CN208272572U - A kind of temporary cable stringer - Google Patents

A kind of temporary cable stringer Download PDF

Info

Publication number
CN208272572U
CN208272572U CN201820516335.2U CN201820516335U CN208272572U CN 208272572 U CN208272572 U CN 208272572U CN 201820516335 U CN201820516335 U CN 201820516335U CN 208272572 U CN208272572 U CN 208272572U
Authority
CN
China
Prior art keywords
upright bar
lower upright
temporary cable
chock
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820516335.2U
Other languages
Chinese (zh)
Inventor
刘俊杰
付勇
王硕
袁杰
张晓军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nuclear Industry Jingxiang Construction Group Co Ltd
Original Assignee
Nuclear Industry Lane Construction Group Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nuclear Industry Lane Construction Group Co filed Critical Nuclear Industry Lane Construction Group Co
Priority to CN201820516335.2U priority Critical patent/CN208272572U/en
Application granted granted Critical
Publication of CN208272572U publication Critical patent/CN208272572U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of temporary cable stringers, and the Screw Pile including screwing in installation ground, bottom is socketed in the lower upright bar at the top of the Screw Pile, the upper pright stanchion being co-axially inserted from the lower upright bar upper end;The temporary cable stringer further include the chock for being bolted in the Screw Pile, the cutting for extending transversely through the Screw Pile and the lower upright bar connecting portion, be connected on the upper pright stanchion for connecting the cable installation rack of temporary cable, the connection structure for limiting the upper pright stanchion and being fixed in the lower upright bar.The utility model is designed reasonably, structure is simple, stablizes, and is easily assembled to, conveniently moving, with tearing open with frame, is suitable for a variety of temporary cables and sets up environment, carries out effective protection to temporary cable used in power supply for construction process.

Description

A kind of temporary cable stringer
Technical field
The utility model relates to engineering construction field, in particular to a kind of temporary cable stringer.
Background technique
Facing between construction site temporary electricity second level case and three-level case, between three-level case and construction equipment in engineering construction When cable often along temporary facilities such as building, structures, scaffolds using the aerial laying of hook, or directly it is exposed on the ground. The aerial laying of hook is limited by ambient enviroment, needs works as support;Directly it is exposed ground because long-time pull or Personnel, equipment, which roll, can damage cable, and Electrical Safety does not ensure.Especially cable will pass through the barrier such as road, ditch, catch pit When hindering object, it is desirable to which temporary cable is maked somebody a mere figurehead laying by suitable stringer.
Utility model content
The purpose of the utility model is to provide a kind of temporary cable stringer, rationally, structure is simple, stablizes, easily for design In assembling, conveniently moving is adaptable with tearing open with frame, carries out effective protection to temporary cable used in power supply for construction process.
The above-mentioned technical purpose of the utility model has the technical scheme that
A kind of temporary cable stringer, the Screw Pile including screwing in installation ground, bottom is socketed in the screw thread stake top The lower upright bar in portion, the upper pright stanchion being co-axially inserted from the lower upright bar upper end;The temporary cable stringer further includes being bolted in The chock of the Screw Pile, the cutting for extending transversely through the Screw Pile and the lower upright bar connecting portion, be connected to it is described vertical It is used to connect the cable installation rack of temporary cable, the connection for limiting the upper pright stanchion and being fixed in the lower upright bar on bar Structure.
Screw Pile can be the screw thread member of cast iron quality, have sharp head, easily screw in installation ground, be device Securely support is provided.Chock is used to increase the weight of device, reduces device center of gravity, improves mounting stability.Cutting material is iron Matter can open the transversal openings being adapted with cutting at the top of Screw Pile and the bottom of lower upright bar, be connected in lower vertical rod sleeve Screw Pile, and after the alignment of two through holes, cutting is laterally inserted into two through holes, completes the connection of lower upright bar and Screw Pile.It inserts Both ends grow lower upright bar both ends, and cutting is pressed in Screw Pile by lower upright bar and the self weight for the part being connected thereto, connection Stablize;On the other hand, cutting can be used as force application rod, and adjusting Screw Pile is facilitated to install ground with whole device in chock Interior screw-in depth guarantees the connective stability of device to adapt to the ground of different hardness.
Preferably, the connection structure is included out in the axial link slot in the lower upright bar, along the lower upright bar axis The multiple limiting slots communicated with the axial link slot opened up to interval are being convexly equipped in the upper pright stanchion surface with the axial direction The gag lever post that link slot and the limiting slot are adapted.
Locating part can be a pin, be also possible to the columns nose bar such as bolt, upper pright stanchion is by the locating part in axial direction The height of mobile adjusting upper pillar stand and the cable installation rack on upper pillar stand in link slot, so that the erection for adjusting temporary cable is high Degree;After reaching the antenna height needed, gag lever post is caught in into limiting slot, to maintain the antenna height.
Preferably, the cable installation rack offers mounting groove, the cable installation rack for connecting temporary cable It is equipped between the upper pright stanchion and is fastenedly connected circle.
Being fastenedly connected circle can be elastic rubber ring, and tensioner makes cable installation rack between cable installation rack and upper pillar stand Stable connection, at the same make cable installation rack can sliding axially along upper pillar stand, be conveniently adjusted temporary cable antenna height.Electricity The pattern of the mounting bar including multiple radial extensions can be set into cable mounting rack, and material can be rigid plastics, each to install The mounting groove is set on item, is installed to adapt to multi-quantity while multidirectional temporary cable.
Preferably, the temporary cable stringer includes the encapsulating steel plate being coated on outside the chock, it is set to described Encapsulate the pull ring of steel plate top surface and the lower upright bar surface.
Encapsulating steel plate by welding is coated on chock appearance, guarantee the durable of the structure of chock, prevent chock corrode or by It destroys, and clump weight can be increased on encapsulating steel plate, to increase the weight of chock, make the center of gravity of device during installation more Surely.Pull ring can be attached by welding, and the pull ring encapsulated on steel plate is connected with the pull ring in lower upright bar by rope, be improved The mounting stability of device prevents the threaded connection of chock and screwed plug from failing.Pull ring may be configured as it is multiple, it is each to encapsulate on steel plate Pull ring arrange that the pull ring in each lower upright bar is arranged along lower upright bar axially spaced-apart by benchmark axis uniform intervals of chock center, and It is uniformly arranged under identical height multiple, chock and the rope of lower upright bar is made to connect stress more evenly, connected more stable.
Preferably, the temporary cable stringer further includes chock splicing block, the spelling of the chock splicing block is coated Connect block encapsulating steel plate;The side and the encapsulating steel plate side are equipped with the connection grab of interworking.
Connection grab is respectively provided at the side of encapsulating steel plate and splicing block encapsulating steel plate, and chock splice plate is connected to pad Wood, and can also continue to connect other chock splice plates by connecting grab except the chock splice plate being mounted on chock, So as to any area for increasing chock as needed, increases the quantity and size that can prevent the pouring weight on chock, make to fill The weight set is bigger, and center of gravity is more steady, and the erection of temporary cable is more stable.
Preferably, the splicing block encapsulating steel plate is equipped with the pull ring.
Pull ring can be set to chock splicing block center, it is connect with the pull ring in lower upright bar by rope, guarantee that chock is spelled The position for connecing block is stablized, and prevents the connection of chock splicing block and chock from loosening.
Preferably, the lower upright bar, the upper pright stanchion is thin-wall steel tube, the inner hole aperture of the lower upright bar and it is described on The outer diameter of upright bar is adapted.
In conclusion the utility model has the following beneficial effects:
1, be threaded connection or plug connection between each structure of the utility model, dismount conveniently moving, can with tear open with Frame, it is adaptable.
2, the utility model is slided in the axial link slot of lower upright bar by upper pright stanchion and cable installation rack is upper vertical The adjustable temporary cable antenna height of sliding in bar meets the erection requirement to temporary cable different height.
3, the utility model is adapted to difference by adjustable screw-in depth of the Screw Pile in chock of rotation of cutting The ground of hardness, so that it is guaranteed that the stability of device.Such as it is deep for the ground screw-in depth such as soil property, rubble, for cement, The ground such as concrete, rock, screw.
4, the utility model increases chock area, places counterweight on chock by splicing chock splicing block in chock side Block is connected with rope between chock and chock splicing block and the pull ring of lower upright bar to increase weight, lower the center of gravity, device can be improved Stability, for ground out-of-flatness, Screw Pile can not anchor on the ground, wind-force is larger etc., and situations are adaptable.
5, the utility model, which can set up cable and efficiently solve temporary cable, does not have works support, and cable will pass through The problem of barriers such as road, ditch, catch pit.
6, the low manufacture cost of the utility model, using effect is good, convenient for promoting the use of.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the cross-sectional view of the utility model;
Fig. 3 is structural schematic diagram when the utility model is connected with chock splicing block.
In figure:
1- encapsulates steel plate;2- chock;3- Screw Pile;Upright bar under 4-;41- axial direction link slot;42- limiting slot;5- upper pright stanchion; 6- cutting;7- is fastenedly connected circle;8- cable installation rack;81- mounting groove;9- gag lever post;10- connection grab;11- pull ring;12- is spelled Connect block encapsulating steel plate;13- chock splicing block.
Specific embodiment
The utility model is described in more detail for scheme with reference to the accompanying drawing and preferably.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Embodiment: a kind of temporary cable stringer as shown in Figs. 1-2, the Screw Pile 3 including screwing in installation ground, bottom Portion is socketed in the lower upright bar 4 at the top of Screw Pile, the upper pright stanchion 5 being co-axially inserted from lower upright bar upper end;Temporary cable stringer is also Including being bolted in the chock 2 of Screw Pile, the cutting 6 for extending transversely through Screw Pile and lower upright bar connecting portion, being connected on upper pright stanchion For connecting the cable installation rack 8 of temporary cable, the connection structure for limiting upper pright stanchion and being fixed in lower upright bar.
Connection structure includes out the multiple and axis in the axial link slot 41 in lower upright bar, opened up along lower upright bar axially spaced-apart The limiting slot 42 communicated to link slot is convexly equipped in the gag lever post 9 adaptable with axial link slot and limiting slot on upper pright stanchion surface; Cable installation rack is offered to be equipped between mounting groove 81, cable installation rack and upper pright stanchion for connecting temporary cable and is fastenedly connected Circle 7;Temporary cable stringer includes the encapsulating steel plate 1 being coated on outside chock, is set to encapsulating steel plate top surface and lower upright bar surface Pull ring 11.
Lower upright bar 4, upper pright stanchion 5 are thin-wall steel tube, and the inner hole aperture of lower upright bar and the outer diameter of upper pright stanchion are adapted.
As shown in figure 3, temporary cable stringer further includes chock splicing block 13, the splicing block packet of chock splicing block is coated Seal steel plate 12;Side and encapsulating steel plate side are equipped with the connection grab 10 of interworking;Splicing block encapsulates steel plate and is equipped with pull ring 11.
The temporary cable stringer is mainly used for temporary cable erection, in use, be first installed device assembly, then Temporary cable is placed in the mounting groove of cable installation rack, height of the 7 adjustable temporary cables of circle on upper pright stanchion is fastenedly connected Gag lever post 9 after height is adjusted in upright bar 4 under then sliding by connection structure, is placed in limiting slot 42 fixed, most back spin by degree Turn cutting 6, adjusts screw-in depth of the Screw Pile 3 in chock 1 and installation ground, it is ensured that device is stablized.
In the present embodiment, the chock splicing block 13 encapsulated with splicing block encapsulating steel plate 12 and the pad encapsulated with encapsulating steel plate 2 Wood 1 is connected by connection grab 10, to increase chock area;It is described to be placed on splicing block encapsulating steel plate 12 and encapsulating steel plate 2 Clump weight is to increase weight, lower the center of gravity;Pull ring between the splicing block encapsulating steel plate 12 and encapsulating steel plate 2 and lower upright bar 4 Between 11 with rope connection, device stability can be improved, for ground out-of-flatness, Screw Pile can not anchor on the ground, wind-force compared with The situations such as big are adaptable.
In the present embodiment, the chock 2 and Screw Pile 3, Screw Pile 3 and lower upright bar 4, lower upright bar 4 and upper pright stanchion 5, cutting 6 With lower upright bar 4, Screw Pile 3, gag lever post 9 and upper pright stanchion 5, are fastenedly connected circle 7 and upper pright stanchion 5 is that threaded connection or grafting connect It connects, dismounts conveniently moving, it can be adaptable with tearing open with frame.

Claims (7)

1. a kind of temporary cable stringer, it is characterised in that: the Screw Pile (3) including screwing in installation ground, bottom is socketed in Lower upright bar (4) at the top of the Screw Pile, the upper pright stanchion (5) being co-axially inserted from the lower upright bar upper end;The temporary cable frame If device further includes the chock (2) for being bolted in the Screw Pile, extends transversely through the Screw Pile and the lower upright bar connecting portion Cutting (6), be connected on the upper pright stanchion the cable installation rack (8) for connecting temporary cable, the upper pright stanchion limited Position and the connection structure being fixed in the lower upright bar.
2. a kind of temporary cable stringer according to claim 1, it is characterised in that: the connection structure include open in Axial link slot (41) in the lower upright bar, the multiple and axial link slot phase opened up along the lower upright bar axially spaced-apart Logical limiting slot (42) is convexly equipped in the limit adaptable with the axial link slot and the limiting slot on the upper pright stanchion surface Bar (9).
3. a kind of temporary cable stringer according to claim 1, it is characterised in that: the cable installation rack offers It is equipped between mounting groove (81), the cable installation rack and the upper pright stanchion for connecting temporary cable and is fastenedly connected circle (7).
4. a kind of temporary cable stringer according to claim 1, it is characterised in that: the temporary cable stringer Pull ring including the encapsulating steel plate (1) being coated on outside the chock, set on encapsulating the steel plate top surface and the lower upright bar surface (11).
5. a kind of temporary cable stringer according to claim 4, it is characterised in that: the temporary cable stringer Further include chock splicing block (13), coats splicing block encapsulating steel plate (12) of the chock splicing block;The side and the packet Seal the connection grab (10) that steel plate side is equipped with interworking.
6. a kind of temporary cable stringer according to claim 5, it is characterised in that: on the splicing block encapsulating steel plate Equipped with the pull ring (11).
7. a kind of temporary cable stringer according to claim 1, it is characterised in that: the lower upright bar (4), it is described on Upright bar (5) is thin-wall steel tube, and the inner hole aperture of the lower upright bar and the outer diameter of the upper pright stanchion are adapted.
CN201820516335.2U 2018-04-12 2018-04-12 A kind of temporary cable stringer Expired - Fee Related CN208272572U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820516335.2U CN208272572U (en) 2018-04-12 2018-04-12 A kind of temporary cable stringer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820516335.2U CN208272572U (en) 2018-04-12 2018-04-12 A kind of temporary cable stringer

Publications (1)

Publication Number Publication Date
CN208272572U true CN208272572U (en) 2018-12-21

Family

ID=64677837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820516335.2U Expired - Fee Related CN208272572U (en) 2018-04-12 2018-04-12 A kind of temporary cable stringer

Country Status (1)

Country Link
CN (1) CN208272572U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109830917A (en) * 2019-03-15 2019-05-31 中国三冶集团有限公司 A kind of device and method setting up temporary cable
CN112234511A (en) * 2020-09-30 2021-01-15 国网河南省电力公司南召县供电公司 Temporary cable erecting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109830917A (en) * 2019-03-15 2019-05-31 中国三冶集团有限公司 A kind of device and method setting up temporary cable
CN112234511A (en) * 2020-09-30 2021-01-15 国网河南省电力公司南召县供电公司 Temporary cable erecting device

Similar Documents

Publication Publication Date Title
US8505265B2 (en) Power line tower alignment method
US8407967B2 (en) Apparatus and method for an adjustable column
CN208272572U (en) A kind of temporary cable stringer
US20080230108A1 (en) Solar panel apparatus and method utilizing pounded vertical supports
JP2014517170A (en) Frame support
CN211257011U (en) Triaxial stirring stake stagnant water curtain structure
DE102005003972A1 (en) Offshore-wind turbine foundation, has tower stabilized in its position by cable wirings and joint provided as connection between tower pedestal/tower lower side and bearing pole and allowing slight tilting movements of foundation supports
CN110894759A (en) Power transmission line erected electric power telegraph pole
US5081804A (en) Power line pylon and lamp post
CN207632371U (en) A kind of soft soil foundation Super High tower crane firm banking
KR101353488B1 (en) Multiple supporting file foundation
CN204385762U (en) A kind of Rock Bolt Foundation structure
CN110158498B (en) Construction method of elastic passive protective net upright post structure
CN210946537U (en) Elastic passive protective net upright post structure
CN106495026A (en) Attachment built temporarily by construction tower crane
CN104532873A (en) Rock anchor rod foundation structure
FI86755B (en) STOLPE.
US8490287B2 (en) Fence end spacer apparatus and method for use
US20090064633A1 (en) Telescopic Post and Bracing System for Bedrock Locations
CN206143797U (en) Overhead transmission line foundation
CN206328867U (en) A kind of post bottom steel structure member
RU153340U1 (en) THE BASE OF REUSABLE USE UNDER THE COMPOSITE SUPPORT OF THE ELECTRIC TRANSMISSION LINE
CN219219360U (en) Steel construction assembled building for building engineering
CN215888009U (en) Town road crossing is with limit for height device
CN214033674U (en) Steel structure supporting column with good stability

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 313000 4th Floor, 666 Huanzhu Road, Wuxing District, Huzhou City, Zhejiang Province

Patentee after: NUCLEAR INDUSTRY WELL AND ROADWAY CONSTRUCTION GROUP Co.,Ltd.

Address before: 313000 4th Floor, 666 Huanzhu Road, Wuxing District, Huzhou City, Zhejiang Province

Patentee before: NUCLEAR SHAFT AND ROADWAY ENGINEERING Group Corp.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181221

CF01 Termination of patent right due to non-payment of annual fee