CN208347789U - A kind of more joint fissure breaking surrounding rocks tunnel allows pressure type composite lining structure - Google Patents

A kind of more joint fissure breaking surrounding rocks tunnel allows pressure type composite lining structure Download PDF

Info

Publication number
CN208347789U
CN208347789U CN201820887314.1U CN201820887314U CN208347789U CN 208347789 U CN208347789 U CN 208347789U CN 201820887314 U CN201820887314 U CN 201820887314U CN 208347789 U CN208347789 U CN 208347789U
Authority
CN
China
Prior art keywords
secondary liner
preliminary bracing
tunnel
rubber spacer
liner structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820887314.1U
Other languages
Chinese (zh)
Inventor
黄向韬
陈秋南
周光裕
周相识
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University of Science and Technology
Original Assignee
Hunan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Science and Technology filed Critical Hunan University of Science and Technology
Priority to CN201820887314.1U priority Critical patent/CN208347789U/en
Application granted granted Critical
Publication of CN208347789U publication Critical patent/CN208347789U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Pressure type composite lining structure, including preliminary bracing structure and secondary liner structure are allowed the utility model discloses a kind of more joint fissure breaking surrounding rocks tunnel;The preliminary bracing structure setting is on tunnel surrounding inner wall, and the secondary liner structure setting is in the early stage on the inside of supporting construction;Rubber spacer is equipped between the portion of side in the tunnel and the preliminary bracing structure and secondary liner structure at top.The utility model is equipped with rubber spacer in the early stage between supporting construction and secondary liner structure, reduce the influence vibrated to early-age concrete, protect early age secondary liner structure;It avoids secondary liner structure from cracking, and makes that secondary liner structure durability is good, reliability is high, insensitive to temperature change;It avoids and is directly contacted between preliminary bracing structure and secondary liner structure, pressure from surrounding rock, which squeezes rubber spacer, can also allow compressive strain, absorb portion of energy and protect supporting construction, the utility model also has structure simple, advantage easy for construction.

Description

A kind of more joint fissure breaking surrounding rocks tunnel allows pressure type composite lining structure
Technical field
The utility model belongs to Tunnel Engineering technical field, more particularly to a kind of more joint fissure breaking surrounding rocks tunnel Allow pressure type composite lining structure.
Background technique
The soil in China 70% is mountain area, and with the development of economy, tunnel becomes the head for overcoming elevation obstacle and impediment in plane Scheme is selected, and the massif rock crusher in many areas is weak, rich groundwater, in tunnel excavation, pressure from surrounding rock is big, and explosion is applied In the case where work and casting concrete crossing parallel construction, blasting vibration can be caused to the perturbed problem for closing on newly-laid concrete, This proposes very high requirement to tunnel support construction.
For more joint fissure breaking surrounding rocks tunnel, pressure from surrounding rock is big, rich groundwater, and first branch surface is simultaneously rough, directly Contact is easy to appear the phenomenon that stress is concentrated, and squeezes splash guard, two linings will lead to waterproof dash-board injury, lining crack, disturbance etc. Phenomenon, blast working will lead to early-age concrete intensity, ultimate tensile strength and impervious with casting concrete crossing parallel construction Property reduce, it is serious to also result in phenomena such as concrete directly destroys.
Summary of the invention
In order to solve the above-mentioned technical problem, it is simple to provide a kind of structure for the utility model, easy for construction and be able to solve The extruding splash guard in existing more joint fissure breaking surrounding rocks tunnel, two linings will lead to waterproof dash-board injury, lining crack, disturbance etc. More joint fissure breaking surrounding rocks tunnel of problem allows pressure type composite lining structure.
The technical solution adopted in the utility model is: a kind of more joint fissure breaking surrounding rocks tunnel allows pressure type composite lining Structure, including preliminary bracing structure and secondary liner structure;The preliminary bracing structure setting is on tunnel surrounding inner wall, institute The secondary liner structure setting stated is in the early stage on the inside of supporting construction;The portion of side in the tunnel and the preliminary bracing structure at top and Rubber spacer is equipped between secondary liner structure.
Above-mentioned more joint fissure breaking surrounding rocks tunnel allows in pressure type composite lining structure, the rubber spacer surface It is coated with polyurethane water-proof paint.
Above-mentioned more joint fissure breaking surrounding rocks tunnel allows in pressure type composite lining structure, the rubber spacer direction The face of preliminary bracing structure is equipped with multiple drainage grooves, and drainage groove lower end is connected to gutter.
Above-mentioned more joint fissure breaking surrounding rocks tunnel allows in pressure type composite lining structure, inside the rubber spacer Equipped with cavity, granule damper is equipped in cavity.
Compared with prior art, the utility model has the beneficial effects that
1) the utility model is equipped with rubber spacer in the early stage between supporting construction and secondary liner structure, reduces vibration pair The influence of early-age concrete protects early age secondary liner structure;Secondary liner structure is avoided, and makes secondary lining knot Structure durability is good, reliability is high, insensitive to temperature change;And can to avoid preliminary bracing structure and secondary liner structure it Between directly contact, pressure from surrounding rock, which squeezes rubber spacer, can also allow compressive strain, absorb portion of energy and protect supporting construction;Rubber spacer Multiple drainage grooves are equipped with towards the face of preliminary bracing structure, drainage groove lower end is connected to gutter, is accelerated draining and is made With.
) the utility model is simple and reasonable, site operation is simple and convenient.
3) it is equipped with granule damper in rubber spacer, improves effectiveness in vibration suppression;The particle position of granule damper is non- Often flexibly, it can be additional to the outside of civil structure, can also be embedded in structural elements, do not influenced structure use, original is tied Structure changes very little, and particles used materials are cheap convenient;Prearrangement of deformation amount can not be had to well by allowing compressive strain to absorb portion of energy Amount makes secondary liner structure uniform stressed avoid the occurrence of stress concentration, protects secondary liner structure.
Detailed description of the invention
Fig. 1 is the integral installation schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of the rubber spacer of the utility model.
Fig. 3 is the sectional view of the rubber spacer of the utility model.
In figure: 1- preliminary bracing structure, 2- rubber spacer, 3- secondary liner structure, 4- drainage groove, the damping of 5- particle Device.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.
As shown in Figure 1, the utility model includes preliminary bracing structure 1 and secondary liner structure 3;The preliminary bracing knot Structure 1 is arranged on tunnel surrounding inner wall, and the setting of secondary liner structure 3 is in the early stage on the inside of supporting construction;The tunnel Portion of side and top preliminary bracing structure 1 and secondary liner structure 3 between be equipped with rubber spacer 2.
As shown in Fig. 2, the rubber spacer 2 is equipped with multiple drainage grooves 4, row towards the face of preliminary bracing structure 1 4 lower end of water groove is connected to gutter, accelerates drainage.As shown in figure 3, cavity is equipped with inside the rubber spacer 2, It is equipped with granule damper 5 in cavity, improves effectiveness in vibration suppression.The particle position of granule damper 5 is very flexible, can be attached It is added on the outside of civil structure, can also be embedded in structural elements, does not influence structure use, very little, institute are changed to original structure It is cheap convenient to be drawn materials with particle.Granule damper 5 can not have to prearrangement of deformation amount well by allowing compressive strain to absorb portion of energy Amount, makes 3 uniform stressed of secondary liner structure, avoids the occurrence of stress concentration, protects secondary liner structure.The rubber spacer 2 Surface be coated with polyurethane water-proof paint, enhance waterproof action.
When the utility model is constructed, the construction of preliminary bracing structure 1 is carried out first, after the completion of preliminary bracing structure 1 applies, Carry out live vault sinking, perimeter convergence displacement monitoring;After tunnel surrounding rock displacement meets design and code requirement, prop up in the early stage 1 surface of the protection structure installation rubber spacer 2 for being built-in with granule damper 5 and being coated with polyurethane water-proof paint as shown in Figure 2, it Installation template pours secondary liner structure 3 afterwards.

Claims (4)

1. a kind of more joint fissure breaking surrounding rocks tunnel allows pressure type composite lining structure, it is characterised in that: including preliminary bracing Structure and secondary liner structure;The preliminary bracing structure setting is on tunnel surrounding inner wall, the secondary liner structure Setting is in the early stage on the inside of supporting construction;Between the portion of side in the tunnel and the preliminary bracing structure and secondary liner structure at top Equipped with rubber spacer.
2. more joint fissure breaking surrounding rocks tunnel according to claim 1 allows pressure type composite lining structure, feature exists In: the rubber spacer surface is coated with polyurethane water-proof paint.
3. more joint fissure breaking surrounding rocks tunnel according to claim 1 or 2 allows pressure type composite lining structure, feature Be: the rubber spacer is equipped with multiple drainage grooves, drainage groove lower end and draining towards the face of preliminary bracing structure Ditch connection.
4. more joint fissure breaking surrounding rocks tunnel according to claim 1 or 2 allows pressure type composite lining structure, feature It is: is equipped with cavity inside the rubber spacer, is equipped with granule damper in cavity.
CN201820887314.1U 2018-06-08 2018-06-08 A kind of more joint fissure breaking surrounding rocks tunnel allows pressure type composite lining structure Expired - Fee Related CN208347789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820887314.1U CN208347789U (en) 2018-06-08 2018-06-08 A kind of more joint fissure breaking surrounding rocks tunnel allows pressure type composite lining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820887314.1U CN208347789U (en) 2018-06-08 2018-06-08 A kind of more joint fissure breaking surrounding rocks tunnel allows pressure type composite lining structure

Publications (1)

Publication Number Publication Date
CN208347789U true CN208347789U (en) 2019-01-08

Family

ID=64882956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820887314.1U Expired - Fee Related CN208347789U (en) 2018-06-08 2018-06-08 A kind of more joint fissure breaking surrounding rocks tunnel allows pressure type composite lining structure

Country Status (1)

Country Link
CN (1) CN208347789U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653751A (en) * 2019-01-09 2019-04-19 济南城建集团有限公司 A kind of use wears city expressway method for tunnel construction under yielding rubber ledge
CN109958462A (en) * 2019-04-03 2019-07-02 江苏金阳交通工程有限公司 A kind of tunnel sound-proof wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653751A (en) * 2019-01-09 2019-04-19 济南城建集团有限公司 A kind of use wears city expressway method for tunnel construction under yielding rubber ledge
CN109958462A (en) * 2019-04-03 2019-07-02 江苏金阳交通工程有限公司 A kind of tunnel sound-proof wall

Similar Documents

Publication Publication Date Title
CN106337690B (en) Fracture zone-crossing tunnel lining waterproof joint structure and construction method thereof
CN113494299B (en) Tunnel rockburst grading prevention and control method using NPR material
CN110700857B (en) Composite tunnel supporting system and construction method
CN103899329B (en) A kind of administering method of large deformation breaking surrounding rock tunnel
CN108442569A (en) A kind of recoverable function energy consumption reinforced concrete shear wall and its method of construction
CN103912292B (en) One is passed through tomography tunnel water proof damping erosion control coupling supporting method
CN208347789U (en) A kind of more joint fissure breaking surrounding rocks tunnel allows pressure type composite lining structure
CN106437789A (en) Tunnel lining waterproof joint
CN105736003A (en) Structure of shield launching portal and shield launching construction method
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
KR101859612B1 (en) Reinforcement and waterproof structure of vertical shafts-utility tunnels interface
CN205063967U (en) Anti roadway support structure that combines that lets
CN106382124A (en) Flexible force transferring member as well as tunnel joint structure with force transferring member and construction method thereof
CN205776246U (en) A kind of Structure About Soldier Pile
CN111365036A (en) I-steel-corrugated steel (GB) combined supporting structure for soft rock large-deformation tunnel
CN205617390U (en) A softer side of sears layer excavation supporting system for loess area
CN109139022B (en) Construction method of fabricated lining tunnel capable of resisting active fault dislocation
KR102103978B1 (en) Reinforcement and waterproof structure of vertical shafts for utility interface
CN104453914B (en) The construction method of ingate anti-impact shock-absorbing supporting construction
CN103498571B (en) Adopt reinforcing stone structure and the construction method thereof of the additional gauze wire cloth of cage of reinforcement through walls
CN105134249A (en) Gradual support method for large broken rock zone tunnel of mine
CN206409234U (en) A kind of pitshaft water-tight device
CN105201525A (en) Repairable bottom heave control method
CN211397573U (en) Protective structure for shield to pass through existing tunnel under working condition in short distance
CN104405398B (en) Ingate anti-impact shock-absorbing supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190108

Termination date: 20210608