CN208362934U - It is a kind of to facilitate the steel form for increasing abutment pier pier seam - Google Patents
It is a kind of to facilitate the steel form for increasing abutment pier pier seam Download PDFInfo
- Publication number
- CN208362934U CN208362934U CN201820966722.6U CN201820966722U CN208362934U CN 208362934 U CN208362934 U CN 208362934U CN 201820966722 U CN201820966722 U CN 201820966722U CN 208362934 U CN208362934 U CN 208362934U
- Authority
- CN
- China
- Prior art keywords
- pier
- steel
- nut
- steel form
- swivel becket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of steel forms for facilitating and increasing abutment pier pier and stitching, belong to bridge pier column construction field, it is intended to provide a kind of steel form for facilitating and increasing pier seam distance, to solve the problems, such as that pier seam increases difficult in the prior art, its key points of the technical solution are that, the steel form of cavity is spliced to form including two pieces, steel rib and split bolt, the steel rib is fixed on the outside of the surrounding of steel form, split bolt is arranged on adjacent steel rib, pier seam is formed between two pieces of steel forms, rotating bar is equipped in the pier seam, the one end of the rotating bar on the outside of template is equipped with threaded portion, nut is threaded on the threaded portion;Two pieces of steel forms are outward extended with connecting plate towards the two sides that pier stitches respectively, and connecting plate is located at the lower section of threaded portion, and the connecting plate is equipped with bolt.The utility model is constructed suitable for Straddle type monorail bridge pier column.
Description
Technical field
The utility model relates to bridge pier column constructions, in particular to a kind of to facilitate the steel form for increasing abutment pier pier seam.
Background technique
The structural system of straddle type monorail rail tracks has system of simple supporting, continuous system, continuous rigid frame system.At present in the world
It has runed and in the cross-saddle single-track traffic built, track girder generallys use prestressed concrete Simple Rail Bearer.
The continuous rigid frame PC guideway beam structural system that Wuhu City's rail traffic uses.The system uses simple-supported thencontinuous
Method construction, the form of construction work of simply supported-to-continuous system is by the batch Prefabrication of simply supported beam and the superior function of continuous beam
Combine, its main feature is that first press simply supported beam scale fabrication and erection construction, after by pouring continuous segment, tensioning second phase prestressing force
Muscle and dismounting temporary support, complete the conversion by freely-supported to continuous system, realize the mode of batch Prefabrication to accelerate to connect
The construction speed of continuous beam, has the advantages of saving cumbersome branch die process, having taken into account freely-supported and continuous system.In order to guarantee longitudinal direction
It adjusts, needs that the pier seam of 5cm is arranged in continuous rigid frame abutment pier, but since the pier seam between steel form is smaller, need to stitch in pier
Middle filled and process stitches to increase pier, and this mode for increasing pier seam is relatively complicated and easily impacts to environment.
Utility model content
The purpose of the utility model is to provide a kind of steel forms for facilitating and increasing abutment pier pier and stitching, and have and facilitate increase steel form
Between pier seam the advantages of.
The above-mentioned technical purpose of the utility model has the technical scheme that
It is a kind of to facilitate the steel form for increasing abutment pier pier seam, including two pieces of steel forms for being spliced to form cavity, steel rib and to drawing
Bolt, the steel rib are fixed on the outside of the surrounding of steel form, and split bolt is arranged on adjacent steel rib, two pieces of steel forms
Between be formed with pier seam, rotating bar is equipped in pier seam, the one end of the rotating bar on the outside of steel form is equipped with threaded portion,
Nut is threaded on the threaded portion;
Two pieces of steel forms are outward extended with connecting plate towards the two sides that pier stitches respectively, and connecting plate is located under threaded portion
Side, the connecting plate are equipped with bolt.
By using above-mentioned technical proposal, rotating bar is raised by tool, steel form is placed on to the two sides of swingle,
Two pieces of steel forms are tensed by steel rib and split bolt, rotating bar is clamped between two pieces of steel forms, finally leads to again
Bolt is crossed further to clamp rotating bar, to keep the pier of 5cm to stitch.After use, by tool rotating nut by rotating bar
Back-out.More convenient to increase pier seam operation in this way, operating efficiency is higher.
Further, the nut is fixedly connected with annular slab, the diameter of the annular slab on the side of steel form
Greater than the diameter of nut.
By using above-mentioned technical proposal, the setting of annular slab increases the contact area of tool and nut, so that nut
It is not easy to slip from tool, nut rotation is more steady, accelerates rotating bar taking-up.
Further, two connecting plates are relatively set with fixed block close to the side of rotating bar, on the fixed block
It is equipped with half slot of positioning for annular slab rotation.
By using above-mentioned technical proposal, the setting for positioning half slot not only can play position-limiting action to the rotation of nut,
So that nut is not easily shifted during rotation, it can also play a supporting role to nut, so that nut begins during rotation
Whole and rotating bar coaxial line, so that rotating bar taking-up is more steady.
Further, the nut is equipped with card slot far from the side of annular slab, is arranged with swivel becket in the rotating bar, institute
It states swivel becket and is equipped with the limited post cooperated with card slot close to the side of nut, be fixedly connected with and rotating bar axis on the swivel becket
The vertical driving lever of line;
Half slot of limit is equipped on two fixed blocks, the swivel becket is located in half slot of limit.
Limited post is embedded into card slot when nut needs to rotate by using above-mentioned technical proposal, rotating lever,
Thus to drive nut to rotate.It is more laborsaving when making rotating nut provided with driving lever, it is more convenient.Swivel becket is placed in limit half
In slot, support and position-limiting action can be played to the rotation of fixed block, more convenient swivel becket turns nut.
Further, spring, and spring are equipped between side of the swivel becket far from nut and the side wall of half slot of limit
One end be fixedly connected with the side wall of half slot of limit, the other end and swivel becket contradict.
It is done due to the setting of fixed block so that driving lever exists when rotating nut by using above-mentioned technical proposal
It relates to, needs after swivel becket turns an angle, limited post is detached from from card slot, then adjust the position of driving lever, then will limit
Position column is embedded into card slot, and continues to rotate nut.When the setting of spring is so that limited post is detached from from card slot, swivel becket is risen
It to the effect of buffering, reduces swivel becket and is directly contacted with the side wall for limiting half slot, and swivel becket is caused to damage.
Further, the limited post is equipped with guide surface towards the side of card slot side wall.
By using above-mentioned technical proposal, be equipped in the more convenient limited post insertion card slot of guide surface, reduce limited post with
Swivel becket collides and damages limited post.
Further, the slot bottom of half slot of half slot of the positioning and limit is equipped with ball.
By using above-mentioned technical proposal, annular slab contacts with the slot bottom of half slot of limit in the course of rotation and generates cunning
Dynamic friction accelerates the abrasion of annular slab, and the abrasion of annular slab can be reduced equipped with ball, extends the service life of annular slab.
The abrasion of swivel becket can be reduced by limiting the ball in half slot equally, extend the service life of swivel becket.
Further, the driving lever is equipped with anti-skid chequer far from one end of swivel becket.
By using above-mentioned technical proposal, anti-skid chequer increases the friction between driving lever and the tool of rotating lever, so that
Tool is not easy to slip from driving lever during the work time, improves work efficiency.
In conclusion the utility model has the following beneficial effects:
1. using rotating bar, threaded portion and nut, the pier between steel form is enabled to stitch the effect that distance is maintained at 5cm
Fruit;
2. using half slot of annular slab and positioning, the effect of support and limit can be played to the rotation of nut;
3. using swivel becket, card slot, limited post and driving lever, it can play and facilitate rotating nut, so that taking-up be facilitated to turn
The effect of lever.
Detailed description of the invention
Fig. 1 is in the present embodiment for embodying steel form, steel rib, the connection relationship between split bolt;
Fig. 2 is the enlarged drawing in the portion A in Fig. 1, for embodying the connection relationship between pier seam, rotating bar;
Fig. 3 is in the present embodiment for embodying the connection relationship diagram of threaded portion and nut;
Fig. 4 is the enlarged drawing in the portion B in Fig. 3, for embodying annular slab, swivel becket, the connection relationship between nut;
Fig. 5 is the big enlarged drawing in the portion C in Fig. 4, for embodying card slot, limited post, the connection relationship between guide surface.
In figure, 1, steel form;11, pier stitches;12, rotating bar;121, threaded portion;13, nut;131, annular slab;132, block
Slot;2, steel rib;3, split bolt;4, connecting plate;41, fixed block;411, half slot is positioned;4111, ball;412, half slot is limited;
4121, spring;5, swivel becket;51, limited post;511, guide surface;52, driving lever;521, anti-skid chequer.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Wherein identical components are presented with like reference characters.It should be noted that word used in the following description
Language "front", "rear", "left", "right", "up" and "down" refer to the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and
"outside" refers respectively to the direction towards or away from geometric center of specific component.
It is a kind of to facilitate the steel form for increasing abutment pier pier seam, as shown in Figure 1, include two pieces of steel forms 1 for being spliced to form cavity,
The split bolt 3 for being fixed on the steel rib 2 in 1 outside of steel form and being arranged on adjacent steel rib 2.Spelling of the split bolt 3 to steel form 1
Pick up the effect of fastening.
As shown in figure 4, two pieces of steel forms 1 are connected, place is formed with pier seam 11(referring to fig. 2), pier seam 11 is interior to be equipped with rotating bar
12(is referring to fig. 2), and rotating bar 12 is equipped with threaded portion 121 close to the one end in 1 outside of steel form, threaded portion 121 is equipped with nut
13.The two sides of two pieces of steel forms 1 towards pier seam 11 have each extended over connecting plate 4, and connecting plate 4 is located at the lower section of threaded portion 121,
Two connecting plates are bolted.When construction, swingle is raised by tool first, two pieces of steel forms 1 are placed on rotation
The two sides of bar are fastenedly connected steel form 1 by steel rib 2, split bolt 3 and bolt, so that swingle is clamped in two blocks of steel
Between template 1, thus the construction pier seam 11 to guarantee 5cm.By other tool rotating nuts 13 after construction, will rotate
Bar 12 is extracted out from pier seam 11.
As shown in figure 4, two connecting plates 4 are fixedly connected with fixed block 41 close to the side of threaded portion 121, on fixed block 41
It is equipped with half slot 411 of positioning, the annular slab 131 with swingle coaxial line is equipped in half slot 411 of positioning, and annular slab 131 is fixed
In nut 13 on the side of steel form 1.Annular slab 131 increases the contact area of tool Yu nut 13, so that tool exists
When turning nut 13, it is not easy to slip from nut 13.It positions half slot 411 and plays the role of support and limit to annular slab 131, make
It is more steady in rotation to obtain nut 13.
As shown in figure 4, be equipped with half slot 412 of limit on two fixed blocks 41, and limit half slot 412 to be located at nut 13 separate
Position the side of half slot 411.Nut 13 is equipped with card slot 132(referring to Fig. 5 far from the side of annular slab 131), in rotating bar 12
It is arranged with swivel becket 5, and swivel becket 5 is located in two half slots 412 of limit.Swivel becket 5 towards the side of nut 13 be equipped with
The limited post 51(that card slot 132 cooperates is referring to Fig. 5).Swivel becket 5 is equipped with the driving lever 52 vertical with 12 axis of rotating bar.It uses
When, limited post 51 is placed in card slot 132, driving lever 52 is stirred, so that swivel becket 5 rotates, to drive nut 13 to rotate, more
Facilitate and takes out rotating bar 12.It limits half slot 412 and plays the role of support and limit to swivel becket 5, so that the rotation of nut 13 is more
Steadily.
As shown in figure 4, it is equipped with spring 4121 between side of the swivel becket 5 far from nut 13 and the side plate of half slot 412 of limit,
And one end of spring 4121 is fixedly connected with the side wall of half slot 412 of limit, the other end and swivel becket 5 contradict.Spring 4121 makes
Limited post 51(is referring to Fig. 5) when being detached from from card slot 132, play the role of buffering to swivel becket 5 so that swivel becket 5 be not easy with
The side wall for limiting half slot 412 directly hits and causes to damage, and extends the service life of swivel becket 5.
As shown in figure 5, limited post 51 is inserted into card slot 132 for convenience, in limited post 51 towards 132 side of card slot
The side of wall is equipped with guide surface 511, and guide surface 511 plays guiding role to limited post 51, enables limited post 51 accurate
It is inserted into card slot 132, improves efficiency.
As shown in figure 4, the slot bottom of half slot 412 of half slot 411 of positioning and limit is equipped with ball 4111, by annular slab 131 with
The sliding friction positioned between half slot 412 of half slot 411, swivel becket 5 and limit becomes rolling friction, reduces annular slab 131 and turns
The abrasion of rotating ring 5 extends the service life of annular slab 131 Yu swivel becket 5.
As shown in figure 4, driving lever 52 is equipped with anti-skid chequer 521 far from one end of swivel becket 5, driving lever 52 can be increased and rotation is dialled
Friction between the tool of bar 52 so that nut 13 turns more smooth, mentions so that tool is not easy to slip from driving lever 52
High working efficiency.
Specific implementation process: being raised rotating bar 12 by tool, and two pieces of steel forms 1 are placed on the two of rotating bar 12
Side makes two pieces of connection fastenings of steel form 1 by steel rib 2, split bolt 3 and bolt, and rotating bar 12 is securely held at two pieces
In the pier seam 11 of steel form 1, thus the construction pier seam 11 to guarantee 5cm, to facilitate construction.It needs to rotate after construction
Bar 12 takes out, and rotates ring 5, so that limited post 51 is embedded into card slot 132, stirs driving lever 52 by tool, so that rotation
Ring 5 rotates in limiting half slot 412, so that nut 13 be driven to rotate, annular slab 131 rotates in positioning half slot 411 at this time, mentions
Rotating bar 12 is back-outed from pier seam 11 when nut 13 rotates, facilitates subsequent disassembly steel form by the stability that high nut 13 rotates
1。
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Claims (8)
1. it is a kind of facilitate increase abutment pier pier seam steel form, including two pieces of steel forms (1) for being spliced to form cavity, steel rib (2) and
Split bolt (3), the steel rib (2) are fixed on the outside of the surrounding of steel form (1), and adjacent steel rib is arranged in split bolt (3)
(2) on, it is characterised in that: be formed with pier seam (11) between two pieces of steel forms (1), be equipped with rotating bar in the pier seam (11)
(12), the one end of the rotating bar (12) on the outside of template is equipped with threaded portion (121), and screw thread connects on the threaded portion (121)
It is connected to nut (13);
The two sides of two pieces of steel forms (1) towards pier seam (11) are outward extended with connecting plate (4) respectively, and connecting plate (4) is located at spiral shell
The lower section in line portion (121), the connecting plate (4) are equipped with bolt.
2. a kind of facilitate according to claim 1 increases the steel form that abutment pier pier stitches, it is characterised in that: the nut (13)
It is fixedly connected with annular slab (131) on the side of steel form (1), the diameter of the annular slab (131) is greater than nut (13)
Diameter.
3. a kind of facilitate according to claim 2 increases the steel form that abutment pier pier stitches, it is characterised in that: two connections
Plate (4) is relatively set with fixed block (41) close to the side of rotating bar (12), is equipped on the fixed block (41) for annular slab
(131) half slot of positioning (411) rotated.
4. a kind of facilitate according to claim 3 increases the steel form that abutment pier pier stitches, it is characterised in that: the nut (13)
Side far from annular slab (131) is equipped with card slot (132), is arranged with swivel becket (5), the swivel becket on the rotating bar (12)
(5) side close to nut (13) is equipped with the limited post (51) cooperated with card slot (132), is fixedly connected on the swivel becket (5)
There are the driving lever vertical with rotating bar (12) axis (52);
Limit half slot (412) is equipped on two fixed blocks (41), the swivel becket (5) is located in limit half slot (412).
5. a kind of facilitate according to claim 4 increases the steel form that abutment pier pier stitches, it is characterised in that: the swivel becket
(5) spring (4121) are equipped between the side far from nut (13) and the side wall for limiting half slot (412), and the one of spring (4121)
It holds and is fixedly connected with the side wall of limit half slot (412), the other end and swivel becket (5) contradict.
6. a kind of facilitate according to claim 5 increases the steel form that abutment pier pier stitches, it is characterised in that: the limited post
(51) guide surface (511) are equipped with towards the side of card slot (132) side wall.
7. a kind of facilitate according to claim 5 increases the steel form that abutment pier pier stitches, it is characterised in that: half slot of the positioning
(411) and the slot bottom of limit half slot (412) is equipped with ball (4111).
8. a kind of facilitate according to claim 7 increases the steel form that abutment pier pier stitches, it is characterised in that: the driving lever (52)
One end far from swivel becket (5) is equipped with anti-skid chequer (521).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820966722.6U CN208362934U (en) | 2018-06-21 | 2018-06-21 | It is a kind of to facilitate the steel form for increasing abutment pier pier seam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820966722.6U CN208362934U (en) | 2018-06-21 | 2018-06-21 | It is a kind of to facilitate the steel form for increasing abutment pier pier seam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208362934U true CN208362934U (en) | 2019-01-11 |
Family
ID=64926272
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820966722.6U Active CN208362934U (en) | 2018-06-21 | 2018-06-21 | It is a kind of to facilitate the steel form for increasing abutment pier pier seam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208362934U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111691313A (en) * | 2020-07-09 | 2020-09-22 | 重庆交通大学 | Bridge construction is with combination support of turning |
-
2018
- 2018-06-21 CN CN201820966722.6U patent/CN208362934U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111691313A (en) * | 2020-07-09 | 2020-09-22 | 重庆交通大学 | Bridge construction is with combination support of turning |
CN111691313B (en) * | 2020-07-09 | 2022-05-03 | 重庆交通大学 | Bridge construction is with combination support of turning |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109162157A (en) | The construction method of track girder | |
CN209602961U (en) | A kind of supporting bracket of bridge construction | |
CN208362934U (en) | It is a kind of to facilitate the steel form for increasing abutment pier pier seam | |
CN113585965B (en) | Roadbed high slope anchor rod frame beam movable drilling platform | |
CN109372523A (en) | Rotary bracket is used in a kind of construction of tunnel blasting excavation | |
CN110485411A (en) | End supports amplitude variation type stirring piling all-in-one machine and its construction method | |
CN113106869A (en) | Prefabricated assembly component erecting equipment driven by change gear to move forward and construction method | |
CN211395397U (en) | T beam-slab shear rib positioning device | |
CN110468702B (en) | Center belt anti-collision guardrail sliding template and construction method thereof | |
CN113089395B (en) | Rail mounting auxiliary positioning device for rail transit | |
CN210127416U (en) | Hang basket convenient to it is gliding | |
CN208759393U (en) | A kind of anchorage processing auxiliary clamping device | |
CN208501508U (en) | A kind of steel form increasing abutment pier pier seam | |
CN205474634U (en) | III plate -type ballastless track board road bridge of CRTS are general to prevent closing device that sideslips | |
CN208379441U (en) | Moving die plate | |
CN105887588A (en) | Medium-and-low-speed maglev turnout girder vibration suppression structure | |
CN110453680A (en) | Side supports amplitude variation type stirs piling all-in-one machine and its construction method | |
CN216640277U (en) | Radial adjustable supporting force device for close contact of lower chord of beam-arch combined bridge curve | |
CN213267539U (en) | Supporting structure for bridge construction | |
CN111691302B (en) | Integral tensioning installation method for I-shaped beam | |
CN210886937U (en) | Rotating mechanism | |
CN108952005B (en) | Y-shaped support column and auxiliary pouring mold | |
CN210217762U (en) | Combined template system for circular tunnel concrete pouring | |
CN111996917A (en) | Device for adjusting hinge joint reinforcing steel bars between prefabricated hollow plate beams and using method | |
CN221682475U (en) | Beam side die |