CN208297087U - A kind of Flow Field outside test test segment structure - Google Patents

A kind of Flow Field outside test test segment structure Download PDF

Info

Publication number
CN208297087U
CN208297087U CN201820914041.5U CN201820914041U CN208297087U CN 208297087 U CN208297087 U CN 208297087U CN 201820914041 U CN201820914041 U CN 201820914041U CN 208297087 U CN208297087 U CN 208297087U
Authority
CN
China
Prior art keywords
flow field
field outside
test
air inlet
measuring section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820914041.5U
Other languages
Chinese (zh)
Inventor
高超
滕状
于忠强
初少斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AECC Shenyang Engine Research Institute
Original Assignee
AECC Shenyang Engine Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AECC Shenyang Engine Research Institute filed Critical AECC Shenyang Engine Research Institute
Priority to CN201820914041.5U priority Critical patent/CN208297087U/en
Application granted granted Critical
Publication of CN208297087U publication Critical patent/CN208297087U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Indicating Or Recording The Presence, Absence, Or Direction Of Movement (AREA)

Abstract

The utility model relates to launch the field of test technology to trace particle, specifically related to a kind of structure of Flow Field outside test test section, target three parts are launched including air inlet measuring section, Flow Field outside simulation test piece and trace particle, trace particle in the utility model is launched target and is installed on air inlet measuring section and Flow Field outside simulation test piece, for launching trace particle, after blending section adequately mixes, by Flow Field outside test test section, eventually passes through and the leaf grating component of outlet is set drains into atmospheric environment.

Description

A kind of Flow Field outside test test segment structure
Technical field
The utility model relates to launch the field of test technology to trace particle, and in particular to a kind of test examination of Flow Field outside Test the structure of section.
Background technique
With the extensive use of optical touchless measuring technology, Particle Image Velocimetry (PIV) obtained significantly into Step, flow-field test application range also from traditional flow field testing field, gradually widen by outside flow-field test field.Flow Field outside Testing research needs are carried out on suitable test section.Most of existing PIV flow-field test test section is tested for flow field, is lacked The weary Special test section for Flow Field outside test;Trace particle dispensing technical research is less, lacks for Flow Field outside test Trace particle delivery device.
In addition, it is also one of technical problem urgently to be resolved at present that trace particle, which launches technology, when carrying out Flow Field outside test, Trace particle is launched to after test pipeline, with air motion to Flow Field outside test zone, under the premise of meeting PIV test request Flow-field test could be carried out.
Utility model content
The utility model provides a kind of Flow Field outside test test segment structure, is existed in the prior art with mitigating or solving At least one problem.
The utility model is a kind of Flow Field outside test test segment structure, including air inlet measuring section, Flow Field outside simulation test Part, trace particle launch target three parts;
The air inlet measuring section is a segment pipe, comprising:
First installation side, positioned at the both ends end of the air inlet measuring section, as the air inlet measuring section and other pipelines Connection structure;
First installation interface, is arranged on the air inlet measuring section tube body, communicates with pipeline, launches target or pressure for installing Power detector probe;
Section is blended, in a tubular form, by the wherein one section of pipe for being located at first installation interface downstream of the air inlet measuring section Body is constituted;
The Flow Field outside simulation test piece is a segment pipe, comprising:
Second installation side, is arranged Flow Field outside simulation test piece one end end, and the of the Flow Field outside simulation test piece Two installations are fixedly connected while with the first of air inlet measuring section one end the installation;
Second installation interface, is arranged on the Flow Field outside simulation test piece tube body, communicates with pipeline, launch for installing Target or pressure detector probe;
Leaf grating component is simulated, the conduit outlet position of the Flow Field outside simulation test piece, the pipe outlet are installed on Positioned at it is described second installation while far from described second installation while one end top;
The trace particle launches target in a tubular form, comprising:
Jet rod offers radial through-hole, and axial closed at one end, and the end seal of another end opening, the jet rod is closed It is extended vertically into the Flow Field outside simulation test piece pipeline by the second installation interface, and passes through the second installation interface It is fixed;
Connection mouth, one end are fixedly attached to the open end of the jet rod, the outlet of the other end and trace displaying particle generator End is tightly connected.
Preferably, the rectangular in cross-section along the air inlet measuring section radial direction of the blending section.
Preferably, the simulation leaf grating component is laid out using 3 × 3 orthogonal formula cascade structures.
Preferably, the closed end of the jet rod is sealed using closure plate.
Preferably, first installation is flange while with the described second installation.
Preferably, the jet rod is provided with 4, and through-hole diameter is respectively With
The utility model proposes Flow Field outside test test segment structure, can be realized Flow Field outside test, and in test Technology is launched using trace particle.
Detailed description of the invention
Fig. 1 is the utility model Flow Field outside test structure diagram;
Fig. 2 is the utility model air inlet measuring section structure diagram;
Fig. 3 is the utility model Flow Field outside simulation test piece structure diagram;
Fig. 4 is that the utility model trace particle launches target structure schematic diagram;
Wherein, air inlet measuring section 1, Flow Field outside simulation test piece 2, trace particle launch target 3, the first installation side 4, the first peace Attaching mouth 5, blending section 6, the second installation side 7, hydrostatic measuring point 8, simulation leaf grating component 9, connection mouth 10, jet rod 11, closure plate 12, Second installation interface 21.
Specific embodiment
It can be understood by make the utility model more, below in conjunction with attached drawing to the specific embodiment of the utility model Be described in detail, in the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of describing the present invention and simplifying the description, rather than indicate Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand For the limitation to scope of protection of the utility model.
The following are the specific embodiment of the utility model is further detailed in conjunction with Fig. 1-Fig. 4.
What Fig. 1-Fig. 4 was indicated is a kind of Flow Field outside of the utility model test test segment structure, including air inlet measuring section 1, Flow Field outside simulation test piece 2, trace particle launch 3 three parts of target;
Wherein, air inlet measuring section 1 is a segment pipe, comprising:
First installation side 4, the connection positioned at the both ends end of air inlet measuring section 1, as air inlet measuring section 1 and other pipelines Structure;
First installation interface 5, is arranged on 1 tube body of air inlet measuring section, communicates with pipeline, launches target or pressure for installing Detector probe, it is to be understood that be equipped with multiple installation interfaces on the utility model pipeline, it is to be tested to be conducive to installation institute Component, the first installation interface 5 is one of them, it is seen that Fig. 2;
Section 6 is blended, in a tubular form, by the wherein one section of tube body structure for being located at the first installation 5 downstream of interface of air inlet measuring section 1 At as shown in Figure 2, in figure is airflow direction from left to right, i.e. blending section 6 downstream that is located at the first installation interface 5, from the The trace particle and be sufficiently mixed at blending section 6 from the gas that left end enters that one installation interface 5 is launched;
Fig. 3 is the Flow Field outside simulation test piece 2 in the utility model, is a segment pipe, comprising:
2 one end end of Flow Field outside simulation test piece, the second installation of Flow Field outside simulation test piece 2 is arranged in second installation side 7 When 7 install with the first of 1 one end of air inlet measuring section, 4 are fixedly connected;
Second installation interface 21, is arranged on outer 2 tube body of flow field simulation testpieces, communicates with pipeline, launch for installing Target or pressure detector probe, it is to be understood that multiple installation interfaces are equipped on the pipeline of outer flow field simulation testpieces 2, in order to It is distinguished with the first installation interface 5 at air inlet measuring section 1, is herein the second installation interface 21;
Leaf grating component 9 is simulated, is installed on the conduit outlet position of Flow Field outside simulation test piece 2, pipe outlet is located at the Two installations are at 7 top of 7 one end when installing far from second, and in exit, the pressure monitor 8 of setting can real-time monitoring outlet Pressure, convenient for adjusting trystate;
Fig. 4 is that trace particle launches target 3 in a tubular form, comprising:
Jet rod 11 offers radial through-hole, and through-hole is the outlet that trace particle is launched, and does not need too big pressure, The pressure difference for testing channel interior can be launched trace particle to test pipeline by through-hole, and axial direction is closed at one end, separately Open at one end, the end seal of jet rod 11 is closed to be extended vertically into 2 pipeline of Flow Field outside simulation test piece by the second installation interface 21, and It is fixed by the second installation interface 21;
Connection mouth 10, one end are fixedly attached to the open end of jet rod 11, the outlet of the other end and trace displaying particle generator End is tightly connected, and the trace particle in trace displaying particle generator enters Flow Field outside simulation by the through-hole opened up on jet rod 11 Testpieces 2 realizes the dispensing of trace particle.It is understood that the trace particle of the utility model, which launches target 3, can install the One installation interface 5.
Advantageously, the rectangular in cross-section along 1 radial direction of air inlet measuring section of blending section 6.
Advantageously, simulation leaf grating component 9 is laid out using 3 × 3 orthogonal formula cascade structures, by airflow exits into atmosphere.
Advantageously, the closed end of jet rod 11 is sealed using closure plate 12, guarantee the leakproofness of jet rod, it is larger when needing Particle when can also remove.
Advantageously, first installation while 4 with second installation while 7 be flange.
Advantageously, jet rod 11 is provided with 4, through-hole diameter is respectively WithThe trace particle for being able to satisfy different-diameter is applied to the utility model structure.
Finally it is noted that above embodiments are only to illustrate the technical solution of the utility model, rather than it is limited System.Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art should be managed Solution: it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic into Row equivalent replacement;And these are modified or replaceed, various embodiments of the utility model that it does not separate the essence of the corresponding technical solution The spirit and scope of technical solution.

Claims (6)

1. a kind of Flow Field outside test test segment structure, which is characterized in that including air inlet measuring section (1), Flow Field outside simulation test Part (2), trace particle launch target (3) three parts;
The air inlet measuring section (1) is a segment pipe, comprising:
First installation side (4), is located at the both ends end of the air inlet measuring section (1), as the air inlet measuring section (1) and other The connection structure of pipeline;
First installation interface (5), be arranged on air inlet measuring section (1) tube body, communicated with pipeline, for install launch target or Pressure detector probe;
It blends section (6), in a tubular form, by be located at first installation interface (5) downstream wherein one of the air inlet measuring section (1) Duan Guanti is constituted;
The Flow Field outside simulation test piece (2) is a segment pipe, comprising:
Second installation side (7), is arranged Flow Field outside simulation test piece (2) one end end, the Flow Field outside simulation test piece (2) The second installation when the first of (7) and described air inlet measuring section (1) one end installs (4) be fixedly connected;
Second installation interface (21), is arranged on Flow Field outside simulation test piece (2) tube body, communicates with pipeline, for installing Launch target or pressure detector probe;
It simulates leaf grating component (9), is installed on the conduit outlet position of the Flow Field outside simulation test piece (2), the pipeline goes out Mouth is located at second installation at the top of (7) one end when installing far from described second of (7);
The trace particle launches target (3) in a tubular form, comprising:
Jet rod (11) offers radial through-hole, and axial closed at one end, another end opening, the end of the jet rod (11) Closing is extended vertically into Flow Field outside simulation test piece (2) pipeline by second installation interface (21), and by described Second installation interface (21) is fixed;
Connection mouth (10), one end are fixedly attached to the open end of the jet rod (11), the other end and trace displaying particle generator Outlet end is tightly connected.
2. Flow Field outside test test segment structure according to claim 1, which is characterized in that the edge of blending section (6) The rectangular in cross-section of air inlet measuring section (1) radial direction.
3. Flow Field outside test test segment structure according to claim 1, which is characterized in that the simulation leaf grating component (9) it is laid out using 3 × 3 orthogonal formula cascade structures.
4. Flow Field outside test test segment structure according to claim 1, which is characterized in that the envelope of the jet rod (11) Closed end is sealed using closure plate (12).
5. Flow Field outside test test segment structure according to claim 1, which is characterized in that first installation side (4) It is flange with second installation side (7).
6. Flow Field outside test test segment structure according to claim 1, which is characterized in that jet rod (11) setting There are 4, through-hole diameter is respectively With
CN201820914041.5U 2018-06-13 2018-06-13 A kind of Flow Field outside test test segment structure Active CN208297087U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820914041.5U CN208297087U (en) 2018-06-13 2018-06-13 A kind of Flow Field outside test test segment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820914041.5U CN208297087U (en) 2018-06-13 2018-06-13 A kind of Flow Field outside test test segment structure

Publications (1)

Publication Number Publication Date
CN208297087U true CN208297087U (en) 2018-12-28

Family

ID=64701421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820914041.5U Active CN208297087U (en) 2018-06-13 2018-06-13 A kind of Flow Field outside test test segment structure

Country Status (1)

Country Link
CN (1) CN208297087U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110095247A (en) * 2019-06-04 2019-08-06 中国人民解放军国防科技大学 Tracer particle scattering device, tracer particle scattering system and wind tunnel test system
CN114295316A (en) * 2021-12-31 2022-04-08 重庆交通大学绿色航空技术研究院 Suction type transonic velocity plane cascade test bed air inlet device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110095247A (en) * 2019-06-04 2019-08-06 中国人民解放军国防科技大学 Tracer particle scattering device, tracer particle scattering system and wind tunnel test system
CN110095247B (en) * 2019-06-04 2021-01-19 中国人民解放军国防科技大学 Tracer particle scattering device, tracer particle scattering system and wind tunnel test system
CN114295316A (en) * 2021-12-31 2022-04-08 重庆交通大学绿色航空技术研究院 Suction type transonic velocity plane cascade test bed air inlet device
CN114295316B (en) * 2021-12-31 2023-12-12 重庆交通大学绿色航空技术研究院 Suction type transonic plane blade grid test bed air inlet device

Similar Documents

Publication Publication Date Title
CN208297087U (en) A kind of Flow Field outside test test segment structure
CN102435769A (en) Method and device for spreading trace particles in supersonic PIV (Particle Image Velocimetry) flow field testing experiment
CN207923391U (en) Pipeline air-leakage test is equipped
CN110410682B (en) Comprehensive pipe rack gas pipeline leakage diffusion simulation experiment table under ventilation state
CN106679899A (en) Air duct tightness testing method
BR112012007173A2 (en) apparatus for measuring the flow of liquid and gas ql and qg in a multiphase stream flowing into a pipe, and method for measuring the flow of liquid ql and gas qg in a multiphase stream with a flow q flowing inside a pipe
CN208091721U (en) A kind of modified oil net dust filter detection device
CN207081470U (en) A kind of sonic nozzle calibrating installation
CN203069372U (en) Valve testing device in vacuum environment
CN104458272A (en) Exhaust smoke test method and device for engine
CN208534819U (en) Device for the test of fan aeroperformance
CN103698163A (en) Equipment fixing device for chimney gas sampling representativeness verification test
CN107014619A (en) A kind of engine emissions testing fexible unit
CN201945333U (en) Ultrasonic vortex flowmeter
CN208313531U (en) Calibrating installation for the calibrating of glass curtain wall testing machine
CN102495232A (en) Portable air speed measuring apparatus of pipeline
CN203629904U (en) Equipment fixing device for representative verification test of chimney gas sample
CN109839294A (en) The search gas multiple spot injection of master control room fresh air measurement and sampling method and device
CN109506968A (en) Underground coal mine beam tube negative pressure ventilation back-fire relief test device and test method
CN208505550U (en) Door/window testing machine calibrating installation and its simulation window
CN208313536U (en) Live door and window detector calibrating installation
CN106643919A (en) Gas flow measuring method and device
CN209586409U (en) Simulate the experimental provision of a variety of production scene ventilations in mine
CN209821022U (en) Ground calibration and measurement device of pulverized coal concentration measurement system
CN208270220U (en) The tracer single-point of core air cleaning system disperses injection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant