CN208346250U - The cooling-cycle device of coating machine - Google Patents
The cooling-cycle device of coating machine Download PDFInfo
- Publication number
- CN208346250U CN208346250U CN201820765024.XU CN201820765024U CN208346250U CN 208346250 U CN208346250 U CN 208346250U CN 201820765024 U CN201820765024 U CN 201820765024U CN 208346250 U CN208346250 U CN 208346250U
- Authority
- CN
- China
- Prior art keywords
- coating machine
- cooling
- cooler bin
- water
- heat exchanger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
The utility model discloses the cooling-cycle devices of the coating machine of coating machine technical field, including coating machine and cooler bin, filter is from left to right connected in turn by circulating line between the bottom of the coating machine and the bottom of cooler bin, circulating pump one and heat exchanger, circulating pump two is connected with by aqueduct between the top of the coating machine and the top of cooler bin, pressure gauge is installed on the outer wall of the circulating line, cooling blower is installed at the top of the cooler bin, the side of the cooling blower is equipped with water filling port, the outer wall of the cooler bin is separately installed with thermometer and fluid level tube, structure is simple, the circulating cooling to coating machine can be achieved, heat exchange efficiency is fast, effectively save water resource, reduce the waste of water, and reduce production cost.
Description
Technical field
The utility model relates to coating machine technical fields, the specially cooling-cycle device of coating machine.
Background technique
Now production, in life, higher and higher for the hardness of workpiece, the requirement of wear-resisting property, hardness is low, the service life
It is short, have been unable to meet the demand of people, and pass through the workpiece of vacuum ionic coating due to hardness, in terms of it is significant
Advantage increasingly has been favored by people.It needs to carry out vaccum ion coater in vacuum ionic coating continual cold
But, to guarantee technique requirement.It was to be cooled down by being passed directly into tap water in the past, the water direct emission after heating causes to provide
Source waste.In addition, causing cooling effect poor since tap water temperature is unstable.
Based on this, the utility model devises the cooling-cycle device of coating machine, to solve the above problems.
Utility model content
The purpose of this utility model is to provide the cooling-cycle devices of coating machine, to solve to propose in above-mentioned background technique
Cooled down by being passed directly into tap water, the water direct emission after heating results in waste of resources.In addition, due to tap water
Temperature is unstable, causes the problem that cooling effect is poor.
To achieve the above object, the utility model provides the following technical solutions: the cooling-cycle device of coating machine, including plating
Film machine and cooler bin are from left to right connected in turn between the bottom of the coating machine and the bottom of cooler bin by circulating line
Filter, circulating pump one and heat exchanger, are connected between the top of the coating machine and the top of cooler bin by aqueduct
Circulating pump two is equipped with pressure gauge on the outer wall of the circulating line, cooling blower is equipped at the top of the cooler bin, described
The side of cooling blower is equipped with water filling port, and the outer wall of the cooler bin is separately installed with thermometer and fluid level tube.
Preferably, the internal helicoid of the coating machine is wrapped with cooling pipe, and one end of the cooling pipe passes through water inlet
Port is connected to aqueduct, and the other end of the cooling pipe is connected to by water outlet port with circulating line, the cooling tube
The outside in road is fixed on the inner wall of coating machine by fastener.
Preferably, the heat exchanger is dividing wall type baffling water- to-water heat exchanger, and the inside of the heat exchanger is equipped with heat sink, described
The centre of heat sink is welded with heat-dissipating pipe, and the centre of the heat-dissipating pipe is equipped with baffle plate, and the two sidewalls of the heat exchanger are equipped with envelope
Head.
Preferably, the end socket is socket weld formula end socket, and the inside of end socket is equipped with ring flange.
Preferably, the fluid level tube is connected to cooler bin, and the lateral wall of fluid level tube is equipped with graduation mark.
Compared with prior art, the utility model has the beneficial effects that the utility model structure is simple, it can be achieved that plated film
The circulating cooling of machine, heat exchange efficiency is fast, effectively saves water resource, reduces the waste of water, and reduces production cost.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the utility model embodiment, make required for being described below to embodiment
Attached drawing is briefly described, it should be apparent that, the drawings in the following description are merely some embodiments of the present invention,
For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings
Other attached drawings.
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model coating machine schematic diagram of internal structure;
Fig. 3 is the utility model heat exchanger structure schematic diagram.
In attached drawing, parts list represented by the reference numerals are as follows:
1- coating machine, 101- water inlet port, 102- water outlet port, 103- cooling pipe, 104- fastener, 2- filter,
3- heat exchanger, 31- heat sink, 32- heat-dissipating pipe, 33- baffle plate, 34- end socket, 4- cooler bin, 5- circulating line, 6- circulating pump
One, 7- pressure gauge, 8- aqueduct, 9- circulating pump two, 10- cooling blower, 11- water filling port, 12- thermometer, 13- fluid level tube.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts
All other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: the cooling-cycle device of coating machine, including plated film
Machine 1 and cooler bin 4 are from left to right successively connected between the bottom of the coating machine 1 and the bottom of cooler bin 4 by circulating line 5
It is connected to filter 2, circulating pump 1 and heat exchanger 3, passes through water delivery between the top of the coating machine 1 and the top of cooler bin 4
Pipeline 8 is connected with circulating pump 29, and pressure gauge 7, the top installation of the cooler bin 4 are equipped on the outer wall of the circulating line 5
There is cooling blower 10, the side of the cooling blower 10 is equipped with water filling port 11, and the outer wall of the cooler bin 4 is separately installed with temperature
Meter 12 and fluid level tube 13.
Further, the internal helicoid of the coating machine 1 is wrapped with cooling pipe 103, and the one of the cooling pipe 103
End is connected to by the port 101 that intakes with aqueduct 8, and the other end of the cooling pipe 103 passes through water outlet port 102 and circulation
Pipeline 5 is connected to, and the outside of the cooling pipe 103 is fixed on the inner wall of coating machine 1 by fastener 104, by cooling pipe
103 form the inner wall for being installed on coating machine 1 in solderless wrapped connection, considerably increase the film-cooled heat inside coating machine 1, improve coating machine 1
Internal cooling effect.
Further, the heat exchanger 3 is dividing wall type baffling water- to-water heat exchanger, and the inside of the heat exchanger 3 is equipped with heat sink
31, the centre of the heat sink 31 is welded with heat-dissipating pipe 32, and the centre of the heat-dissipating pipe 32 is equipped with baffle plate 33, the heat exchanger
3 two sidewalls are equipped with end socket 34, and heat sink 31 is used to radiate water capillaryization, and heat-transfer pipe 32 is dissipated for absorbing heat in water
It is sent in atmosphere, baffle plate 33 greatly increases liquidity for preventing water flow short circuit from increasing fluid velocity.
Further, the end socket 34 is socket weld formula end socket, and the inside of end socket 34 is equipped with ring flange, by heat exchanger 2
Internal and external environment sealing, for long-term steady operation in heat exchanger internal pressure environment.
Further, the fluid level tube 13 is connected to cooler bin 4, and the lateral wall of fluid level tube 13 is equipped with graduation mark, can examine
Location is in the depth of cooling water in cooler bin 4, in order in time from moisturizing from water filling port 11.
One concrete application of the present embodiment are as follows: in use, by the water filling port 11 on cooler bin 4 into cooler bin 4 into
Row water filling, and processing cooling is carried out by cooling blower 10, then under the action of circulating pump 29, cooling water passes through coating machine 1
The cooling pipe 103 of internal solderless wrapped connection is cooled down, and water after cooling is discharged from water outlet port 102, and under the action of filter 2
Filtering and impurity removing, using heat exchange cooling treatment is carried out under the action of heat exchanger 3, heat exchange efficiency is fast, and the cooling water after heat exchange is following
It is back in cooler bin 4 and is recycled under the action of ring pump 1, guarantee the cooling efficiency inside coating machine 1, and cold
But case 4 is equipped with thermometer 12, and due to being provided with cooling blower 10, the cooler-water temperature after being cooled is constant, good cooling results,
Fluid level tube 13 is then the depth that detection is located at cooling water in cooler bin 4, in order to from moisturizing from water filling port 11, effectively save in time
Water resource, reduces the waste of water, and reduce production cost.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means
Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one of the utility model
In embodiment or example.In the present specification, schematic expression of the above terms be not necessarily referring to identical embodiment or
Example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more embodiment or examples
In can be combined in any suitable manner.
The preferred embodiment in the utility model disclosed above is only intended to help to illustrate the utility model.Preferred embodiment is simultaneously
There is no the details that detailed descriptionthe is all, also not limiting the utility model is only the specific embodiment.Obviously, according to this theory
The content of bright book can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to preferably
The principles of the present invention and practical application are explained, so that skilled artisan be enable to better understand and utilize this
Utility model.The utility model is limited only by the claims and their full scope and equivalents.
Claims (5)
1. the cooling-cycle device of coating machine, including coating machine (1) and cooler bin (4), it is characterised in that: the coating machine (1)
Bottom and cooler bin (4) bottom between be from left to right connected with filter (2), circulating pump in turn by circulating line (5)
One (6) and heat exchanger (3) are connected between the top of the coating machine (1) and the top of cooler bin (4) by aqueduct (8)
There is circulating pump two (9), is equipped with pressure gauge (7) on the outer wall of the circulating line (5), the top installation of the cooler bin (4)
Have cooling blower (10), the side of the cooling blower (10) is equipped with water filling port (11), and the outer wall of the cooler bin (4) is pacified respectively
Equipped with thermometer (12) and fluid level tube (13).
2. the cooling-cycle device of coating machine according to claim 1, it is characterised in that: the inside of the coating machine (1)
Spiral is wrapped with cooling pipe (103), and one end of the cooling pipe (103) passes through water inlet port (101) and aqueduct (8)
The other end of connection, the cooling pipe (103) is connected to by water outlet port (102) with circulating line (5), the cooling pipe
(103) outside is fixed on the inner wall of coating machine (1) by fastener (104).
3. the cooling-cycle device of coating machine according to claim 1, it is characterised in that: the heat exchanger (3) is partition
The inside of formula baffling water- to-water heat exchanger, the heat exchanger (3) is equipped with heat sink (31), and the centre of the heat sink (31) is welded with scattered
The centre of heat pipe (32), the heat-dissipating pipe (32) is equipped with baffle plate (33), and the two sidewalls of the heat exchanger (3) are equipped with end socket
(34)。
4. the cooling-cycle device of coating machine according to claim 3, it is characterised in that: the end socket (34) is socket weld
Formula end socket, and the inside of end socket (34) is equipped with ring flange.
5. the cooling-cycle device of coating machine according to claim 1, it is characterised in that: the fluid level tube (13) and cooling
Case (4) connection, and the lateral wall of fluid level tube (13) is equipped with graduation mark.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820765024.XU CN208346250U (en) | 2018-05-22 | 2018-05-22 | The cooling-cycle device of coating machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820765024.XU CN208346250U (en) | 2018-05-22 | 2018-05-22 | The cooling-cycle device of coating machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208346250U true CN208346250U (en) | 2019-01-08 |
Family
ID=64890111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820765024.XU Expired - Fee Related CN208346250U (en) | 2018-05-22 | 2018-05-22 | The cooling-cycle device of coating machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208346250U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114277349A (en) * | 2021-12-28 | 2022-04-05 | 无锡展硕科技有限公司 | Novel physical vapor deposition equipment capable of adjusting chamber temperature |
-
2018
- 2018-05-22 CN CN201820765024.XU patent/CN208346250U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114277349A (en) * | 2021-12-28 | 2022-04-05 | 无锡展硕科技有限公司 | Novel physical vapor deposition equipment capable of adjusting chamber temperature |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102519032B (en) | Sewage drainage energy-saving flash tank | |
CN104132557A (en) | Intermediate liquid discharge type efficient condensation system | |
CN208346250U (en) | The cooling-cycle device of coating machine | |
CN206431561U (en) | A kind of cooling circulating water automatic water-replenishing device | |
CN206672022U (en) | A kind of computer chip water cooling plant | |
CN205910663U (en) | Efficient computer CPU radiator | |
CN209672865U (en) | A kind of evaporation type oil cooler | |
CN204787965U (en) | Gaseous strip heat exchanger of energy -efficient methyl alcohol | |
CN207424794U (en) | The high efficiency and heat radiation mainframe box of desktop computer | |
CN207469352U (en) | Circulation in TBM | |
CN203098410U (en) | Water-ring vacuum pump water circulation system | |
CN204923933U (en) | Evaporative condenser | |
CN211737654U (en) | Button lithium cell automatic assembly line's water circulative cooling device | |
CN104697356B (en) | A kind of indirect cooling tower with tilting cooling triangle | |
CN212006832U (en) | High-efficient cooling water tank | |
CN204735237U (en) | Practical comdenstion water festival water circle device | |
CN210341038U (en) | Cooling water circulation device of aluminum plating machine | |
CN210900090U (en) | Two-phase immersed electronic equipment heat dissipation device and heat dissipation system formed by same | |
CN208521920U (en) | A kind of Novel fin formula liquid cooling heat radiator | |
CN207301952U (en) | A kind of water cooling computer heat-conducting plate | |
CN110986638A (en) | Circulating water cooling energy-saving device with heat superconducting heat dissipation structure | |
CN209470560U (en) | A kind of cleaning-type combined radiator | |
CN211694843U (en) | Boiler heating deoxidization economizer system | |
CN212431827U (en) | Closed cooling tower | |
CN208042807U (en) | A kind of anticorrosive paint production composite condensator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190108 |