CN208320847U - A kind of production of concrete admixture is with being measured test tube - Google Patents

A kind of production of concrete admixture is with being measured test tube Download PDF

Info

Publication number
CN208320847U
CN208320847U CN201820732086.0U CN201820732086U CN208320847U CN 208320847 U CN208320847 U CN 208320847U CN 201820732086 U CN201820732086 U CN 201820732086U CN 208320847 U CN208320847 U CN 208320847U
Authority
CN
China
Prior art keywords
test tube
main body
clamping column
pedestal
tube main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820732086.0U
Other languages
Chinese (zh)
Inventor
张生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hengtong Additive Co Ltd
Original Assignee
Anhui Hengtong Additive Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hengtong Additive Co Ltd filed Critical Anhui Hengtong Additive Co Ltd
Priority to CN201820732086.0U priority Critical patent/CN208320847U/en
Application granted granted Critical
Publication of CN208320847U publication Critical patent/CN208320847U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses a kind of productions of concrete admixture with being measured test tube, including test tube main body, the top of the test tube main body, which is provided with, emits eaves, and it test tube main body and emits eaves and is an integral structure, the side for emitting eaves is provided with connecting band, the top of the test tube main body is relative to being provided with sealing cover at the position for emitting eaves, the surrounding of the sealing cover is provided with rubber ring, and sealing cover and rubber ring are an integral structure, the bottom end of the sealing cover is provided with pedestal, and the pedestal is internally provided with rubber cover;The setting of pedestal solves the problems, such as that test tube cannot be placed steadily, test tube and bottom end can be connected and fixed by the setting of clamping column on bottom end, and installment work is relatively simple practical, disassembly is also very fast, has saved the time while increasing test tube and stablizing, the contact area of pedestal and desktop is larger, reduce a possibility that test tube is broken, material is saved, the progress of work is accelerated, reduces economic waste.

Description

A kind of production of concrete admixture is with being measured test tube
Technical field
The utility model belongs to vitro techniques field, and in particular to a kind of production of concrete admixture is with being measured test tube.
Background technique
Test tube, the common instrument of chemical laboratory, serves as the reaction vessel of a small amount of reagent, should before test tube heating Preheating, not so test tube is easy explosion, and test tube divides common test tube, tool test tube, centrifuge tube etc. a variety of.
Existing additive is measured test tube when in use there is a problem that it is certain, when we use test tube when, due to examination Test tube can only be horizontally arranged desktop, but in this way can be by test tube so desktop can not be smoothly fixed on for arc-shaped by tube bottom end Internal liquid and experimental material leaks, and since test tube is excessively smooth, falls so placing and being easy to rotation on the table Ground is fallen in, a possibility that broken is increased, this not only wastes material, while delaying the progress of work, the time is wasted, and Economic waste is brought, existing additive, which is measured test tube when in use, has that leakproofness is inadequate, often wants to It covers test tube and blocks bottleneck simply by bottle stopper, leakproofness is not strong enough in fact for this, and invisible spectro liquid or material are likely to It is revealed because bottle stopper does not match tight, material and experimental data is not only wasted, while delaying the progress of work, when wasting Between, and bottle stopper is easily lost, the problem of work progress can be not only stopped over after loss, while bringing certain economic loss, Thus it is proposed that a kind of production of concrete admixture is with being measured test tube.
Utility model content
The purpose of this utility model is to provide a kind of productions of concrete admixture with test tube is measured, to solve above-mentioned background The existing additive proposed in technology is measured test tube when in use there is a problem that it is certain, when we use test tube when, by It is arc-shaped in test tube bottom end, so desktop can not be smoothly fixed on, test tube can only be horizontally arranged to desktop, but can incite somebody to action in this way The liquid and experimental material of test tube interior leak, and since test tube is excessively smooth, are easy to turn on the table so placing It is dynamic to fall on ground, a possibility that broken is increased, this not only wastes material, while delaying the progress of work, when wasting Between, and economic waste is brought, existing additive, which is measured test tube when in use, has that leakproofness is inadequate, usually Want to cover test tube and block bottleneck simply by bottle stopper, leakproofness is not strong enough in fact for this, and invisible spectro liquid or material are very Probably due to bottle stopper is not matched tight and revealed, material and experimental data is not only wasted, while delaying the progress of work, wasted Time, and bottle stopper is easily lost, and work progress can be not only stopped over after loss, while bringing certain economic loss etc. and asking Topic.
To achieve the above object, the utility model provides the following technical solutions: a kind of production of concrete admixture is with being measured Test tube, including test tube main body, the top of the test tube main body, which is provided with, emits eaves, and test tube main body and emits eaves and be an integral structure, The side for emitting eaves is provided with connecting band, the top of the test tube main body relative to being provided with sealing cover at the position for emitting eaves, The surrounding of the sealing cover is provided with rubber ring, and sealing cover and rubber ring are an integral structure, and the bottom end of the sealing cover is set It is equipped with pedestal, the pedestal is internally provided with rubber cover, and pedestal and rubber cover are an integral structure, the top of the pedestal It is provided with clamping column, the interior side of the clamping column is provided with spring, and the side of the clamping column is provided with handle, and clamping column and handle It is an integral structure, the side bottom end of the clamping column is provided with bolt, and clamping column and pedestal are connected and fixed by bolt rotation, institute The bottom end for stating sealing cover is provided with lid plug, and covers plug and sealing cover and be an integral structure, and the interior survey of the clamping column is provided with clamping column Ring, and clamping column ring and clamping column are connected and fixed by hot melt adhesive stickup, the pedestal and test tube main body are connected and fixed by clamping column.
Preferably, the rubber ring is cylindrical body, and the top end diameter of the diameter of rubber ring and test tube main body is always, rubber Ring with a thickness of one centimeter.
Preferably, the pedestal is hollow cylinder, and the diameter of test tube main body is 4/5ths of the diameter of pedestal, bottom The length of seat is the one third of the length of test tube main body.
Preferably, the clamping column is hollow cylinder, and the inside diameter of clamping column is consistent with the diameter of test tube main body, clamping column With a thickness of two centimeters.
Preferably, the lid plug is round estrade, and the top end diameter for covering plug is consistent with the diameter of test tube main body.
Compared with prior art, the utility model has the beneficial effects that the utility model is scientific and reasonable for structure, use is safe Convenient, the setting of pedestal solves the problems, such as that test tube cannot be placed steadily, can be by test tube and bottom by the setting of clamping column on bottom end End is connected and fixed, and installment work is relatively simple practical, and disassembly is also very fast, when having saved while increasing test tube and stablizing Between, the contact area of pedestal and desktop is larger, and test tube is fixed on the center of bottom end, and this reduces because of tubing surfaces excessively light It is sliding and slide the ground the problem of, reduce a possibility that test tube is broken, save material, accelerate the progress of work, reduces warp It while Ji waste, improves work efficiency, the setting of sealing cover and rubber ring increases the leakproofness of test tube, and sealing cover is by bottle Mouth is fixed, then can downwardly turn over rubber ring, increase leakproofness, so that test tube interior gas can not flow out, hinder simultaneously The outside air that broken flows into test tube, saves material and experimental data while increasing leakproofness, accelerates the progress of work, saves About the time, reduce economic loss.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the cross-sectional view of the utility model;
Fig. 3 is the clamping column top view of the utility model;
Fig. 4 is the rubber ring cross-sectional view of the utility model;
In figure: 1, sealing cover;2, connecting band;3, test tube main body;4, eaves is emitted;5, rubber ring;6, spring;7, handle;8, spiral shell Bolt;9, pedestal;10, rubber cover;11, clamping column;12, Gai Sai;13, clamping column ring.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-Fig. 4, the utility model provides a kind of technical solution: a kind of production of concrete admixture is tried with being measured Pipe, including test tube main body 3, the top of test tube main body 3, which is provided with, emits eaves 4, and test tube main body 3 and emits eaves 4 and be an integral structure, and emits The side of eaves 4 is provided with connecting band 2, and the top of test tube main body 3 is relative to being provided with sealing cover 1, sealing cover at the position for emitting eaves 4 1 surrounding is provided with rubber ring 5, and sealing cover 1 and rubber ring 5 are an integral structure, and the bottom end of sealing cover 1 is provided with pedestal 9, Pedestal 9 is internally provided with rubber cover 10, and pedestal 9 and rubber cover 10 are an integral structure, and the top of pedestal 9 is provided with clamping column 11, the interior side of clamping column 11 is provided with spring 6, and the side of clamping column 11 is provided with handle 7, and clamping column 11 and handle 7 are integrated Formula structure, the side bottom end of clamping column 11 is provided with bolt 8, and clamping column 11 and pedestal 9 are connected and fixed by the rotation of bolt 8, are sealed The bottom end of lid 1 is provided with lid plug 12, and lid plug 12 and sealing cover 1 are an integral structure, and the interior survey of clamping column 11 is provided with clamping column ring 13, and clamping column ring 13 and clamping column 11 are connected and fixed by hot melt adhesive stickup, pedestal 9 and test tube main body 3 are solid by the connection of clamping column 11 It is fixed.
In order to increase the leakproofness of test tube, in the present embodiment, it is preferred that rubber ring 5 is cylindrical body, and rubber ring 5 is straight The top end diameter of diameter and test tube main body 3 always, rubber ring 5 with a thickness of one centimeter.
In order to increase the stability of test tube, in the present embodiment, it is preferred that pedestal 9 is hollow cylinder, and test tube main body 3 Diameter be pedestal 9 diameter 4/5ths, the length of pedestal 9 is the one third of the length of test tube main body 3.
More preferably for the stationarity for making pedestal 9 and test tube and flexibility, in the present embodiment, it is preferred that clamping column 11 is hollow Cylindrical body, and the inside diameter of clamping column 11 is consistent with the diameter of test tube main body 3, clamping column 11 with a thickness of two centimeters.
In order to increase test tube by closure, in the present embodiment, it is preferred that lid plug 12 is round estrade, and covers plug 12 Top end diameter is consistent with the diameter of test tube main body 3.
The working principle and process for using of the utility model: before using the utility model, should first check, check errorless After can use, pedestal 9 is installed in test tube main body 3 first, then the inside of the side of pedestal 9 alignment pedestal 9 is opened Clamping column 11 makes 6 stress of spring flexible, so that clamping column 11 be opened, then slowly stretches test tube main body 3 by holding handle 7 The side for entering pedestal 9 gos deep into 2/3rds of pedestal 9 when test tube main body 3 and goes out to unclamp handle 7, so that spring 6 is ineffective Power so that test tube main body 3 is fixed on the inside of pedestal 9, will be tried using the fixation of pedestal 9 to closing clamping column 11 Pipe main body 3 is fixed on desktop, removes also very simply, need to only hold handle 7 and make 6 forced contraction of spring to open clamping column 11, test tube main body 3 is extracted out from the side of pedestal 9 slowly then, the lid plug 12 of 1 bottom end of sealing cover is then directed at examination The bottle mouth position of pipe main body 3, then slowly presses down on, so that lid plug 12 and the bottleneck of test tube main body 3 fit closely, thus by close Capping 1 is fixed on the top of test tube main body 3, then downwardly turns over the rubber ring 5 around sealing cover 1, so that the one of rubber ring 5 End is connect with the bottleneck of test tube main body 3, to increase the leakproofness of test tube main body 3, disassembly opening is also very simple and practical, only Rubber ring 5 need to be flipped up, then slowly rotary seal lid 1, so that lid plug 12 is separated with test tube main body 3, to will seal Lid 1 and test tube main body 3 separate.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of production of concrete admixture is with being measured test tube, including test tube main body (3), it is characterised in that: the test tube main body (3) top, which is provided with, to be emitted eaves (4), and test tube main body (3) and is emitted eaves (4) and be an integral structure, and the side for emitting eaves (4) is set It is equipped with connecting band (2), the top of the test tube main body (3) is described relative to being provided at the position for emitting eaves (4) sealing cover (1) The surrounding of sealing cover (1) is provided with rubber ring (5), and sealing cover (1) and rubber ring (5) are an integral structure, the sealing cover (1) bottom end is provided with pedestal (9), and the pedestal (9) is internally provided with rubber cover (10), and pedestal (9) and rubber cover (10) it is an integral structure, the top of the pedestal (9) is provided with clamping column (11), and the interior side of the clamping column (11) is provided with The side of spring (6), the clamping column (11) is provided with handle (7), and clamping column (11) and handle (7) are an integral structure, described The side bottom end of clamping column (11) is provided with bolt (8), and clamping column (11) and pedestal (9) are connected and fixed by bolt (8) rotation, institute The bottom end for stating sealing cover (1) is provided with lid plug (12), and lid plug (12) and sealing cover (1) are an integral structure, the clamping column (11) interior survey is provided with clamping column ring (13), and clamping column ring (13) and clamping column (11) are connected and fixed by hot melt adhesive stickup, described Pedestal (9) and test tube main body (3) are connected and fixed by clamping column (11).
2. a kind of concrete admixture production according to claim 1 is with being measured test tube, it is characterised in that: the rubber ring (5) be cylindrical body, and the top end diameter of the diameter of rubber ring (5) and test tube main body (3) is always, rubber ring (5) with a thickness of one Centimetre.
3. a kind of concrete admixture production according to claim 1 is with being measured test tube, it is characterised in that: the pedestal It (9) is hollow cylinder, and the diameter of test tube main body (3) is 4/5ths of the diameter of pedestal (9), the length of pedestal (9) is The one third of the length of test tube main body (3).
4. a kind of concrete admixture production according to claim 1 is with being measured test tube, it is characterised in that: the clamping column (11) be hollow cylinder, and the inside diameter of clamping column (11) is consistent with the diameter of test tube main body (3), clamping column (11) with a thickness of Two centimeters.
5. a kind of concrete admixture production according to claim 1 is with being measured test tube, it is characterised in that: the lid is filled in It (12) is round estrade, and the top end diameter for covering plug (12) is consistent with the diameter of test tube main body (3).
CN201820732086.0U 2018-05-17 2018-05-17 A kind of production of concrete admixture is with being measured test tube Expired - Fee Related CN208320847U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820732086.0U CN208320847U (en) 2018-05-17 2018-05-17 A kind of production of concrete admixture is with being measured test tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820732086.0U CN208320847U (en) 2018-05-17 2018-05-17 A kind of production of concrete admixture is with being measured test tube

Publications (1)

Publication Number Publication Date
CN208320847U true CN208320847U (en) 2019-01-04

Family

ID=64777641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820732086.0U Expired - Fee Related CN208320847U (en) 2018-05-17 2018-05-17 A kind of production of concrete admixture is with being measured test tube

Country Status (1)

Country Link
CN (1) CN208320847U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110732359A (en) * 2019-11-15 2020-01-31 湖南刘文龙生物医药有限责任公司 test tubes based on biological medicine science and technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110732359A (en) * 2019-11-15 2020-01-31 湖南刘文龙生物医药有限责任公司 test tubes based on biological medicine science and technology

Similar Documents

Publication Publication Date Title
CN208320847U (en) A kind of production of concrete admixture is with being measured test tube
CN207916423U (en) A kind of art painting bottle
CN108120619A (en) Closed sampler and high-temperature smokeless sampling method
CN208818528U (en) A kind of telescopic anti-leakage water sample collector
CN201834346U (en) Vessel for filling liquid
CN204602165U (en) A kind of chemical reaction Simple negative-pressure pressurizer
CN212309621U (en) Sampling swab conservator with pipetting function
CN105689033B (en) A kind of centrifuge tube
CN207913304U (en) A kind of closed filter device of use for laboratory
CN208636325U (en) A kind of dilution liquid supplying device for medicine detection
CN208617347U (en) A kind of wine lance and the fat for being equipped with the wine lance
CN207751774U (en) A kind of chromatography reagent acquisition process and detection device
CN206583579U (en) A kind of tool component tested for spiral case water pressure resistance
CN207694830U (en) A kind of reagent bottle
CN207215840U (en) A kind of micro-column gel card for Blood grouping
CN204642539U (en) A kind of food sample can
NO117182B (en)
CN209715144U (en) It is suitable for sealing and the reagent bottle of liquid suction function simultaneously
CN213943081U (en) Anhydrous anaerobic reaction device for experiments
CN207307818U (en) A kind of reaction kettle with Multifunctional sampler
CN208683468U (en) A kind of sealing device for harmful liquid in biology laboratory
CN211487732U (en) Sample sealing tube for biological reagent storage
CN210571599U (en) Coal bed gas sampling device
CN220640964U (en) Novel laboratory reagent bottle capable of improving tightness and stability
CN209247429U (en) A kind of sampling of novel electrolyte and pumping equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190104

Termination date: 20200517

CF01 Termination of patent right due to non-payment of annual fee