CN208362901U - One kind, which is penetrated, rushes accelerating type deck drainage system - Google Patents

One kind, which is penetrated, rushes accelerating type deck drainage system Download PDF

Info

Publication number
CN208362901U
CN208362901U CN201820689227.5U CN201820689227U CN208362901U CN 208362901 U CN208362901 U CN 208362901U CN 201820689227 U CN201820689227 U CN 201820689227U CN 208362901 U CN208362901 U CN 208362901U
Authority
CN
China
Prior art keywords
pipeline
bridge floor
drainage system
sewer
rainwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820689227.5U
Other languages
Chinese (zh)
Inventor
周广宇
郭海军
丁建全
惠阵江
杜胜兵
赵鲁斌
曹毅
张瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820689227.5U priority Critical patent/CN208362901U/en
Application granted granted Critical
Publication of CN208362901U publication Critical patent/CN208362901U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

It is penetrated the utility model discloses one kind and rushes accelerating type deck drainage system, including bridge floor, sewer is equipped on the bridge floor, well lid is equipped in the upper end of the sewer, riffler is equipped in the lower end of the sewer, it is equipped with the through-hole through the riffler in the center of the riffler, rain perforaled strainer is equipped in the top of the through-hole, the pipeline of drainage system is connected with below the through-hole.The utility model is under the premise of guaranteeing that bridge floor water inlet line caliber is constant, by bridge deck drainage pipe diameter from abutment to span centre gradual reduction pipe diameter, flowing water speed will be stepped up, and then step up flow velocity, by increasing the flow velocity of rainwater flow ipe, bridge floor ponding problem is effectively reduced;Rainwater time pipeline and main pipeline angle and negative pressure inversely, increase step by step from abutment to span centre, and forming negative pressure will incrementally increase, and then accelerate main pipeline flowing water pressure, effectively increase main pipeline rainwater flow.

Description

One kind, which is penetrated, rushes accelerating type deck drainage system
Technical field
The utility model relates to a kind of deck drainage systems, penetrate more particularly, to one kind and rush accelerating type deck drainage system.
Background technique
Currently, bridge deck drainage mode is mainly based on siphon principle, using rainwater Gravitative Loads and siphonage by rain Water discharge, bridge deck drainage occur leaking such as bridge floor ponding, line clogging, rainwater and the problems such as rainwater utilizations, siphon drainage Mode is no longer satisfied the requirement of modern bridge system, seriously affects science of bridge building normal operation, bridge floor drainage problem It has been can not be ignored that, solve the problems, such as that bridge deck drainage is extremely urgent.
Based on country's bridge deck drainage is mainly drained with gravity type at present, about siphon principle overhead bridge floor draining application It is less, it is mainly used in roof drainage system.Though siphon principle bridge deck drainage can quickly drain bridge floor rainwater, than tradition Gravity type drainage system is superior, but it still falls within a kind of passive type draining theory, can not be according to bridge floor actual form, displacement Equal changing factors adapt to actual conditions and carry out active discharge bridge floor Accumulated Rainwater, especially when front axle beam catchment area gradually Increase, in the biggish situation of instantaneous displacement, has been unable to satisfy bridge deck drainage requirement.
Summary of the invention
In order to overcome the above-mentioned deficiencies of the prior art, the utility model, which provides one kind and penetrates, rushes accelerating type bridge deck drainage system System, the utility model adopts the following technical solutions: one kind, which is penetrated, rushes accelerating type deck drainage system, including bridge floor, in the bridge Face is equipped with sewer, is equipped with well lid in the upper end of the sewer, is equipped with riffler in the lower end of the sewer, so just The thing of impurity either rubbish in filtering rainwater etc, prevents the contaminants clog sewer mouth in rainwater, causes bridge Area water is equipped with the through-hole through the riffler in the center of the riffler, logical convenient for the ponding on bridge floor in this way Sewer discharge is crossed, is equipped with rain perforaled strainer in the top of the through-hole, it is for re-filtering to the ponding in sewer, it prevents from hindering Time pipeline is filled in, the mass rate of emission of rainwater is influenced, the pipeline of drainage system, the drainage system is connected with below the through-hole Pipeline include several the secondary pipelines being connected on sewer and the main pipeline for being connected with catch basin, the secondary pipeline includes upper Time pipeline, secondary pipeline gradual change mouth and lower end time pipeline are held, the upper end time pipeline connection is connected with the sewer, under described Time pipeline is held to be connected by inclined tube road with main pipeline.
Preferably, the secondary pipeline gradual change mouth is gradual change mouth wide at the top and narrow at the bottom, and the bore of the lower end time pipeline is less than institute The bore of upper end time pipeline is stated, in this way when rainwater flows into secondary pipeline gradual change mouth by upper end time pipeline, because pipeline Bore becomes smaller suddenly, and being equivalent to the water speed flowed out in this way using jet current principle can be improved to some extent, and flowing water speed will It is stepped up, and then steps up flow velocity, by increasing the flow velocity of rainwater flow ipe, the product being effectively reduced on bridge floor Water, so that bridge floor is discharged in ponding faster.
Preferably, the secondary pipeline is vertical with the bridge floor, this ensure that under the ponding on bridge floor flows at the first time Water channel prevents rainwater to be detained on bridge floor for a long time and penetrates into beam body and influence the durability of bridge, the position of each secondary pipeline Be it is parallel, ensure that the mobility status of the ponding of each position on bridge floor is identical, be not in the ponding of a position Other local the case where there are also ponding generation is drained, ensure that the clean and tidy dry and comfortable of the entirety of bridge floor.
Preferably, the main pipeline about bridge floor center bilateral symmetry, the main pipeline be it is inclined, in this way be convenient for rainwater It is flowed from bridge floor center to bridge floor two sides, while being also convenient for rainwater and flowing into catch basin, the master along the inclined direction of main pipeline Pipeline position highest at bridge floor center, connects that position at catch basin is minimum, and the bore of the main pipeline is greater than described pipe The bore in road can bear a large amount of rainwater in this way and flow into main pipeline out of each secondary pipeline simultaneously, it is quick to be conducive to rainwater Give off bridge floor, prevent from causing on bridge floor rainwater to be detained.
Preferably, it is presented certain angle between the inclined tube road and the main pipeline, the lower end in the inclined tube road is to bridge The lateral direction in face tilts, this is to use acceleration principle, has certain guiding function, inclined tube road and master for the flowing of rainwater Pipe angle and negative pressure inversely, increase step by step from abutment to span centre, and forming negative pressure will incrementally increase, and then accelerate supervisor Road flowing water pressure effectively increases main pipeline rainwater flow, so that rainwater more quickly flows into main pipeline.
It is further preferred that the secondary pipeline and inclined tube road are about bridge floor center bilateral symmetry, the just meeting of such drainage system Distribution it is more uniform, ensure that the drainage effect of each position of bridge floor be it is identical, not will cause rainwater on bridge floor product It stays, and more convenient beauty when pipe laying, convenient for operation.
Compared with prior art, the utility model has the beneficial effects that 1. are guaranteeing that bridge floor water inlet line caliber is constant Under the premise of, by bridge deck drainage pipe diameter, gradual reduction pipe diameter, flowing water speed will be stepped up from abutment to span centre, into And flow velocity is stepped up, by increasing the flow velocity of rainwater flow ipe, effectively reduce bridge floor ponding problem;2. former according to accelerating Reason, rainwater time pipeline and main pipeline angle and negative pressure inversely, increase step by step from abutment to span centre, and forming negative pressure will gradually Increase, and then accelerate main pipeline flowing water pressure, effectively increases main pipeline rainwater flow.3. main pipeline, secondary pipeline and inclined tube road close In bridge floor center bilateral symmetry, rainwater is more conducive to along bridge floor center and flows discharge, and bilateral symmetry to bridge floor two sides It is more convenient to install while more beautiful.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram at the sewer of the bridge floor of the utility model.
Fig. 3 is the structural schematic diagram of the secondary pipeline of the utility model.
Wherein: 1. bridge floors, 2. sewers, 3. pipelines, 31. upper ends time pipeline, 32. pipeline gradual change mouths, 33. lower ends time Pipeline, 4. inclined tube roads, 5. main pipelines, 6. catch basins, 7. well lids, 8. rain perforaled strainers, 9. rifflers.
Specific embodiment
The utility model is further described below by non-limiting embodiment and in conjunction with attached drawing:
1-3 gives the first embodiment of the utility model in figure: one kind, which is penetrated, rushes accelerating type deck drainage system, packet Bridge floor 1 is included, sewer 2 is equipped on the bridge floor 1, well lid 7 is equipped in the upper end of the sewer 2, in the sewer 2 Lower end is equipped with riffler 9, the in this way thing convenient for impurity or rubbish etc in filtering rainwater, prevents the pollution in rainwater Object blocks sewer mouth, causes bridge floor ponding, is equipped with the through-hole through the riffler 9 in the center of the riffler 9, It is discharged in this way convenient for the ponding on bridge floor 1 by sewer 2, rain perforaled strainer 8 is equipped in the top of the through-hole, to sewer 2 Interior ponding is for re-filtering, prevents from blocking time pipeline, influences the mass rate of emission of rainwater, be connected with below the through-hole The pipeline of drainage system, the pipeline of the drainage system include several the secondary pipelines 3 being connected on sewer 2 and are connected with collection The main pipeline 5 of sink 6, the secondary pipeline 3 includes upper end time pipeline 31, secondary pipeline gradual change mouth 32 and lower end time pipeline 33, described The upper end time connection of pipeline 31 is connected with the sewer 2, and the lower end time pipeline 31 is connected by inclined tube road 4 with main pipeline 5 It connects.
The secondary pipeline gradual change mouth 32 is gradual change mouth wide at the top and narrow at the bottom, and the bore of the lower end time pipeline 33 is less than on described The bore of time pipeline 31 is held, in this way when rainwater flows into secondary pipeline gradual change mouth 32 by upper end time pipeline 31, because of pipeline Bore become smaller suddenly, being equivalent to the water speed flowed out in this way using jet current principle can be improved to some extent, flowing water speed It will be stepped up, and then step up flow velocity, by increasing the flow velocity of rainwater flow ipe, the product being effectively reduced on bridge floor Water, so that bridge floor is discharged in ponding faster.
The secondary pipeline 3 is vertical with the bridge floor 1, this ensure that the ponding on bridge floor 1 flows into sewer at the first time 2, it prevents rainwater to be detained on bridge floor for a long time and penetrates into beam body and influence the durability of bridge, the position of each secondary pipeline 3 is Parallel, it ensure that the mobility status of the ponding of each position on bridge floor 1 is identical, be not in the ponding row an of position The case where using up other local also ponding to occur, and ensure that the clean and tidy dry and comfortable of the entirety of bridge floor 1.
The main pipeline 5 about 1 center of bridge floor bilateral symmetry, the main pipeline 5 be it is inclined, in this way be convenient for rainwater by bridge 1 center of face is flowed to 1 two sides of bridge floor, while being also convenient for rainwater and being flowed into catch basin 6, the master along the inclined direction of main pipeline 5 The position highest at 1 center of bridge floor of pipeline 5, connects that position at catch basin 6 is minimum, and the bore of the main pipeline 5 is greater than described The bore of secondary pipeline 3 can bear a large amount of rainwater in this way and flow into main pipeline 5 out of each secondary pipeline 3 simultaneously, be conducive to rain Water quickly gives off bridge floor 1, prevents from causing rainwater on bridge floor 1 to be detained.
It is presented certain angle between the inclined tube road 4 and the main pipeline 5, the lower end in the inclined tube road 4 is to bridge floor 1 Lateral direction inclination, this is to use acceleration principle, has certain guiding function, inclined tube road 4 and supervisor for the flowing of rainwater 5 angle of road and negative pressure inversely, increase step by step from abutment to span centre, and forming negative pressure will incrementally increase, and then accelerate supervisor 5 flowing water pressure of road effectively increases 5 rainwater flow of main pipeline, so that rainwater more quickly flows into main pipeline 5.
About 1 center of bridge floor bilateral symmetry, such drainage system can be just distributed more for the secondary pipeline 3 and inclined tube road 4 Uniformly, ensure that the drainage effect of each position of bridge floor 1 be it is identical, not will cause rainwater and accumulated on bridge floor 1, Er Qie More convenient beauty when pipe laying, convenient for operation.
1-3 gives second of embodiment of the utility model in figure: one kind, which is penetrated, rushes accelerating type deck drainage system, packet Bridge floor 1 is included, sewer 2 is equipped on the bridge floor 1, well lid 7 is equipped in the upper end of the sewer 2, in the sewer 2 Lower end is equipped with riffler 9, the in this way thing convenient for impurity or rubbish etc in filtering rainwater, prevents the pollution in rainwater Object blocks sewer mouth, causes bridge floor ponding, is equipped with the through-hole through the riffler 9 in the center of the riffler 9, It is discharged in this way convenient for the ponding on bridge floor 1 by sewer 2, rain perforaled strainer 8 is equipped in the top of the through-hole, to sewer 2 Interior ponding is for re-filtering, prevents from blocking time pipeline, influences the mass rate of emission of rainwater, be connected with below the through-hole The pipeline of drainage system, the pipeline of the drainage system include several the secondary pipelines 3 being connected on sewer 2 and are connected with collection The main pipeline 5 of sink 6, the secondary pipeline 3 includes upper end time pipeline 31, secondary pipeline gradual change mouth 32 and lower end time pipeline 33, described The upper end time connection of pipeline 31 is connected with the sewer 2, and the lower end time pipeline 31 is connected by inclined tube road 4 with main pipeline 5 It connects.
The secondary pipeline gradual change mouth 32 is gradual change mouth wide at the top and narrow at the bottom, and the bore of the lower end time pipeline 33 is less than on described The bore of time pipeline 31 is held, in this way when rainwater flows into secondary pipeline gradual change mouth 32 by upper end time pipeline 31, because of pipeline Bore become smaller suddenly, being equivalent to the water speed flowed out in this way using jet current principle can be improved to some extent, flowing water speed It will be stepped up, and then step up flow velocity, by increasing the flow velocity of rainwater flow ipe, the product being effectively reduced on bridge floor Water, so that bridge floor is discharged in ponding faster.
The secondary pipeline 3 is vertical with the bridge floor 1, this ensure that the ponding on bridge floor 1 flows into sewer at the first time 2, it prevents rainwater to be detained on bridge floor for a long time and penetrates into beam body and influence the durability of bridge, the position of each secondary pipeline 3 is Parallel, it ensure that the mobility status of the ponding of each position on bridge floor 1 is identical, be not in the ponding row an of position The case where using up other local also ponding to occur, and ensure that the clean and tidy dry and comfortable of the entirety of bridge floor 1.
The main pipeline 5 about 1 center of bridge floor bilateral symmetry, the main pipeline 5 be it is inclined, in this way be convenient for rainwater by bridge 1 center of face is flowed to 1 two sides of bridge floor, while being also convenient for rainwater and being flowed into catch basin 6, the master along the inclined direction of main pipeline 5 The position highest at 1 center of bridge floor of pipeline 5, connects that position at catch basin 6 is minimum, and the bore of the main pipeline 5 is greater than described The bore of secondary pipeline 3 can bear a large amount of rainwater in this way and flow into main pipeline 5 out of each secondary pipeline 3 simultaneously, be conducive to rain Water quickly gives off bridge floor 1, prevents from causing rainwater on bridge floor 1 to be detained.
It is presented certain angle between the inclined tube road 4 and the main pipeline 5, the lower end in the inclined tube road 4 is to bridge floor 1 Lateral direction inclination, this is to use acceleration principle, has certain guiding function, inclined tube road 4 and supervisor for the flowing of rainwater 5 angle of road and negative pressure inversely, increase step by step from abutment to span centre, and forming negative pressure will incrementally increase, and then accelerate supervisor 5 flowing water pressure of road effectively increases 5 rainwater flow of main pipeline, so that rainwater more quickly flows into main pipeline 5.
Above-described embodiment elaborates the utility model.Certainly, above description is not the limit to the utility model System, the utility model are also not limited to above-mentioned example, and related technical personnel are made in the essential scope of the utility model Variation, remodeling, addition are reduced, replacement, also belong to the protection scope of the utility model.

Claims (6)

1. one kind, which is penetrated, rushes accelerating type deck drainage system, it is characterised in that: including bridge floor (1), be equipped with and be lauched on the bridge floor Road (2), is equipped with well lid (7) in the top of the sewer (2), is equipped with riffler (9) in the lower end of the sewer (2), The center of the riffler (9) is equipped with the through-hole through the riffler (9), is equipped with rainwater grid in the top of the through-hole Sub (8), are connected with the pipeline of drainage system below the through-hole, and the pipeline of the drainage system includes being connected to sewer (2) several secondary pipelines (3) on and the main pipeline (5) for being connected with catch basin (6), the secondary pipeline (3) include upper end time pipe Road (31), secondary pipeline gradual change mouth (32) and lower end time pipeline (33), the upper end time pipeline (31) are connected with the sewer (2) It connects, the lower end time pipeline (33) is connected by inclined tube road (4) with main pipeline (5).
2. according to claim 1 penetrate rushes accelerating type deck drainage system, it is characterised in that: the secondary pipeline gradual change mouth It (32) is gradual change mouth wide at the top and narrow at the bottom, the bore of the lower end time pipeline (33) is less than the bore of the upper end time pipeline (31).
3. according to claim 1 penetrate rushes accelerating type deck drainage system, it is characterised in that: the secondary pipeline (3) and institute State bridge floor (1) vertically, the position of each secondary pipeline (3) is parallel.
4. according to claim 1 penetrate rushes accelerating type deck drainage system, it is characterised in that: the main pipeline (5) about Bridge floor (1) center bilateral symmetry, the main pipeline (5) are inclined, positions at close bridge floor (1) center of the main pipeline (5) Highest, position is minimum at connection catch basin (6), and the bore of the main pipeline (5) is greater than the bore of the secondary pipeline (3).
5. according to claim 1 penetrate rushes accelerating type deck drainage system, it is characterised in that: the inclined tube road (4) and institute It states and angle is presented between main pipeline (5), the lower end of the inclined tube road (4) is tilted to the lateral direction of bridge floor (1).
6. according to claim 1 penetrate rushes accelerating type deck drainage system, it is characterised in that: the secondary pipeline (3) and tiltedly Pipeline (4) is about bridge floor (1) center bilateral symmetry.
CN201820689227.5U 2018-05-10 2018-05-10 One kind, which is penetrated, rushes accelerating type deck drainage system Expired - Fee Related CN208362901U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820689227.5U CN208362901U (en) 2018-05-10 2018-05-10 One kind, which is penetrated, rushes accelerating type deck drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820689227.5U CN208362901U (en) 2018-05-10 2018-05-10 One kind, which is penetrated, rushes accelerating type deck drainage system

Publications (1)

Publication Number Publication Date
CN208362901U true CN208362901U (en) 2019-01-11

Family

ID=64933989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820689227.5U Expired - Fee Related CN208362901U (en) 2018-05-10 2018-05-10 One kind, which is penetrated, rushes accelerating type deck drainage system

Country Status (1)

Country Link
CN (1) CN208362901U (en)

Similar Documents

Publication Publication Date Title
CN105648873B (en) A kind of cabin storage formula kerbstone
CN108203907B (en) A kind of town road discharge structure
CN204475487U (en) Odor-proof inlet for stom water
CN110093966A (en) A kind of biology delay facility overflow mouth structure
CN207878209U (en) A kind of road rainwater concentration discharge structure
CN208362901U (en) One kind, which is penetrated, rushes accelerating type deck drainage system
CN207846206U (en) Bridge drainage system
CN203977556U (en) Negative pressure suction type increases row's catch basin cover automatically
CN209603252U (en) Storm-water system rubbish pollution cutting device
CN209323366U (en) A kind of cross bridge floor board structure with drain function
CN207633479U (en) A kind of urban underground water drainage pipe current-limiting mechanism
CN108411776A (en) One kind, which is penetrated, rushes accelerating type deck drainage system
CN214613574U (en) Bridge drainage system
CN215330325U (en) Rain and sewage flow dividing device
CN209368997U (en) It is a kind of for falling buffer-type vertical shaft in deep layer drainage system
CN206529878U (en) A kind of municipal drainage community storm detention tank
CN210263319U (en) Siphon type rainwater pipe terminal control device
CN209556072U (en) A kind of waterpower self-regulated slow-closing type intercepting pollution for rainwater current limiter
CN210482518U (en) Prefabricated formula floodgate that dams
CN210032043U (en) Gutter inlet with flow dividing function
CN207469412U (en) A kind of control well device of combined system pollutant
CN207017396U (en) Rainwater down pipe abandoning and diverting flow device
CN207452705U (en) A kind of bridge rhone with deodorant function
CN205637090U (en) Hole deviation of damming is put to float and is blocked sediment device
CN206174102U (en) Safe diverging device and use its rainwater recovery system and sewage return -flow system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190111

Termination date: 20190510

CF01 Termination of patent right due to non-payment of annual fee