CN208279995U - Interim tie-rod device for the locking of bowstring arch bridge arch rib - Google Patents

Interim tie-rod device for the locking of bowstring arch bridge arch rib Download PDF

Info

Publication number
CN208279995U
CN208279995U CN201820796258.0U CN201820796258U CN208279995U CN 208279995 U CN208279995 U CN 208279995U CN 201820796258 U CN201820796258 U CN 201820796258U CN 208279995 U CN208279995 U CN 208279995U
Authority
CN
China
Prior art keywords
arch
bridge
bowstring
tie
arch bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820796258.0U
Other languages
Chinese (zh)
Inventor
杨长虹
黄翔
于骏
殷力立
郭佳嘉
宋春晖
赵宝成
刘广保
罗松
金鹏
张岩
陈世云
公绪向
王建勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC SHEC Fourth Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201820796258.0U priority Critical patent/CN208279995U/en
Application granted granted Critical
Publication of CN208279995U publication Critical patent/CN208279995U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of interim tie-rod devices for the locking of bowstring arch bridge arch rib, belong to field of bridge construction, interim tie-rod device is connected between the both ends arch springing side of bowstring arch bridge, interim tie-rod device includes finish rolling threaded tie-rods, nut and attachment base, attachment base is fixed on the arch springing side of bowstring arch bridge, and finish rolling threaded tie-rods are connected between the attachment base of both ends arch springing of bowstring arch bridge by nut.Under the conditions of the utility model can be realized bowstring arch bridge without bracket, the non-opposite sequence construction that binder removes arch rib again is first removed.

Description

Interim tie-rod device for the locking of bowstring arch bridge arch rib
Technical field
The utility model belongs to field of bridge construction, is applicable in the constructions such as arch bridge dismounting.
Background technique
20th century of China build bridge because operation the age it is longer, occur old unsafe bridge in various degree, some because traffic be saturated, Navigation capacity is promoted, and bridge is unsatisfactory for requirement, and more and more bridges need to be removed in situ carries out reorganization and expansion construction.Bowstring arch bridge Because combining arch bridge and beam bridge a little, it is widely used by last century.Because bowstring arch bridge is statically indeterminate system, Normal practice, tied arch Bridge first sets up bracket, support tie bar and arch rib when removing in river, and then segmentation carries out arch rib dismounting.
It being continued to develop and is promoted by Navigation in Navigable, most of navigable river, which does not allow to carry out iceound or navigation hole width, to be reduced, Cause part bowstring arch bridge that can not carry out bracket support when removing.
Utility model content
The purpose of this utility model is that: it proposes a kind of interim tie-rod device for the locking of bowstring arch bridge arch rib, is used for Under the conditions of bowstring arch bridge is without bracket, the non-opposite sequence construction that binder removes arch rib again is first removed.
The utility model aim is realized by following technical proposals:
A kind of interim tie-rod device for the locking of bowstring arch bridge arch rib, interim tie-rod device are connected to the two of bowstring arch bridge Between end arch foot side, interim tie-rod device includes finish rolling threaded tie-rods, nut and attachment base, and attachment base is fixed on bowstring arch bridge Arch springing side, finish rolling threaded tie-rods are connected between the attachment base of both ends arch springing of bowstring arch bridge by nut.
Alternatively, attachment base includes wing plate and web, and wing plate is weldingly fixed on the arch springing side of bowstring arch bridge, and web connects Fixed wing plate and arch springing are connect, finish rolling threaded tie-rods are connected on wing plate by nut.
The aforementioned main scheme of the utility model and its each further selection scheme can be freely combined to form multiple schemes, It can be used for the utility model and claimed scheme;And the utility model, (each non conflicting selection) selection between and and It can also be freely combined between other selections.Those skilled in the art after understanding the utility model according to the prior art and Common knowledge can be illustrated there are many combination, be the claimed technical solution of the utility model, do not do exhaustion herein.
The course of work are as follows: utility model device is installed at tie-rod arch bridge abutment, and applies certain pretightning force, instead of Arch bridge binder overcomes arch rib horizontal thrust.Tied arch can first remove binder, and arch rib is locked by the device, keep stable body System realizes arch bridge opposite sequence without support removing.
The utility model has the beneficial effects that the Support Method dismounting technique that the device is more traditional, the device can be used for arch rib lock Fixed, when arch bridge binder is first removed, arch rib will not occur that horizontal thrust is excessive structure destruction occurs, first remove binder again for arch bridge The non-opposite sequence construction for removing arch rib, effectively prevents setting up bracket within the scope of navigable, and avoiding, which influences navigation channel, normally opens the navigation or air flight, Save the cost improves construction efficiency, constructing operation conveniently.
Detailed description of the invention
Fig. 1 is the positive arragement construction schematic diagram of the interim tie-rod device of the utility model embodiment;
Fig. 2 is the interim tie-rod device thin portion front arragement construction schematic diagram of the utility model embodiment;
Fig. 3 is the interim tie-rod device thin portion plane arrangement structure schematic diagram of the utility model embodiment;
Fig. 4 is the expansion joint plug action side arrangement structural schematic diagram of the utility model embodiment;
Fig. 5 is the arch springing backpressure device front arragement construction schematic diagram of the utility model embodiment;
Fig. 6 is the arch springing backpressure device side arrangement structural schematic diagram of the utility model embodiment;
1 it is wherein binder, 2 be arch rib, 3 be sunpender, 4 be arch springing, 5 be finish rolling threaded tie-rods, 6 be nut, 7 is wing plate, 8 It is end bay beam bridge for web, 9,10 be abutment, 11 be single span freely-supported expansion joint, 12 be filling steel plate, 13 be finish rolling screw thread, 14 is Back-pressure beam, 15 be pier cap, 16 be attachment base.
Specific embodiment
Following non-limiting examples are for illustrating the utility model.
With reference to shown in Fig. 1-3, filled out for the device of bowstring arch bridge arch rib locking, including interim tie-rod device, expansion joint plug Device and arch springing backpressure device.Interim tie-rod device is connected between 4 side of both ends arch springing of bowstring arch bridge, interim tie-rod device Including finish rolling threaded tie-rods 5, nut 6 and attachment base, attachment base is fixed on 4 side of arch springing of bowstring arch bridge, finish rolling threaded tie-rods 5 It is connected to by nut 6 between the attachment base 16 of the both ends arch springing 4 of bowstring arch bridge;Attachment base 16 includes wing plate 7 and web 8, the wing Plate 7 is weldingly fixed on 4 side of arch springing of bowstring arch bridge, and web 8 is connected and fixed wing plate 7 and arch springing 4, and finish rolling threaded tie-rods 5 pass through Nut 6 is connected on wing plate 7.
Refering to what is shown in Fig. 4, expansion joint plug action includes rigid filler mechanism, rigid filler mechanism is respectively arranged on arch springing 4 Between end bay beam bridge 9, between each adjacent edge bridge bridge 9 between arch springing 4 and abutment 10 and end bay beam bridge 9 and abutment 10 Between single span freely-supported expansion joint 11 in, rigid filler mechanism rigid connection 11 both ends bridge mechanism of single span freely-supported expansion joint simultaneously pass Pass 2 horizontal force of arch rib;Preferably, as shown in this embodiment, rigid filler mechanism is dense packing effect at single span freely-supported expansion joint Filling steel plate 12 in 11.
With reference to shown in Fig. 5-6, arch springing backpressure device includes finish rolling screw thread 13, back-pressure beam 14 and nut 6, below arch springing 4 15 top surface of pier cap be implanted into finish rolling screw thread 13,4 top surface of arch springing be arranged back-pressure beam 14, finish rolling screw thread 13 by nut 6 connect back-pressure Beam 14, finish rolling screw thread 13 are symmetrical arranged in 4 two sides of arch springing.
Using the bowstring arch bridge method for dismounting for the device for being previously described for the locking of bowstring arch bridge arch rib, step includes:
1) it before the binder 1 of bowstring arch bridge is removed, is applied by finish rolling threaded tie-rods 5 of the tightening nuts 6 to interim tie-rod device The pretension of finish rolling threaded tie-rods 5 is used to offset the horizontal thrust of the arch rib 2 of bowstring arch bridge after adding pretightning force, binder 1 to remove, real Existing arch rib 2 is locked from steady;
2) before the binder 1 of bowstring arch bridge is removed, dense packing effect fills steel plate 12, tied arch in single span freely-supported expansion joint 11 The horizontal force of bridge is transferred to end bay beam bridge 9 by arch springing 4, then is transferred to abutment 10 by end bay beam bridge 9, overcomes water by abutment 10 Flat-pushing power improves the safety of 2 structure of arch rib;
3) before the binder 1 of bowstring arch bridge is removed, by tightening nuts 6 to 13 prestressing force of finish rolling screw thread of arch springing backpressure device Afterwards, arch springing 4 is pushed down by back-pressure beam 14, assists offsetting the horizontal thrust of arch rib 2 using pier cap 15, to further increase arch bridge system 2 safety of arch rib when beam is removed;
4) bowstring arch bridge is removed, first removes binder 1 and removes arch rib 2 again.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (2)

1. a kind of interim tie-rod device for the locking of bowstring arch bridge arch rib, it is characterised in that: interim tie-rod device, which is connected to, is Between the both ends arch springing side of bar arch bridge, interim tie-rod device includes finish rolling threaded tie-rods, nut and attachment base, and attachment base is fixed In the arch springing side of bowstring arch bridge, finish rolling threaded tie-rods by nut be connected to bowstring arch bridge both ends arch springing attachment base it Between.
2. the interim tie-rod device for the locking of bowstring arch bridge arch rib as described in claim 1, it is characterised in that: attachment base packet Wing plate and web are included, wing plate is weldingly fixed on the arch springing side of bowstring arch bridge, and web is connected and fixed wing plate and arch springing, finish rolling screw thread Tie-rod is connected on wing plate by nut.
CN201820796258.0U 2018-05-28 2018-05-28 Interim tie-rod device for the locking of bowstring arch bridge arch rib Expired - Fee Related CN208279995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820796258.0U CN208279995U (en) 2018-05-28 2018-05-28 Interim tie-rod device for the locking of bowstring arch bridge arch rib

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820796258.0U CN208279995U (en) 2018-05-28 2018-05-28 Interim tie-rod device for the locking of bowstring arch bridge arch rib

Publications (1)

Publication Number Publication Date
CN208279995U true CN208279995U (en) 2018-12-25

Family

ID=64705200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820796258.0U Expired - Fee Related CN208279995U (en) 2018-05-28 2018-05-28 Interim tie-rod device for the locking of bowstring arch bridge arch rib

Country Status (1)

Country Link
CN (1) CN208279995U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113981828A (en) * 2021-11-10 2022-01-28 广西路桥工程集团有限公司 Temporary tie bar crossing mechanism

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113981828A (en) * 2021-11-10 2022-01-28 广西路桥工程集团有限公司 Temporary tie bar crossing mechanism
CN113981828B (en) * 2021-11-10 2023-09-22 广西路桥工程集团有限公司 Temporary tie rod crossing mechanism

Similar Documents

Publication Publication Date Title
CN108487038A (en) Combination unit and arch bridge method for dismounting for the locking of bowstring arch bridge arch rib
CN204919347U (en) Iron wedge support system with adjustable pier is accepted bent cap construction and is used
CN207646604U (en) Leveling multi-directional deflection comb plate, comb joint bridge extension joint is turned up in unit assembled damping
CN204919346U (en) Knotted bar iron strutting arrangement that detached pier bent cap is adjustable
CN208279995U (en) Interim tie-rod device for the locking of bowstring arch bridge arch rib
CN204419200U (en) One kind of multiple bore tunnel hydraulic lining trolleys
CN103741591B (en) There is the rubber concrete hollow pier of inside and outside constraint
CN105113434A (en) Framing demounting supporting structure of spandrelless arch bridge of over crossing operation highway and construction method
CN208279994U (en) Combination unit for the locking of bowstring arch bridge arch rib
CN204780907U (en) Stake device is sealed in stake of prestressed anchorage pole static pressure among civil engineering
CN208533346U (en) Arch springing backpressure device for the locking of bowstring arch bridge arch rib
CN209243551U (en) Energy dissipating Self-resetting bridge shockproof structure
JP5716117B1 (en) Hinge reinforcement method and reinforcement structure for existing girder bridge
CN105220622A (en) T beam widens reinforcing construction and construction method thereof
CN102182469B (en) Construction method for preventing cracking of second lining of middle cavity of large span tunnel
CN109594651A (en) A kind of steel pipe fashioned iron regeneration concrete column-PEC steel girder frame and assembly method
KR102484097B1 (en) the assembling method of the afterta conservation part replacement type finger joint and finger joint and replacement method
KR101012105B1 (en) Temporary bridge having disparity flange and variable section
CN204023422U (en) A kind of assembling Coping Construction operating platform
CN104158119B (en) A kind of overhead ground wire suspension clamp regulation method and buffer unit
CN205711722U (en) A kind of packaged type bridges expansion joint
CN204097930U (en) A kind of protector of Railway Bridges And Piers
CN204663571U (en) A kind of for the fire-fighting evacuation platform outside subway tunnel
CN209443568U (en) A kind of steel pipe fashioned iron regeneration concrete column-PEC steel girder frame
CN106049277A (en) Bridge panel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181225

CF01 Termination of patent right due to non-payment of annual fee