CN208288935U - Arbor support with step shape - Google Patents

Arbor support with step shape Download PDF

Info

Publication number
CN208288935U
CN208288935U CN201820851332.4U CN201820851332U CN208288935U CN 208288935 U CN208288935 U CN 208288935U CN 201820851332 U CN201820851332 U CN 201820851332U CN 208288935 U CN208288935 U CN 208288935U
Authority
CN
China
Prior art keywords
arbor
layer step
layer
support
arbor support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820851332.4U
Other languages
Chinese (zh)
Inventor
杨基
秦礼凤
许振冲
张俊
马武彬
杨炳坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Yuchai Machinery Co Ltd
Original Assignee
Guangxi Yuchai Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Yuchai Machinery Co Ltd filed Critical Guangxi Yuchai Machinery Co Ltd
Priority to CN201820851332.4U priority Critical patent/CN208288935U/en
Application granted granted Critical
Publication of CN208288935U publication Critical patent/CN208288935U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

The arbor support with step shape that the utility model discloses a kind of, arbor support are installed in lower core box, and arbor support is four layers of step structure, it include: first layer step, its top for being set to arbor support, first layer step is used to be through on arbor, and supports arbor by the bottom of first layer step;The lower section of first layer step is arranged in second layer step, and second layer step has pattern draft, to demould;The lower section of second layer step is arranged in third layer step, the positioning for arbor support;And the 4th layer of step, the lower section of third layer step is set, for being fixed on lower core box;Wherein, relief hole corresponding with first layer step is provided on arbor, relief hole does not penetrate through arbor, and the length of first layer step is arranged to when first layer step penetrates in relief hole, the bottom of first layer step can be withstood on arbor, to prevent arbor from overturning or shifting under the impact of sand flow.The arbor of the utility model supports small in size, supporting & stablizing.

Description

Arbor support with step shape
Technical field
The utility model relates to casting technology field, in particular to a kind of arbor support with step shape.
Background technique
Arbor in sand casting is for securely being connected entire sand core, to become an entirety, to protect Demonstrate,prove sand core during production and transportation, the problems such as being not in fracture, its main function is to increase the rigidity of sand core and strong Degree.In addition, arbor is also used to lift by crane, so that convenient carry out sand core the work such as to allocate and transport.
The support of sand core bone is to design and be mounted on mold, is typically mounted in lower core box, for supporting and fixing arbor, with Prevent arbor during coremaking as shift position and caused by sand core the problem of scrapping.
Currently, for the ease of arbor placement and prevent arbor from supportting upper shift position in arbor, as shown in Figure 1, existing Arbor supports 1 upper end and is designed to U-type groove 4, and designs magnet mounting hole 5 in 4 bottom of U-type groove.Arbor 2 is placed on the U that arbor supports 1 upper end In type groove 4, magnet 6 is placed on magnet mounting hole 5.By the attraction of magnet 6 and the limitation of U-type groove 4, arbor 2 is capable of fixing In arbor support 1, and it will not move.It is existing in particular for the hollow steel tube arbor of lifting but for big brod The design method for having arbor to support has certain limitation in use, is not able to satisfy the requirement of large-scale arbor, main to show : (1) design method of existing arbor support can only meet tiny arbor, and for big brod, the U-type groove in arbor support needs Accordingly become larger, so that arbor support body product greatly increases.Too big arbor support can occupy mold cavity location, can not be arranged in On mold;(2) only arbor is sucked by magnet in the design method of existing arbor support, and arbor still has mobile hidden danger in use, especially It is in core shooting on core shooter, and arbor can get rid of magnet and shift position under the impact energetically of sand flow;(3) if arbor supports Too big, manufacturing cost increases, and corresponding magnet cost also will increase.
The information disclosed in the background technology section is intended only to increase the understanding to the general background of the utility model, and It is not construed as recognizing or implying in any form that information composition is already known to those of ordinary skill in the art existing Technology.
Utility model content
The arbor support with step shape that the purpose of this utility model is to provide a kind of, to overcome the core of the prior art Bone support body product disadvantage big, at high cost.
To achieve the above object, the utility model provides a kind of arbor support with step shape, and arbor support is installed on In lower core box, arbor support is four layers of step structure, and four layers of step structure include: first layer step, is set to the top of arbor support Portion, first layer step is used to be through on arbor, and supports arbor by the bottom of first layer step;Second layer step, setting In the lower section of first layer step, second layer step has pattern draft, to demould;Third layer step is arranged in the second layer The lower section of step, the positioning for arbor support;And the 4th layer of step, the lower section of third layer step is set, for fixing In lower core box;Wherein, it is provided with relief hole corresponding with first layer step on arbor, relief hole does not penetrate through arbor, and first The length of layer step is arranged to when first layer step penetrates in relief hole, and the bottom of first layer step can withstand on arbor On, to prevent arbor from overturning or shifting under the impact of sand flow.
In a preferred embodiment, the root of first layer step and second layer step is provided with fillet, is answered with reducing Power is concentrated.
In a preferred embodiment, the corresponding position of lower core box is additionally provided with counterbore corresponding with third layer step, With the positioning supportted for arbor.
In a preferred embodiment, the 4th layer of step is provided with screw thread, and the corresponding position of lower core box is provided with accordingly Threaded hole so that the 4th layer of step is capable of fixing in threaded hole.
Compared with prior art, the arbor support according to the present utility model with step shape has the following beneficial effects:
(1) arbor support penetrates in arbor, is effectively prevented arbor shift position in use.
(2) arbor support is reduced costs without design magnet to reduce the use of magnet.
(3) arbor support is small in size, is not take up the too many area of mold cavity, can be optionally arranged on mold.
(4) arbor support structure is simple, easy to manufacture, easy to operate, at low cost, can improve the yield rate of sand core significantly.
(5) arbor of the utility model is supportted especially suitable for that can guarantee on the arbor that volume is big, weight is big, hollow Arbor is mounted on the correct position of mold, thus reduce due to arbor shifts and the phenomenon that cause sand core to be scrapped, Jin Erti High sand core yield rate, improves production efficiency.
Detailed description of the invention
Fig. 1 is arbor support and the structural schematic diagram of arbor of the prior art.
Fig. 2 is the structural schematic diagram of the arbor support according to the present utility model with step shape.
Fig. 3 is that arbor according to the present utility model supports the schematic diagram being mounted in lower core box.
Fig. 4 is the schematic diagram that arbor according to the present utility model is mounted in arbor support.
Fig. 5 is the schematic diagram that sand grains wraps arbor in coremaking supportted using the arbor of the utility model.
Fig. 6 is the signal that the former arbor support position formation pit on sand core after molding is supportted using the arbor of the utility model Figure.
Main appended drawing reference explanation:
The support of 1- arbor, 11- first layer step, 12- second layer step, 13- third layer step, the 4th layer of step of 14-, 15- Fillet, 2- arbor, 4-U type groove, 5- magnet mounting hole, 6- magnet, 7- lower core box, 8- sand core, 9- pit.
Specific embodiment
With reference to the accompanying drawing, specific embodiment of the present utility model is described in detail, it is to be understood that this is practical Novel protection scope is not limited by the specific implementation.
Unless otherwise explicitly stated, otherwise in entire disclosure and claims, term " includes " or its change Changing such as "comprising" or " including " etc. will be understood to comprise stated element or component, and not exclude other members Part or other component parts.
As shown in Fig. 2, the arbor support 1 with step shape according to the preferred embodiments of the present invention is installed on lower core On box, arbor support 1 is four layers of step structure, and four layers of step structure include: first layer step 11, second layer step 12, third layer Step 13 and the 4th layer of step 14.Wherein, first layer step 11 is set to the top of arbor support 1, and first layer step 11 is used to It is through on arbor 2, and arbor 2 is supported by the bottom of first layer step 11.Second layer step 12 is arranged in first layer step 11 Lower section, second layer step 11 have pattern draft, so as to be easy demoulding.Second layer step 12 is arranged in third layer step 13 Lower section, the positioning for arbor support 1.The lower section of third layer step 13 is arranged in 4th layer of step 14, for being fixed on lower core box On.Wherein, relief hole corresponding with first layer step 11 is provided on arbor 2, relief hole does not penetrate through arbor 2, first layer platform The length of rank 11 is arranged to when first layer step 11 penetrates in relief hole, and the bottom of first layer step 11 can withstand on arbor On 2, to prevent arbor 2 from overturning or shifting under the impact of sand flow.
In above scheme, the corresponding position of lower core box is provided with counterbore corresponding with third layer step 13, to be used for arbor The positioning of support 1.4th layer of step 14 is provided with screw thread, and the corresponding position of lower core box is provided with corresponding threaded hole, so that the Four layers of step 14 are capable of fixing in threaded hole.
In a preferred embodiment, the root of first layer step 11 and second layer step 12 is provided with fillet 15, with It reduces stress to concentrate, arbor support 1 is prevented to be broken in use.Every arbor 2 needs two above-mentioned arbor supports 1 to support, So that arbor 2 can be smoothly fixed in arbor support 1.
As shown in Figure 3-4, the application method of the above-mentioned arbor support with step shape, includes the following steps to carry out coremaking: first First, before coremaking, arbor support 1 is mounted in lower core box 7, and is molded after arbor 2 is mounted in arbor support 1;When coremaking, sand is used Grain filling mold inner-cavity forms sand core 8, and sand grains wraps arbor 2, as shown in Figure 5;When molding, sand core 8 is in lower plunger tip bar Under the action of leave lower core box 7, sand core 8, arbor 2 and arbor support 1 are detached from, and the position of former arbor support forms pit 9 on sand core 8, As shown in Figure 6;After plunger tip demoulding, sand core 8 is taken out, and block pit 9 with self-hardening sand;And arbor 2 is placed on arbor support 1 again On, it prepares for coremaking next time.
In above scheme, arbor 2 is supported by two arbor supports 1, so that arbor 2 can smoothly be fixed on arbor support On 1.The above-mentioned arbor support with step shape is four layers of step structure, and four layers of step structure include: first layer step, setting In the top of arbor support, first layer step is used to be through on arbor, and supports arbor by the bottom of first layer step;The second layer The lower section of first layer step is arranged in step, and second layer step has pattern draft, to demould;Third layer step, sets Set the positioning in the lower section of second layer step, for arbor support;And the 4th layer of step, it is arranged under third layer step Side, for being fixed on lower core box;Wherein, relief hole corresponding with first layer step is provided on arbor, relief hole does not pass through Obturator bone, the length of first layer step are arranged to when first layer step penetrates in relief hole, the bottom energy of first layer step It enough withstands on arbor, to prevent arbor from overturning or shifting under the impact of sand flow.
In a preferred embodiment, the 4th layer of step is provided with screw thread, and the corresponding position of lower core box is provided with accordingly Threaded hole, the corresponding position of lower core box is additionally provided with counterbore corresponding with third layer step.Arbor support is mounted on lower core box On, and arbor is mounted in arbor support specifically: the third layer step of arbor support is arranged in counterbore to position arbor support, and 4th layer of step is threadedly secured in threaded hole, first layer step penetrates in relief hole, and passes through first layer step Bottom is withstood on arbor.The root of first layer step and second layer step is provided with fillet, to reduce stress concentration.
The description of the aforementioned specific exemplary embodiment to the utility model is in order to illustrate and illustration purpose.These Description is not wishing to for the utility model to be limited to disclosed precise forms, and it will be apparent that according to the above instruction, can carry out It is many to change and change.The purpose of selecting and describing the exemplary embodiment is that explaining the specific principle of the utility model And its practical application, so that those skilled in the art can be realized and utilize a variety of different examples of the utility model Property embodiment and various chooses and changes.The scope of the utility model is intended to by claims and its waits similar shapes Formula is limited.

Claims (4)

1. a kind of arbor support with step shape, which is characterized in that the arbor support is installed in lower core box, the arbor support For four layers of step structure, four layers of step structure includes:
First layer step is set to the top of the arbor support, and the first layer step is used to be through on arbor, and passes through institute The bottom for stating first layer step supports the arbor;
The lower section of the first layer step is arranged in second layer step, and the second layer step has pattern draft, to take off Mould;
The lower section of the second layer step is arranged in third layer step, the positioning for arbor support;And
4th layer of step, is arranged in the lower section of the third layer step, for being fixed on the lower core box;
Wherein, relief hole corresponding with the first layer step is provided on the arbor, the relief hole does not penetrate through described Arbor, the length of the first layer step are arranged to when the first layer step penetrates in the relief hole, and described first The bottom of layer step can be withstood on the arbor, to prevent the arbor from overturning or shifting under the impact of sand flow.
2. arbor support according to claim 1, which is characterized in that the root of the first layer step and the second layer step Portion is provided with fillet, to reduce stress concentration.
3. arbor according to claim 1 support, which is characterized in that the corresponding position of the lower core box be additionally provided with it is described The corresponding counterbore of third layer step, with the positioning supportted for the arbor.
4. arbor support according to claim 1, which is characterized in that the 4th layer of step is provided with screw thread, the lower core The corresponding position of box is provided with corresponding threaded hole, so that the 4th layer of step is capable of fixing in the threaded hole.
CN201820851332.4U 2018-06-04 2018-06-04 Arbor support with step shape Expired - Fee Related CN208288935U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820851332.4U CN208288935U (en) 2018-06-04 2018-06-04 Arbor support with step shape

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820851332.4U CN208288935U (en) 2018-06-04 2018-06-04 Arbor support with step shape

Publications (1)

Publication Number Publication Date
CN208288935U true CN208288935U (en) 2018-12-28

Family

ID=64722529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820851332.4U Expired - Fee Related CN208288935U (en) 2018-06-04 2018-06-04 Arbor support with step shape

Country Status (1)

Country Link
CN (1) CN208288935U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108480567A (en) * 2018-06-04 2018-09-04 广西玉柴机器股份有限公司 Arbor support with step shape and its application method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108480567A (en) * 2018-06-04 2018-09-04 广西玉柴机器股份有限公司 Arbor support with step shape and its application method
CN108480567B (en) * 2018-06-04 2023-11-07 广西玉柴机器股份有限公司 Core skeleton support with step shape and use method thereof

Similar Documents

Publication Publication Date Title
CN208288935U (en) Arbor support with step shape
CN202672699U (en) Steel pipe scaffold non-metallic chassis
CN207464143U (en) A kind of sand core die lifter
CN108480567A (en) Arbor support with step shape and its application method
CN202725984U (en) Special device for demounting loose piece in cast sand core or air release plug of hot box
CN102717033B (en) Axostylus axostyle class foundry goods end face is given vent to anger scum riser
CN205218007U (en) Plunger casting mould depoling tube vibration machine
CN204747425U (en) Cylinder block jacket core storage rack
CN102151797A (en) Table top lifting device
CN202271474U (en) Self-leveling pouring mould
CN208812060U (en) A kind of mould placing rack
CN202053355U (en) Core-pulling type mold
CN204299104U (en) External screw rod back of the body bolt
CN103537624A (en) Wind energy thick and large casting pouring device
CN203998900U (en) A kind of bottle lift system with setting device
CN203418090U (en) Feed head used for casting gear rings
CN202861335U (en) Hub casting edge mould
CN214495386U (en) A hoist device for production of wine jar
CN203599482U (en) Lateral mold for solving bottom deformation of wheel rim
CN218503322U (en) Foundry goods production is with supplementary shedder
CN201744622U (en) Barrel-shaped casting pouring sand molding box
CN212822605U (en) Casting mould
CN203118761U (en) Pressing tool for three-phase elliptical coil
CN203308596U (en) Water jacket sand core structure of automobile engine cylinder cover
CN205147083U (en) Mould of material piece is lifted to improvement buoyancy lift

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181228

CF01 Termination of patent right due to non-payment of annual fee