CN208347274U - It is a kind of to increase rain-proof scaffold certainly - Google Patents

It is a kind of to increase rain-proof scaffold certainly Download PDF

Info

Publication number
CN208347274U
CN208347274U CN201820989567.XU CN201820989567U CN208347274U CN 208347274 U CN208347274 U CN 208347274U CN 201820989567 U CN201820989567 U CN 201820989567U CN 208347274 U CN208347274 U CN 208347274U
Authority
CN
China
Prior art keywords
vertical bar
bar
scaffold
rain
positioning case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820989567.XU
Other languages
Chinese (zh)
Inventor
杜甲桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Nan Hao Construction Engineering Co Ltd
Original Assignee
Yunnan Nan Hao Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Nan Hao Construction Engineering Co Ltd filed Critical Yunnan Nan Hao Construction Engineering Co Ltd
Priority to CN201820989567.XU priority Critical patent/CN208347274U/en
Application granted granted Critical
Publication of CN208347274U publication Critical patent/CN208347274U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of from raising rain-proof scaffold.The utility model installs movable pulley by being installed as scaffold, entire scaffold can be pushed, scaffold is allowed to be moved easily, the lower section two sides of scaffold are additionally provided with the first positioning case and the second positioning case, pass through the curtain-rolling machine being mounted in positioning case, and the working end of curtain-rolling machine is equipped with chain, the other end of chain is equipped with fixed block, fixed block is separately mounted in the first vertical bar and the 4th vertical bar, open curtain-rolling machine, pass through the effect of chain, entire foot prop can be pulled away from ground, positioning case is allowed to become support member, it effectively prevents when staff constructs, there is sliding slipping;Waterproof ceiling is installed on the top of scaffold, is rotatably equipped with the eaves that keeps off the rain on waterproof ceiling, the eaves that keeps off the rain is connect with the top of waterproof ceiling by soft cloth, when rainy, keeping off the rain can rotate down after product rain in eaves, stop after eaves rotation of keeping off the rain is horizontal, can be realized increase and keep off the rain area.

Description

It is a kind of to increase rain-proof scaffold certainly
Technical field
The utility model relates to a kind of scaffolds, are a kind of from raising rain-proof scaffold specifically.
Background technique
Scaffold is to guarantee each work progress is gone on smoothly and is set up workbench.It is divided by the position set up outer Scaffold, internal scaffolding;Timber scaffolding, bamboo scaffolding, steel pipe scaffold can be divided by material difference;It is divided by structural form vertical Rod-type scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula foot hand bridge scaffold Frame.
But in common scaffold, measure of not keeping off the rain has the construction environment of worker larger at rainy day Influence, and also have large effect for the component of construction, it is possible to caused because of the leaching brush of rainwater along bad;And often The scaffold seen in the actual operation process, is merely able to upwardly or downwardly move by ladder above and below worker, right in this way In the operation of construction personnel, there are some potential safety problemss.
Utility model content
The purpose of this utility model is to provide a kind of from rain-proof scaffold is increased, and is existed with the scaffold for solving common at present There is no the problem of preferable waterproof measure to staff when rainy day.
To solve the above-mentioned problems, the utility model uses following technological means:
A kind of to increase rain-proof scaffold certainly, the scaffold includes the first vertical bar, the second vertical bar, third vertical bar And the 4th vertical bar, first vertical bar are connect with the top of the second vertical bar by first level bar, described second is perpendicular Straight-bar is connect with the top of third vertical bar by the second horizon bar, and the top of the third vertical bar and the 4th vertical bar passes through The connection of third horizon bar, the 4th vertical bar are connect with the top of the first vertical bar by the 4th horizon bar, first water Flat bar, the second horizon bar, third horizon bar and the 4th horizon bar form rectangle structure, and first vertical bar, second are erected The bottom end of straight-bar, third vertical bar and the 4th vertical bar is mounted on movable pulley, is connected in the middle part of the first level bar First support is connected with second support in the middle part of the third horizon bar;The scaffold further includes people's row platform, the people Four angles of row platform are separately fixed in first vertical bar, first support, second support and the 4th vertical bar;It is described Scaffold further include the first positioning case and the second positioning case, the end of first positioning case and the second positioning case is mounted on Pedestal, is equipped with curtain-rolling machine on the pedestal, and the working end of the curtain-rolling machine is equipped with chain, and the serobila of the chain is around having A fixed pulley, the A fixed pulley are separately mounted to the top of the first vertical bar and the 4th vertical bar, the other end of the chain Fixed block is installed, the fixed block is separately mounted in first vertical bar and the 4th vertical bar, and described first is vertical It is fixed through described second that bar and the second vertical bar run through first positioning case, the third vertical bar and the 4th vertical bar Position case;Waterproof ceiling is installed on the first level bar, the second horizon bar, third horizon bar and the 4th horizon bar, institute The four sides for stating waterproof ceiling is equipped with rotation axis, and the eaves that keeps off the rain is rotatably equipped in the rotation axis, and the eaves that keeps off the rain is prevented with described The top of water ceiling is connected by soft cloth.
Preferably, being structure diagonally downward at the top of the waterproof ceiling.
More optimize, A fixed bracket is installed between the first support and first vertical bar, described second B fixed bracket is installed between frame and the 4th vertical bar, is respectively mounted on the fixed bracket of the A and the fixed bracket of the B There is rolling-up machine, the winding output end of the rolling-up machine is equipped with rope, and for the rope body of the rope around there is B fixed pulley, the B is fixed Pulley is separately mounted on the first level bar and third horizon bar, and the other end of the rope is equipped with pulling block, institute It states and block is pulled to be installed in the two sides of people's row platform, and four angles of people's row platform and first vertical bar, First support, second support and the 4th vertical bar are flexibly connected.
Further, several bars of stopping over are installed, adjacent is described between the first support and second vertical bar The distance between bar of stopping over is identical, and sunk structure, the recess downwards of the sunk structure are provided on the bar of stopping over.
Further, several bars of stopping over, adjacent institute are installed between the second support and the third vertical bar It is identical to state the distance between bar of stopping over, sunk structure, the recess downwards of the sunk structure are provided on the bar of stopping over.
Further, first vertical bar, the second vertical bar, third vertical bar and the 4th vertical bar are mounted on Sliding rail offers in first positioning case and the second positioning case across channel, and described pass through in channel is equipped with sliding The track of block, the sliding shoe and the sliding rail matches.
Further, the sliding shoe is idler wheel, and the idler wheel is rotatably installed in described in channel and described The width of idler wheel matches with the sliding rail.
Can also further, first positioning case and the second positioning case are a kind of the hollow rectangular of bottom surface opened Body cabinet.
The utility model at least has one of following beneficial effect compared with common scaffold: by the first vertical bar, Second vertical bar, third vertical bar, the 4th vertical bar, first level bar, the second horizon bar, third horizon bar and the 4th are horizontal Bar forms the cuboid framework of entire scaffold, by being mounted on the first vertical bar, the second vertical bar, third vertical bar and The movable pulley of four bottom end of vertical rod can push entire scaffold, scaffold is allowed to be moved easily, people is also equipped on scaffold Row platform, operator can walk on people's row platform, and be constructed on people's row platform by station;The lower section two of scaffold Side is additionally provided with the first positioning case and the second positioning case, and the first vertical bar and the second vertical bar run through the first positioning case, Third vertical bar and the 4th vertical bar run through the second positioning case, by the curtain-rolling machine being mounted in positioning case, the first positioning case and Curtain-rolling machine is mounted in second positioning case, and the working end of curtain-rolling machine is equipped with chain, the other end of chain is equipped with solid Determine block, fixed block is separately mounted in the first vertical bar and the 4th vertical bar, on the top of the first vertical bar and the 4th vertical bar A fixed pulley is installed, by the way that chain is bypassed A fixed pulley, the direction of motion of chain can be changed, shutter is opened, to work as After positioning case contacts ground, by the effect of chain, entire foot prop can be pulled away from ground, positioning case is allowed to become support member, It effectively prevents sliding slipping occur when staff constructs, influences staff's construction or cause certain safety The problem of hidden danger.
Waterproof ceiling, waterproof are installed on first level bar, the second horizon bar, third horizon bar and the 4th horizon bar Four bottom edges of ceiling are separately fixed on first level bar, the second horizon bar, third horizon bar and the 4th horizon bar, anti- The side top of water ceiling is equipped with rotation axis, and the eaves that keeps off the rain is equipped in rotation axis, the top of keep off the rain eaves and waterproof ceiling It is connected by soft cloth, in normal state, the eaves that keeps off the rain is upwards collected through, and when rainy, can be rotated down after product rain in the eaves that keeps off the rain And it is limited by soft cloth, prevents rotation excessively, stopped after the eaves rotation of keeping off the rain is horizontal, can be realized increase and keep off the rain face Product, make the operating environment of operator better, will not when rainy affected purpose.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the partial enlargement structural representation of Fig. 1.
Wherein, the first vertical bar of 1-, the second vertical bar of 2-, 3- third vertical bar, the 4th vertical bar of 4-, 5- third are horizontal Bar, the 4th horizon bar of 6-, 7- movable pulley, 8- first support, 9- second support, 10- people's row platform, the first positioning case of 11-, 12- Second positioning case, 13- pedestal, 14- curtain-rolling machine, 15- chain, 16-A fixed pulley, 17- fixed block, 18- waterproof ceiling, 19- rotation Axis, 20- keep off the rain the fixed bracket of the fixed bracket of eaves, 21- soft cloth, 22-A, 23-B, 24- rolling-up machine, 25- rope, 26-B fixed pulley, 27- pulls stop over bar, 29- sliding rail, 30- pulley, 31- of block, 28- to be pierced by channel.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
Embodiment 1
As shown in Figure 1, a kind of from rain-proof scaffold is increased, the scaffold includes that the first vertical bar 1, second is vertical The top of bar 2, third vertical bar 3 and the 4th vertical bar 4, first vertical bar 1 and the second vertical bar 2 passes through first level Bar connection, first level bar and the first vertical bar 1 and the second vertical bar 2 pass through welded connecting, second vertical bar 2 and the The top of three vertical bars 3 is connected by the second horizon bar, and the second horizon bar passes through with the second vertical bar 2 and third vertical bar 3 Be welded to connect, the top of the third vertical bar 3 and the 4th vertical bar 4 is connected by third horizon bar 5, third horizon bar 5 and The third vertical bar 3 and the 4th vertical bar 4 are by being welded to connect, the top of the 4th vertical bar 4 and the first vertical bar 1 It is connected by the 4th horizon bar 6, the 4th horizon bar 6 and the first vertical bar 1 and the 4th vertical bar 4 are by welding, described in connection First level bar, the second horizon bar, third horizon bar 5 and the 4th horizon bar 6 form rectangle structure, first vertical bar 1, the bottom end of the second vertical bar 2, third vertical bar 3 and the 4th vertical bar 4 is installed by welding with movable pulley 7, first water First support 8 is welded and connected in the middle part of flat bar, the middle part of the third horizon bar 5 is welded and connected with second support 9;Described Scaffold further includes people's row platform 10, and four angles of people's row platform 10, which are respectively welded, is fixed on first vertical bar 1, In one bracket 8, second support 9 and the 4th vertical bar 4;The scaffold further includes the first positioning case 11 and the second positioning case 12, the end of first positioning case 11 and the second positioning case 12 is installed by welding with pedestal 13, welds peace on the pedestal 13 Equipped with curtain-rolling machine 14, the working end of the curtain-rolling machine 14, which is inlayed, is equipped with chain 15, and the serobila of the chain 15, which bypasses, has A to slide surely Wheel 16, the top for being mounted on the first vertical bar 1 and the 4th vertical bar 4 is respectively welded in the A fixed pulley 16, the chain 15 The other end is installed by welding with fixed block 17, and the fixed block 17 is respectively welded that be mounted on first vertical bar 1 and the 4th perpendicular On straight-bar 4, first vertical bar 1 and the second vertical bar 2 run through first positioning case 11, the third vertical bar 3 with And the 4th vertical bar 4 run through second positioning case 12, and the first vertical bar 1 and the second vertical bar 2 can be fixed first It is moved up and down in the case 11 of position, third vertical bar 3 can be moved up and down with the 4th vertical bar 4 in the second positioning case 12;Described Waterproof ceiling 18 is installed by welding on first level bar, the second horizon bar, third horizon bar 5 and the 4th horizon bar 6, it is described anti- The four sides of water ceiling 18 is installed by welding with rotation axis 19, and the eaves 20 that keeps off the rain, the eaves that keeps off the rain are rotatably equipped in the rotation axis 19 20 are connect with the top of the waterproof ceiling 18 by soft cloth 21, the both ends of soft cloth 21 be respectively welded be mounted on waterproof ceiling 18 with On weather shield 20.
In the present embodiment, pass through the first vertical bar 1, the second vertical bar 2, third vertical bar 3, the 4th vertical bar 4, first Horizon bar, the second horizon bar, third horizon bar 5 and the 4th horizon bar 6 form the cuboid framework of entire scaffold, pass through peace Mounted in the first vertical bar 1, the second vertical bar 2,4 bottom end of third vertical bar 3 and the 4th vertical bar movable pulley 7, can push Entire scaffold, allows scaffold to be moved easily, and people's row platform 10 is also equipped on scaffold, and operator can be at people's row station It walks on platform 10, and is constructed on people's row platform 10 by station;The lower section two sides of scaffold are additionally provided with the first positioning case 11 With the second positioning case 12, and the first vertical bar 1 and the second vertical bar 2 run through the first positioning case 11, third vertical bar 3 and the Four vertical bars 4 run through the second positioning case 12, by the curtain-rolling machine 14 being mounted in positioning case, the first positioning case 11 and the second positioning Curtain-rolling machine 14 is mounted on case 12, and the working end of curtain-rolling machine 14 is equipped with chain 15, the other end of chain 15 is equipped with Fixed block 17, fixed block 17 are separately mounted in the first vertical bar 1 and the 4th vertical bar 4, vertical in the first vertical bar 1 and the 4th The top of bar 4 is equipped with A fixed pulley 16, by the way that chain 15 around A fixed pulley 16, can be changed the direction of motion of chain 15, It opens shutter 14 and puts down positioning case, after positioning case contacts ground, by the effect of chain 15, entire foot prop can be pulled away from Ground allows positioning case to become support member, effectively prevents from occurring the sliding of movable pulley 7 when staff constructs, influencing work The problem of personnel construct or cause some potential safety problems.First level bar, the second horizon bar, third horizon bar 5 and Waterproof ceiling 18 is installed, four bottom edges of waterproof ceiling 18 are separately fixed at first level bar, the second water on the 4th horizon bar 6 On flat bar, third horizon bar 5 and the 4th horizon bar 6, rotation axis 19 is installed on the side top of waterproof ceiling 18, and turn The eaves 20 that keeps off the rain is installed on moving axis 19, the eaves 20 that keeps off the rain is connect with the top of waterproof ceiling 18 by soft cloth 21, in normal state, The eaves 20 that keeps off the rain is upwards collected through, and when rainy, can be rotated down after product rain in the eaves 20 that keeps off the rain and be limited by soft cloth 21, be prevented There is rotation excessively, stop after eaves 20 rotation of keeping off the rain is horizontal, can be realized increase and keep off the rain area, allows the operation ring of operator Border is better, will not when rainy affected purpose.
Embodiment 2
On the basis of embodiment 1, in order to allow the collection of rainwater can be more smooth, rainwater will not largely be stored up Product is on waterproof ceiling 18, and the top of the waterproof ceiling 18 is structure diagonally downward, and structure diagonally downward can be under Smoothly by rainwater diversion to the depressed area kept off the rain between eaves 20 and waterproof ceiling 18 when rain, when the rain water-harvesting one of depressed area When quantitative, keep off the rain eaves 20 can smooth opening, achieve the purpose that increase the area that keeps off the rain.
Embodiment 3
On the basis of embodiment 2, in order to solve worker if it is intended to constructing in the part for being higher than itself height, need to climb The problem of ladder rack to cause certain security risk, is installed by welding between the first support 8 and first vertical bar 1 A fixes bracket 22, and the fixed bracket 23 of B is installed by welding between the second support 9 and the 4th vertical bar 4, and the A is fixed Rolling-up machine 24, the winding output end storage of the rolling-up machine 24 are installed by welding on bracket 22 and the fixed bracket 23 of the B There is rope 25, around there is B fixed pulley 26, the fixing end of the B fixed pulley 26 is respectively welded to be mounted on the rope body of the rope 25 On the first level bar and third horizon bar 5, the other end of the rope 25, which is installed by welding with, pulls block 27, the pulling Block 27 welds the two sides for being mounted on people's row platform 10, and four angles of people's row platform 10 and described first are vertically Bar 1, first support 8, second support 9 and the 4th vertical bar 4 are flexibly connected, and by opening rolling-up machine 24, wind rope 25, People's row platform 10 can be drawn high, allow the location of staff to increase, effectively staff can be avoided to want in height More stable, construction effect when climbing the security risk during aerial ladder when place's construction, and staff being allowed aloft to construct More preferably.
Embodiment 4
On the basis of embodiment 3, put on record to increase prevention, prevents from not going up when rolling-up machine 24 breaks down supreme Place's construction, is equipped with several bars 28 of stopping between the second support 9 and the third vertical bar 3, bar 28 of stopping over is a kind of general Logical steel stem, adjacent described the distance between bar 28 of stopping over is identical, is provided with sunk structure on the bar 28 of stopping over, described The recess downwards of sunk structure, the size of sunk structure are greater than the mean breadth of normal adult step width, and downwards The sunk structure of recess can become limit operator's step structure, can allow operator upward climbing when can be more Add stabilization.
Embodiment 5
On the basis of embodiment 4, it is equipped between the first support 8 and second vertical bar 2 and similarly falls Staff can climb upwards from two sides for foot lever 28.
Embodiment 6
On the basis of embodiment 5, in order to allow the first vertical bar 1, the second vertical bar 2, third vertical bar 3 and Four vertical bars 4 can in positioning case more it is smooth it is more stable move up and down, first vertical bar 1, the second vertical bar 2, the Three vertical bars 3 and the 4th vertical bar 4 are mounted on sliding rail 29, open in first positioning case 11 and the second positioning case 12 Equipped with across channel 31, and vertical bar is passed through from passing through in channel 31, and described pass through in channel 31 is equipped with sliding shoe, institute The track for stating sliding shoe and the sliding rail 29 matches, and the position installed can be inlayed into sliding rail, pass through 29 He of sliding rail The collective effect of sliding shoe can allow vertical bar under the position-limiting action of sliding rail 29, more smoothly more stable to move up and down, and And the shaking in moving process is smaller, allows scaffold more safety and stability in running.
Embodiment 7
On the basis of embodiment 6, in order to reduce the friction between sliding shoe and sliding rail 29, increase scaffold uses the longevity Life, the sliding shoe is idler wheel 30, the idler wheel 30 be rotatably installed in it is described pass through in channel 31, and the width of the idler wheel 30 Degree matches with the sliding rail 29, and the sliding friction between sliding shoe and sliding rail 29 is changed between idler wheel 30 and sliding rail 29 Rolling friction can effectively reduce the frictional force between sliding rail 29 and sliding shoe, and make the movement of vertical bar more smooth, more It is easy movement.
Embodiment 8
On the basis of embodiment 7, in order to meet the use of entire scaffold, first positioning case 11 and the second positioning Case 12 is a kind of hollow rectangular box body of bottom surface opened, and the bottom surface of positioning case is to open, and scaffold can be allowed softer Ground on when, positioning case can be inlayed as in ground, and scaffold can be allowed more stable.
" one embodiment ", " another embodiment ", " embodiment ", " preferred implementation spoken of in the present specification Example " etc., referring to combining specific features, structure or the feature of embodiment description includes describing extremely in the application generality In few one embodiment.It is not centainly to refer to the same embodiment that statement of the same race, which occur, in multiple places in the description.Into one For step, when describing a specific features, structure or feature in conjunction with any embodiment, what is advocated is to combine other implementations Example realizes that this feature, structure or feature are also fallen in the scope of the utility model.
Although reference be made herein to the utility model is described in multiple explanatory embodiments of the utility model, still, It should be understood that those skilled in the art can be designed that a lot of other modification and implementations, these modifications and implementations It will fall within scope and spirit disclosed in the present application.More specifically, it discloses in the application, drawings and claims In range, can building block to theme combination layout and/or layout carry out a variety of variations and modifications.In addition to building block And/or outside the modification and improvement of layout progress, to those skilled in the art, other purposes also be will be apparent.

Claims (8)

1. a kind of from increasing rain-proof scaffold, it is characterised in that: the scaffold includes the first vertical bar (1), second vertical Bar (2), third vertical bar (3) and the 4th vertical bar (4), first vertical bar (1) and the top of the second vertical bar (2) are logical The connection of first level bar is crossed, second vertical bar (2) is connect with the top of third vertical bar (3) by the second horizon bar, institute The top for stating third vertical bar (3) and the 4th vertical bar (4) is connected by third horizon bar (5), the 4th vertical bar (4) with The top of first vertical bar (1) is connected by the 4th horizon bar (6), the first level bar, the second horizon bar, third horizon bar (5) and the 4th horizon bar (6) forms rectangle structure, first vertical bar (1), the second vertical bar (2), third vertical bar (3) and the bottom end of the 4th vertical bar (4) is mounted on movable pulley (7), is connected with first in the middle part of the first level bar Frame (8) is connected with second support (9) in the middle part of the third horizon bar (5);
The scaffold further includes people's row platform (10), and four angles of people's row platform (10) are separately fixed at described first In vertical bar (1), first support (8), second support (9) and the 4th vertical bar (4);
The scaffold further includes the first positioning case (11) and the second positioning case (12), first positioning case (11) and second The end of positioning case (12) is mounted on pedestal (13), is equipped with curtain-rolling machine (14), the curtain-rolling machine on the pedestal (13) (14) working end is equipped with chain (15), and the serobila of the chain (15), which bypasses, to be had A fixed pulley (16), the A fixed pulley (16) it is separately mounted to the top of the first vertical bar (1) and the 4th vertical bar (4), the other end of the chain (15) is equipped with Fixed block (17), the fixed block (17) is separately mounted in first vertical bar (1) and the 4th vertical bar (4), described First vertical bar (1) and the second vertical bar (2) run through first positioning case (11), the third vertical bar (3) and the Four vertical bars (4) run through second positioning case (12);
Waterproof top is installed on the first level bar, the second horizon bar, third horizon bar (5) and the 4th horizon bar (6) The four sides of canopy (18), the waterproof ceiling (18) is equipped with rotation axis (19), is rotatably equipped with and is kept off the rain on the rotation axis (19) Eaves (20), the eaves that keeps off the rain (20) are connect with the top of the waterproof ceiling (18) by soft cloth (21).
2. according to claim 1 a kind of from raising rain-proof scaffold, which is characterized in that the top of the waterproof ceiling (18) Portion is structure diagonally downward.
3. according to claim 1 a kind of from raising rain-proof scaffold, it is characterised in that: the first support (8) and institute It states and A fixation bracket (22) is installed between the first vertical bar (1), between the second support (9) and the 4th vertical bar (4) It is fixed bracket (23) that B is installed, is mounted on rolling-up machine on the A fixed bracket (22) and the B fixed bracket (23) (24), the winding output end of the rolling-up machine (24) is equipped with rope (25), and the rope body of the rope (25), which bypasses, B fixed pulley (26), the B fixed pulley (26) is separately mounted on the first level bar and third horizon bar (5), the rope (25) The other end be equipped with and pull block (27), it is described that block (27) is pulled to be installed in the two sides of people's row platform (10), and institute Four angles and first vertical bar (1), first support (8), second support (9) and the 4th for stating people's row platform (10) are vertical Bar (4) is flexibly connected.
4. according to claim 1 a kind of from raising rain-proof scaffold, it is characterised in that: the first support (8) and institute It states and several bars of stopping over (28) is installed between the second vertical bar (2), adjacent described the distance between bar (28) of stopping over is identical, institute It states and is provided with sunk structure on bar of stopping over (28), the recess downwards of the sunk structure.
5. according to claim 1 a kind of from raising rain-proof scaffold, it is characterised in that: the second support (9) and institute It states and several bars of stopping over (28) is installed between third vertical bar (3), adjacent described the distance between bar (28) of stopping over is identical, institute It states and is provided with sunk structure on bar of stopping over (28), the recess downwards of the sunk structure.
6. according to claim 1 a kind of from increasing rain-proof scaffold, it is characterised in that: first vertical bar (1), the Two vertical bars (2), third vertical bar (3) and the 4th vertical bar (4) are mounted on sliding rail (29), in first positioning case (11) and in the second positioning case (12) it offers across channel (31), described pass through in channel (31) is equipped with sliding shoe, institute The track for stating sliding shoe and the sliding rail (29) matches.
7. according to claim 6 a kind of from raising rain-proof scaffold, it is characterised in that: the sliding shoe is idler wheel (30), the idler wheel (30) is rotatably installed in described in channel (31), and the width of the idler wheel (30) and the cunning Rail (29) matches.
8. according to claim 1 a kind of from increasing rain-proof scaffold, it is characterised in that: first positioning case (11) with Second positioning case (12) is a kind of hollow rectangular box body of bottom surface opened.
CN201820989567.XU 2018-06-26 2018-06-26 It is a kind of to increase rain-proof scaffold certainly Expired - Fee Related CN208347274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820989567.XU CN208347274U (en) 2018-06-26 2018-06-26 It is a kind of to increase rain-proof scaffold certainly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820989567.XU CN208347274U (en) 2018-06-26 2018-06-26 It is a kind of to increase rain-proof scaffold certainly

Publications (1)

Publication Number Publication Date
CN208347274U true CN208347274U (en) 2019-01-08

Family

ID=64880973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820989567.XU Expired - Fee Related CN208347274U (en) 2018-06-26 2018-06-26 It is a kind of to increase rain-proof scaffold certainly

Country Status (1)

Country Link
CN (1) CN208347274U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113188722A (en) * 2021-04-14 2021-07-30 湖北三江航天万峰科技发展有限公司 Waterproof device and method for heat preservation cabin

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113188722A (en) * 2021-04-14 2021-07-30 湖北三江航天万峰科技发展有限公司 Waterproof device and method for heat preservation cabin

Similar Documents

Publication Publication Date Title
CN206783167U (en) A kind of safe climbing device of tower crane
CN205557327U (en) Bridge operating repair device
CN208347274U (en) It is a kind of to increase rain-proof scaffold certainly
CN203173644U (en) Multifunctional lifting shaft working platform system
CN208347273U (en) A kind of scaffold
CN207393108U (en) For the climbing device of vertical greening wall
JPS6299556A (en) Freely extensible tower
CN106836785A (en) Possesses the scaffold of rotary work ability
CN108590146A (en) A kind of frame elevating construction platform
CN207597271U (en) A kind of bridge column construction operation platform
CN209512851U (en) A kind of rotatable mapping operations instrument in construction site
CN209494204U (en) Suspension type steel ladder
CN107740601A (en) Water supply first-aid repair weather proof enclosure device
CN108999082B (en) Platform for bridge maintenance
KR101419026B1 (en) A dryin tower for fire hose
CN205977072U (en) Gardens emergency staircase frame for maintaining use
CN206158239U (en) Outdoor tourism post house
CN216690304U (en) Intelligent construction platform
CN217867799U (en) Light safety protection device for crane walking channel
CN219100889U (en) Anti-falling angle steel tower
CN220767761U (en) Prefabricated T-beam hogging moment stretching operation equipment
CN110284598A (en) The installation method and device of spherical net brace roof structure
CN212773387U (en) Building external climbing type building construction operation platform
CN217581117U (en) Rapid moving aerial work platform based on rail device
CN205772930U (en) Seat type loop wheel machine machine room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190108

Termination date: 20190626