CN208328687U - A kind of drainage arrangement of bridge - Google Patents

A kind of drainage arrangement of bridge Download PDF

Info

Publication number
CN208328687U
CN208328687U CN201820544621.XU CN201820544621U CN208328687U CN 208328687 U CN208328687 U CN 208328687U CN 201820544621 U CN201820544621 U CN 201820544621U CN 208328687 U CN208328687 U CN 208328687U
Authority
CN
China
Prior art keywords
wall
slot
round bar
fixedly connected
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820544621.XU
Other languages
Chinese (zh)
Inventor
安代春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN SPLEBO HI-TEC Co Ltd
Original Assignee
SHENZHEN SPLEBO HI-TEC Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN SPLEBO HI-TEC Co Ltd filed Critical SHENZHEN SPLEBO HI-TEC Co Ltd
Priority to CN201820544621.XU priority Critical patent/CN208328687U/en
Application granted granted Critical
Publication of CN208328687U publication Critical patent/CN208328687U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of drainage arrangements of bridge, including bridge ontology and rainwater bamboo comb, the upper surface of the bridge ontology offers through slot and groove respectively, the quantity of the groove is two, the through slot is located at the centre of two grooves, the bottom of the rainwater bamboo comb is connect with the top movable of through slot inner wall, the two sides of the through slot inner wall are fixedly connected to attachment base, the front and back of the attachment base inner wall is flexibly connected with the both ends of bull stick respectively, the surface activity of bull stick is socketed with torque spring, one end of torque spring is fixedly connected with the back side of attachment base inner wall, the other end of torque spring is fixedly connected with the front of the first filter screen.The utility model passes through setting attachment base, round bar, torque spring, support plate and collection box, solves the case where most bridges have leaf in use or block drainage system compared with bigger material at present, rainwater penetrates into the problem of beam body is to influence bridge proper drainage when water flow is larger.

Description

A kind of drainage arrangement of bridge
Technical field
The utility model relates to drainage system technical field, specially a kind of drainage arrangement of bridge.
Background technique
With the rapid development of urban construction and transportation network, various bridge is just gradually built and comes into operation, in bridge Use in drainage system play an important role, on bridge floor be arranged drainage system be in order to rapidly exclude bridge floor ponding, Preventing rainwater from stagnating influences the durability of bridge in bridge floor infiltration beam body.
There is leaf in use or block draining system compared with bigger material in the drainage system that majority bridge opens up at present The case where system, causes rainwater to stagnate on bridge floor and penetrates into beam body when water flow is larger, to influence the proper drainage of bridge.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of drainage arrangement of bridge, solves current majority The case where bridge has leaf in use or blocks drainage system compared with bigger material, when water flow is larger, rainwater penetrates into The problem of beam body is to influence bridge proper drainage.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: a kind of drainage arrangement of bridge, including bridge Ontology and rainwater bamboo comb, the upper surface of the bridge ontology offer through slot and groove respectively, and the quantity of the groove is two, The through slot is located at the centre of two grooves, and the bottom of the rainwater bamboo comb is connect with the top movable of through slot inner wall, described logical The two sides of slot inner wall are fixedly connected to attachment base, and the front and back of the attachment base inner wall is movable with the both ends of bull stick respectively Connection, the surface activity of the bull stick are socketed with torque spring, and one end of the torque spring and the back side of attachment base inner wall are solid Fixed connection, the other end of the torque spring are fixedly connected with the front of the first filter screen, the first filter screen pivot bush unit On the surface of torque spring, the two sides of the through slot inner wall are fixedly connected to baffle, and baffle is located at the underface of attachment base, The two sides of the through slot inner wall offer square groove, and the square groove is located at the lower section of baffle, the front of the through slot inner wall and back Face is flexibly connected with the both ends of round bar respectively, and round bar is located at the lower section of baffle, and the quantity of the round bar is two, described in two The surface of round bar is fixedly connected to connecting plate, and the surface fixing sleeve of the connecting plate is connected to support plate, and the connecting plate is separate The surface activity of round bar side is socketed with hairbrush, and the opposite face of the hairbrush and support plate is fixed with the both ends of reset spring respectively Connection, the bottom of the hairbrush are overlapped with the second filter screen, the two sides of second filter screen two sides with square groove inner wall respectively It is fixedly connected, and the second filter screen is located at the lower section of round bar, the upper surface of second filter screen is overlapped with collection box, the receipts The quantity for collecting box is two, and two sides of the collection box far from round bar are run through bridge ontology and extended in groove Portion, two collection boxes are fixedly connected with magnetic patch far from the side of round bar.
Preferably, the front and back of the through slot inner wall is inlaid with rolling bearing, the inner wall of the rolling bearing and The surface of round bar is fixedly connected.
Preferably, two round bars are respectively positioned in same level.
Preferably, the collection box is fixedly connected with magnetic patch far from the side of round bar.
Preferably, the front view of the collection box is trapezoidal.
Preferably, formed angle is 30 degree between the baffle and horizontal plane.
(3) beneficial effect
The utility model provides a kind of drainage arrangement of bridge, have it is following the utility model has the advantages that
(1), the utility model is by setting attachment base, round bar, torque spring, support plate and collection box, when rainfall is more When, rainwater flows into through slot by rainwater bamboo comb and the first filter screen, the first filter screen of rain-impact make the first filter screen around Bar rotation, to rotate around round bar, the upper surface that hairbrush squeezes the second filter screen makes some larger rain-impact connecting plate Sundries be swept into collection box, open the cover board above groove at this time, user contacts iron with magnetic patch, pulls up iron The rubbish inside collection box can be cleared up, has achieved the effect that cleaning, most bridges at present is solved and deposits in use In leaf or the case where compared with bigger material block drainage system, when water flow is larger, rainwater penetrates into beam body to influencing bridge just Often the problem of draining.
(2), the utility model is by setting rolling bearing and baffle, when rainwater is larger, the first filter screen of rain-impact, Baffle, which can guarantee the first filter screen in the course of rotation, does not influence the normal rotation of round bar and connecting plate, and round bar is rotating When rolling bearing can make round bar rotation it is more steady.
Detailed description of the invention
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is schematic enlarged-scale view at A in the utility model Fig. 1;
Fig. 3 is schematic enlarged-scale view at B in the utility model Fig. 1.
In figure: Bridge 1 beam ontology, 2 rainwater bamboo combs, 3 through slots, 4 grooves, 5 attachment bases, 6 bull sticks, 7 torque springs, 8 first mistakes Strainer, 9 rolling bearings, 10 baffles, 11 square grooves, 12 round bars, 13 connecting plates, 14 support plates, 15 reset springs, 16 magnetic patch, 17 are received Collect box, 18 hairbrush, 19 second filter screens.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1-3, the utility model provides a kind of technical solution: a kind of drainage arrangement of bridge, including bridge sheet Body 1 and rainwater bamboo comb 2, the upper surface of bridge ontology 1 offer through slot 3 and groove 4 respectively, and the quantity of groove 4 is two, through slot 3 are located at the centre of two grooves 4, and the bottom of rainwater bamboo comb 2 is connect with the top movable of 3 inner wall of through slot, the two sides of 3 inner wall of through slot It is fixedly connected to attachment base 5, the front and back of 5 inner wall of attachment base is flexibly connected with the both ends of bull stick 6 respectively, bull stick 6 Surface activity is socketed with torque spring 7, and one end of torque spring 7 is fixedly connected with the back side of 5 inner wall of attachment base, torque spring 7 The other end be fixedly connected with the front of the first filter screen 8, the first filter screen 8 is actively socketed on the surface of torque spring 7, through slot The two sides of 3 inner walls are fixedly connected to baffle 10, and formed angle is 30 degree between baffle 10 and horizontal plane, and 10, baffle In the underface of attachment base 5, the two sides of 3 inner wall of through slot offer square groove 11, and square groove 11 is located at the lower section of baffle 10, through slot 3 The front and back of inner wall is flexibly connected with the both ends of round bar 12 respectively, and the front and back of 3 inner wall of through slot is inlaid with rolling The inner wall of bearing 9, rolling bearing 9 is fixedly connected with the surface of round bar 12, and two round bars are respectively positioned in same level, and round bar 12 are located at the lower section of baffle 10, and the quantity of round bar 12 is two, and the surface of two round bars 12 is fixedly connected to connecting plate 13, even The surface fixing sleeve of fishplate bar 13 is connected to support plate 14, and connecting plate 13 is socketed with hairbrush 18 far from the surface activity of 12 side of round bar, Hairbrush 18 is arranged certain cavity cooperation reset spring 15 and uses, the opposite face of hairbrush 18 and support plate 14 respectively with reset spring 15 both ends are fixedly connected, and the bottom of hairbrush 18 is overlapped with the second filter screen 19, the two sides of the second filter screen 19 respectively with square groove The two sides of 11 inner walls are fixedly connected, and the second filter screen 19 is located at the lower section of round bar 12, the upper surface overlap joint of the second filter screen 19 There is collection box 17, the front view of collection box 17 is trapezoidal, and the quantity of collection box 17 is two, and two collection boxes 17 are far from round bar 12 Side run through bridge ontology 1 and extend to the inside of groove 4, two collection boxes 17 are fixedly connected far from the side of round bar 12 There is magnetic patch 16.
When in use, when rainfall is more, rainwater flows into through slot 3 by rainwater bamboo comb 2 and the first filter screen 8, due to The reason of rainwater gravity, the first filter screen of rain-impact 8 rotated the first filter screen 8 around bull stick 6, and two the first filter screens 8 are same When open, the surface of subsequent rain-impact connecting plate 13 make connecting plate 13 around round bar 12 rotate, hairbrush 18 squeeze second filtering The upper surface of net 19 is swept into leaf or some biggish sundries in collection box 17, opens the cover board of 4 top of groove, user Iron is contacted with magnetic patch 16 is inhaled into collection box 17 on iron, pull up iron make collection box 17 follow iron together to Upper movement, user can clean up leaf or some biggish sundries.
It can to sum up obtain, the utility model passes through setting attachment base 5, round bar 12, torque spring 7, support plate 14 and collection box 17, it solves the case where most bridges have leaf in use or block drainage system compared with bigger material at present, works as water Rainwater penetrates into the problem of beam body is to influence bridge proper drainage when flow is larger.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of drainage arrangement of bridge, including bridge ontology (1) and rainwater bamboo comb (2), it is characterised in that: the bridge ontology (1) upper surface offers through slot (3) and groove (4) respectively, and the quantity of the groove (4) is two, and the through slot (3) is located at The bottom of the centre of two grooves (4), the rainwater bamboo comb (2) is connect with the top movable of through slot (3) inner wall, the through slot (3) two sides of inner wall are fixedly connected to attachment base (5), the front and back of attachment base (5) inner wall respectively with bull stick (6) Both ends be flexibly connected, the surface activity of the bull stick (6) is socketed with torque spring (7), one end of the torque spring (7) with The back side of attachment base (5) inner wall is fixedly connected, and the other end of the torque spring (7) and the front of the first filter screen (8) are fixed Connection, first filter screen (8) are actively socketed on the surface of torque spring (7), and the two sides of through slot (3) inner wall are fixed It is connected with baffle (10), and baffle (10) is located at the underface of attachment base (5), the two sides of through slot (3) inner wall offer Square groove (11), the square groove (11) are located at the lower section of baffle (10), the front and back of through slot (3) inner wall respectively with round bar (12) both ends are flexibly connected, and round bar (12) is located at the lower section of baffle (10), and the quantity of the round bar (12) is two, two The surface of the round bar (12) is fixedly connected to connecting plate (13), and the surface fixing sleeve of the connecting plate (13) is connected to support plate (14), the connecting plate (13) is socketed with hairbrush (18) far from the surface activity of round bar (12) side, the hairbrush (18) and branch The opposite face of fagging (14) is fixedly connected with the both ends of reset spring (15) respectively, and the bottom of the hairbrush (18) is overlapped with second Filter screen (19), the two sides of second filter screen (19) are fixedly connected with the two sides of square groove (11) inner wall respectively, and the second mistake Strainer (19) is located at the lower section of round bar (12), and the upper surface of second filter screen (19) is overlapped with collection box (17), the receipts The quantity for collecting box (17) is two, and two collection boxes (17) run through bridge ontology (1) simultaneously far from the side of round bar (12) Extend to the inside of groove (4).
2. a kind of drainage arrangement of bridge according to claim 1, it is characterised in that: the front of through slot (3) inner wall It is inlaid with the back side rolling bearing (9), the inner wall of the rolling bearing (9) is fixedly connected with the surface of round bar (12).
3. a kind of drainage arrangement of bridge according to claim 1, it is characterised in that: two round bars (12) are respectively positioned on In same level.
4. a kind of drainage arrangement of bridge according to claim 1, it is characterised in that: the collection box (17) is far from round bar (12) side is fixedly connected with magnetic patch (16).
5. a kind of drainage arrangement of bridge according to claim 1, it is characterised in that: the front view of the collection box (17) It is trapezoidal.
6. a kind of drainage arrangement of bridge according to claim 1, it is characterised in that: the baffle (10) and horizontal plane it Between formed angle be 30 degree.
CN201820544621.XU 2018-04-17 2018-04-17 A kind of drainage arrangement of bridge Expired - Fee Related CN208328687U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820544621.XU CN208328687U (en) 2018-04-17 2018-04-17 A kind of drainage arrangement of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820544621.XU CN208328687U (en) 2018-04-17 2018-04-17 A kind of drainage arrangement of bridge

Publications (1)

Publication Number Publication Date
CN208328687U true CN208328687U (en) 2019-01-04

Family

ID=64781798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820544621.XU Expired - Fee Related CN208328687U (en) 2018-04-17 2018-04-17 A kind of drainage arrangement of bridge

Country Status (1)

Country Link
CN (1) CN208328687U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113457274A (en) * 2021-07-23 2021-10-01 臧红飞 Water resource filter equipment that water conservancy construction was used
CN117160103A (en) * 2023-11-03 2023-12-05 山西省水利水电勘测设计研究院有限公司 Filter equipment for hydraulic engineering

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113457274A (en) * 2021-07-23 2021-10-01 臧红飞 Water resource filter equipment that water conservancy construction was used
CN117160103A (en) * 2023-11-03 2023-12-05 山西省水利水电勘测设计研究院有限公司 Filter equipment for hydraulic engineering
CN117160103B (en) * 2023-11-03 2024-01-23 山西省水利水电勘测设计研究院有限公司 Filter equipment for hydraulic engineering

Similar Documents

Publication Publication Date Title
CN208328687U (en) A kind of drainage arrangement of bridge
CN111877494A (en) Sponge urban rainwater recycle system
CN207898432U (en) A kind of sweeper scraping article mounting structure
CN108434842A (en) A kind of filter mechanism of large-scale pipeline filter device for water delivery supervisor's net
CN103452185B (en) Turbine rain perforated strainer
CN211143223U (en) Sponge city rainwater shunting hinders dirty anti-reflux discharging equipment
CN211052109U (en) Water collecting tank for collecting overflow clear water
CN212487697U (en) Cleaning device is retrieved to rubbish for landscape
CN208830004U (en) A kind of textile composite face surface sundry removal device
CN106073662A (en) Mop cleaning hangs car and using method thereof
CN212418992U (en) Landscape fountain structure
CN207769446U (en) A kind of building machinery environmental protection device for reducing dust
CN205518827U (en) Prevent blockking up suction nozzle
CN114293619A (en) Unpowered rainwater collecting and utilizing system for super high-rise building
CN212166656U (en) Greasy dirt collection device
CN209837265U (en) Stainless steel drainage ditch cover plate convenient to install
CN210917647U (en) Road drainage water filtering device
CN207032188U (en) A kind of hydraulic engineering fence of removing contamination
CN220768344U (en) Ditch cover plate for preventing foreign matter from falling
CN206138072U (en) Mop cleanness hangs car
CN216892618U (en) Drainage structures is used in gardens
CN208395064U (en) A kind of auger type urine collecting ditch for fecaluria separating dry space from moist space V-groove
CN216196154U (en) Glass balcony guardrail with combined structure
CN215105884U (en) Floor drain convenient to clean
CN216275214U (en) Highway bridge drainage structures

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190104

CF01 Termination of patent right due to non-payment of annual fee