CN208280162U - A kind of piping lane - Google Patents
A kind of piping lane Download PDFInfo
- Publication number
- CN208280162U CN208280162U CN201621155564.3U CN201621155564U CN208280162U CN 208280162 U CN208280162 U CN 208280162U CN 201621155564 U CN201621155564 U CN 201621155564U CN 208280162 U CN208280162 U CN 208280162U
- Authority
- CN
- China
- Prior art keywords
- wall
- column
- piping lane
- lane according
- jurisdiction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a kind of piping lanes, and including top surface, bottom surface and the section of jurisdiction between top and bottom, the section of jurisdiction includes the first wall, the second wall and column;The column is folded between the first wall and the second wall.The piping lane can effectively promote the integral strength of section of jurisdiction and piping lane and the integral waterproofing effect of piping lane.
Description
Technical field
The utility model relates to building engineering field, especially a kind of piping lane.
Background technique
Piping lane is the main place that pipeline is laid with, and is usually located at underground, piping lane side wall is known as section of jurisdiction, usually prefabricated wall
Body, is the top plate of cast-in-site in the top of wall, and lower section is cast-in-place bottom plate.Existing piping lane section of jurisdiction generally includes two panels interval
The wall of arrangement is placed with the staggered multiple tracks reinforcing bar of transverse and longitudinal between two panels wall, then with concreting at complete prefabricated
Piping lane section of jurisdiction.Cast-in-place top plate and bottom plate and section of jurisdiction form complete piping lane unit, and multiple piping lane units continuously spliced are final
Constitute complete piping lane.But existing this prefabricated piping lane has following defects that
1, the intensity of section of jurisdiction wall body structure is poor;
2, due to the problem of pouring material itself or construction technology the problem of, concrete is easy to produce in casting process
Bubble is not easy to be discharged, and will form many pits after the completion of pouring, influences prefabricated pipe section final product quality.
Utility model content
The purpose of the utility model is to provide a kind of piping lanes that intensity is high.
To achieve the goals above, a kind of piping lane provided by the utility model, including top surface, bottom surface and be located at top surface and
Section of jurisdiction between bottom surface, the section of jurisdiction include
First wall, the second wall and column;
The column is folded between the first wall and the second wall.
Alternatively and preferably, the quantity of the column is at least two, between being in parallel to each other between each column
Every arrangement.
Alternatively and preferably, the quantity of the column is at least three.
Alternatively and preferably, the quantity of the column is three, and three columns are in the first wall and the second wall
Between in the space that is formed along the width direction parallel arrangement of the first wall and the second wall, two of them column distinguishes position
In the both ends in the space, a column is located at the centre in the space.
Alternatively and preferably, the bubble that is generated when the lower end of the column has for casting concrete and by wall
Lower part is linked to be whole flow-guiding structure.
Alternatively and preferably, the flow-guiding structure extends obliquely upward shape along column including two self-bonding column lower ends
At guide face, the bottom end linking of two guide faces and there are distances with the lower edge of the first wall and the second wall, for mixed
Solidifying soil passes through.
Alternatively and preferably,
Two guide faces are upwardly extended according to fixed slope along column, and the bottom end of two guide faces is with sharp
Mode be connected, to form V-type flow-guiding structure, or
Two guide faces are upwardly extended according to the slope of variation along column, and the bottom end of two guide faces is with smooth
Mode be connected, to form U-shaped flow-guiding structure.
Alternatively and preferably, the lower edge of the bottom end of the column and the first wall and the second wall there are away from
From.
Alternatively and preferably, the edge of first wall and the second wall is equipped with for docking with other walls
Notch.
Alternatively and preferably, the through-hole for being in the milk and/or being vented is equipped with above the bottom surface.
A kind of piping lane provided by the utility model, it is described including top surface, bottom surface and the section of jurisdiction between top and bottom
Section of jurisdiction includes the first wall, the second wall and column;The column is folded between the first wall and the second wall.?
After pouring, column, the first wall, the second wall and reinforcing bar are combined together, and column can give the first wall and second
Wall provides support, improves the integral strength of piping lane.
Detailed description of the invention
Fig. 1 is a kind of schematic front view of piping lane provided by the utility model embodiment 1;
Fig. 2 is a kind of schematic top plan view of piping lane provided by the utility model embodiment 1;
Fig. 3 is a kind of schematic side view of piping lane provided by the utility model embodiment 1;
Fig. 4 is a kind of schematic front view of piping lane provided by the utility model embodiment 2;
Fig. 5 is a kind of schematic top plan view of piping lane provided by the utility model embodiment 2;
Fig. 6 is a kind of schematic side view of piping lane provided by the utility model embodiment 2;
Fig. 7 is a kind of schematic front view of piping lane provided by the utility model embodiment 3;
Fig. 8 is a kind of schematic top plan view of piping lane provided by the utility model embodiment 3;
Fig. 9 is a kind of schematic side view of piping lane provided by the utility model embodiment 3;
Figure 10 is a kind of schematic diagram of piping lane emargintion provided by various embodiments of the utility model.
In figure:
The first wall of 1-;The second wall of 2-;3- column;4- guide face;5- notch;The cast-in-place wall zone of 6-;The cast-in-place top 7-
Face;The prefabricated top surface 8-;The bottom surface 9-;10- through-hole;11- rigid waterproof layer;12- Cast-in-situ Beam;The cast-in-place column of 13-;The section of jurisdiction 14-;15- is pre-
Making sheet.
Specific embodiment
In order to make those skilled in the art better understand the scheme of the utility model, with reference to the accompanying drawing and specific implementation
The utility model is described in further detail for mode.
Embodiment 1
It please refers to Fig. 1-3, a kind of piping lane that the utility model embodiment 1 provides, including top surface, bottom surface 9 and is located at top
Section of jurisdiction 14 between face and bottom surface 9.Wherein top surface includes prefabricated top surface 8 and cast-in-place top surface 7, and bottom surface 9 also forms for cast in situs.
Section of jurisdiction 14 is prefabricated forms.Through-hole 10 is equipped with above bottom surface 9, for bubble to be discharged and for being in the milk.Piping lane it is pre- up and down
Making sheet has Figure of eight structure, can play better stressed effect.Section of jurisdiction 14 includes two panels wall, i.e. the first wall 1 and the second wall
Body 2 is equipped with the staggered reinforcing bar of transverse and longitudinal between first wall 1 and the second wall 2.Lateral reinforcing bar is from the first wall 1 and the second wall 2
(due to the state that the position Fig. 1 pours, the reinforcing bar in figure is not shown) is stretched out at the both ends of body, is used for and neighbouring piping lane pipe
The transverse steel of piece, which is bound, to be combined.Section of jurisdiction 14 further includes column 3, and column 3 is folded in by the first wall 1 and the second wall 2
Between the two.I.e. the one side of column 3 is bonded with the inner surface of the first wall 1, the interior table of opposite another side and the second wall 2
Face paste is closed.Lateral reinforcing bar also passes through column.When pouring, concrete is filled up between the first wall 1 and the second wall 2 and is formed
Cast-in-place wall zone 6 so that the first wall 1, the second wall 2, column 3 and reinforcing bar form overall structure.Since column 3 is right
The supporting role of first wall 1 and the second wall 2, can be improved the integral strength of wall.Second wall, the 2 (wall positioned inside
Body) height be overlapped on above with forming step structure for casting top slab lower than the height of the first wall 1.
The quantity of column 3 can flexibly be adjusted according to the width of the first wall 1 and the second wall 2 and the requirement to intensity
It is whole, two columns are preferably selected, is arranged between the first wall 1 and the second wall 2, more preferably uses in parallel
At least three columns, intensity is higher, in the present embodiment, arranges in parallel in the space between the first wall 1 and the second wall 2
Three columns 3 of cloth, the direction of arrangement are arranged along the width direction of the first wall 1 and the second wall 2.Two of them
Column is located at the both ends in the space, and a column is located at the middle in space, equal at the both ends of wall and middle part in this way
Form support, intensity height and uniform force.Since section of jurisdiction provided by the embodiment of the utility model is desirable in pouring construction
It places vertically, therefore vertical side is known as to the "high" of wall, horizontal side is known as " width ", the first wall 1 and the second wall 2
Between the space length that is formed be known as " thickness " in the space.
In the casting process of concrete, can because material itself defect or casting craft defect the reason of generate
Bubble will remain in concrete surface, a small amount of bubble will affect the beauty of wall if these bubbles cannot be discharged in time
It sees, a large amount of bubble will affect the durability of concrete, and furthermore concrete is also required to that wall is made to form whole knot after pouring
Structure.In order to solve this problem, further, the lower end of column 3 has flow-guiding structure, the bubble for being discharged in concrete
And concrete is promoted to flow freely in column two sides, so that wall lower part is capable of forming overall structure.Flow-guiding structure can be
A variety of, for example, the flow-guiding structure may include two guide faces, the bottom end difference of two guide face self-bonding columns 3 is oblique
It upwardly extends to be formed, bubble can be discharged from the two sides of column 3 in this way, it is uniform that high-efficient and bubbly flow is steeped in exhaust.?
In one preferred embodiment, two guide faces 4 are extended obliquely upward with fixed slope self-bonding 3 bottom end of column, and guide face 4
Bottom end with sharp mode transition, form broken line type transition wire, i.e., on the whole, two guide faces 4 constitute V-shape knot
The effect of structure, in this way exhaust bubble is more preferable.In addition, guide face can also be upwardly extended according to the slope of variation in 3 two sides of column
, form smooth inclined-plane, the position of two guide faces linking be also it is smooth, that is, form U-shaped structure, but diversion effect
It is good not as good as V-structure.
When using a plurality of column, these columns are together with lateral reinforcing bar in the first wall 1 and the second wall 2
The structure of similar " H " type is formd, and guide face 4 forms " V " type structure, therefore under this embodiment, this is practical
The piping lane that new embodiment provides is properly termed as " H-V type section of jurisdiction piping lane " or " H-V system " again.When guide face form it is U-shaped
It when structure, then can be described as " H-U type section of jurisdiction piping lane ".Entire piping lane is referred to as HUV system.
After column is placed between the first wall 1 and the second wall 2, concrete material can be in the first wall when being poured
Flow, in a preferred embodiment, the bottom end of column and the first wall 1 and second in the space of body 1 and the second wall 2
The lower edge of wall 2 remains with a certain distance d, this is to guarantee that castable can be from the space that distance d is formed
Circulation is realized in the two sides of column 3, ensure that the concrete bodies poured form an entirety, intensity is higher, avoids column
Barrier is formd in concreting, bubble discharge is hindered, to ensure that the effect of closely knit waterproof.For example, in the V of use
In the case where type flow-guiding structure, the bottom end of flow-guiding structure is the bottom end of column 3, with the first wall 1 and the second wall 2
Lower edge remains with distance d.
The edge of first wall 1 and the second wall 2 is concordant, i.e. two area equations and perspective plane coincides together.
Adjacent section of jurisdiction 14 is after docking, often because docking does not generate crack sternly.In order to realize regional waterproof, first
The edge of wall 1 and the second wall 2 is equipped with the notch 5 for docking with other walls, after wall body structure docking, is lacking
Mortar is smeared at mouth 5 to tamp, and prevents crack, the shape of notch 5 is unlimited, specifically can be L-type (as shown in Figure 10).Multiple tracks pipe
After piece 14 connects, mutual crossover position can also pour into waterproof mortar, form rigid waterproof layer 11.
The piping lane of the present embodiment 1 is single piping lane, only a gallery.
Embodiment 2
Fig. 4-6 is please referred to, the present embodiment is the difference from embodiment 1 is that piping lane is double gallery structures, i.e. top and bottom
Between have three sections of jurisdiction 14, twice section of jurisdiction is side wall, and one of section of jurisdiction 14 is located at centre, is separated into two gallerys, each gallery
Including section of jurisdiction 14, cast-in-place top surface 7, prefabricated top surface 8 and bottom surface 9.Its section of jurisdiction 14 is also mainly by the first wall 1, the second wall 2 and folder
It is constituted in intermediate column 3.
Embodiment 3
Please refer to Fig. 7-9, the piping lane of the present embodiment the difference from example 2 is that, intermediate section of jurisdiction replaces with Cast-in-situ Beam
12 and cast-in-place column 13 composite structure, in large-scale gallery system, gallery also to include section of jurisdiction 14, cast-in-place top surface 7, prefabricated top surface
8 and bottom surface 9, section of jurisdiction 14 be also mainly made of the first wall 1, the second wall 2 and the column 3 being clipped in the middle.In addition, cast-in-place
The side of beam 12 can also add prefabricated board 15, further increase intensity.
A kind of piping lane provided by the utility model is described in detail above.Specific case pair used herein
The principles of the present invention and embodiment are expounded, and the above embodiments are only used to help understand, and this is practical new
The core concept of type.It should be pointed out that for those skilled in the art, not departing from the utility model principle
Under the premise of, several improvements and modifications can be made to this utility model, these improvement and modification also fall into the utility model
In scope of protection of the claims.
Claims (10)
1. a kind of piping lane, including top surface, bottom surface and the section of jurisdiction between top and bottom, which is characterized in that the section of jurisdiction
Including
First wall, the second wall and column;
The column is folded between the first wall and the second wall.
2. piping lane according to claim 1, which is characterized in that the quantity of the column is at least two, each column
Between in parallel to each other in being intervally arranged.
3. piping lane according to claim 2, which is characterized in that the quantity of the column is at least three.
4. piping lane according to claim 3, which is characterized in that the quantity of the column is three, and three columns exist
Along the width direction parallel arrangement of the first wall and the second wall in the space formed between first wall and the second wall,
In two columns be located at the both ends in the space, a column is located at the centre in the space.
5. piping lane according to claim 1, which is characterized in that the lower end of the column, which has, pours coagulation for being discharged
The bubble that generates when native and wall lower part is linked to be to whole flow-guiding structure.
6. piping lane according to claim 5, which is characterized in that the flow-guiding structure include two self-bonding column lower ends along
Column extends obliquely upward the guide face to be formed, the bottom end linking of two guide faces and following with the first wall and the second wall
There are distances for edge, so that concrete passes through.
7. piping lane according to claim 6, which is characterized in that
Two guide faces are upwardly extended according to fixed slope along column, and the bottom end of two guide faces is with sharp side
Formula linking, so that V-type flow-guiding structure is formed, or
Two guide faces are upwardly extended according to the slope of variation along column, and the bottom end of two guide faces is with smooth side
Formula linking, to form U-shaped flow-guiding structure.
8. -7 any piping lane according to claim 1, which is characterized in that the bottom end of the column and the first wall and the
There are distances for the lower edge of two walls.
9. -7 any piping lane according to claim 1, which is characterized in that the edge of first wall and the second wall is equal
Equipped with the notch for being docked with other walls.
10. -7 any piping lane according to claim 1, which is characterized in that be equipped with above the bottom surface for being in the milk and/or
The through-hole of exhaust.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621155564.3U CN208280162U (en) | 2016-10-31 | 2016-10-31 | A kind of piping lane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621155564.3U CN208280162U (en) | 2016-10-31 | 2016-10-31 | A kind of piping lane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208280162U true CN208280162U (en) | 2018-12-25 |
Family
ID=64746916
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621155564.3U Active CN208280162U (en) | 2016-10-31 | 2016-10-31 | A kind of piping lane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208280162U (en) |
-
2016
- 2016-10-31 CN CN201621155564.3U patent/CN208280162U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104480803B (en) | Medium-and-low speed magnetic levitation railway low route continuous arched supporting rail beam structure and construction method | |
CN208486404U (en) | A kind of concrete shear force wall of steel bar template integrative installation technology | |
CN207812488U (en) | Globality underground pipe gallery | |
CN107268675A (en) | Laying method and structure of combined multi-bin underground comprehensive pipe gallery | |
CN208280162U (en) | A kind of piping lane | |
CN106320376A (en) | Pipe gallery | |
CN107083776A (en) | A kind of basement raft foundation rear pouring tape construction method | |
CN105756377A (en) | Swimming pool and construction method thereof | |
CN106368347B (en) | Connecting structure of wall and construction method | |
CN105862664A (en) | Water retaining dam | |
CN206428864U (en) | A kind of inner wall structure | |
CN206428882U (en) | A kind of external wall structure | |
CN108691382A (en) | Pin-connected panel precast floor slab and its construction method | |
CN212896767U (en) | Bottom plate structure of cast-in-place concrete pool | |
CN110005429B (en) | Box-type top plate structure of urban tunnel bifurcation | |
CN206503259U (en) | A kind of inner wall structure | |
CN206503260U (en) | A kind of external wall structure | |
CN207469553U (en) | A kind of prefabricated arch hollow block and its joist cast-in-situ monoblock type floor construction | |
CN210946907U (en) | High-strength and high-waterproofness high-low span structure | |
CN210530086U (en) | Box type composite heat-insulating floor slab | |
CN209637142U (en) | Steel concrete combines the light-duty assembled stair of flat underside | |
CN209412844U (en) | A kind of assembled resin concrete drainage ditch | |
CN209066442U (en) | A kind of inverse construction joint structure for building construction of deep basal pit | |
CN106368373B (en) | A kind of external wall structure | |
CN207775725U (en) | A kind of special disposable light filling composite core mould of bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |