CN208327209U - A kind of auxiliary part of arc ceiling hoisting structure - Google Patents

A kind of auxiliary part of arc ceiling hoisting structure Download PDF

Info

Publication number
CN208327209U
CN208327209U CN201820710741.2U CN201820710741U CN208327209U CN 208327209 U CN208327209 U CN 208327209U CN 201820710741 U CN201820710741 U CN 201820710741U CN 208327209 U CN208327209 U CN 208327209U
Authority
CN
China
Prior art keywords
fixedly installed
outer box
block
rotation axis
auxiliary part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820710741.2U
Other languages
Chinese (zh)
Inventor
李如璀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Changlong Decoration Design Engineering Co Ltd
Original Assignee
Shenzhen Changlong Decoration Design Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Changlong Decoration Design Engineering Co Ltd filed Critical Shenzhen Changlong Decoration Design Engineering Co Ltd
Priority to CN201820710741.2U priority Critical patent/CN208327209U/en
Application granted granted Critical
Publication of CN208327209U publication Critical patent/CN208327209U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to hoisting technology fields, and disclose a kind of auxiliary part of arc ceiling hoisting structure, including outer box, the outer box are internally provided with platform sling, hook is fixedly installed in the top of the platform sling and the inner bottom wall of outer box, it is movably installed with swivel becket on the outer box bottom hook, the cartridge positioned at platform sling bottom is fixedly installed in the inner left wall and right side inner wall of the outer box, the internal activity of the cartridge is equipped with rotation axis.The auxiliary part of the arc ceiling hoisting structure, by having spring in setting shell and inner casing, half arc block can be made to be adjusted, by having screw bolt and nut on setting projecting block, it can be adjusted to make rotation axis by the pressure of half arc block to stop avoiding mistuning by double of arc block of adjusting nut, so that the furred ceiling of effective solution ceiling is generally using being all larger heavier finishing material needs auxiliary part come the problem of lifting.

Description

A kind of auxiliary part of arc ceiling hoisting structure
Technical field
The utility model relates to hoisting technology field, specially a kind of auxiliary part of arc ceiling hoisting structure.
Background technique
Lifting refers to the installation and general designation in place of crane or lifting mechanism to equipment, sharp in maintenance or maintenance process Equipment, workpiece, utensil and material etc. are sling with various hoisting machine tools, bring it about change in location, sufficiently inspection job site Surface condition, job site ground must have and crane can be in a horizontal state, and can sufficiently bear to act on the power of supporting leg Moment condition, when with derrick mast hoisting Large Towers class equipment, more hoist engine joint operations, must be requested that the lifting-speed of each hoist engine It is roughly the same, it is ensured that each suspension centre stress substantially tends to uniformly, avoid tower body stress irregular and deform on tower body.
Many places have all applied to lifting now, carry out furred ceiling to ceiling when sprucing up and just need to lift It carries out, what is generally used due to the furred ceiling of ceiling is all larger heavier finishing material, so just need some auxiliary structures Part lifts, so propose a kind of auxiliary part of arc ceiling hoisting structure solve the problems, such as it is above-mentioned proposed in.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of auxiliary part of arc ceiling hoisting structure, Has the advantages of adjusting auxiliary, it is that larger heavier finishing material needs to assist structure that the furred ceiling for solving ceiling, which generally uses all, Part is come the problem of lifting.
(2) technical solution
For the purpose for realizing above-mentioned adjusting auxiliary, the utility model is provided the following technical solutions: a kind of arc ceiling is hung The auxiliary part of assembling structure, including outer box, the outer box are internally provided with platform sling, the top of the platform sling and the interior bottom of outer box Be fixedly installed with hook on wall, be movably installed with swivel becket on the outer box bottom hook, the inner left wall of the outer box and The cartridge positioned at platform sling bottom is fixedly installed on the inner wall of right side, the internal activity of the cartridge is equipped with rotation axis, described The both ends of rotation axis and be located at cartridge inside be fixedly installed with snap-gauge, wrapping post is fixedly installed in the rotation axis, it is described It is equipped on wrapping post and surround swivel becket and the drawstring fixed with platform sling upper hook, in the rotation axis and positioned at the right side of wrapping post Side is fixedly installed with two block baffles, and circular groove, activity in the circular groove are offered in the rotation axis and between two block baffles Ball chain is installed, in the inner left wall of the outer box and is located to be fixedly installed at the top of cartridge and extends at the top of rotation axis Extension board, the bottom of the extension board are fixedly installed with shell, and the outer casing inner wall is fixedly installed with spring, and the spring is separate One end of shell is fixedly installed with the inner casing positioned at interior of shell, and the inner casing and shell are fixedly installed with far from one end of spring Half arc block, the bottom of the half arc block are fixedly installed with projecting block, bolt, the spiral shell are movably installed on two projecting blocks Nut is threaded on bolt.
Preferably, the outside of the inner casing is fixedly installed with fixture block, and inner casing is flexibly connected by fixture block with shell.
Preferably, the inside of the half arc block is fixedly installed with rubber bumper.
Preferably, the wrapping post is flexibly connected by drawstring, hook and swivel becket with platform sling.
Preferably, the rotation axis is flexibly connected by snap-gauge and cartridge with outer box.
Preferably, the positive half arc block is flexibly connected by projecting block, nuts and bolt with the half arc block at the back side.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of auxiliary part of arc ceiling hoisting structure, has Below the utility model has the advantages that
1, the auxiliary part of the arc ceiling hoisting structure can pass through ball by having circular groove in setting rotation axis Chain and circular groove are clamped, so that pulling can drive rotation axis to rotate when ball chain, achieve the effect that shrink drawstring, by setting Hook is arranged at the bottom for setting outer box, and it is movable on swivel becket can to make drawstring, to adjust the height of platform sling, has reached the effect adjusted Fruit.
2, the auxiliary part of the arc ceiling hoisting structure can make half by having spring in setting shell and inner casing Arc block is adjusted, by setting projecting block on have screw bolt and nut, can be adjusted by double of arc block of adjusting nut from And make rotation axis by the pressure of half arc block to stop avoiding mistuning, so that the furred ceiling of effective solution ceiling is generally adopted With being all that larger heavier finishing material needs auxiliary part come the problem of lifting.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the structure connection diagram of half arc block of the utility model.
In figure: 1 outer box, 2 hooks, 3 platform slings, 4 swivel beckets, 5 drawstrings, 6 extension boards, 7 shells, 8 rotation axis, 9 snap-gauges, 10 Cartridge, 11 half arc blocks, 12 projecting blocks, 13 bolts, 14 wrapping posts, 15 circular grooves, 16 baffles, 17 ball chains, 18 springs, 19 inner casings, 20 nuts.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
A kind of auxiliary part of arc ceiling hoisting structure referring to FIG. 1-2, including outer box 1, the inside of outer box 1 are set It is equipped with platform sling 3, hook 2, activity on 1 bottom of outer box hook 2 are fixedly installed on the top of platform sling 3 and the inner bottom wall of outer box 1 Swivel becket 4 is installed, the cartridge 10 positioned at 3 bottom of platform sling is fixedly installed in the inner left wall and right side inner wall of outer box 1, is blocked The internal activity of box 10 is equipped with rotation axis 8, both ends of the rotation axis 8 and inside for being located at cartridge 10 is fixedly installed with snap-gauge 9, Rotation axis 8 is flexibly connected by snap-gauge 9 and cartridge 10 with outer box 1, and wrapping post 14, wrapping post 14 are fixedly installed in rotation axis 8 On drawstring 5 around swivel becket 4 and fixed with 3 upper hook 2 of platform sling is installed, wrapping post 14 passes through drawstring 5, hook 2 and rotation Ring 4 is flexibly connected with platform sling 3, is fixedly installed with two block baffles 16, rotation axis 8 in rotation axis 8 and positioned at the right side of wrapping post 14 Circular groove 15 above and between two block baffles 16 is offered, ball chain 17, the inner left wall of outer box 1 are movably installed in circular groove 15 Top that is upper and being located at cartridge 10 is fixedly installed with the extension board 6 for extending to 8 top of rotation axis, the fixed peace in the bottom of extension board 6 Equipped with shell 7,7 inner wall of shell is fixedly installed with spring 18, and spring 18 is fixedly installed with far from one end of shell 7 positioned at shell 7 Internal inner casing 19, the outside of inner casing 19 is fixedly installed with fixture block, and inner casing 19 is flexibly connected by fixture block with shell 7, inner casing 19 and shell 7 far from one end of spring 18 be fixedly installed with half arc block 11, the inside of half arc block 11 is fixedly installed with rubber bumper, half The bottom of arc block 11 is fixedly installed with projecting block 12, and bolt 13 is movably installed on two projecting blocks 12, and screw thread connects on bolt 13 It is connected to nut 20, positive half arc block 11 is flexibly connected by projecting block 12, nut 20 and bolt 13 with the half arc block 11 at the back side, The auxiliary part of the arc ceiling hoisting structure can pass through ball chain 17 and circle by having circular groove 15 in setting rotation axis 8 Slot 15 is clamped, so that pulling can drive rotation axis 8 to rotate when ball chain 17, achievees the effect that shrink drawstring 5, by setting Hook 2 is arranged at the bottom for setting outer box 1, and drawstring 5 can be made movable on swivel becket 4, to adjust the height of platform sling 3, reached tune The effect of section, and the auxiliary part of the arc ceiling hoisting structure can by having spring 18 in setting shell 7 and inner casing 19 So that half arc block 11 is adjusted, it, can be right by adjusting nut 20 by having bolt 13 and nut 20 on setting projecting block 12 Half arc block 11 is adjusted to make rotation axis 8 by the pressure of half arc block 11 to stop avoiding mistuning, to effectively solve Determined ceiling furred ceiling generally using being all that larger heavier finishing material needs auxiliary part come the problem of lifting.
When in use, to achieve the effect that half arc block 11 loose for rotating nut 20 first, then ball chain 17 is pulled to make card Plate 9 rotates, so that the height for adjusting platform sling 3 is shunk or loosened to drawstring 5, last rotating nut 20 keeps rotation axis 8 fixed.
In conclusion the auxiliary part of the arc ceiling hoisting structure can by having circular groove 15 in setting rotation axis 8 To be clamped by ball chain 17 and circular groove 15, so that pulling can drive rotation axis 8 to rotate when ball chain 17, reach contraction Hook 2 is arranged at the effect of drawstring 5, the bottom by the way that outer box 1 are arranged, and drawstring 5 can be made movable on swivel becket 4, hung to adjust The height of plate 3 has achieved the effect that adjust.
Also, the auxiliary part of the arc ceiling hoisting structure, by having spring 18 in setting shell 7 and inner casing 19, Half arc block 11 can be made to be adjusted, by having bolt 13 and nut 20 on setting projecting block 12, adjusting nut 20 can be passed through Double of arc block 11 is adjusted to make rotation axis 8 by the pressure of half arc block 11 to stop avoiding mistuning, thus effectively Solve the problems, such as the furred ceiling of ceiling generally using being all that larger heavier finishing material needs auxiliary part and lifts.
It should be noted that the terms "include", "comprise" or its any other variant are intended to the packet of nonexcludability Contain, so that the process, method, article or equipment for including a series of elements not only includes those elements, but also including Other elements that are not explicitly listed, or further include for elements inherent to such a process, method, article, or device. In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including the element Process, method, article or equipment in there is also other identical elements.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of auxiliary part of arc ceiling hoisting structure, including outer box (1), it is characterised in that: the outer box (1) it is interior Portion is provided with platform sling (3), is fixedly installed with hook (2) in the top of the platform sling (3) and the inner bottom wall of outer box (1), described It is movably installed with swivel becket (4) on outer box (1) bottom hook (2), it is solid in the inner left wall and right side inner wall of the outer box (1) Dingan County is equipped with the cartridge (10) positioned at platform sling (3) bottom, and the internal activity of the cartridge (10) is equipped with rotation axis (8), described The both ends of rotation axis (8) and be located at cartridge (10) inside be fixedly installed with snap-gauge (9), be fixedly mounted on the rotation axis (8) Have wrapping post (14), drawing around swivel becket (4) and fixed with platform sling (3) upper hook (2) is installed on the wrapping post (14) It restricts (5), is fixedly installed with two block baffles (16), the rotation axis on the rotation axis (8) and on the right side of wrapping post (14) (8) it is offered circular groove (15) on and between two block baffles (16), is movably installed with ball chain (17) in the circular groove (15), It is fixedly installed in the inner left wall of the outer box (1) and at the top of cartridge (10) and extends to prolonging at the top of rotation axis (8) It stretches plate (6), the bottom of the extension board (6) is fixedly installed with shell (7), and shell (7) inner wall is fixedly installed with spring (18), the spring (18) is fixedly installed with the inner casing (19) internal positioned at shell (7) far from the one end of shell (7), described interior One end of shell (19) and shell (7) separate spring (18) is fixedly installed with half arc block (11), and the bottom of the half arc block (11) is solid Dingan County is equipped with projecting block (12), is movably installed with bolt (13) on two projecting blocks (12), screw thread on the bolt (13) It is connected with nut (20).
2. a kind of auxiliary part of arc ceiling hoisting structure according to claim 1, it is characterised in that: the inner casing (19) outside is fixedly installed with fixture block, and inner casing (19) is flexibly connected by fixture block with shell (7).
3. a kind of auxiliary part of arc ceiling hoisting structure according to claim 1, it is characterised in that: half arc The inside of block (11) is fixedly installed with rubber bumper.
4. a kind of auxiliary part of arc ceiling hoisting structure according to claim 1, it is characterised in that: the coiling Column (14) is flexibly connected by drawstring (5), hook (2) and swivel becket (4) with platform sling (3).
5. a kind of auxiliary part of arc ceiling hoisting structure according to claim 1, it is characterised in that: the rotation Axis (8) is flexibly connected by snap-gauge (9) and cartridge (10) with outer box (1).
6. a kind of auxiliary part of arc ceiling hoisting structure according to claim 1, it is characterised in that: positive institute Half arc block (11) is stated to be flexibly connected by projecting block (12), nut (20) and bolt (13) with the half arc block (11) at the back side.
CN201820710741.2U 2018-05-14 2018-05-14 A kind of auxiliary part of arc ceiling hoisting structure Active CN208327209U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820710741.2U CN208327209U (en) 2018-05-14 2018-05-14 A kind of auxiliary part of arc ceiling hoisting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820710741.2U CN208327209U (en) 2018-05-14 2018-05-14 A kind of auxiliary part of arc ceiling hoisting structure

Publications (1)

Publication Number Publication Date
CN208327209U true CN208327209U (en) 2019-01-04

Family

ID=64777093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820710741.2U Active CN208327209U (en) 2018-05-14 2018-05-14 A kind of auxiliary part of arc ceiling hoisting structure

Country Status (1)

Country Link
CN (1) CN208327209U (en)

Similar Documents

Publication Publication Date Title
CN106809720B (en) A kind of potting breaker arc-chutes hoisting fixture
CN102198914A (en) Working platform for installing wind generating set
CN204848017U (en) Swing crane; derrick
CN208071727U (en) A kind of blast furnace hanging scaffold
CN208327209U (en) A kind of auxiliary part of arc ceiling hoisting structure
CN105947900A (en) Energy-saving hoisting construction device
CN211343235U (en) Maintenance tool on gearbox tower of wind driven generator
CN107215799A (en) A kind of auxiliary lifting device and the descending operation method for treating operation part
CN207061738U (en) The auxiliary lifting device that a kind of anti-side is fallen
CN217051413U (en) Sea water pump anti-falling assembly
CN216196814U (en) Adjustable horizontal entrance to a cave anti-falling device
CN216444881U (en) Hook for heat treatment of large-scale seal head
CN206654649U (en) A kind of simply adjustable shaped steel lifting card construction equipment
CN205590168U (en) Overturning lifting device
CN212740428U (en) Hoisting device for hoisting raw water treatment materials
CN205927778U (en) Straightening machine roller shell dismouting device
CN211444792U (en) Can dismantle civil air defense engineering protective apparatus hoist device
CN210621617U (en) 360-degree rotation and automatic chain-off lifting appliance for breakwater armor block
CN206872274U (en) A kind of spiral case dismounts aid
CN202011709U (en) Installation work platform for wind turbine generator set
CN105970893A (en) Combined round rack pile leg construction platform
CN210286647U (en) Climbing and holding structure of wind power tower
CN219929466U (en) Simple and easy quick hoist and mount support
CN205036319U (en) Be applied to tap gallows on oil -well rig
CN219992218U (en) Pier stud maintenance film winding device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant