CN208363150U - Long screw auger pressure deposited pile pile head elevation control device - Google Patents

Long screw auger pressure deposited pile pile head elevation control device Download PDF

Info

Publication number
CN208363150U
CN208363150U CN201820993265.XU CN201820993265U CN208363150U CN 208363150 U CN208363150 U CN 208363150U CN 201820993265 U CN201820993265 U CN 201820993265U CN 208363150 U CN208363150 U CN 208363150U
Authority
CN
China
Prior art keywords
control circuit
central control
pile
long screw
screw auger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820993265.XU
Other languages
Chinese (zh)
Inventor
周芳
尚学伟
陈炳如
张亚平
吴海龙
张伟国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Foundation Engineering Co Ltd
Original Assignee
Jiangsu Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Foundation Engineering Co Ltd filed Critical Jiangsu Foundation Engineering Co Ltd
Priority to CN201820993265.XU priority Critical patent/CN208363150U/en
Application granted granted Critical
Publication of CN208363150U publication Critical patent/CN208363150U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of long screw auger pressure deposited pile pile head elevation control device and its application method, which includes shell, and central control circuit and power supply are provided in shell, and central control circuit control is connected with laser range finder;Central control circuit is also connected with temperature sensor and baroceptor;Central control circuit is also connected with the pressure sensor of concrete slurry plumpness in detection power head feed inlet;The power contactor of the output control concrete transfer pump of signal all the way of central control circuit, central control circuit are also connected with data input module.Long screw auger pressure deposited pile foundation pile concrete requirement is in different construction sites, it is affected by various factors, in the case where determining on construction ground, pile foundation concrete demand also suffers from temperature, air pressure, concrete slump in addition to pile foundation depth, the influence such as soil layer coefficient, fullness coefficient is passed through in stake, it is provided with data input module, these parameters can be inputted in data input module, and data input module is connect with central control circuit.

Description

Long screw auger pressure deposited pile pile head elevation control device
Technical field
The utility model belongs to building field, and more particularly to one kind, the utility model relates to a kind of long screw auger pressure deposited pile stakes Push up height controller.
Background technique
At present when carrying out the constructing operation of long screw auger pressure deposited pile, be by artificial observation, with working experience to drilling machine and Concrete conveying mechanism is controlled.When work, construction personnel needs the hoisting depth and concrete pulp fall according to long spire cobalt bar When the sound that is issued in the drilling rod or concrete slurry sprayed according to the capacity of drilling rod upper discharge hole and gas vent moment Situations such as, to judge the amount of sent concrete slurry feed-line Nei, and coherent signal is issued to turn on pump driver according to this.Turn on pump driver The feeding of concrete transportation system is controlled according to coherent signal and stops expecting.Since the experience difference of construction personnel and existing judgement are missed Difference, and because caused by the reasons such as environmental factor signal transmission not in time or the reasons such as not in place, pass through the conveying capacity of concrete slurry Biggish error is often generated, this just brings certain adverse effect to the construction quality of pile foundation.And close to stake top absolute altitude place The excessive error of the conveying of generation also will cause the loss and waste of concrete slurry, and cause to the construction of next procedure certain Difficulty, while also will form certain environmental pollution.
In Chinese patent literature CN201191365Y, a kind of long screw auger pressure deposited pile automatic controller is disclosed, the device It include that control counts the starting sensor started, the position sensor for detecting power head adjustable height and detection power head charging The pressure sensor of concrete slurry plumpness, three sensors are connected to the central control circuit with tally function in mouthful Signal input part, the signal output end all the way of central control circuit are connected to the electrical power contacts of the hoist engine of control power head lifting On device, the another way signal output of central control circuit controls the power contactor of concrete transfer pump, power supply and central control circuit It is electrically connected with each sensor.
Technical solution disclosed in above patent document, improves pile quality to a certain extent, has saved constructor Member, but superfilled height is still controlled it is undesirable, waste concrete it is serious;Therefore, it is necessary to develop a kind of new length Spiral guncreting pile pile head elevation control device.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of construction quality of raising pile foundation, reduces concrete damage It becomes estranged the long screw auger pressure deposited pile pile head elevation control device of waste.
In order to solve the above technical problems, the technical solution adopted in the utility model is, the long screw auger pressure deposited stake top absolute altitude Controller includes shell, and central control circuit and power supply, the central control circuit control connection are provided in the shell There is laser range finder;The central control circuit is also connected with temperature sensor and baroceptor;The central control circuit It is also connected with the pressure sensor of concrete slurry plumpness in detection power head feed inlet;The signal all the way of the central control circuit The power contactor of output control concrete transfer pump, the central control circuit are also connected with data input module.
Long screw auger pressure deposited pile foundation pile concrete requirement is affected by various factors in different construction sites, on construction ground really In the case where fixed, foundation pile concrete demand (can calculate one-dimensional elasticity ideally other than foundation pile depth and diameter with this The volume V of bar foundation pile, i.e., concrete dosage ideally), temperature, air pressure, concrete slump are also suffered from, soil layer property is passed through in stake Deng influence, thus have to accurate fullness coefficient will be determined (according to the actual situation to V's in conjunction with these Parameter Conditions Amendment, i.e., the concrete dosage under virtual condition), concrete conveying capacity could be preferably controlled, the construction quality of foundation pile is improved, reduces coagulation Soil loss and waste.In addition, in the present invention, being provided with data input module, this can be inputted in data input module A little parameters, and data input module is connect with central control circuit, and as described in CN201191365Y, central control circuit can To be the Computerized intelligent control circuit being overlapped to form with single-chip microcontroller and IC chip, this integrated circuit includes counter Tally function;Switch, Switching Power Supply, the time relay, intermediate relay, relay and counting can also be imported using by power supply The common control circuit of the discrete components such as device connection composition.Furthermore for a certain specific stake machine, the length of drill bit of pile machine Be it is fixed, diameter be also it is fixed, due to detecting drill bit to the distance of laser range finder using laser range finder, drill bit is deep The length of soil layer can be calculated quickly, then the volume in pile foundation hole can be calculated, required concrete is also just secured, In conjunction with the external factor parameter of construction site, the concrete slurry for needing to be pumped into will reach most preferably, reduce concrete loss and wave Take.
Preferably, on the housing, and it is connected with the signal output end of the central control circuit and is provided with alarm Device.
Reach absolute altitude when superfilled, alarm device alarm prompts concrete slurry to be pumped into and meets the requirements, and it is defeated that central control circuit controls concrete Send the power contactor of pump.
Preferably, the data input module is arranged in Intelligent mobile equipment;Correspondingly, central control circuit is provided with Wireless transport module realizes that the data of the central control circuit and Intelligent mobile equipment are mutual by the wireless transport module It is logical.
It enters data into module to be arranged in Intelligent mobile equipment, and data is transmitted by wireless transport module, using intelligence Can App, input that can be more convenient and analyze data, can be more accurate calculate concrete demand, and safety coefficient Also high, construction personnel can implement control far from construction site.
Preferably, the shell is divided into top half and lower half portion, wherein the central control circuit is located at shell In top half, the lower half portion of the shell is provided with an accommodating cavity.
Using the above structure, internal structure is compact for controller, and internal component placement more optimizes;Accommodating cavity can be used for Heat dissipation, can be used for placing cable when not used.
Preferably, the rear wall of the shell is equipped with relieve heat hole.
Preferably, the data input module is arranged on shell, has Data Entry Panel.Module is entered data into set It sets on shell, integral structure.
Another problem to be solved in the utility model is to provide a kind of making for long screw auger pressure deposited pile pile head elevation control device With method, comprising the following steps:
(1) laser range finder is mounted on above drill bit of pile machine, confirms central control circuit and opening on stake machine is set The power contactor of the pressure sensor, control concrete transfer pump of concrete slurry plumpness in dynamic sensor, detection power head feed inlet Electric signal communication;
Confirm central control circuit and temperature sensor and baroceptor electric signal communication;
(2) data information, the data information including construction site are obtained, soil layer coefficient, fullness coefficient are passed through in stake;Further include There are concrete slump, the diameter of drill bit of pile machine, drill bit of pile machine length;
(3) data information got in the step (2) is inputted from data input module;
(4) start drill bit of pile machine, after drill bit of pile machine reaches predetermined position, during laser range finder feeds back to measurement data Control circuit is entreated, central control circuit combination laser range finder controls the data information in measurement data and the step (2) The pressure sensor of concrete slurry plumpness in system detection power head feed inlet, so that drilled pile pours into slurry and reaches designed elevation.
Detailed description of the invention
It is further described with reference to the accompanying drawing with the embodiments of the present invention:
Fig. 1 is the electrical block diagram of the utility model long screw auger pressure deposited pile pile head elevation control device;
Fig. 2 is the structural schematic diagram of the utility model long screw auger pressure deposited pile pile head elevation control device;
Fig. 3 is the backsight structural representation of Fig. 2;
Fig. 4 is the utility model long screw auger pressure deposited pile pile head elevation control device another kind structural schematic diagram;
Wherein: 1- shell;101- top half;The lower half portion 102-;2- central control circuit;3- power supply;4- Laser Measuring Distance meter;5- temperature sensor;6- baroceptor;7- pressure sensor;The power contactor of 8- concrete transfer pump;The input of 9- data Module;10- alarm device;11- wireless transport module;12- accommodates cavity;13- relieve heat hole;14- Data Entry Panel.
Specific embodiment
It include shell 1, the shell as shown in Fig. 2, being the long screw auger pressure deposited pile pile head elevation control device of the utility model Central control circuit 2 and power supply 3 are provided in body 1, as shown in Figure 1, the control of the central control circuit 2 is connected with Laser Measuring Distance meter 4;The central control circuit 2 is also connected with temperature sensor 5 and baroceptor 6;The central control circuit 2 also connects It is connected to the pressure sensor 7 of concrete slurry plumpness in detection power head feed inlet;The signal all the way of the central control circuit 2 is defeated The power contactor 8 of concrete transfer pump is controlled out, and the central control circuit 2 is also connected with data input module 9.
On the shell 1, and it is connected with the signal output end of the central control circuit 6 and is provided with alarm device 10; In the present embodiment, the data input module 9 is arranged in Intelligent mobile equipment;Correspondingly, central control circuit 2 is provided with Wireless transport module 11 realizes the number of the central control circuit 2 and Intelligent mobile equipment by the wireless transport module 11 According to intercommunication.
The shell 1 divides for top half 101 and lower half portion 102, wherein the central control circuit 2 is located at shell 1 Top half 101 in, the lower half portion 102 of the shell 1 is provided with an accommodating cavity 12.
As shown in figure 3, the rear wall of the shell 1 is equipped with relieve heat hole 13;The data input module 9 is arranged on shell 1, With Data Entry Panel 14.
The application method of long screw auger pressure deposited pile pile head elevation control device, comprising the following steps:
(1) laser range finder is mounted on above drill bit of pile machine, confirms central control circuit and opening on stake machine is set The power contactor of the pressure sensor, control concrete transfer pump of concrete slurry plumpness in dynamic sensor, detection power head feed inlet Electric signal communication;
Confirm central control circuit and temperature sensor and baroceptor electric signal communication;
(2) data information, the data information including construction site are obtained, soil layer coefficient, fullness coefficient are passed through in stake;Further include There are concrete slump, foundation pile diameter, foundation pile length;
(3) data information got in the step (2) is inputted from data input module;
(4) start drill bit of pile machine, after drill bit of pile machine reaches predetermined position, during laser range finder feeds back to measurement data Control circuit is entreated, central control circuit combination laser range finder controls the data information in measurement data and the step (2) The pressure sensor of concrete slurry plumpness in system detection power head feed inlet, so that drilled pile pours into slurry and reaches designed elevation.
When carrying out site operation using llong helix bored piles pile head elevation control device, specifically includes the following steps: (1) stake Position measuring;(2) pore-forming;(3) concrete pumping material pile;(4) production of steel reinforcement cage;(5) underthrust steel reinforcement cage is constructed;It is hung certainly using drilling machine Vibration hammer underthrust steel reinforcement cage, and the sensor of llong helix bored piles pile head elevation control device is placed in and is designed on steel reinforcement cage Elevation location, and start to insert steel reinforcement cage in three minutes after concrete pouring.
The basic principles and main features and advantage of the utility model have been shown and described above.The technical staff of the industry It should be appreciated that the present utility model is not limited to the above embodiments, the above embodiments and description only describe this The principle of utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model also has various change And improvement, as dimensionally become larger or become smaller or material on change, these changes and improvements both fall within claimed The scope of the utility model in, for example, as shown in figure 4, enter data into module 9 be arranged on shell 1, have Inplanat Plate 14.The protection scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1. a kind of long screw auger pressure deposited pile pile head elevation control device, includes shell, central control circuit is provided in the shell And power supply, which is characterized in that the central control circuit control is connected with laser range finder;The central control circuit is also connected with There are temperature sensor and baroceptor;It is full that the central control circuit is also connected with concrete slurry in detection power head feed inlet The pressure sensor of degree;The central control circuit signal all the way output control concrete transfer pump power contactor, it is described in Centre control circuit is also connected with data input module.
2. long screw auger pressure deposited pile pile head elevation control device according to claim 1, which is characterized in that on the housing, And it is connected with the signal output end of the central control circuit and is provided with alarm device.
3. long screw auger pressure deposited pile pile head elevation control device according to claim 2, which is characterized in that the data input mould Block is arranged in Intelligent mobile equipment;Correspondingly, central control circuit is provided with wireless transport module, pass through the wireless transmission Module realizes the data interchange of the central control circuit and Intelligent mobile equipment.
4. long screw auger pressure deposited pile pile head elevation control device according to claim 3, which is characterized in that the shell is divided into Half part and lower half portion, wherein the central control circuit is located in the top half of shell, the lower half portion of the shell It is provided with an accommodating cavity.
5. long screw auger pressure deposited pile pile head elevation control device according to claim 4, which is characterized in that the rear wall of the shell Equipped with relieve heat hole.
6. long screw auger pressure deposited pile pile head elevation control device according to claim 1, which is characterized in that the data input mould Block is arranged on shell, has Data Entry Panel.
CN201820993265.XU 2018-06-26 2018-06-26 Long screw auger pressure deposited pile pile head elevation control device Active CN208363150U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820993265.XU CN208363150U (en) 2018-06-26 2018-06-26 Long screw auger pressure deposited pile pile head elevation control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820993265.XU CN208363150U (en) 2018-06-26 2018-06-26 Long screw auger pressure deposited pile pile head elevation control device

Publications (1)

Publication Number Publication Date
CN208363150U true CN208363150U (en) 2019-01-11

Family

ID=64926865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820993265.XU Active CN208363150U (en) 2018-06-26 2018-06-26 Long screw auger pressure deposited pile pile head elevation control device

Country Status (1)

Country Link
CN (1) CN208363150U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678038A (en) * 2018-06-26 2018-10-19 江苏地基工程有限公司 Long screw auger pressure deposited pile pile head elevation control device and its application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678038A (en) * 2018-06-26 2018-10-19 江苏地基工程有限公司 Long screw auger pressure deposited pile pile head elevation control device and its application method

Similar Documents

Publication Publication Date Title
CN111058438B (en) Long spiral drilling machine pile-forming automatic measurement construction method
CN208363150U (en) Long screw auger pressure deposited pile pile head elevation control device
CN108678038A (en) Long screw auger pressure deposited pile pile head elevation control device and its application method
CN208645653U (en) A kind of prefabricated pile pumping distribution device
CN106873490A (en) Filling concrete monitoring system based on long-spiral drilling machine
CN210917309U (en) Novel vibroflotation gravel pile construction system
CN108196487A (en) A kind of towed concrete pump vehicle concrete flow quantity monitoring system and monitoring method
CN113404035A (en) Full-automatic vibroflotation construction system based on pile frame and crane
CN203795870U (en) Intelligent mud jacking system
CN201191365Y (en) Long screw auger pressure deposited pile automatic controller
CN211007690U (en) Agitating lorry and emptying system combining agitating lorry with pumping equipment
CN112855218A (en) Intelligent monitoring system for tunnel secondary lining concrete pouring
CN208415239U (en) A kind of CFG ram machine construction parameter monitoring system
CN116469235A (en) Masonry structure wall underpinning safety monitoring and early warning system
CN207567834U (en) The superfilled automatic alarm set of concrete pipe base
CN104863157A (en) Distorted concrete grouting system and grouting method
CN116122277A (en) Precast pile driving device and power mechanism control method
CN211234555U (en) Long auger drilling concrete volume detection display device
CN208060974U (en) A kind of towed concrete pump vehicle concrete flow quantity monitoring system
CN211948603U (en) Bored concrete pile concrete filling degree of depth real-time detection device
CN211596779U (en) Long auger drilling machine becomes stake automatic measuring system
CN201141281Y (en) Rotary digging drill rig with slurry level automatic control device
CN207331649U (en) Integral intelligent measures water installations
CN212641538U (en) Pile top elevation monitoring device for cast-in-situ bored pile
CN216892487U (en) Automatic water injection device for caisson water injection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant