carrier bar 3 is located at storage The top of sandbox 5;Sand dredger 2 is equipped with power supply unit 7, and driving motor 4 and the power supply unit 7 are electrically connected;This system is also wrapped Frequency sensor 12, data processing equipment 9 and headend equipment 11 are included, the headend equipment 11 is located in the driver's cabin of sand dredger 2, The power end of frequency sensor 12 is electrically connected through transformer 8 and the power supply unit 7, and the collection terminal of frequency sensor 12, which connects, to be supplied The output end of route between electric installation 7 and driving motor 4, frequency sensor 12 connects headend equipment 11, institute through RS485 bus Headend equipment 11 is stated with display screen 10 and wireless signal sending device 13.
It further include bank base monitoring device 14, bank base monitoring device 14 has display 15 and wireless signal receiver 16, Wireless signal receiver 16 is connected with 13 wireless telecommunications of wireless signal sending device.The driving motor 4 is three-phase electricity Machine.
Embodiment 2: as depicted in figs. 1 and 2, a kind of 2 efficiency monitoring system of sand dredger, sand dredger 2 is equipped with support frame 1, Support frame 1 is fixed in sand dredger 2, and the lower end of support frame 1 is fixed with driving motor 4, the company of transmission on the output shaft of driving motor 4 It is connected to carrier bar 3, carrier bar 3 is equipped with sand hopper 6;Sand dredger 2 is equipped with sandbox 5, and the top of carrier bar 3 is located at the top of sandbox 5; Sand dredger 2 is equipped with power supply unit 7, and driving motor 4 and the power supply unit 7 are electrically connected;This system further includes frequency sensor 12, data processing equipment 9 and headend equipment 11, the headend equipment 11 are located in the driver's cabin of sand dredger 2, frequency sensor 12 Power end be electrically connected through transformer 8 and the power supply unit 7, the collection terminal connection power supply unit 7 of frequency sensor 12 and drive The output end of route between dynamic motor 4, frequency sensor 12 connects headend equipment 11, the headend equipment through RS485 bus 11 have display screen 10 and wireless signal sending device 13.
It further include bank base monitoring device 14, bank base monitoring device 14 has display 15 and wireless signal receiver 16, Wireless signal receiver 16 is connected with 13 wireless telecommunications of wireless signal sending device.The driving motor 4 is three-phase electricity Machine.
The working principle of an embodiment of the present invention: the sand hopper 6 that frequency sensor 12 is mounted on sand dredger 2 is driven At the power supply unit 7 of dynamic motor 4, signal wire RS485 is connected to headend equipment;At this point, frequency sensor 12 enters monitor state. When sand dredger 2 starts to adopt sand, frequency sensor 12 collects current of electric, and the operating of sand hopper 6 is calculated in data processing equipment 9 Speed estimates yield, and is sent to headend equipment 11;After headend equipment 11 receives data, bank base monitoring device 14 is uploaded. So far, monitoring personnel can check the actual yield of sand dredger and yield.

Claims (3)

1. a kind of sand dredger efficiency monitoring system, which is characterized in that sand dredger (2) is equipped with support frame (1), and support frame (1) is solid It is scheduled on sand dredger (2), the lower end of support frame (1) is fixed with driving motor (4), the company of transmission on the output shaft of driving motor (4) It is connected to carrier bar (3), carrier bar (3) is equipped with sand hopper (6);Sand dredger (2) is equipped with sandbox (5), and the top of carrier bar (3) is located at storage The top of sandbox (5);Sand dredger (2) is equipped with power supply unit (7), driving motor (4) and the power supply unit (7) electrical connection; This system further includes frequency sensor (12), data processing equipment (9) and headend equipment (11), and the headend equipment (11) is located at In the driver's cabin of sand dredger (2), the power end of frequency sensor (12) is electrically connected through transformer (8) and the power supply unit (7), Route between collection terminal connection power supply unit (7) of frequency sensor (12) and driving motor (4), frequency sensor (12) Output end connects headend equipment (11) through RS485 bus, and there are the headend equipment (11) display screen (10) and wireless signal to send out Send device (13).
2. a kind of sand dredger efficiency monitoring system according to claim 1, which is characterized in that further include bank base monitoring device (14), bank base monitoring device (14) has display (15) and wireless signal receiver (16), wireless signal receiver (16) it is connected with wireless signal sending device (13) wireless telecommunications.
3. a kind of sand dredger efficiency monitoring system according to claim 1, which is characterized in that the driving motor (4) is Three-phase motor.
CN201820975012.XU 2018-06-25 2018-06-25 A kind of sand dredger efficiency monitoring system Active CN208367734U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820975012.XU CN208367734U (en) 2018-06-25 2018-06-25 A kind of sand dredger efficiency monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820975012.XU CN208367734U (en) 2018-06-25 2018-06-25 A kind of sand dredger efficiency monitoring system

Publications (1)

Publication Number Publication Date
CN208367734U true CN208367734U (en) 2019-01-11

Family

ID=64926446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820975012.XU Active CN208367734U (en) 2018-06-25 2018-06-25 A kind of sand dredger efficiency monitoring system

Country Status (1)

Country Link
CN (1) CN208367734U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110147621A (en) * 2019-05-23 2019-08-20 广东海洋大学 Sand job model is adopted at a kind of sea based on dynamic demonstration technology in kind

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110147621A (en) * 2019-05-23 2019-08-20 广东海洋大学 Sand job model is adopted at a kind of sea based on dynamic demonstration technology in kind

Similar Documents

Publication Publication Date Title
CN105444875A (en) Vibration monitoring device for self-power-supply type wireless transformer
CN103039395A (en) Industrial aquaculture automatic feeding system
CN105717451B (en) Pumping unit and pumping unit permanent magnet motor no-load back electromotive force measurement method, device
CN109403928A (en) A kind of intelligence pumping unit monitoring system
CN111342557A (en) Base station power generation and signal acquisition device, standby power system, signal acquisition method and standby power method
CN208367734U (en) A kind of sand dredger efficiency monitoring system
CN111760675A (en) Aggregate processing equipment energy consumption optimization method based on Internet of things
CN201461501U (en) Energy-saving control device of blower
CN201027537Y (en) Control device for drilling machine driven by digitized AC variable-frequency electricity
CN203080569U (en) Energy-saving grab-bucket-type dredger
CN206376832U (en) Energy-saving control system of beam-pumping unit
CN106638809A (en) Multi-path water supply control system of constant-pressure variable frequency pump
CN217210975U (en) Health monitoring terminal for three-phase asynchronous low-voltage motor
CN206211240U (en) A kind of slip ring and rotor outgoing cable mounting structure
CN206409217U (en) Intelligent variable parameter oil recovery energy-saving controller
CN209149132U (en) A kind of beam pumping unit long-distance monitor and control energy conserving system
CN208751530U (en) A kind of communication of insulator chain obliquity sensor and power supply mounting apparatus
CN2812365Y (en) Frequency conversion synchronizer of cable drum
CN208477045U (en) A kind of Mobile portable formula low-pressure line-outgoing cable load monitoring device
CN202494916U (en) Infrastructure mine electromechanical device safety monitoring device
CN206387433U (en) Monitor the support of test on-line for oceanographic instrumentation
CN202967430U (en) Multipoint contrast-type intelligent slipping fault monitoring system for belt conveyor
CN211959093U (en) Synchronous reluctance motor system
CN201690304U (en) Alternating current variable frequency transmission device
CN101371135B (en) Apparatus for sensing at least one parameter in a liquid

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant