CN208310198U - A kind of cylinder formwork erecting structure - Google Patents

A kind of cylinder formwork erecting structure Download PDF

Info

Publication number
CN208310198U
CN208310198U CN201820816659.8U CN201820816659U CN208310198U CN 208310198 U CN208310198 U CN 208310198U CN 201820816659 U CN201820816659 U CN 201820816659U CN 208310198 U CN208310198 U CN 208310198U
Authority
CN
China
Prior art keywords
cylinder
steel pipe
several
group
rod piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820816659.8U
Other languages
Chinese (zh)
Inventor
邓军
王晖
汪东山
谭金国
刘昌林
沈兴东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201820816659.8U priority Critical patent/CN208310198U/en
Application granted granted Critical
Publication of CN208310198U publication Critical patent/CN208310198U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a kind of cylinder formwork erecting structure, including cylinder, two the first clamp systems and several securing plates, edge is axially arranged with notch on the barrel of cylinder, securing plate is by two half block plates to being combined into, semicircular notch is equipped on two half block plates, after two half block plate pairings, two notches form a circular hole, cylinder is located in circular hole, two the first clamp systems are divided into front side and the rear side of cylinder, first clamp system includes several several first pair of wire drawing bar vertically arranged and two group of first steel pipe, two group of first steel pipe is divided into the left side and right side of securing plate, several first pair of wire drawing bar are to being pulled between two group of first steel pipe, so that two group of first steel pipe is by several half block board clampings being involutory on cylinder.By adopting the above-described technical solution, the utility model saves cost of manufacture, it is easy lifting;It is easy to make, saves manpower;And it reinforces very convenient.

Description

A kind of cylinder formwork erecting structure
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of cylinder formwork erecting structure.
Background technique
In building construction process, occasional is related to the construction to cylinder, currently, in the work progress of cylinder, often Formwork erecting structure is punching block and wooden model;But the cost of manufacture of punching block is high and the chance that recycles is few, compares its sexual valence It is low;Great big, lifting is difficult;And wooden model is mostly that carpenter makes at the construction field (site), but makes the difficulty of column-form Degree is big, and time-consuming, waste of manpower.
Summary of the invention
Goal of the invention: the utility model aim is to provide a kind of structurally reasonable cylinder in view of the deficiencies of the prior art Formwork erecting structure, cost performance is low when solving to use punching block in cylinder work progress, and lifting is difficult and uses manufacture difficulty when wooden model Greatly, the problem of time-consuming, waste of manpower.
Technical solution: a kind of cylinder formwork erecting structure described in the utility model, if including cylinder, two the first clamp systems and Securing plate is done, edge is axially arranged with an elongated notch on the barrel of the cylinder, and several securing plates are distributed along the axial direction of cylinder, The securing plate, to being combined into, is equipped with semicircular notch by two half block plates on two half block plates, and two described half After block plate pairing, two notches form the circular hole of one with the cross-section adaptation of cylinder, and the cylinder is located in circular hole, two institutes State front side and rear side that the first clamp system is divided into cylinder, first clamp system include it is several vertically arrange it is several First pair of wire drawing bar and two group of first steel pipe, every first pair of wire drawing bar are arranged in left-right direction, described in two groups One steel pipe is divided into the left side and right side of securing plate, and several first pair of wire drawing bar are to being pulled in two group of first steel pipe Between group, so that two group of first steel pipe is by several half block board clampings being involutory on cylinder.
Further, first pair of wire drawing bar includes setting threaded first rod piece, being divided into the two of the first rod piece both ends A first mountain type card and two the first nuts for being divided into the first rod piece both ends, two first mountain types are arranged in two first Between nut, two the first mountain type cutting ferrules are located on the first rod piece, and the first steel pipe described in two groups is located at two the first mountains Between type card, two first nuts are arranged on the first rod piece and two group of first steel pipe are clamped in two the first mountain types Between card.
Further, first steel pipe includes two first steel pipes disposed in parallel, and first rod piece is located at two Between first steel pipe, two bayonets of the mountain type card are stuck on two first steel pipes.
Further, the formwork erecting structure further includes two the second clamp systems, and two second clamp systems are divided into The left and right side of cylinder, each second clamp system include several second vertically to arrange pair wire drawing bars and two group Two steel pipes, every second pair of wire drawing bar are arranged along the longitudinal direction, and the second steel pipe described in two groups is divided into securing plate Front side and rear side, several second pair of wire drawing bar are to being pulled between two group of second steel pipe, so that two group of second steel Pipe group is sandwiched therebetween by several half block plates.
Further, second pair of wire drawing bar includes setting threaded second rod piece, being divided into the two of the second rod piece both ends A second mountain type card and two the second nuts for being divided into the second rod piece both ends, two second mountain types are arranged in two second Between nut, two the second mountain type cutting ferrules are located on the second rod piece, and the second steel pipe described in two groups is located at two the second mountains Between type card, two second nuts are arranged on the second rod piece and two group of second steel pipe are clamped in two the second mountain types Between card.
Further, second steel pipe includes two second steel pipes disposed in parallel, and second rod piece is located at two Between second steel pipe, two bayonets of the mountain type card are stuck on two second steel pipes.
Further, the securing plate includes the plate body and several cushion blocks of about two pieces faces, and several cushion block upper ends are fixed on On one of plate body, the lower end of several cushion blocks is fixed on another piece of plate body.
Further, the cylinder is plastic cylinder.
The utility model has the advantages that
By adopting the above-described technical solution, the utility model has the advantages that structurally reasonable, plastic cylinder is fabricated to This is low, cost of manufacture is saved, even if disposable also have higher cost performance;Plastic cylinder it is light-weight, lift Very easily, to be easy lifting;When making column-form, it is only necessary to an elongated notch is cut on cylinder, is easy to make, Save manpower;By the side of cylinder be arranged notch, by cylindrical sleeve when on steel reinforcement cage, notch can by distending, reduce Card between cylinder and steel reinforcement cage touches, and is more easier in hoisting process;By first pair of wire drawing bar to drawing the first steel pipe, First steel pipe on cylinder, carries out the notch pressing on cylinder and to cylinder the half block board clamping after several pairings with this It reinforces, reinforces very convenient;By second pair of wire drawing bar to two group of second steel pipe is drawn, two group of second steel pipe is by half block Plate is clipped in the middle, and prevents half block plate from withstanding forces weaker position from gap position and cleaves, keeps structure more firm.
Detailed description of the invention
Fig. 1 is the front view of the utility model;
Fig. 2 is the left view of the utility model;
Fig. 3 is the top view of the utility model;
Fig. 4 is the enlarged drawing of a in Fig. 3;
Fig. 5 is the structural schematic diagram of securing plate in the utility model;
Fig. 6 is the rearview of Fig. 5.
Wherein: 1, cylinder, 2, securing plate, 3, notch, 4, half block plate plate, 5, circular notch, 6, circular hole, the 7, first bar Part, the 8, first mountain type card, the 9, first nut, the 10, first steel pipe, the 11, second rod piece, the 12, second mountain type card, the 13, second nut, 14, the second steel pipe, 15, plate body, 16, cushion block.
Specific embodiment
Technical solutions of the utility model are described in detail below by attached drawing, but the protection scope of the utility model It is not limited to the embodiment.
Embodiment 1: a kind of cylinder formwork erecting structure, as shown in Figure 1, Figure 2, Figure 3 and Figure 4, the present embodiment include cylinder 1, two A first clamp system and several securing plates 2, along being axially arranged with an elongated notch 3, several securing plates on the barrel of cylinder 1 2 along cylinder 1 axial direction distribution, securing plate 2 is square, securing plate 2 by two half block plates 4 to being combined into, on two half block plates 4 Equipped with semicircular notch 5, after two 4 pairings of half block plate, two notches 5 form the circle of one with the cross-section adaptation of cylinder 1 Hole 6, cylinder 1 are located in circular hole 6, and two the first clamp systems are divided into front side and the rear side of cylinder 1, and the first clamp system includes Several several first pair of wire drawing bar vertically arranged and two group of first steel pipe, every first pair of wire drawing bar is in left-right direction Setting, two group of first steel pipe are divided into the left side and right side of securing plate 2, and several first pair of wire drawing bar are to being pulled in two groups Between first steel pipe, two group of first steel pipe is tensed in opposite directions and is tightly attached on the left side and right side of securing plate 2, so that It obtains two group of first steel pipe several half block plates 4 being involutory are clamped on cylinder 1, each corresponding sides of several securing plates 2 are flat Row is aligned on the axis direction of cylinder 1, so that the first steel pipe is tightly attached on the end face of several securing plates 2 simultaneously with this, will Several half block plates 4 simultaneously clamp on.By first pair of wire drawing bar to drawing the first steel pipe, the first steel pipe is by half after several pairings Block plate 4 is clamped on cylinder 1, is pressed the notch 3 on cylinder 1 with this and is reinforced to cylinder 1, reinforces very square Just.
As shown in Figure 1, Figure 2 and Figure 3, first pair of wire drawing bar includes setting threaded first rod piece 7, being divided into the first rod piece Two first mountain type cards 8 at 7 both ends and two the first nuts 9 for being divided into 7 both ends of the first rod piece, two the first mountain type cards 8 are set Between two the first nuts 9, two the first mountain type cards 8 are set on the first rod piece 7 by the hole in the middle part of it, and two group first Steel pipe is located between two the first mountain type cards 8, and two the first nuts 9 are arranged on the first rod piece 7 and by two group of first steel pipe Group is clamped between two the first mountain type cards 8, and by screwing the first nut 9 to 1 direction of cylinder, the first mountain type card 8 is pressed In corresponding first steel pipe, the first steel pipe is pressed in securing plate, is clamped the half block plate 4 of several pairings with this.
As shown in figures 1 and 3, the first steel pipe includes two first steel pipes 10 disposed in parallel, and the first rod piece 7 is located at two Between the second steel pipe of item 14, two bayonets of the first mountain type card 8 are stuck on two first steel pipes 10.Pass through the first mountain type card Two bayonets on 8 are stuck on the first steel pipe 10 of 7 two sides of the first rod piece, prevent steel pipe from slipping, fastening effect is good.
As shown in Figure 1, Figure 2 and Figure 3, the utility model further includes two the second clamp systems, two the second clamp systems It is divided into the left and right side of cylinder 1, each second clamp system includes several second vertically to arrange pair wire drawing bars and two The second steel pipe of group, every second pair of wire drawing bar is arranged along the longitudinal direction, before two group of second steel pipe is divided into securing plate Side and rear side, several second pair of wire drawing bar are to being pulled between two group of second steel pipe, if so that two group of second steel pipe will Dry half block plate 4 is sandwiched therebetween.Two group of second steel pipe is tensed to securing plate direction by second pair of wire drawing bar, makes two group second Steel pipe is tightly attached to respectively on the front end face and rear end face of securing plate, clamping to carrying out on the front-rear direction of half block plate 4, prevents half Fragile position of the block plate 4 from notch 5 cleaves, and keeps structure more firm.
As shown in Figure 1, Figure 2 and Figure 3, second pair of wire drawing bar includes setting threaded second rod piece 11, being divided into the second bar Two second mountain type cards 12 at 11 both ends of part and two the second nuts 13 for being divided into 11 both ends of the second rod piece, two the second mountain types Card 12 is set between two the second nuts 13, and two the second mountain type cards 12 are set in the second rod piece 11 by the hole in the middle part of it On, two group of second steel pipe is located between two the second mountain type cards 12, and two the second nuts 13 are arranged on the second rod piece 11 simultaneously Two group of second steel pipe is clamped between two the second mountain type cards 12.By screwing the second rod piece 11 to 1 direction of cylinder Two the second mountain type cards 12 on first rod piece 11 are pressed in corresponding second steel pipe by second nut 13 at both ends relatively, Second steel pipe is pressed in securing plate, is clamped several half block plates 4 with this.
As shown in Figures 2 and 3, the second steel pipe includes two second steel pipes 14 disposed in parallel, and the second rod piece 11 is located at Between two second steel pipes 14, two bayonets of the second mountain type card 12 are stuck on two second steel pipes 14.Pass through the second mountain Two bayonets on type card 12 are stuck on the second steel pipe 14 of 11 two sides of the second rod piece, prevent steel pipe from slipping, fastening effect is good.
As shown in Figure 5 and Figure 6, securing plate 2 includes the plate body 15 and two cushion blocks 16 of about two pieces faces, two cushion blocks, 16 upper end It is fixed therein on one piece of plate body 15, the lower end of two cushion blocks 16 is fixed on another piece of plate body 15.Do not wasting too many material In the case of increase the thickness of securing plate 2, make securing plate 2 and cylinder 1 and the contact surface with first the second steel pipe of steel pipe combination Product increases, and keeps securing plate 2 more stable, it is not easy to tilted upward.In other embodiments, cushion block 16 can also for 1 piece or Person's muti-piece.
Cylinder 1 is plastic cylinder.1 production cost of plastic cylinder is low, light-weight, facilitates lifting.
The utility model has the advantages that structurally reasonable, and the low manufacture cost of plastic cylinder 1 saves cost of manufacture, just It calculates and disposable also has higher cost performance;Plastic cylinder 1 it is light-weight, lifting get up very easily, be easy lifting;? When making column-form, it is only necessary to cut an elongated notch 3 on cylinder 1, be easy to make, save manpower;By in cylinder 1 Side notch 3 is set, by 1 set of cylinder when on steel reinforcement cage, notch 3 can by distending, reduce cylinder 1 and steel reinforcement cage it Between card touch, be more easier in hoisting process;By first pair of wire drawing bar to drawing the first steel pipe, the first steel pipe is by pairing Two half block plates 4 afterwards are clamped on cylinder 1, are pressed the notch 3 on cylinder 1 with this, and reinforce to cylinder 1, are reinforced Get up very convenient;By second pair of wire drawing bar to two group of second steel pipe is drawn, during half block plate 4 is clipped in by two group of second steel pipe Between, it prevents half block plate 4 from withstanding forces weaker position from 5 position of notch and cleaves, keep structure more firm.
As described above, although the utility model has been indicated and described referring to specific preferred embodiment, it must not It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define Under the premise of, it can various changes can be made in the form and details to it.

Claims (8)

1. a kind of cylinder formwork erecting structure, it is characterised in that: described including cylinder, two the first clamp systems and several securing plates Along an elongated notch is axially arranged on the barrel of cylinder, several securing plates are distributed along the axial direction of cylinder, the securing plate by Two half block plates are equipped with semicircular notch to being combined on two half block plates, after two half block plate pairings, two A notch forms the circular hole of one with the cross-section adaptation of cylinder, and the cylinder is located in circular hole, two first clamping machines Structure is divided into front side and the rear side of cylinder, and first clamp system includes several several first pair of wire drawing bar vertically arranged With two group of first steel pipe, every first pair of wire drawing bar is arranged in left-right direction, and the first steel pipe described in two groups sets up separately In the left side and right side of securing plate, several first pair of wire drawing bar to being pulled between two group of first steel pipe so that Two group of first steel pipe by several half block board clampings being involutory on cylinder.
2. a kind of cylinder formwork erecting structure as described in claim 1, it is characterised in that: first pair of wire drawing bar includes being equipped with spiral shell First rod piece of line, two the first mountain type cards for being divided into the first rod piece both ends and two first that are divided into the first rod piece both ends Nut, two first mountain types are arranged between two the first nuts, and two the first mountain type cutting ferrules are located at the first rod piece On, the first steel pipe described in two groups is located between two the first mountain type cards, and two first nuts are arranged on the first rod piece And two group of first steel pipe is clamped between two the first mountain type cards.
3. a kind of cylinder formwork erecting structure as claimed in claim 2, it is characterised in that: first steel pipe includes two parallel The first steel pipe being arranged, first rod piece are located between two first steel pipes, and two bayonets of the mountain type card are stuck in On two first steel pipes.
4. a kind of cylinder formwork erecting structure as described in claim 1, it is characterised in that: the formwork erecting structure further includes two second Clamp system, two second clamp systems are divided into the left and right side of cylinder, and each second clamp system includes Several second vertically to arrange pair wire drawing bars and two group of second steel pipe, every second pair of wire drawing bar is along the longitudinal direction Setting, the second steel pipe described in two groups are divided into front side and the rear side of securing plate, and several second pair of wire drawing bar are to being pulled in Between two group of second steel pipe, so that two group of second steel pipe is sandwiched therebetween by several half block plates.
5. a kind of cylinder formwork erecting structure as claimed in claim 4, it is characterised in that: second pair of wire drawing bar includes being equipped with spiral shell Second rod piece of line, two the second mountain type cards for being divided into the second rod piece both ends and two second that are divided into the second rod piece both ends Nut, two second mountain types are arranged between two the second nuts, and two the second mountain type cutting ferrules are located at the second rod piece On, the second steel pipe described in two groups is located between two the second mountain type cards, and two second nuts are arranged on the second rod piece And two group of second steel pipe is clamped between two the second mountain type cards.
6. a kind of cylinder formwork erecting structure as claimed in claim 5, it is characterised in that: second steel pipe includes two parallel The second steel pipe being arranged, second rod piece are located between two second steel pipes, and two bayonets of the mountain type card are stuck in On two second steel pipes.
7. a kind of cylinder formwork erecting structure as described in claim 1, it is characterised in that: the securing plate includes about two pieces faces Plate body and several cushion blocks, several cushion block upper ends are fixed therein on one piece of plate body, and the lower end of several cushion blocks is fixed on another piece On plate body.
8. a kind of cylinder formwork erecting structure as described in claim 1, it is characterised in that: the cylinder is plastic cylinder.
CN201820816659.8U 2018-05-28 2018-05-28 A kind of cylinder formwork erecting structure Expired - Fee Related CN208310198U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820816659.8U CN208310198U (en) 2018-05-28 2018-05-28 A kind of cylinder formwork erecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820816659.8U CN208310198U (en) 2018-05-28 2018-05-28 A kind of cylinder formwork erecting structure

Publications (1)

Publication Number Publication Date
CN208310198U true CN208310198U (en) 2019-01-01

Family

ID=64716735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820816659.8U Expired - Fee Related CN208310198U (en) 2018-05-28 2018-05-28 A kind of cylinder formwork erecting structure

Country Status (1)

Country Link
CN (1) CN208310198U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005198A (en) * 2019-04-22 2019-07-12 上海建工一建集团有限公司 Taper pile shuttering support system and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005198A (en) * 2019-04-22 2019-07-12 上海建工一建集团有限公司 Taper pile shuttering support system and its construction method

Similar Documents

Publication Publication Date Title
CN208310198U (en) A kind of cylinder formwork erecting structure
CN204510792U (en) A kind of steel form
CN207079905U (en) A kind of external scaffolding connects wall construction
CN202359553U (en) Pure mechanical connection structure between piles
CN203230177U (en) Tool type column formwork fixing fastener
CN202137288U (en) Feeding support frame
CN210436651U (en) Compression-resistant protective type pipe die of hydraulic pultrusion machine for glass profile production
CN210160642U (en) Clamping fixture is used in top of can preparation
CN107938857B (en) Connecting node of concrete structure and section steel
CN102587364A (en) Connecting method between piles and simple mechanical connection structure between piles
CN204152019U (en) A kind of integral wall module
CN203174892U (en) Pre-stressed tendon single pole multi-thread connector for field processing
CN211058312U (en) Steel back edge
CN209350506U (en) A kind of plucking unit of energy-saving prefabricated components napper
CN210855199U (en) Clamping rod of light wallboard
CN207156181U (en) Side walk slab's brick cutting machine
CN218346808U (en) Expansion joint construction template
CN217326519U (en) Concrete building ground elevation control device
CN205519376U (en) Construction steel bar cutting machine
CN205444481U (en) Core tube shear wall and post-cast frame beam steel bar embedded part
CN205577411U (en) Building supports uses mechanical tubes
CN213868915U (en) Adjustable secondary structure template reinforcement
CN211690472U (en) Steel anchor rod solid force detection tool
CN214996129U (en) Round steel hoisting ring
CN212004106U (en) Dop for wire rope of inner space size adjustable