CN208276140U - The tundish company's of using instead base component fastly - Google Patents

The tundish company's of using instead base component fastly Download PDF

Info

Publication number
CN208276140U
CN208276140U CN201820811045.0U CN201820811045U CN208276140U CN 208276140 U CN208276140 U CN 208276140U CN 201820811045 U CN201820811045 U CN 201820811045U CN 208276140 U CN208276140 U CN 208276140U
Authority
CN
China
Prior art keywords
base component
tundish
company
section
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820811045.0U
Other languages
Chinese (zh)
Inventor
朱正海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maanshan Shangyuan Metallurgical Technology Co Ltd
Original Assignee
Maanshan Shangyuan Metallurgical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maanshan Shangyuan Metallurgical Technology Co Ltd filed Critical Maanshan Shangyuan Metallurgical Technology Co Ltd
Priority to CN201820811045.0U priority Critical patent/CN208276140U/en
Application granted granted Critical
Publication of CN208276140U publication Critical patent/CN208276140U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Continuous Casting (AREA)

Abstract

The utility model discloses a kind of tundish company's of using instead base components fastly, belong to casting for shaped blank continuous field.The utility model includes two horizontal segments being parallel to each other, and is connected between two horizontal segments by vertical section;The top of vertical section is connected with several tilting sections inclined upward, and the lower part of vertical section is connected with several tilting sections inclined downward;Even the middle part of base member upper horizontal segment is equipped with the positioning protrusion extended respectively to two sides;Several extension rods are connected on each tilting section;Breeze way, the breeze way small big conical structure under being are equipped with positioned at its bottom end of the horizontal segment of lower part;The bottom end of breeze way be connected with extend downward protrude into bar.The purpose of the utility model is to overcome existing even base components not can guarantee the deficiency securely connected between new and old slab when tundish quick change operates, and provides a kind of tundish company's of using instead base component fastly, can guarantee that new and old slab securely connects.

Description

The tundish company's of using instead base component fastly
Technical field
The utility model relates to casting for shaped blank continuous field, more specifically to a kind of tundish company's of using instead base component fastly.
Background technique
With the development of iron and steel enterprise and the raising of whole industrial level, steel production scale constantly becomes larger, imitates to production The requirement of rate is higher and higher, and the production efficiency of steel-making continuous casting has become the bottleneck problem of development of iron and steel enterprises.In terms of continuous casting, it is It realizes continual continuous casting for a long time, has developed submersed nozzle fast exchanging process, ladle quick-replaceable work at present Skill and relevant device.Continuous casting production service life directly affects the raising of conticaster operating rate, fast using continuous casting production Technology is changed, casting machine machine stop times can be reduced, effectively reduces tundish time, improves caster work rate, improves casting machine production capacity, Reduce production cost.
Under the conditions of tundish service life can not be significant extended, exploitation tundish quick change technique is very necessary. Wherein, the casting blank section geometry in the continuous casting process of Hot Metal in Beam Blank due to Hot Metal in Beam Blank is special, and setting rate is fast, fast in tundish It is more demanding to the firmness of new and old slab junction, quick change speed, connection precision during changing, but tundish quick change at present Process is mainly manually operated by operator, and technology stability is difficult to ensure, manually connects steel in base component insertion crystallizer When in molten steel, once operation error, gently then leaves scratch on copper plate of crystallizer, cc billet surface quality is reduced, it is heavy then damage knot Brilliant device copper sheet, causes production accident, upsets rhythm of production.
Have related art scheme about Hot Metal in Beam Blank tundish fast replacing device in the prior art to disclose, such as patent disclosure Number: CN1986115A, publication date: on 06 27th, 2007, invention and created name are as follows: packet fast sprue-replacing is poured in casting for shaped blank continuous Method and device, this application include middle packet and crystallizer, and two middle water-coating ports, each middle water-coating port lower section is at least arranged in middle packet Be arranged fast sprue-replacing mechanism, which is provided with sliding filling pipe end and sliding collector nozzle, respectively with middle water-coating port and full submersed nozzle It is connected, full submersed nozzle is plugged in crystallizer, and by bearing bracket, molten steel is poured by the two closed ladle canals Note prevents secondary oxidation of steel, improves slab quality;Fast sprue-replacing mechanism for implementing molten steel flow and in crystallizer liquid level tune Control reduces bonding, bleed-out tendency;Realize the fast online replacement mouth of a river, continuous cast crystallizer number in raising, in reduction packet replacement number and Middle packet dosage improves caster work rate.But connect in this application base component installation speed and installation accuracy it is lower, it is difficult To ensure smoothly completing for tundish quick change operation.But connects base component used in this application and not can guarantee new and old slab Between firmly connect.
In conclusion it is firm between new and old slab how to overcome existing even base component not can guarantee in the operation of tundish quick change The deficiency being solidly connected, be in the prior art urgent need to resolve the technical issues of.
Utility model content
1. utility model technical problems to be solved
The purpose of the utility model is to overcome existing even base components not can guarantee new and old casting when tundish quick change operates The deficiency securely connected between base provides a kind of tundish company's of using instead base component fastly, can guarantee that new and old slab securely connects.
2. technical solution
In order to achieve the above objectives, technical solution provided by the utility model are as follows:
The tundish of the utility model company's of using instead base component fastly, the horizontal segment being parallel to each other including two, two horizontal segments Between pass through vertical section connect;The top of the vertical section is connected with several tilting sections inclined upward, the vertical section Lower part is connected with several tilting sections inclined downward.
It is further improved as the utility model, the middle part of the even base member upper horizontal segment is equipped with respectively to two The positioning protrusion that side extends.
It is further improved as the utility model, several extension rods is connected on each tilting section.
It is further improved as the utility model, is equipped with breeze way, the buffering positioned at its bottom end of the horizontal segment of lower part Section be under small big conical structure.
It is further improved as the utility model, the bottom end of the breeze way is connected with protruding into of extending downward Bar.
It is further improved as the utility model, its surrounding of superposed horizontal segment is provided with the shunting of annular Section, the shunting section upper surface are inclined annular slope from top to bottom, and the annular slope is close to shunting section central point direction Height is higher than the height far from shunting section central point direction.
3. beneficial effect
Using technical solution provided by the utility model, compared with prior art, there is following remarkable result:
(1) geometry for connecting base component in the utility model, is conducive to tundish quick change process and connects base component quickly to insert Enter in crystallizer and solidified with the seamless fusion of molten steel, and fuse solidification closely with the molten steel after tundish replacement, can guarantee new and old Slab securely connects.
(2) in the utility model, several extension rods are connected on each tilting section, what is connected on each tilting section several prolongs Boom increases the surface area that entire tilting section is contacted with molten steel, so that can securely connect between new and old slab after solidification of molten steel It connects.
(3) in the utility model, breeze way is equipped with positioned at its bottom end of the horizontal segment of lower part, and the breeze way is small big under being Conical structure, the bottom end of breeze way are connected with the bar that protrudes into extended downward, when entirely connecting base component and being inserted into molten steel, stretch Enter bar and touch molten steel at first, then under the breeze way of small big conical structure gradually protrude into molten steel, it is straight to avoid molten steel The phenomenon that connecing exposure level section and splashing, while being conducive to entirely to connect base component and smoothly protrude into molten steel.
(4) in the utility model, its surrounding of superposed horizontal segment is provided with the shunting section of annular, shunting section upper surface For inclined annular slope from top to bottom, height of the annular slope close to shunting section central point direction is higher than far from shunting section The height in heart point direction, when molten steel trickles from tundish into crystallizer, by the blocking of shunting section, molten steel is first in crystallizer Interior aggregation, the molten steel liquid level then assembled is gradually increasing entirely will connect base component and wrap gradually, to be conducive to molten steel and entire The even close contact between base component, so that can securely be connected between new and old slab after solidification of molten steel.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment Attached drawing be briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore should not be by Regard the restriction to range as, for those of ordinary skill in the art, without creative efforts, may be used also To obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is the schematic view of the front view of the Hot Metal in Beam Blank tundish fast replacing device of embodiment;
Fig. 2 is the side structure schematic view of the Hot Metal in Beam Blank tundish fast replacing device of embodiment;
Fig. 3 is the schematic view of the front view for connecting base component in embodiment;
Fig. 4 is the overlooking structure diagram of carrier bar in embodiment;
Fig. 5 is the overlooking structure diagram of Hot Metal in Beam Blank in embodiment;
Fig. 6 is the flow chart of the Hot Metal in Beam Blank tundish quick change method of embodiment.
Label declaration in schematic diagram: 1, support frame;2, connect base component;201, horizontal segment;2011, positioning protrusion;202, Vertical section;203, tilting section;204, breeze way;205, bar is protruded into;206, extension rod;207, shunting section;3, extension rod;4, slag is thick Meter;5, rotating disk;6, drive rod;7, transmission gear;8, lifters;9, sliding rail;10, locating piece;11, laser range finder;12, red Outer temperature measurer;13, carrier bar;1301, locating slot;14, Hot Metal in Beam Blank.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Therefore, below to providing in the accompanying drawings The detailed description of the embodiments of the present invention be not intended to limit the range of claimed invention, but only Indicate the selected embodiment of the utility model.Based on the embodiments of the present invention, those of ordinary skill in the art are not having Every other embodiment obtained under the premise of creative work is made, is fallen within the protection scope of the utility model.
For the content for further appreciating that the utility model, the utility model is described in detail in conjunction with the accompanying drawings and embodiments.
Embodiment 1
With reference to Fig. 1-5, the Hot Metal in Beam Blank tundish fast replacing device of the present embodiment, comprising: support frame 1 is equipped with inside support frame 1 Two sliding rails 9 being parallel to each other, sliding rail 9 are arranged in vertical;Carrier bar 13, carrier bar 13 is horizontally disposed, carrying The one end fits of bar 13 are mounted on a sliding rail 9, and the other end of carrier bar 13 is fitted on another sliding rail 9;Even base component 2, even base component 2 is for connection to the steel structure part that packet front and back molten steel in quick change is formed by new and old slab, and even base component 2 wraps Two horizontal segments being parallel to each other 201 are included, are connected between two horizontal segments 201 by vertical section 202;The top of vertical section 202 Several tilting sections inclined upward 203 are connected with, the lower part of vertical section 202 is connected with several tilting sections inclined downward 203, the design of tilting section 203 on 202 top of vertical section, lower part enables company's base component 2 closely to connect with the molten steel after solidification It connects, guarantees that new and old slab securely connects;The both ends of carrier bar 13 are connected separately with company's base component 2.Wherein, the two of carrier bar 13 End is respectively equipped with locating slot 1301, and the two sides of each locating slot 1301 are respectively equipped with outwardly extending extension rod 3;Even base component 2 The middle part of upper horizontal section 201 is equipped with the positioning protrusion 2011 extended respectively to two sides, and positioning protrusion 2011 hangs on locating slot 1301 top, positioning protrusion 2011 can support the weight for entirely connecting base component 2, and locating slot 1301 will be for that will connect base component 2 Certain height is hung on, is prolonged in use, the positioning protrusion 2011 extended in upper horizontal section 201 to two sides is ridden over correspondence respectively On boom 3, even base component 2 then is pushed to 1301 direction of locating slot, so that even the vertical section 202 of base component 2 passes through locating slot 1301, even the positioning protrusion 2011 on base component 2 hangs on the top of locating slot 1301, thus conveniently and efficiently by two companies Base component 2 is symmetrically connected to the both ends of carrier bar 13;Carrier bar 13 is used to two blocks of company's base components 2 being placed on the same horizontal plane On, guarantee that two blocks of company's base components 2 can be inserted into the corresponding position of beam blank mould section simultaneously and (can refer in Fig. 5 special-shaped Two rectangular areas of 14 section of base).Lifters 8 are installed, the side of lifters 8 is coupled vertical in one in support frame 1 On slideway on direction, the other side of lifters 8 is equipped with the spur rack of vertical direction;Spur rack is engaged with transmission gear 7, is led to The rotation of transmission gear 7 is crossed, lifters 8 can slide up and down in slideway, and the end of transmission gear 7 passes through drive rod 6 and rotation The middle part of disk 5 connects, and rotating disk 5 adjusts the height and position of lifters 8 by drive rod 6 and transmission gear 7, realizes to carrier bar Connect the control of 2 height and position of base component on 13;The middle part of carrier bar 13 is connected in lifters 8.If the bottom of support frame 1 is equipped with Dry locating piece 10, locating piece 10 are three movable bolts for being in a plane, are used for entire Hot Metal in Beam Blank tundish fast replacing device In crystallizer location and installation suitable for reading, thus realize the positioning to even 2 underthrust position of base component, the insertion of the company's of raising base component 2 Precision and insertion speed.It is equipped with slag thickness meter 4 in support frame 1, slag thickness meter 4 be the silk thread disk of winding copper silk thread, and silk thread is from silk thread The lower section of disk pulls out, and has scale above silk thread disk, can compare with scale after being inserted into the silk thread taking-up of crystallizer, for measuring knot The thickness of covering slag in brilliant device.The top of support frame 1 is equipped with laser range finder 11, and laser range finder 11 is for the company's of measurement base component Distance of 2 upper surfaces away from molten steel face, guarantee even 2 height and position of base component accurately control and even base component 2 in new and old slab In it is symmetrical.The top of support frame 1 is equipped with infrared radiation thermometer 12, and infrared radiation thermometer 12 is for measuring Mold face Temperature, with the suitable insertion opportunity of the company's of determination base component 2.
With reference to Fig. 6, the Hot Metal in Beam Blank tundish quick change method of the present embodiment, comprising the following steps:
Step A: getting out Hot Metal in Beam Blank tundish fast replacing device, and steel plate is processed as to the geometry of even base component 2, checks Middle hired car track has no-sundries to influence walking, and centering packet track is cleared up, by the new baking of tundish for preparing to change to 1000 DEG C More than, it is ensured that the mouth of a river is unobstructed, mechanism sliding block is normal and tundish car lifting, traversing, walking normal operation;
Step B: Hot Metal in Beam Blank tundish fast replacing device is installed on above crystallizer;Specifically, even base component 2 is placed in 100 DEG C of environment above are toasted, by support frame 1 by the locating piece 10 of its bottom rapidly and accurately location and installation on crystallizer Side, is adjusted to setting position for the height of carrier bar 13 according to laser range finder 11, each even base component 2 is hung on corresponding In locating slot 1301;
Step C: gradually reducing covering slag additive amount in crystallizer, when protection thickness of slag layer is 3-8mm and knot in crystallizer When molten steel surface temperature is 1510-1530 DEG C in brilliant device, two blocks of company's base components 2 are inserted into crystallizer by rotation rotating disk 5 simultaneously Target position;Specifically, crystallizer and two cold intensities of cooling are reduced, covering slag additive amount is gradually reduced, reduces Casting speed, Reach and stifled stream operation is carried out to each mouth of a river after stopping pouring pulling rate and stirs molten steel;Using being protected in more than 4 measurement crystallizers of slag thickness meter The thickness of slag blanket, (protection thickness of slag layer is too thick to be unfavorable for even base structure after protecting slag blanket to reach expected thickness 3-8mm in crystallizer The insertion of part 2, protection thickness of slag layer is too thin to be unfavorable for forming molten steel isolation protection), molten steel is observed by infrared radiation thermometer 12 Face temperature change, in set temperature section, (1510-1530 DEG C, the too low even base component 2 that is unfavorable for of molten steel temperature is inserted into, temperature mistake Height is unfavorable for even base component 2 and the seamless fusion of molten steel solidifies) by rotation rotating disk 5 by two blocks of company's base components 2 simultaneously, it is safe, It is accurately inserted into the target position in crystallizer, stops decline even base component 2 when molten steel face reaches even 2 center of base component, It leaves half and connects base component 2 in steel ullage, subsequent molten steel starts to solidify, and even the position of base component 2 is fixed, by even base structure Part 2 is removed out of corresponding locating slot 1301, withdraws Hot Metal in Beam Blank tundish fast replacing device rapidly;
Step D: Metal in Tundish is poured to crystallizer;Specifically, old tundish car is moved away from working position, while will be new Middle hired car is moved to working position, carries out big packet open casting operation, and big Baogang's water enters tundish, Metal in Tundish is poured to crystallizer Interior, high-temperature molten steel gradually floods even base component 2, pulling rate and is gradually recovered normally, and crystallizer and secondary cooling water intensity of cooling are gradually recovered.
The purpose of the utility model is to overcome the installation essences of installation when existing Hot Metal in Beam Blank tundish quick change even base component 2 Degree, installation speed and installation opportunity unstable deficiency provide a kind of Hot Metal in Beam Blank tundish fast replacing device and method, energy On the best installation opportunity of the enough company's of grasp base components 2, installation speed is improved, ensure that installation accuracy, improves slab seam matter Amount, it is ensured that smoothly completing for tundish quick change operation improves production efficiency.
The geometry for connecting base component 2 in the utility model is conducive to tundish quick change process and connects 2 quick insertion of base component It is solidified in crystallizer with the seamless fusion of molten steel, and fuses solidification closely with the molten steel after tundish replacement, can guarantee new and old casting Base securely connects.
The Hot Metal in Beam Blank tundish fast replacing device of the utility model can monitor covering slag thickness and molten steel temperature in crystallizer Degree to guarantee the accurate installation opportunity of even base component 2, and can guarantee the synchronous and rapid installation of two company's base components 2, thirdly Tieing up positioning function can guarantee the installation accuracy of even base component 2, and 2 grazing of the company's of avoiding base component damages copper plate of crystallizer.
Embodiment 2
With reference to Fig. 2, the Hot Metal in Beam Blank tundish fast replacing device of the present embodiment, structure is substantially the same manner as Example 1, more into one Step: several extension rods 206 are connected on each tilting section 203;Breeze way is equipped with positioned at its bottom end of the horizontal segment 201 of lower part 204, the breeze way 204 small big conical structure under being, the bottom end of breeze way 204 be connected with extend downward protrude into bar 205;Superposed its surrounding of horizontal segment 201 is provided with the shunting section 207 of annular, and 207 upper surface of shunting section is from top to bottom Inclined annular slope, height of the annular slope close to 207 central point direction of shunting section are higher than far from 207 central point of shunting section The height in direction.
In the present embodiment, several extension rods 206 are connected on each tilting section 203, if connected on each tilting section 203 Dry extension rod 206 increases the surface area that entire tilting section 203 is contacted with molten steel, so that energy between new and old slab after solidification of molten steel Enough securely connections.
In the present embodiment, it is equipped with breeze way 204 positioned at its bottom end of the horizontal segment 201 of lower part, on the breeze way 204 is small under being Big conical structure, the bottom end of breeze way 204 be connected with extend downward protrude into bar 205, entirely connect base component 2 to molten steel When middle insertion, protrude into bar 205 and touch molten steel at first, then under the breeze way 204 of small big conical structure gradually protrude into steel In liquid, the phenomenon that avoiding the direct exposure level section 201 of molten steel and splash, while being conducive to entirely to connect base component 2 and smoothly stretch Enter in molten steel.
In the present embodiment, superposed its surrounding of horizontal segment 201 is provided with the shunting section 207 of annular, on shunting section 207 Surface is that inclined annular slope, height of the annular slope close to 207 central point direction of shunting section are higher than separate from top to bottom The height in 207 central point direction of shunting section, when molten steel trickles from tundish into crystallizer, passes through the blocking of shunting section 207, steel Liquid is assembled in crystallizer first, and the molten steel liquid level then assembled is gradually increasing entirely will connect base component 2 and wrap gradually, thus Conducive to molten steel and the entire close contact connected between base component 2, so that can securely be connected between new and old slab after solidification of molten steel.
Above embodiments are only to illustrate the technical solution of the utility model, rather than its limitations;Although referring to aforementioned reality Example is applied the utility model is described in detail, those skilled in the art should understand that: it still can be to preceding Technical solution documented by each embodiment is stated to modify or equivalent replacement of some of the technical features;And these It modifies or replaces, the spirit and model of various embodiments of the utility model technical solution that it does not separate the essence of the corresponding technical solution It encloses.

Claims (6)

1. the tundish company's of using instead base component fastly, it is characterised in that including two horizontal segments being parallel to each other (201), two horizontal segments (201) it is connected between by vertical section (202);The top of the vertical section (202) is connected with several inclinations inclined upward Section (203), the lower part of the vertical section (202) is connected with several tilting sections inclined downward (203).
2. the tundish according to claim 1 company's of using instead base component fastly, it is characterised in that: described even base component (2) top The middle part of horizontal segment (201) is equipped with the positioning protrusion (2011) extended respectively to two sides.
3. the tundish according to claim 2 company's of using instead base component fastly, it is characterised in that: connect on each tilting section (203) It is connected to several extension rods (206).
4. the tundish according to claim 3 company's of using instead base component fastly, it is characterised in that: the horizontal segment positioned at lower part (201) its bottom end is equipped with breeze way (204), the breeze way (204) small big conical structure under being.
5. the tundish according to claim 4 company's of using instead base component fastly, it is characterised in that: the bottom of the breeze way (204) End be connected with extend downward protrude into bar (205).
6. the company's of using instead base component fastly of tundish described in -5 any one according to claim 1, it is characterised in that: superposed Horizontal segment (201) its surrounding is provided with the shunting section (207) of annular, and shunting section (207) upper surface is to tilt from top to bottom Annular slope, height of the annular slope close to shunting section (207) central point direction be higher than far from shunting section (207) central point The height in direction.
CN201820811045.0U 2018-05-29 2018-05-29 The tundish company's of using instead base component fastly Expired - Fee Related CN208276140U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820811045.0U CN208276140U (en) 2018-05-29 2018-05-29 The tundish company's of using instead base component fastly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820811045.0U CN208276140U (en) 2018-05-29 2018-05-29 The tundish company's of using instead base component fastly

Publications (1)

Publication Number Publication Date
CN208276140U true CN208276140U (en) 2018-12-25

Family

ID=64706346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820811045.0U Expired - Fee Related CN208276140U (en) 2018-05-29 2018-05-29 The tundish company's of using instead base component fastly

Country Status (1)

Country Link
CN (1) CN208276140U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110976833A (en) * 2019-11-20 2020-04-10 河钢乐亭钢铁有限公司 Quick-change cooling device and quick-change process for large-shrinkage steel grade hot tundish

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110976833A (en) * 2019-11-20 2020-04-10 河钢乐亭钢铁有限公司 Quick-change cooling device and quick-change process for large-shrinkage steel grade hot tundish

Similar Documents

Publication Publication Date Title
US8215375B2 (en) Continuous casting plant having at least one multifunction robot
CN208276140U (en) The tundish company's of using instead base component fastly
CN108555274A (en) Hot Metal in Beam Blank tundish quick change method
JP4721775B2 (en) Automatic pouring device for casting and pouring method for mold
CN208276170U (en) Hot Metal in Beam Blank tundish fast replacing device
CN105562669A (en) Ladle pouring device adjustable in pouring position
US3884400A (en) Articulated holder for pouring tube
CN108393481A (en) Hot Metal in Beam Blank tundish fast replacing device
CN112387946B (en) Device and method for continuous casting of small square billets
CN201082464Y (en) Molten metal continuously casting device
CN207138846U (en) A kind of monoblock type tundish immersed nozzle centralizer
CA1176428A (en) Method of, and arrangement for, determining the amount of slag present in a tundish when continuously casting a metal melt
CN105562671A (en) Transfer device for pouring medium
JP5958810B2 (en) Ingot casting method
CN211135505U (en) Accurate casting system
CN113263168B (en) Pouring method of ladle
CN209272453U (en) Fixed type casting furnace automatic flow control system
JP5732646B2 (en) Hot water supply apparatus and method
KR100843937B1 (en) Monitering system for temperature of melten steel in tundish
JPS6056580B2 (en) Automatic injection method of molten metal using rotary nozzle between ladle and tundish in continuous casting
CN215356076U (en) Novel aluminum ingot casting machine
CN204603239U (en) A kind of fixture of the sensor for die casting molten steel level detection
CN111570744B (en) Pouring device and pouring method of continuous casting machine
CN211028071U (en) Casting workbench
CN215279799U (en) Material taking device for continuous casting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181225

Termination date: 20190529