CN208293900U - Assembled ultra-high performance concrete-part shaped steel combination beam - Google Patents

Assembled ultra-high performance concrete-part shaped steel combination beam Download PDF

Info

Publication number
CN208293900U
CN208293900U CN201820780455.3U CN201820780455U CN208293900U CN 208293900 U CN208293900 U CN 208293900U CN 201820780455 U CN201820780455 U CN 201820780455U CN 208293900 U CN208293900 U CN 208293900U
Authority
CN
China
Prior art keywords
high performance
performance concrete
ultra
fashioned iron
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820780455.3U
Other languages
Chinese (zh)
Inventor
邵旭东
邱明红
赵华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University
Original Assignee
Hunan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University filed Critical Hunan University
Priority to CN201820780455.3U priority Critical patent/CN208293900U/en
Application granted granted Critical
Publication of CN208293900U publication Critical patent/CN208293900U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides assembled ultra-high performance concrete-part shaped steel combination beam, which includes girder fashioned iron, ultra-high performance concrete beam and interior diaphragm plate above girder fashioned iron, and the interior diaphragm plate is connect with ultra-high performance concrete beam;Ultra-high performance concrete depth of beam >=the 200mm, and height ratio >=1 of itself and girder fashioned iron.The economic and practical across footpath of original fashioned iron-ultra-high performance concrete combination beam has been expanded in the combination beam construction, it not only solves the problems, such as traditional shape steel-concrete combined beam self weight in whole stress greatly and economic and practical across footpath is limited, also it brings great convenience in terms of workability, reduce field operation amount as far as possible, improves the assembly rate of assembled combination beam.

Description

Assembled ultra-high performance concrete-part shaped steel combination beam
Technical field
The utility model relates to a kind of bridge member and its technical field of construction, especially assembled very-high performance coagulation Soil-part shaped steel combination beam.
Background technique
Currently, conventional steel-concrete composite beam is because can make full use of the performance of steel tension, the property of concrete compression Can, and be more and more widely used.Wherein, rolled section steel or welding steel can be used for the girder steel of conventional combination beam Beam.Compared with welded steel beam, rolled section steel has (about the 50% of welded steel beam cost) low in cost, reduces raw material, the energy The advantages that with artificial consumption, residual stress is low, and fatigue strength is high, appearance and good surface quality.
Since normal concrete tensile strength is low, normal concrete floorings are preferably constantly in pressured state, it is desirable that combination Neutral axis of the beam is located within the scope of girder steel section, therefore steel beam structure height is generally higher than girder knot in conventional steel-concrete composite beam 2/3rds of structure height, and concrete slab (beam) is highly less than the one third of main beam structure height, and current fashioned iron is most Big height is 1 m, and the self weight of normal concrete floorings is larger, and the across footpath of conventional shape steel-concrete combined beam is more than 20 m After, the steel using amount of fashioned iron can significantly increase, and the quantity of wet seam can obviously increase, and economy is deteriorated, and assembling level is relatively low, Lose the advantage using fashioned iron.Therefore, the economic and practical across footpath of conventional shape steel-concrete combined beam is mainly within 20 m.
Ultra-high performance concrete (UHPC) is a kind of high compressive strength, high-tensile, high ductility, the superelevation of high-durability Performance fibers enhance cement-base composite material.Existing engineering experience show ultra-high performance concrete can effectively mitigate dead load, Improve the utilization efficiency of structure.Normal concrete floorings, shape are substituted using the ultra-high performance concrete floorings of high-strength light The light-duty combination beam of Cheng Gang-ultra-high performance concrete has from heavy and light, intensity is high, durability is good, structure height is low, assembly rate High advantage.But finished product rolled section steel height maximum currently on the market is only 1 m, using steel main beam and very-high performance coagulation The economic and practical across footpath of ultra-high performance concrete-part shaped steel combination beam that native floorings are formed still is difficult to break through 30 m.
Therefore, in order to make full use of, fashioned iron is low in cost, fatigue strength is high and ultra-high performance concrete is high-intensitive and high-ductility The advantages that property, and the economic and practical across footpath of fashioned iron-ultra-high performance concrete composite beam bridge is expanded, develop assembled very-high performance Concrete-part shaped steel combination beam and its construction method.
Utility model content
Technical problem to be solved by the utility model is: overcoming the deficiencies of the prior art and provide a kind of Standard, height Intensity, high tenacity, construction is rapid, dead load is light and economic and practical across footpath can be more than the assembled very-high performance coagulation of 30 m Soil-part shaped steel combination beam.Structure construction makes full use of ultra-high performance concrete light-high-strength, high tenacity and fashioned iron tension High, low in cost, fatigue strength the is high feature of intensity mitigates dead load, can effectively expand fashioned iron-ultra-high performance concrete group The span ability of beam is closed, while can realize that scene zero is welded, field operation amount is reduced, improves the assembly rate of structure.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
Assembled ultra-high performance concrete-part shaped steel combination beam is super including girder fashioned iron, above girder fashioned iron High performance concrete beam and interior diaphragm plate, the interior diaphragm plate are connect with ultra-high performance concrete beam;The very-high performance coagulation Native depth of beam >=200mm, and height ratio >=1 of itself and girder fashioned iron.
Preferably, the ultra-high performance concrete depth of beam is 200 ~ 4000mm, and the height ratio of itself and girder fashioned iron It is 1 ~ 6.This setting can be such that ultra-high performance concrete-part shaped steel combination beam neutral axis is located in ultra-high performance concrete beam And nearly girder fashioned iron side, and then give full play to the compressive property of ultra-high performance concrete back plate, the tensile property of bottom plate and tough The tensile property of property and girder fashioned iron, to improve the utilization efficiency of material, and then reaches and widens ultra-high performance concrete-portion The purpose of the economic and practical across footpath of parting steel combination beam.
Preferably, the ultra-high performance concrete beam uses the reactive powder coagulation for being not less than 100 MPa by compression strength Soil, very-high performance fibre reinforced concrete or the closely knit ultra-high performance concretes such as rib reinforced composite material of matching are made, very-high performance coagulation Soil is more easily implemented assembled ultra-high performance concrete-lightweight of part shaped steel combination beam, high intensity, high rigidity.
Further, the girder fashioned iron using any one or more combination in i shaped steel, H profile steel or channel steel and At height is 150 ~ 1000 mm.
Further, the ultra-high performance concrete beam is made of top plate, web and bottom plate, and the top plate and bottom plate are set relatively It sets, connects to form ultra-high performance concrete beam by web, the top plate is equipped with interconnecting piece along the one or both sides of bridge longitudinal direction, The interconnecting piece is equipped with the connection reinforcing bar for extending outward and carrying out the connection of seam formula with another adjacent ultra-high performance concrete beam.
Further, the top plate is the latticed slim plate that the slim plate of uniform thickness or lower part have longitudinal rib and cross rib.
Preferably, the interconnecting piece upper limb is equipped with notch, pre-buried in notch to be provided with upper limb transverse direction embedded bar, and passes through The floorings upper limb transverse direction embedded bar binding for connecting reinforcing bar and contiguous prefabricated unit connects integral force structure;In abundant benefit On the basis of the excellent tensile property of ultra-high performance concrete and anchoring property, which further enhances very-high performance coagulation The bending resistance of native interconnecting piece draws performance and is convenient for site operation, can effectively solve the problems, such as the easy crack in tension of top plate seam and infiltration.
Preferably, the interconnecting piece lower edge is additionally provided with the lower edge transverse direction embedded bar of part stretching, and adjacent lower edge is horizontal To embedded bar interlaced arrangement, to further strengthen top plate connection and whole stress.
Further, the web of the ultra-high performance concrete beam passes through local haunch chamfering and connect with top plate and bottom plate.
Further, the combination beam further includes lateral connection portion between fashioned iron, between the fashioned iron both ends in lateral connection portion with The connection of girder fashioned iron.
Lateral connection portion is made of stiffener and crossbeam fashioned iron between the fashioned iron, the crossbeam fashioned iron by welding form with One or more connections in the end of girder fashioned iron and the span centre or quartile of girder fashioned iron or other designated positions.
Further, the interior diaphragm plate is arranged above crossbeam fashioned iron.
Further, the top flange of the girder fashioned iron and the top flange of crossbeam fashioned iron are equipped with shear connector, the superelevation The bottom plate of performance concrete beam and interior diaphragm plate by shear connector respectively with the upper limb wing of girder fashioned iron, crossbeam fashioned iron it is upper Edge of a wing connection.
Preferably, shear connector form is socket cap weldering nail, this setting can make ultra-high performance concrete and steel plate it Between combine even closer, avoid that delamination sliding and the discontinuously arranged phenomenon of steel fibre occurs.
Assembled ultra-high performance concrete-part shaped steel combination beam construction method, comprising the following steps:
S1: the ultra-high performance concrete that is prefabricated in the factory-part shaped steel combination beam prefabricated unit;
S2: setting up at the construction field (site) by the prefabricated obtained prefabricated unit of the S1, pour wet seam ultra-high performance concrete, Completion bridge floor is continuously constructed or structure is continuously constructed and system transform;
S3: carrying out the construction of appurtenant work and deck paving, that is, completes the ultra-high performance concrete-part shaped steel combination Beam construction.
The ultra-high performance concrete-part shaped steel combination beam prefabricated unit it is prefabricated the following steps are included:
S1.1: market finished product hot-rolled steel section is directlyed adopt in factory and processes to form girder formed steel construction;
S1.2: two girder fashioned iron are arranged in parallel and are fixed temporarily, and two are fixed in lateral connection portion between fashioned iron The designated position of girder fashioned iron;
S1.3: the upper limb wing in lateral connection portion welds shear connector between the girder fashioned iron, fashioned iron;
S1.4: it in the top formwork erection and binding ultra-high performance concrete beam steel of the girder fashioned iron, then pours super High performance concrete, and conserved in time;
S1.5: when pouring ultra-high performance concrete and reaching design requirement, form removal, storage to designated position is formed The prefabricated assembled beam prefabricated unit of ultra-high performance concrete-shaped steel combination.
The utility model assembled ultra-high performance concrete-part shaped steel combination beam the utility model has the advantages that
Girder fashioned iron and ultra-high performance concrete beam one-pass molding, it is integral prefabricated in factory, so that combination beam has more preferably Globality, save steel using amount, reduce the program carried out at the construction field (site), ensure that the manufacturing quality of component, while can save Save the dosage of steel.
It is composed using ultra-high performance concrete-part shaped steel, fashioned iron is set to the bottom of combination beam tensile region, and The height ratio of ultra-high performance concrete depth of beam and girder fashioned iron is 1 ~ 6, i.e. fashioned iron height only accounts for the 1/7 of combination beam total height ~ 1/2, which can give full play to the tensile property of the excellent resistance to compression of ultra-high performance concrete, tensile property and steel, The economic and practical across footpath of ultra-high performance concrete-part shaped steel combination beam is effectively expanded, economic and practical across footpath can be more than 30m, It not only solves the problems, such as traditional shape steel-concrete combined beam self weight in whole stress greatly and economic and practical across footpath is limited, It brings great convenience in terms of workability, reduces field operation amount as far as possible, it is mixed to improve assembled very-high performance The assembly rate of the solidifying light-duty combination beam of soil-part shaped steel.
The utility model assembled ultra-high performance concrete-part shaped steel combination beam construction method the utility model has the advantages that
Fashioned iron and ultra-high performance concrete beam one-pass molding, it is integral prefabricated in factory, it can be achieved that live zero welding, reduces Field operation amount improves the assembly rate of structure, is convenient for assembling, rapid construction.
The construction equipment and construction technology that existing steel-concrete composite beam can be used, without increasing new equipment investment, Without carrying out new skills training to construction personnel, construction method is easy, quick.
Detailed description of the invention
Fig. 1-is assembled ultra-high performance concrete-part shaped steel combination beam vertical view schematic three dimensional views in embodiment 1;
Fig. 2-is that assembled ultra-high performance concrete-part shaped steel combination beam looks up schematic three dimensional views in embodiment 1;
Fig. 3-is the schematic three dimensional views of 1 middle girder fashioned iron of embodiment;
Fig. 4 is assembled ultra-high performance concrete-part shaped steel combination beam vertical view schematic three dimensional views in embodiment 2;
Fig. 5 is that assembled ultra-high performance concrete-part shaped steel combination beam looks up schematic three dimensional views in embodiment 2;
Fig. 6 is 2 middle girder fashioned iron schematic three dimensional views of embodiment;
Fig. 7 is assembled ultra-high performance concrete-part shaped steel combination beam vertical view schematic three dimensional views in embodiment 3;
Fig. 8 is that assembled ultra-high performance concrete-part shaped steel combination beam looks up schematic three dimensional views in embodiment 3;
Fig. 9 is 3 middle girder fashioned iron schematic three dimensional views of embodiment;
Figure 10 is assembled ultra-high performance concrete-part shaped steel combination beam vertical view schematic three dimensional views in embodiment 4;
Figure 11 is that assembled ultra-high performance concrete-part shaped steel combination beam looks up schematic three dimensional views in embodiment 4;
Figure 12 is 4 middle girder fashioned iron schematic three dimensional views of embodiment.
In figure: 1-girder fashioned iron, 11-channel steels, 12-H profile steels, 2-ultra-high performance concrete beams, 21-top plates, 22- Lateral connection portion, 31-stiffeners, 32-crossbeam fashioned iron, 4-interior diaphragm plates, 5-connections between web, 23-bottom plates, 3-fashioned iron Portion, 51-notches, 52-upper limb transverse direction embedded bars, 53-lower edge transverse direction embedded bars, 6-shear connectors, 7-haunches fall Angle.
Specific embodiment
The following is a further explanation of the present invention with reference to the accompanying drawings and embodiments.
Embodiment 1
A kind of assembled ultra-high performance concrete-part shaped steel combination beam of the present embodiment, including girder fashioned iron 1, be set to Lateral connection portion 3 and interior diaphragm plate 4 between ultra-high performance concrete beam 2, fashioned iron above girder fashioned iron, the interior diaphragm plate 4 with Ultra-high performance concrete beam 2 connects;The both ends in lateral connection portion 3 are connect with girder fashioned iron 1 between fashioned iron;The very-high performance coagulation The height of native beam 2 be 1200 mm, and its be 3 for the height ratio of main beam type steel 1.
The ultra-high performance concrete beam 2 is made of top plate 21, web 22 and bottom plate 23, the top plate 21 and bottom plate 23 It is oppositely arranged, the ultra-high performance concrete beam is formed by the connection of web 22, the top plate is along bridge longitudinal direction One or both sides be set as interconnecting piece 5, which extends outward is connect with another adjacent ultra-high performance concrete beam The connection reinforcing bar of seam connection.
The ultra-high performance concrete of the present embodiment-part shaped steel combination beam girder fashioned iron 1 uses H profile steel 12, is highly 400 mm。
Girder fashioned iron 1 is equipped with lateral connection portion 3 between fashioned iron at end and span centre.Lateral connection portion 3 is by putting more energy between fashioned iron Plate 31 and crossbeam fashioned iron 32 form, and are connect by welding form with girder fashioned iron 1.Crossbeam fashioned iron 32 uses H profile steel 12.
Girder fashioned iron 1 and 32 top flange of crossbeam fashioned iron are provided with shear connector 6, the ultra-high performance concrete beam Bottom plate 23 and interior diaphragm plate 4 are connected with the 1 upper limb wing of girder fashioned iron and 32 top flange of crossbeam fashioned iron respectively by shear connector 6 It connects.Shear connector form is socket cap weldering nail.
The top plate 21 of ultra-high performance concrete beam 2 uses the slim plate of uniform thickness, and web 22 passes through local haunch chamfering 7 and institute The top plate 21 and the bottom plate 23 stated connect.
21 two sides of top plate are provided with interconnecting piece 5.5 upper limb of interconnecting piece is provided with notch 51, pre-buried in notch to be provided with upper limb Lateral embedded bar 52, and tied up by the 21 upper limb transverse direction embedded bar 52 of top plate of dowel and adjacent ultra-high performance concrete beam It pricks and connects integral force structure.Interconnecting piece 5 is additionally provided with the lower edge transverse direction embedded bar 53 of part stretching, adjacent two prefabricated list 53 interlaced arrangement of lower edge transverse direction embedded bar of member.Diaphragm plate 4 is arranged on crossbeam fashioned iron 32 in ultra-high performance concrete beam 2 Side.
The ultra-high performance concrete of the present embodiment is very-high performance fibre reinforced concrete.
The present embodiment assembled ultra-high performance concrete-part shaped steel combination beam construction method, comprising the following steps:
S1: the assembled ultra-high performance concrete that is prefabricated in the factory-part shaped steel combination beam prefabricated unit, specific steps Are as follows:
S1.1: hot rolled H-shaped 12 processing of market finished product is directlyed adopt in factory and forms specified 1 structure shape of girder fashioned iron Formula;
S1.2: two girder fashioned iron 1 are arranged in parallel and are fixed temporarily, and lateral connection portion 3 between fashioned iron is fixed on two The designated position of a girder fashioned iron;
S1.3: the welding shear connector of the 3 upper limb wing of lateral connection portion between the girder fashioned iron 1, fashioned iron;
S1.4: it in the top formwork erection and binding ultra-high performance concrete beam steel of the girder girder steel, then pours super High performance concrete, and conserved in time;
S1.5: when pouring ultra-high performance concrete and reaching design requirement, form removal, storage to designated position is formed Prefabricated assembled ultra-high performance concrete-part shaped steel combination beam prefabricated unit.
S2: setting up at the construction field (site) by the prefabricated obtained prefabricated unit of the S1, pour wet seam ultra-high performance concrete, Completion structure is continuously constructed and system transform;
S3: the construction of appurtenant work and deck paving is carried out, that is, completes the assembled ultra-high performance concrete-part type Steel combination beam construction.
Embodiment 2
The present embodiment is a kind of assembled ultra-high performance concrete-part shaped steel combination beam, including girder fashioned iron 1, is set to Lateral connection portion 3 and interior diaphragm plate 4 between ultra-high performance concrete beam 2, fashioned iron above girder fashioned iron, the interior diaphragm plate 4 with Ultra-high performance concrete beam 2 connects;The both ends in lateral connection portion 3 are connect with girder fashioned iron 1 between fashioned iron;The very-high performance coagulation The height of native beam 2 be 1600 mm, and its be 4 for the height ratio of main beam type steel 1.
The ultra-high performance concrete beam 2 is made of top plate 21, web 22 and bottom plate 23, the top plate 21 and bottom plate 23 It is oppositely arranged, the ultra-high performance concrete beam is formed by the connection of web 22, the top plate is along bridge longitudinal direction One or both sides be set as interconnecting piece 5, which extends outward is connect with another adjacent ultra-high performance concrete beam The connection reinforcing bar of seam connection.
Assembled ultra-high performance concrete-part shaped steel combination beam girder fashioned iron 1 of the present embodiment uses two channel steel groups It closing, two channel steels are by being welded to connect, wherein two channel steels are placed vertically, it is highly 400 mm.
Girder fashioned iron 1 is equipped with lateral connection portion 3 between fashioned iron at end and span centre.Lateral connection portion 3 is by putting more energy between fashioned iron Plate 31 and crossbeam fashioned iron 32 form, and are connect by welding form with girder fashioned iron 1.Crossbeam fashioned iron 32 uses H profile steel 12.
Girder fashioned iron 1 and 32 top flange of crossbeam fashioned iron are provided with shear connector 6, the ultra-high performance concrete beam Bottom plate 23 and interior diaphragm plate 4 are connected with the 1 upper limb wing of girder fashioned iron and 32 top flange of crossbeam fashioned iron respectively by shear connector 6 It connects.Shear connector form is socket cap weldering nail.
The top plate 21 of ultra-high performance concrete beam 2 uses the slim plate of uniform thickness, and web 22 passes through local haunch chamfering 7 and institute The top plate 21 and the bottom plate 23 stated connect.
21 two sides of top plate are provided with interconnecting piece 5.5 upper limb of interconnecting piece is provided with notch 51, pre-buried in notch to be provided with upper limb Lateral embedded bar 52, and tied up by the 21 upper limb transverse direction embedded bar 52 of top plate of dowel and adjacent ultra-high performance concrete beam It pricks and connects integral force structure.Interconnecting piece 5 is additionally provided with the lower edge transverse direction embedded bar 53 of part stretching, adjacent two prefabricated list 53 interlaced arrangement of lower edge transverse direction embedded bar of member.Diaphragm plate 4 is arranged on crossbeam fashioned iron 32 in ultra-high performance concrete beam 2 Side.
The ultra-high performance concrete of the present embodiment is very-high performance fibre reinforced concrete.
The present embodiment assembled ultra-high performance concrete-part shaped steel combination beam construction method, comprising the following steps:
S1: the assembled ultra-high performance concrete that is prefabricated in the factory-part shaped steel combination beam prefabricated unit, specific steps Are as follows:
S1.1: market finished product hot-rolled steel channel is directlyed adopt in factory and processes to form specified 1 structure type of girder fashioned iron;
S1.2: two girder fashioned iron 1 are arranged in parallel and are fixed temporarily, and lateral connection portion 3 between fashioned iron is fixed on two The designated position of a girder fashioned iron;
S1.3: the welding shear connector of the 3 upper limb wing of lateral connection portion between the girder fashioned iron 1, fashioned iron;
S1.4: it in the top formwork erection and binding ultra-high performance concrete beam steel of the girder girder steel, then pours super High performance concrete, and conserved in time;
S1.5: when pouring ultra-high performance concrete and reaching design requirement, form removal, storage to designated position is formed Prefabricated assembled ultra-high performance concrete-part shaped steel combination beam prefabricated unit.
S2: setting up at the construction field (site) by the prefabricated obtained prefabricated unit of the S1, pour wet seam ultra-high performance concrete, Completion structure is continuously constructed and system transform;
S3: the construction of appurtenant work and deck paving is carried out, that is, completes the assembled ultra-high performance concrete-part type Steel combination beam construction.
Embodiment 3
The present embodiment is a kind of assembled ultra-high performance concrete-part shaped steel combination beam, including girder fashioned iron 1, is set to Ultra-high performance concrete beam 2 and interior diaphragm plate 4 above girder fashioned iron, the interior diaphragm plate 4 connect with ultra-high performance concrete beam 2 It connects;The height of the ultra-high performance concrete beam 2 be 900 mm, and its be 6 for the height ratio of main beam type steel 1.
The ultra-high performance concrete beam 2 is made of top plate 21, web 22 and bottom plate 23, the top plate 21 and bottom plate 23 It is oppositely arranged, the ultra-high performance concrete beam is formed by the connection of web 22, the top plate is along bridge longitudinal direction One or both sides be set as interconnecting piece 5, which extends outward is connect with another adjacent ultra-high performance concrete beam The connection reinforcing bar of seam connection.
Assembled ultra-high performance concrete-part shaped steel combination beam girder fashioned iron 1 of the present embodiment is processed using channel steel It forms, and channel steel short transverse is placed in the horizontal direction, channel steel height is 400 mm, 150 mm of hem width, the i.e. height of girder fashioned iron Degree is 150mm.
1 top flange of girder fashioned iron is provided with shear connector 6, and the bottom plate 23 of the ultra-high performance concrete beam is by cutting Power connector 6 is connect with the 1 upper limb wing of girder fashioned iron respectively.Shear connector form is socket cap weldering nail.
The top plate 21 of ultra-high performance concrete beam 2 uses the slim plate of uniform thickness, and web 22 passes through local haunch chamfering 7 and institute The top plate 21 and the bottom plate 23 stated connect.
21 two sides of top plate are provided with interconnecting piece 5.5 upper limb of interconnecting piece is provided with notch 51, pre-buried in notch to be provided with upper limb Lateral embedded bar 52, and tied up by the 21 upper limb transverse direction embedded bar 52 of top plate of dowel and adjacent ultra-high performance concrete beam It pricks and connects integral force structure.Interconnecting piece 5 is additionally provided with the lower edge transverse direction embedded bar 53 of part stretching, adjacent two prefabricated list 53 interlaced arrangement of lower edge transverse direction embedded bar of member.
The both ends of ultra-high performance concrete beam 2 are arranged in diaphragm plate 4 in ultra-high performance concrete beam 2.
The ultra-high performance concrete of the present embodiment is very-high performance fibre reinforced concrete.
Assembled ultra-high performance concrete-part shaped steel combination beam construction method of the present embodiment, comprising the following steps:
S1: the assembled ultra-high performance concrete that is prefabricated in the factory-part shaped steel combination beam prefabricated unit, specific steps Are as follows:
S1.1: market finished product hot-rolled steel channel is directlyed adopt in factory and is horizontally arranged and processes to form specified girder fashioned iron 1 Structure type;
S1.2: two girder fashioned iron 1 are arranged in parallel and are fixed temporarily;
S1.3: in the welding shear connector of the 1 upper limb wing of girder fashioned iron;
S1.4: it in the top formwork erection and binding ultra-high performance concrete beam steel of the girder girder steel, then pours super High performance concrete, and conserved in time;
S1.5: when pouring ultra-high performance concrete and reaching design requirement, form removal, storage to designated position is formed Prefabricated assembled ultra-high performance concrete-part shaped steel combination beam prefabricated unit.
S2: setting up at the construction field (site) by the prefabricated obtained prefabricated unit of the S1, pour wet seam ultra-high performance concrete, Completion structure is continuously constructed and system transform;
S3: the construction of appurtenant work and deck paving is carried out, that is, completes the assembled ultra-high performance concrete-part type Steel combination beam construction.
Embodiment 4
The present embodiment is a kind of assembled ultra-high performance concrete-part shaped steel combination beam, including girder fashioned iron 1, is set to Lateral connection portion 3 and interior diaphragm plate 4 between ultra-high performance concrete beam 2, fashioned iron above girder fashioned iron, the interior diaphragm plate 4 with Ultra-high performance concrete beam 2 connects;The both ends in lateral connection portion 3 are connect with girder fashioned iron 1 between fashioned iron;The very-high performance coagulation The height of native beam 2 be 2250 mm, and its be 5 for the height ratio of main beam type steel 1.
The ultra-high performance concrete beam 2 is made of top plate 21, web 22 and bottom plate 23, the top plate 21 and bottom plate 23 It is oppositely arranged, the ultra-high performance concrete beam is formed by the connection of web 22, the top plate is along bridge longitudinal direction One or both sides be set as interconnecting piece 5, which extends outward is connect with another adjacent ultra-high performance concrete beam The connection reinforcing bar of seam connection.
The assembled ultra-high performance concrete of the present embodiment-part shaped steel combination beam girder fashioned iron 1 uses channel steel 11 and H-type Steel 12 is composed, and channel steel 11 and H profile steel 12 are by being welded to connect, and wherein channel steel 11 is horizontal positioned, and opening edge is towards H profile steel 12 Side, 11 height of channel steel are 300 mm, 150 mm of hem width, 12 300 mm of height of H profile steel, and girder fashioned iron height adds up to 450mm.
Girder fashioned iron 1 is equipped with lateral connection portion 3 between fashioned iron at end and span centre.Lateral connection portion 3 is by putting more energy between fashioned iron Plate 31 and crossbeam fashioned iron 32 form, and are connect by welding form with girder fashioned iron 1.Crossbeam fashioned iron 32 uses H profile steel.
Girder fashioned iron 1 and 32 top flange of crossbeam fashioned iron are provided with shear connector 6, the ultra-high performance concrete beam Bottom plate 23 and interior diaphragm plate 4 are connected with the 1 upper limb wing of girder fashioned iron and 32 top flange of crossbeam fashioned iron respectively by shear connector 6 It connects.Shear connector form is socket cap weldering nail.
The top plate 21 of ultra-high performance concrete beam 2 uses the slim plate of uniform thickness, and web 22 passes through local haunch chamfering 7 and institute The top plate 21 and the bottom plate 23 stated connect.
21 two sides of top plate are provided with interconnecting piece 5.5 upper limb of interconnecting piece is provided with notch 51, pre-buried in notch to be provided with upper limb Lateral embedded bar 52, and tied up by the 21 upper limb transverse direction embedded bar 52 of top plate of dowel and adjacent ultra-high performance concrete beam It pricks and connects integral force structure.Interconnecting piece 5 is additionally provided with the lower edge transverse direction embedded bar 53 of part stretching, adjacent two prefabricated list 53 interlaced arrangement of lower edge transverse direction embedded bar of member.Diaphragm plate 4 is arranged on crossbeam fashioned iron 32 in ultra-high performance concrete beam 2 Side.
The ultra-high performance concrete of the present embodiment is very-high performance fibre reinforced concrete.
Assembled ultra-high performance concrete-part shaped steel combination beam construction method, comprising the following steps:
S1: the assembled ultra-high performance concrete that is prefabricated in the factory-part shaped steel combination beam prefabricated unit, specific steps Are as follows:
S1.1: market finished product hot-rolled steel channel 11 is directlyed adopt in factory and the processing of H profile steel 12 forms specified girder fashioned iron 1 Structure type;
S1.2: two girder fashioned iron 1 are arranged in parallel and are fixed temporarily, and lateral connection portion 3 between fashioned iron is fixed on two The designated position of a girder fashioned iron;
S1.3: the welding shear connector of the 3 upper limb wing of lateral connection portion between the girder fashioned iron 1, fashioned iron;
S1.4: it in the top formwork erection and binding ultra-high performance concrete beam steel of the girder girder steel, then pours super High performance concrete, and conserved in time;
S1.5: when pouring ultra-high performance concrete and reaching design requirement, form removal, storage to designated position is formed Prefabricated assembled ultra-high performance concrete-part shaped steel combination beam prefabricated unit.
S2: setting up at the construction field (site) by the prefabricated obtained prefabricated unit of the S1, pour wet seam ultra-high performance concrete, Completion structure is continuously constructed and system transform;
S3: the construction of appurtenant work and deck paving is carried out, that is, completes the assembled ultra-high performance concrete-part type Steel combination beam construction.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. assembled ultra-high performance concrete-part shaped steel combination beam, which is characterized in that including girder fashioned iron, be set to girder type Ultra-high performance concrete beam and interior diaphragm plate above steel, the interior diaphragm plate are connect with ultra-high performance concrete beam;It is described super High performance concrete depth of beam >=200 mm, and height ratio >=1 of itself and girder fashioned iron.
2. assembled ultra-high performance concrete-part shaped steel combination beam as described in claim 1, which is characterized in that the superelevation Performance concrete depth of beam is 200 ~ 4000mm, and the height ratio of itself and girder fashioned iron is 1 ~ 6.
3. assembled ultra-high performance concrete-part shaped steel combination beam as claimed in claim 1 or 2, which is characterized in that the master Beam type steel is composed using any one or more in i shaped steel, H profile steel or channel steel, and height is 150 ~ 1000 mm。
4. assembled ultra-high performance concrete-part shaped steel combination beam as claimed in claim 1 or 2, which is characterized in that described super High performance concrete beam is made of top plate, web and bottom plate, and the top plate and bottom plate are oppositely arranged, connected by web to be formed it is super High performance concrete beam, the top plate are equipped with interconnecting piece along the one or both sides of bridge longitudinal direction, and the interconnecting piece is equipped with to extension Stretch out the connection reinforcing bar that the connection of seam formula is carried out with another adjacent ultra-high performance concrete beam.
5. assembled ultra-high performance concrete-part shaped steel combination beam as claimed in claim 4, which is characterized in that the top plate The latticed slim plate of longitudinal rib and cross rib is had for the slim plate of uniform thickness or lower part, the interconnecting piece upper limb is equipped with notch, slot It is pre-buried in mouthful to be provided with upper limb transverse direction embedded bar and laterally pre- by the floorings upper limb of connection reinforcing bar and contiguous prefabricated unit It buries reinforcing bar binding and connects integral force structure;The interconnecting piece lower edge is additionally provided with the lower edge transverse direction pre-buried steel of part stretching Muscle, adjacent lower edge transverse direction embedded bar interlaced arrangement.
6. assembled ultra-high performance concrete-part shaped steel combination beam as claimed in claim 4, which is characterized in that the superelevation The web of performance concrete beam passes through local haunch chamfering and connect with top plate and bottom plate.
7. assembled ultra-high performance concrete-part shaped steel combination beam as claimed in claim 1 or 2, which is characterized in that described group Closing beam further includes lateral connection portion between fashioned iron, and the both ends in lateral connection portion are connect with girder fashioned iron between the fashioned iron.
8. assembled ultra-high performance concrete-part shaped steel combination beam as claimed in claim 7, which is characterized in that the fashioned iron Between lateral connection portion be made of stiffener and crossbeam fashioned iron, the crossbeam fashioned iron by the end of welding form and girder fashioned iron with And girder fashioned iron span centre or in quartile one or more connection.
9. assembled ultra-high performance concrete-part shaped steel combination beam as claimed in claim 7, which is characterized in that the interior cross Partition is arranged above crossbeam fashioned iron.
10. assembled ultra-high performance concrete-part shaped steel combination beam as claimed in claim 7, which is characterized in that the girder The top flange of fashioned iron and the top flange of crossbeam fashioned iron are equipped with shear connector, the bottom plate and interior cross of the ultra-high performance concrete beam Partition is connect with the top flange of the upper limb wing of girder fashioned iron, crossbeam fashioned iron respectively by shear connector.
CN201820780455.3U 2018-05-24 2018-05-24 Assembled ultra-high performance concrete-part shaped steel combination beam Active CN208293900U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820780455.3U CN208293900U (en) 2018-05-24 2018-05-24 Assembled ultra-high performance concrete-part shaped steel combination beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820780455.3U CN208293900U (en) 2018-05-24 2018-05-24 Assembled ultra-high performance concrete-part shaped steel combination beam

Publications (1)

Publication Number Publication Date
CN208293900U true CN208293900U (en) 2018-12-28

Family

ID=64727040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820780455.3U Active CN208293900U (en) 2018-05-24 2018-05-24 Assembled ultra-high performance concrete-part shaped steel combination beam

Country Status (1)

Country Link
CN (1) CN208293900U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412124A (en) * 2018-05-24 2018-08-17 湖南大学 Assembled ultra-high performance concrete-part shaped steel combination beam and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412124A (en) * 2018-05-24 2018-08-17 湖南大学 Assembled ultra-high performance concrete-part shaped steel combination beam and its construction method

Similar Documents

Publication Publication Date Title
CN106049255B (en) The light-duty combination beam Simply supported non-uniform structure construction of steel and ultra-high performance concrete and its construction method
CN203768784U (en) Super toughness concrete plate-steel beam light combined bridge structure
CN105839510B (en) A kind of steel and ultra-high performance concrete composite continuous bridge structure and its construction method
CN108677685A (en) A kind of ultra-high performance concrete-part girder steel combination bent cap and its construction method
CN108824162A (en) A kind of steel_concrete composite beam and its construction method using plain plate and corrugated sheet steel mixing web
CN108385503A (en) A kind of assembled light combination beam freely-supported structure changes continuous structure and its construction method
CN108660921A (en) Orthotropic steel-ultra-high performance concrete bridge deck structure and its construction method
CN108412049A (en) A kind of wood-concrete combination beam shear connector push out test test specimen
CN208293400U (en) A kind of ultra-high performance concrete-part girder steel combination bent cap
CN108412124A (en) Assembled ultra-high performance concrete-part shaped steel combination beam and its construction method
CN109057148A (en) Ultra-high performance concrete is without regular reinforcement Prestressed U type beam and its construction method
CN206570672U (en) The box beam of full assembled steel-concrete combined structure
CN108532810A (en) A kind of recycled concrete superposed composite floor of steel plate-
CN208293900U (en) Assembled ultra-high performance concrete-part shaped steel combination beam
CN106012806B (en) Cored slab hinge seam Shear connection construction and construction technology
CN207878254U (en) A kind of assembled light combination beam freely-supported structure changes continuous structure
CN208219952U (en) A kind of recycled concrete superposed composite floor of steel plate-
CN207659851U (en) A kind of bridge fishback telescopic device
CN109057115A (en) A kind of ultra-high performance concrete sandwich floor slab with ribbing and its manufacturing method
CN206189249U (en) Steel light -duty combination beam of an ultra high performance concrete letter change continuous structure structure
CN209114297U (en) Composite Steel-Concrete Bridges structure and combined bridge deck
CN209323343U (en) A kind of light section-ultra-high performance concrete stiffness bracket floor
CN208933808U (en) Using the steel_concrete composite beam of plain plate and corrugated sheet steel mixing web
CN110359353A (en) A kind of Steel-concrete Combined Beam Structures
CN108265883A (en) A kind of wine cup shape Section of Steel-concrete Composite Beam and its construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant