CN208280019U - A kind of workpiece of bridge pier and bridge contact position - Google Patents

A kind of workpiece of bridge pier and bridge contact position Download PDF

Info

Publication number
CN208280019U
CN208280019U CN201820652633.4U CN201820652633U CN208280019U CN 208280019 U CN208280019 U CN 208280019U CN 201820652633 U CN201820652633 U CN 201820652633U CN 208280019 U CN208280019 U CN 208280019U
Authority
CN
China
Prior art keywords
hinge
concrete
bridge
grout
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820652633.4U
Other languages
Chinese (zh)
Inventor
侯永姣
宋柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Polytechnic of Construction
Original Assignee
Guangxi Polytechnic of Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Polytechnic of Construction filed Critical Guangxi Polytechnic of Construction
Priority to CN201820652633.4U priority Critical patent/CN208280019U/en
Application granted granted Critical
Publication of CN208280019U publication Critical patent/CN208280019U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the workpiece of a kind of bridge pier and bridge contact position.The grout groove is respectively arranged on the left side and the right side hinge, and hinge front-rear position is provided with hinged hole slot, and the hinge top center is provided with notch;Strengthening steel slab has been caught on two hinges;Grout groove, hinge, strengthening steel slab collectively constitute a concrete grout storage module;And concrete grout storage module is wrapped up by dust cover;It is storage bucket using coagulator reserve tank two sides, storage bucket is hinged with hinge;Coagulator stores front of the slot and is equipped with reinforcing bar engagement plate, and the front end of reinforcing bar engagement plate is steel-fastening rib;It is provided with rivet bolt hole on reinforcing bar engagement plate, inserted with expansion tube in rivet bolt hole, concrete grout storage group successively can hingedly be formed by the hinge of head and the tail between each concrete grout storage module;And concrete grout storage group constitutes the technical solution that quantity stores module for the 4-12 concrete grouts, realizes the workpiece design of a kind of bridge pier and bridge contact position.

Description

A kind of workpiece of bridge pier and bridge contact position
Technical field
The utility model relates to the workpiece of a kind of bridge pier and bridge contact position.
Background technique
Bridge pier is bearing bridge span structure and object is built in the Asia that permanent section and vehicle active load reach ground, abutment is located at bridge two Lake.Bridge pier is then between two abutments.The effect of bridge domain is to support bridge span structure: the old work for playing bearing bridge span structure of face abutment With outer, to be also connected with embankment and prevent the sliding field of embankment.Fill out scholar for protection analysis platform and embankment, analysis platform two sides often do some protection and Training works.Bridge pier is mainly made of top cap, pier shaft.Abutment is mainly made of top cap, abutment body.The effect of top cap is spanning branch Larger and concentration the power that seat transmits, disperses and is transmitted to pier shaft and abutment body well-balancedly.Therefore top cap should use the higher material of intensity Material building, generally uses not low 200 grades of reinforced concrete buildings, and thickness is not 40 centimetres small.In addition, top cap must also have biggish put down Face size sets a roof beam in place for construction and maintenance provides necessary working face.Pier shaft and abutment body be supporting bridge across main structure, no It is subjected only to the whole load that bridge span structure transmits, but also directly bears soil pressure, water flow impact pressure, ice pressure, ship collision A variety of loads such as power, so pier shaft and abutment body all have enough intensity, rigidity and stability.Generally use concrete or stone The entity structure of block.Pier cap is set on pier shaft, under connect basis.Its feature is to make full use of the compressive property of masonry material, is borrowed certainly The larger cross-section size and weight of body bear external force vertically and horizontally, have firm durable, and construction is simple, materials Conveniently, the advantages that saving steel.The disadvantage is that quantity of masonry is big, the coarse heaviness of shape reduces effective aperture under bridge, and it is negative to increase ground Lotus;It is particularly disadvantageous when foundation bearing capacity is lower when bridge pier is higher.Gravity pier mostly uses simple streamline section shape, Such as nose circle pier, tip pier, round pier are lauched stream swimmingly around bridge pier with suspension bridge, reduction block water and pier by wash away.Work as water It is indefinite or when with bridge oblique to flow direction change, preferably use circle pier.On the bridge pier influenced by floating ice, ice-breaking should be set in upstream end Rib.The viaduct in non-city and not by the bridge pier of water currents then preferably uses the rectangular section convenient for construction.Therefore bridge pier and bridge Contact position is core place, and contact position construction is firm, directly determines pontic endurance issues.
Summary of the invention
The purpose of the utility model is to provide the workpiece of a kind of bridge pier and bridge contact position.
The utility model solves its above-mentioned technical problem institute, and the following technical solution is employed: a kind of bridge pier is contacted with bridge The workpiece at place, is mainly configured with: dust cover, grout groove, hinge, strengthening steel slab, coagulator reserve tank, storage bucket, reinforcing bar rank Fishplate bar, rivet bolt hole, steel-fastening rib, expansion tube, the grout groove are respectively arranged on the left side and the right side hinge, before the hinge Position is provided with hinged hole slot afterwards, and the hinge top center is provided with notch;
Strengthening steel slab has been caught on hinge described in two;The grout groove, hinge, strengthening steel slab collectively constitute one Concrete grout stores module;And concrete grout storage module is wrapped up by dust cover;
The coagulator reserve tank two sides are storage bucket, and storage bucket is hinged with hinge;The coagulator storage Front of the slot is equipped with reinforcing bar engagement plate, and the front end of reinforcing bar engagement plate is steel-fastening rib;It is provided with rivet bolt hole on the reinforcing bar engagement plate, It is hollow in the expansion tube inserted with expansion tube in rivet bolt hole;
Concrete successively can hingedly be formed by the hinge of head and the tail between each concrete grout storage module Starch storage group;And it is that the 4-12 concrete grouts store module that concrete grout storage group, which constitutes quantity,.
Further, the spacing between the steel-fastening rib is 4.5-7 centimetres.
Further, the coagulator reserve tank is injected with concrete early strength agent to be interior.
The utility model has the beneficial effects that being storage bucket using coagulator reserve tank two sides, storage bucket is mutually cut with scissors with hinge It connects;Coagulator stores front of the slot and is equipped with reinforcing bar engagement plate, and the front end of reinforcing bar engagement plate is steel-fastening rib;It is provided on reinforcing bar engagement plate Rivet bolt hole, inserted with expansion tube in rivet bolt hole, between each concrete grout storage module can by the hinges of head and the tail according to Secondary hinged formation concrete grout storage group;And it is the 4-12 concrete grout storages that concrete grout storage group, which constitutes quantity, The technical solution of module realizes the workpiece design of a kind of bridge pier and bridge contact position.
Detailed description of the invention
Fig. 1 is the workpiece overall structure figure of a kind of bridge pier of the utility model and bridge contact position.
Fig. 2 is the single overall structure figure of workpiece of a kind of bridge pier of the utility model and bridge contact position.
Fig. 3 is the single detonation configuration figure of workpiece of a kind of bridge pier of the utility model and bridge contact position.
1- dust cover in figure, 2- grout groove, 3- hinge, 4- strengthening steel slab, 5- coagulator reserve tank, 51- storage bucket, 6- Reinforcing bar engagement plate, 61- rivet bolt hole, 62- steel-fastening rib, 7- expansion tube.
Specific embodiment
1-3 makes a detailed explanation specific embodiment of the present utility model with reference to the accompanying drawing.
Embodiment: a kind of workpiece of bridge pier and bridge contact position is mainly configured with: dust cover 1, grout groove 2, hinge 3, Strengthening steel slab 4, coagulator reserve tank 5, storage bucket 51, reinforcing bar engagement plate 6, rivet bolt hole 61, steel-fastening rib 62, expansion tube 7, institute The grout groove 2 stated is respectively arranged on the left side and the right side hinge 3, and 3 front-rear position of hinge is provided with hinged hole slot, the hinge 3 top center of chain is provided with notch;
Strengthening steel slab 4 has been caught on hinge 3 described in two;The grout groove 2, hinge 3,4 common groups of strengthening steel slab Module is stored at a concrete grout;And concrete grout storage module is wrapped up by dust cover 1;
5 two sides of coagulator reserve tank are storage bucket 51, and storage bucket 51 is hinged with hinge 3;The solidification 5 front end of agent reserve tank is equipped with reinforcing bar engagement plate 6, and the front end of reinforcing bar engagement plate 6 is steel-fastening rib 62;The reinforcing bar engagement plate 6 On be provided with rivet bolt hole 61, it is hollow in the expansion tube 7 inserted with expansion tube 7 in rivet bolt hole 61;
Concrete successively can hingedly be formed by the hinge 3 of head and the tail between each concrete grout storage module Starch storage group;And it is that the 4-12 concrete grouts store module that concrete grout storage group, which constitutes quantity,.
Spacing between the steel-fastening rib 62 is 4.5-7 centimetres.
The coagulator reserve tank 5 is injected with concrete early strength agent in being.
Secondly it is in design bright spot: can be by the hinge of head and the tail between each concrete grout storage module 3 successively hingedly form concrete grout storage group;And it is the 4-12 concrete grouts that concrete grout storage group, which constitutes quantity, Store module.It can be designed so that each concrete grout storage module carries out one by one according to the needs of actual amount using this Splicing ensure that concrete grout does not leak and by way of being inserted in dust cover 1.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (3)

1. the workpiece of a kind of bridge pier and bridge contact position, is mainly configured with: dust cover (1), hinge (3), adds grout groove (2) Gu steel plate (4), coagulator reserve tank (5), storage bucket (51), reinforcing bar engagement plate (6), rivet bolt hole (61), steel-fastening rib (62), swollen Swollen screwed pipe (7), it is characterised in that: grout groove (2) is respectively arranged on the left side and the right side hinge (3), the hinge (3) front-rear position It is provided with hinged hole slot, the hinge (3) top center is provided with notch;
Strengthening steel slab (4) have been caught on hinge (3) described in two;The grout groove (2), hinge (3), strengthening steel slab (4) Collectively constitute a concrete grout storage module;And concrete grout storage module is wrapped up by dust cover (1);
Described coagulator reserve tank (5) two sides are storage bucket (51), and storage bucket (51) is hinged with hinge (3);Described Coagulator reserve tank (5) front end is equipped with reinforcing bar engagement plate (6), and the front end of reinforcing bar engagement plate (6) is steel-fastening rib (62);Described It is provided on reinforcing bar engagement plate (6) rivet bolt hole (61), inserted with expansion tube (7), the expansion tube (7) in rivet bolt hole (61) It is interior hollow;
Concrete grout successively can hingedly be formed by the hinge (3) of head and the tail between each concrete grout storage module Storage group;And it is that the 4-12 concrete grouts store module that concrete grout storage group, which constitutes quantity,.
2. the workpiece of a kind of bridge pier and bridge contact position according to claim 1, it is characterised in that the steel-fastening rib (62) spacing between is 4.5-7 centimetres.
3. the workpiece of a kind of bridge pier and bridge contact position according to claim 1, it is characterised in that the coagulator storage It deposits slot (5) and is injected with concrete early strength agent to be interior.
CN201820652633.4U 2018-05-03 2018-05-03 A kind of workpiece of bridge pier and bridge contact position Expired - Fee Related CN208280019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820652633.4U CN208280019U (en) 2018-05-03 2018-05-03 A kind of workpiece of bridge pier and bridge contact position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820652633.4U CN208280019U (en) 2018-05-03 2018-05-03 A kind of workpiece of bridge pier and bridge contact position

Publications (1)

Publication Number Publication Date
CN208280019U true CN208280019U (en) 2018-12-25

Family

ID=64752850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820652633.4U Expired - Fee Related CN208280019U (en) 2018-05-03 2018-05-03 A kind of workpiece of bridge pier and bridge contact position

Country Status (1)

Country Link
CN (1) CN208280019U (en)

Similar Documents

Publication Publication Date Title
CN109868898A (en) Assembled is from restoring to throne node
CN101298756A (en) Technique for widening concrete box girder without increasing foot stall steel component
CN207130634U (en) A kind of structure for connecting existing T beams and newly-built T beams with reinforcing pull rod using steel plate
Zhao et al. State-of-the-art and annual progress of bridge engineering in 2020
CN208280019U (en) A kind of workpiece of bridge pier and bridge contact position
CN208072166U (en) Hybrid combining beam three stride continuous suspension bridge
CN205934687U (en) Antinode worker roof beam - steel concrete roof - external prestress combination T type simple beam
CN209178845U (en) Improve Hollow Slab Beam Bridge reinforcement structure
CN208632981U (en) Enhance Hollow Slab Beam Bridge lateral ties ruggedized construction
You et al. Sutong Bridge–the longest cable-stayed bridge in the world
CN102392421B (en) Small-town arch bridge local widening and reinforcing method based on characteristic of tidal traffic flow
CN209010958U (en) A kind of steel box girder of overpass
CN211848900U (en) Fixed knot constructs is restoreed in building road bridge crack
CN211368433U (en) Swivel bridge with seismic isolation and reduction functions
CN206529709U (en) A kind of Anti-seismic bridge pier ruggedized construction
CN202000249U (en) Building bridge
CN204875494U (en) Scalable abutment of plain type suitable for bridge
CN207552905U (en) The short side that a kind of steel truss girder is mixed with beams of concrete is across Cable-Stayed Bridge Structure
CN206800163U (en) A kind of base-supporting steel reinforced concrete combines cable-stayed bridge cross section structure
CN220927483U (en) Steel leading bridge shore device suitable for limited type shore protection
CN217601331U (en) Novel high-pile port and pier structure based on PVA-ECC
CN105088939B (en) A kind of cold-resistant type railway waterproof retractor device
CN215164587U (en) Municipal bridge lower part bearing structure
Tang The New Shibanpo Bridge, Chongqing, China
CN110700126A (en) Single-column pier bridge anti-overturning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181225

Termination date: 20190503

CF01 Termination of patent right due to non-payment of annual fee