CN208272335U - A kind of network connecting head mounting device - Google Patents

A kind of network connecting head mounting device Download PDF

Info

Publication number
CN208272335U
CN208272335U CN201820705875.5U CN201820705875U CN208272335U CN 208272335 U CN208272335 U CN 208272335U CN 201820705875 U CN201820705875 U CN 201820705875U CN 208272335 U CN208272335 U CN 208272335U
Authority
CN
China
Prior art keywords
cylinder
mounting groove
block
fixed
plastic part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820705875.5U
Other languages
Chinese (zh)
Inventor
吴界
曹开武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Ding Jie Automation Technology Co Ltd
Original Assignee
Wenzhou Ding Jie Automation Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Ding Jie Automation Technology Co Ltd filed Critical Wenzhou Ding Jie Automation Technology Co Ltd
Priority to CN201820705875.5U priority Critical patent/CN208272335U/en
Application granted granted Critical
Publication of CN208272335U publication Critical patent/CN208272335U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Branching, Merging, And Special Transfer Between Conveyors (AREA)

Abstract

The utility model discloses a kind of network connecting head mounting devices, its drip irrigation device includes mounting rack, mounting rack is equipped with mounting groove, the front side of mounting groove is equipped with for the tape-feed to mounting groove push material strip, the rear side of mounting groove is equipped with for the feeding mechanism to mounting groove conveying plastic part, material cutting mechanism is installed, the top of mounting groove is equipped with the Material moving device for assembled material to be moved into subsequent processing in mounting groove;Feeding mechanism includes stock support, stock support is fixedly arranged above delivery sheet, delivery sheet is equipped with chute feeder, moving assembly for the plastic part in chute feeder to be inserted into shell is installed on delivery sheet, the top of mounting groove is equipped with accessory plate, accessory plate is equipped with chamfering towards the side of tape-feed, the width of accessory plate is greater than the distance between two side baffles, the auxiliary body for sliding accessory plate is fixed on delivery sheet, there is the utility model plastic part to be easily inserted between two side baffles, the high function of packaging efficiency.

Description

A kind of network connecting head mounting device
Technical field
The utility model relates to network connecting heads to assemble field, and more specifically it is related to a kind of network connecting head installation dress It sets.
Background technique
Include for a kind of schematic diagram of network connecting head explosion, including plastic part A1 and shell A2, shell A2 as shown in Figure 1 Side baffle A22 is connected at left and right sides of top plate A21, top plate A21, the front side of top plate A21 is equipped with and side baffle A22 and top plate It is connected with rear baffle A24 on rear side of the front apron A23 of A21 connection, top plate A21, locating slot A25 is equipped on side baffle A22, it is fixed Position slot A25 is corresponding with the locating piece A11 on plastic part A1 side wall.
It is illustrated in figure 2 a Seed packaged band, including multiple shell A2, each shell A2 is externally connected with waste material section A3, each useless Expect that section A3 is connected with each other, waste material section A3 and the shell A2 being fixed on waste material section A3, the rear baffle A24 on shell A2 herein is still It does not bend and parallel with top plate A23, scrap belt is equipped with jack A31, and the rear baffle A24 of shell A2 is not bent.
First shell A2 is separated with material strip during installation, then plastic part A1 is inserted into two side baffles from the rear side of shell A2 Until being abutted with front apron A23 between A22, plastic part A1 is moved then up, plastic part A1 is abutted simultaneously with top plate A21 Locating piece A11 be inserted into locating slot A25 in, so as to complete the assembling of plastic part A1 and shell A2, it is subsequent can also rear baffle A24 it is curved Folding is so that plastic part A1 is wrapped up by shell A2.In order to enable shell A2 can be firmly stuck on plastic part A1, two side baffles The distance between A22 is slightly less than the width of plastic part A1, so that two side baffle A22 make to centre extruding after shell A2 installation Shell A2 and plastic part A1 is obtained to be connected firmly, but during installation since the distance between two side baffle A22 are slightly less than plastics The width of part A1 causes the problem that packaging efficiency is low so that plastic part A1 is not easy to be inserted between two side baffle A22.
Utility model content
In view of the deficienciess of the prior art, having the utility model lies in that providing a kind of network connecting head mounting device Plastic part is easily inserted between two side baffles, the high function of packaging efficiency.
To achieve the above object, the utility model provides following technical solution: a kind of network connecting head mounting device, packet Mounting rack is included, the mounting rack is equipped with mounting groove, and the front side of the mounting groove is equipped with for sending to mounting groove push material strip Band mechanism, the rear side of the mounting groove are equipped with for the feeding mechanism to mounting groove conveying plastic part, the interior installation of the mounting groove There is material cutting mechanism, the top of the mounting groove is equipped with the Material moving device for assembled material to be moved into subsequent processing;It is described Feeding mechanism includes stock support, and stock support is fixedly arranged above delivery sheet, and the delivery sheet is equipped with chute feeder, the feeding It is equipped on plate for by the moving assembly of the plastic part insertion shell in chute feeder, the top of the mounting groove to be equipped with auxiliary Plate, the accessory plate are equipped with chamfering towards the side of tape-feed, and the width of the accessory plate is greater than between two side baffles Distance is fixed with the auxiliary body for sliding back and forth accessory plate along mounting groove on the delivery sheet.
By using above-mentioned technical proposal, material strip is moved into mounting groove by tape-feed, is sent by auxiliary body's movement Flitch, so that delivery sheet is inserted between two side baffles of delivery sheet shell.In delivery sheet insertion process, two side plates It is deformed under the guiding role of chamfering to two sides, so that the distance between two side baffles become larger, it then will by Material moving device Plastic part is sent into mounting groove;Plastic part is inserted between two side baffles and abuts on front side of it with front apron during feeding, so Accessory plate is moved backward by auxiliary body afterwards, since shell is connect and limitation by plastic part front apron with material strip, thus So that accessory plate not will drive shell movement when accessory plate is separated with shell;After accessory plate is removed, two side baffles are inwardly The two sides of plastic part are deformed and are clamped in, so that plastic part is close with cage connection;Then by material cutting mechanism by with modeling The shell of materials and parts connection is separated with material strip, and assembled shell and plastic part immigration are moved down work finally by Material moving device Sequence, convenient for assembling next shell and plastics.
Since before plastic part is inserted into two side baffles, the distance between two side baffles are in above-mentioned installation process It is increased so that plastic part be inserted into two side baffles between it is more easy and convenient, be easily installed in place, improve shell with The assembling speed of plastic part.
The utility model is further arranged to: the chute feeder includes opening up the horizontal shifting hopper being interconnected on delivery sheet Hopper is moved with longitudinal, longitudinal position for moving hopper is corresponding with mounting groove, and the delivery sheet is fixedly arranged above cover board, described Auxiliary body includes fixed assistant cylinder on the cover board, and the accessory plate is threaded through below cover board, the work of the assistant cylinder Linkage block is fixed on stopper rod, the linkage block is fixedly connected with the rear end of accessory plate.
By using above-mentioned technical proposal, plastic part is moved from level by hopper by Material moving device and moves into longitudinal shifting hopper, It is moved into mounting groove from longitudinal hopper that moves again;Then the front and back of accessory plate is driven to transport by moving forward and backward for assistant cylinder piston rod It is dynamic, enable accessory plate to expand the distance between two side baffles simultaneously after shell is connect with plastic part, accessory plate can It is separated with shell.
The utility model is further arranged to: the moving assembly includes that the cylinder being arranged on the right side of stock support is fixed Frame is fixed with straight feeding cylinder in the air cylinder supporting structure, is fixed with level on the piston rod of the straight feeding cylinder and send Expect that bar, the straight feeding bar are located at the horizontal right side for moving hopper, longitudinal move in hopper slidably connects push rod, described to push away Bar is connect far from longitudinal one end for moving hopper with the piston rod for being fixed on longitudinal feeding cylinder on delivery sheet.
By using above-mentioned technical proposal, when conveying plastic part, plastic part is placed on the horizontal opening for moving hopper, Straight feeding bar is driven to move hopper shipper pole to longitudinal by straight feeding cylinder, so that plastic part is admitted to longitudinal move in hopper; Then it is mobile to mounting groove push rod to be pushed by longitudinal feeding cylinder, so that being located at longitudinal plastic part moved in hopper is admitted to peace In tankage and it is inserted into the shell adjacent with Material moving device.
The utility model is further arranged to: the tape-feed includes two support plates and fixed on the supporting plate upper Baffle, the overhead gage send trough of belt, described to send trough of belt corresponding with installation groove location, the overhead gage equipped with what feed strip passed through Be fixedly arranged above shutter, set on the shutter there are two with the shipper pole hole of sending trough of belt be connected to, slide above the shutter It is connected with transfer block, the transfer block is equipped with far from the side of mounting rack send band cylinder, described to send the piston rod with cylinder in Switch block is fixedly connected, and the lower end of the transfer block is set there are two groove, is rotatably connected to swinging block, the swing in the groove Close to sending the side with cylinder to be fixed with limited block, the upper end of the swinging block is separate to send the side with cylinder to fix for the upper end of block There is reset spring, the other end and the bottom portion of groove of the reset spring are fixed, and the lower end of the swinging block is fixed with shipper pole block, institute Shipper pole block is stated as right angled triangle and bevel edge is towards band cylinder is sent, the shipper pole block is threaded through in shipper pole hole.
By using above-mentioned technical proposal, by sending band cylinder that shipper pole block is driven to be moved forward and backward, when movable block is to rear side When mounting groove is mobile, limited block is connected to groove upper end and swinging block can not be rotated, so that movable block drives material strip to installation Slot is mobile;When side is mobile forward for movable block, material strip and the contact of incline plane on shipper pole block are sent so that swinging block is separate with cylinder One end is rotated up and compression reseting spring, so that material strip will not be by shipper pole block brought forward, so by sending band cylinder Piston rod moves forward and backward, so that material strip is gradually sent into mounting groove.
The utility model is further arranged to: the mounting rack includes erecting bed and is used to support erecting bed two positioning Plate, the mounting groove are provided with the upper surface of erecting bed;The material cutting mechanism includes two strippings and slicings being threaded through on erecting bed, and two A stripping and slicing is located at the left and right sides of mounting groove, and the rear end of the stripping and slicing is equipped with blade, and two strippings and slicings are opposite to be all provided on one side There is the grooving for the insertion of waste material section, the driving mechanism that driving stripping and slicing moves up and down is connected with below stripping and slicing.
By using above-mentioned technical proposal, needing to be located on rear side of stripping and slicing and the waste material section adjacent with feeding mechanism and material When band separation, stripping and slicing is moved down by driving mechanism, so that blade, which pushes, will be located at the waste material section on rear side of stripping and slicing and original material strip point From.
The utility model is further arranged to: the driving mechanism includes the blank cylinder below overhead gage, blank Drive rod is hinged on the piston rod of cylinder, the other end of the drive rod and two strippings and slicings are hinged, the middle part of the drive rod It is hinged with adjacent support plate.
By using above-mentioned technical proposal, drives the front end of drive rod to move up when the piston rod of blank cylinder stretches out, make Must be connected to transmission rod rear end two strippings and slicings move down realize be located at stripping and slicing on rear side of and waste material section separated with material strip;When blank gas When the piston rod of cylinder is shunk, stripping and slicing is moved down, and is enabled material strip by stripping and slicing and is delivered to the rear side and Material moving device phase of stripping and slicing It is adjacent.
The utility model is further arranged to: the Material moving device includes moving material frame, is fixed with first on the shifting material frame Material cylinder is moved, shifting flitch is fixed on the piston rod of the first shifting material cylinder, the second shifting material cylinder is fixed on the shifting flitch, the Two move the piston rod of material cylinder downward and are fixed with link block, briquetting are fixed on the link block, the upper end of the briquetting is set There is sucker, the sucker upper end is connect with air extractor.
By using above-mentioned technical proposal, after the shell for being equipped with plastic part is separated with material strip, is moved by first and expect gas Briquetting is moved to the upper end for being connected to shell by cylinder and the second shifting material cylinder, is then evacuated by air extractor, so that peace The plastic part and shell installed is picked up;Then material cylinder and second can be moved by first move material cylinder for mounted plastic part It is moved to subsequent processing with shell, convenient for next group of shell and plastic part of assembling.It moves up stripping and slicing and makes plastic part jacket, thus So that plastic part and shell assemble in place in locating piece insertion locating slot.
The utility model is further arranged to: the top of the mounting groove is equipped with feeding pressure mechanism, wears in the mounting groove Block is rushed, the lower end for rushing block is connected with the punching mechanism that driving punching moves up and down fastly.
By using above-mentioned technical proposal, by first move material cylinder and the second cylinder by the shell fitted together and Before plastic part is removed, first briquetting is moved in the top of the shell of plastic part connection, is then driven by punching mechanism Block is rushed to move up, so that in locating piece insertion locating slot, so that plastic part is close with cage connection, so that plastic part and shell Convenient for being picked up simultaneously by sucker.Plastic part and shell can disposably assemble in place, reduce subsequent manufacturing procedure.
So that moving material cylinder water by first translates dynamic pressure block, is moved by second and expect the vertically movable briquetting of cylinder, so that Sucker can move material cylinder by first after picking up the shell installed and plastic part and the second shifting material cylinder is moved to Move down station.
In conclusion the utility model has the following beneficial effects:
Before plastic part is inserted into shell, accessory plate is first passed through to increase the distance between two side baffles, so that plastic part It is lighter to be inserted into shell, improves the assembling speed of shell and plastics, and when auxiliary is separated with shell, shell is by original There is the limitation of material strip not easily shifted, and front apron is abutted with plastic part but also being not easy to drive when accessory plate is separated with shell outer Shell movement, enables the installation of subsequent shell and plastic part to go on smoothly, to improve the assembling speed of shell and plastics.
Detailed description of the invention
Fig. 1 is a kind of schematic diagram of network connecting head explosion in background technique;
Fig. 2 is the structural schematic diagram of a Seed packaged band in background technique;
Fig. 3 is the structural schematic diagram of the present embodiment;
Fig. 4 is enlarged diagram of the Fig. 3 at A;
Fig. 5 is the perspective view of the explosion of tape-feed in the present embodiment;
Fig. 6 is the perspective view of the explosion of the present embodiment;
Fig. 7 is enlarged diagram of the Fig. 6 at B;
Fig. 8 is the structural schematic diagram for highlighting blank cylinder in the present embodiment;
Fig. 9 is the structural schematic diagram for highlighting delivery sheet structure in the present embodiment.
Appended drawing reference: 1, mounting rack;2, tape-feed;3, feeding mechanism;4, material cutting mechanism;5, Material moving device;11, it installs Slot;12, erecting bed;13, positioning plate;21, support plate;22, overhead gage;23, shutter;24, transfer block;25, band cylinder is sent; 26, swinging block;27, shipper pole block;221, trough of belt is sent;231, shipper pole hole;241, groove;261, limited block;262, reset spring; 31, stock support;32, delivery sheet;33, air cylinder supporting structure;34, straight feeding bar;35, push rod;36, cover board;37, accessory plate; 38, linkage block;39, assistant cylinder;321, horizontal to move hopper;322, longitudinal to move hopper;323, longitudinal feeding cylinder;331, horizontal Feeding cylinder;371, chamfering;41, stripping and slicing;42, blade;43, blank cylinder;44, drive rod;45, grooving;51, material frame is moved;52, First moves material cylinder;53, flitch is moved;54, second material cylinder is moved;55, link block;56, briquetting;57, block is rushed;58, stamping cylinder; 561, sucker;A1, plastic part;A11, locating piece;A2, shell;A21, top plate;A22, side baffle;A23, front apron;A24, rear gear Plate;A25, locating slot;A3, waste material section;A31, jack.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Present embodiment discloses one kind, and as shown in Fig. 3, Fig. 6, including mounting rack 1, mounting groove 11 is equipped with above mounting rack 1, The front side of mounting rack 1 is equipped with tape-feed 2, and the rear side of mounting rack 1 is equipped with feeding mechanism 3, is equipped in mounting groove 11 for that will pacify The isolated material cutting mechanism 4 of the material cutting mechanism 4 that shell A2 and its waste material section A3 equipped with plastic part A1 are separated with original material strip, installation The top of frame 1 is equipped with the Material moving device 5 for removing material mounted on mounting rack 1.
As shown in Figure 5, Figure 6, tape-feed 2 includes two support plates 21 and the overhead gage 22 being fixed in support plate 21, Trough of belt 221 is sent equipped with what feed strip passed through on overhead gage 22, send trough of belt 221 corresponding with 11 position of mounting groove.In overhead gage 22 Be fixedly arranged above shutter 23, set on shutter 23 there are two with the shipper pole hole 231 of sending trough of belt 221 to be connected to.In shutter 23 Top slidably connects transfer block 24, and transfer block 24 is equipped with far from the side of mounting rack 1 and send band cylinder 25, send the work with cylinder 25 Stopper rod is fixedly connected with transfer block 24, by sending the flexible transfer block 24 that is able to drive with 25 piston rod of cylinder to be moved forward and backward.
As shown in Figure 5, Figure 6, it sets in the lower end of transfer block 24 there are two groove 241, is rotatably connected to swing in groove 241 Block 26, the upper end of swinging block 26 is close to send the side with cylinder 25 to be fixed with limited block 261.The upper end of swinging block 26 is separate to send band The side of cylinder 25 is fixed with reset spring 262, and the other end and 241 bottom of groove of reset spring 262 are fixed;In swinging block 26 Lower end be fixed with shipper pole block 27, shipper pole block 27 is right angled triangle and bevel edge towards band cylinder 25 is sent, and shipper pole block 27 is threaded through In shipper pole hole 231 and it is inserted into jack A31.
As shown in Figure 5, Figure 6, when shipper pole block 27 is to far from sending band cylinder 25 mobile, limited block 261 is connected to groove 241 Upper end rotate swinging block 26 can not, so that movable block drives material strip to far from the side movement sent with cylinder 25;When Shipper pole block 27 to close to send band cylinder 25 mobile when, contact of incline plane on material strip and shipper pole block 27, so that swinging block 26 is far from sending One end with cylinder 25 is rotated up and compression reseting spring 262, so that material strip can not move, so that sending band cylinder When 25 promotion movable blocks move back and forth, material strip is enabled to constantly to move into mounting groove 11.
As shown in Figure 7, Figure 8, mounting rack 1 includes erecting bed 12 and is used to support 12 two positioning plates 13 of erecting bed, is installed The upper surface of erecting bed 12 is arranged in slot 11.Material cutting mechanism 4 includes two strippings and slicings 41 being threaded through on erecting bed 12, two strippings and slicings 41 are located at the left and right sides of mounting groove 11, and stripping and slicing 41 is equipped with blade 42 far from the side of overhead gage 22.In two strippings and slicings 41 The opposite grooving 45 being equipped on one side for waste material section A3 insertion.Blank cylinder 43, blank cylinder are equipped with below overhead gage 22 Be hinged with drive rod 44 on 43 piston rod, the other end of drive rod 44 and two strippings and slicings 41 are hinged, the middle part of drive rod 44 with Adjacent support plate 21 is hinged.It is able to drive stripping and slicing 41 when the piston rod of blank cylinder 43 is raised above to move down, so that being located at The waste material section A3 of 45 rear side of grooving is separated with material strip.
As shown in Fig. 3, Fig. 9, feeding mechanism 3 includes stock support 31, and stock support 31 is fixedly arranged above delivery sheet 32, send The upper end of flitch 32 be equipped be interconnected horizontal move hopper 321 and it is longitudinal move hopper 322, longitudinal position for moving hopper 322 with Mounting groove 11 is corresponding.It is equipped with air cylinder supporting structure 33 on the right side of stock support 31, is fixed with straight feeding in air cylinder supporting structure 33 Cylinder 331, is fixed with straight feeding bar 34 on the piston rod of straight feeding cylinder 331, and straight feeding bar 34, which is located at, horizontal moves material The right side of slot 321.Plastic part A1 horizontal move in hopper 321 is put into feeding to send material to vertical by straight feeding bar 34 To moving in hopper 322, push rod 35 is slidably connected longitudinally moving in hopper 322, push rod 35 is far from longitudinal one end for moving hopper 322 It is connect with the piston rod for being fixed on longitudinal feeding cylinder 323 on delivery sheet 32, it is mobile by the push rod 35 of 321 band of feeding cylinder, To which material is pushed into mounting groove 11;It is fixedly arranged above cover board 36 in delivery sheet 32, the lower section of cover board 36 is equipped with accessory plate 37, accessory plate 37 is fixed with linkage block 38 far from longitudinal one end for moving hopper 322, linkage block 38 be fixed on it is auxiliary on cover board 36 It helps the piston rod of cylinder 39 to connect, is equipped with chamfering 371 close to one end of material strip in accessory plate 37, and the width of accessory plate 37 omits Greater than the width of plastic part A1.
As shown in Fig. 3, Fig. 9, when installing shell A2, by the mobile material strip of shipper pole block 27, so that a shell A2 is mobile To the rear side of stripping and slicing 41, then accessory plate 37 is inserted into the shell A2 of accessory plate 37 by assistant cylinder 39, is being assisted Two side baffle A22 in 37 insertion process of plate on shell A2 are being deformed outward along chamfering 371, so that two side baffle A22 Between distance become larger;Then material is sent to longitudinal by straight feeding bar 34 and is moved in hopper 322, by push rod 35 by longitudinal shifting In the plastic part A1 push-in mounting groove 11 of hopper 322, during push rod 35 pushes plastic part A1, plastic part A1 insertion is close It is abutted between two side baffle A22 of the shell A2 of accessory plate 37 and with front apron A23, due to the spacing of two side baffle A22 From becoming larger, so that plastic part A1 is simple and convenient when being inserted into.
As shown in Fig. 4, Fig. 7, Material moving device 5 (showing in Fig. 3) includes moving material frame 51, moves on material frame 51 and is fixed with the first shifting Expect cylinder 52, is fixed on the piston rod of the first shifting material cylinder 52 and moves flitch 53, moved on flitch 53 and be fixed with the second shifting material cylinder 54, second moves the piston rod of material cylinder 54 downward and is fixed with link block 55.Briquetting 56 is fixed on link block 55, on briquetting 56 End is equipped with sucker 561, and the upper end of sucker 561 is connect with getter device (not shown).It is equipped in mounting groove 11 and rushes block 57, the lower end for rushing block 57 is connect with the piston rod for the stamping cylinder 58 for being located at 12 lower section of erecting bed, is rushed block 57 and is located at stripping and slicing 41 Rear side.
As shown in Fig. 4, Fig. 7, when plastic part A1 is abutted and limited block 261 and accessory plate 37 are inserted into two with limited block 261 When between a side plate, accessory plate 37 is taken away between two side plates by assistant cylinder 39;Then the drive of blank cylinder 43 is cut Block 41 is mobile, so that separating with the shell A2 of plastic part A1 connection and its corresponding waste material section A3 with material strip;Then pass through first It moves material cylinder 52 and second and moves the mobile briquetting 56 of material cylinder 54, so that briquetting 56 abuts on the top plate A21 of shell A2;Then pass through Stamping cylinder 58 will rush block 57 and jack up upwards, so that plastic part A1 is abutted with top plate A21 and locating piece A11 insertion locating slot A25 It is interior, so that plastic part A1 and shell A2 is assembled in place;Then it is evacuated by getter device, so that under sucker 561 End generates negative pressure and picks up the shell A2 being completed and plastic part A1;Then material cylinder 52 and second is moved by first move material gas The near shell A2 being completed of cylinder 54 and plastic part A1 subsequent processing, so that the installation of plastic part A1 is completed, convenient for next Assembly housing A2 and plastic part A1 are assembled.
Specific process: it is mobile by 39 shipper pole accessory plate 37 of assistant cylinder, so that the insertion of accessory plate 37 and feeder Increase the distance between two side baffle A22 in the adjacent shell A2 of structure 3;Next plastic part A1 is put into horizontal shifting hopper Horizontal will be moved in hopper 321 in 321 and by straight feeding cylinder 331 be sent into it is longitudinal move in hopper 322, then pass through longitudinal feeding Cylinder 323 pushes push rod 35, so that longitudinal hopper 322 that moves is inserted into mounting groove 11 and feeding mechanism 3 under the drive of push rod 35 Adjacent shell A2.Since distance becomes larger between two side baffle A22, so that plastic part A1 is simple and convenient when being inserted into.Then to Post-tensioning dynamic auxiliary plate 37 separates accessory plate 37 with shell A2, then by stripping and slicing 41 will be located at the rear side of stripping and slicing 41 and with give Material mechanism 3 adjacent shell A2 and its waste material section A3 are separated with material strip.
After the shell A2 for being equipped with plastic part A1 is separated with material strip, material cylinder 52 and second is moved by first and moves material cylinder 54 are moved to briquetting 56 upper end for being connected to shell A2, then move up top stripping and slicing 41 and locating piece A11 is made to be inserted into locating slot A25 It is interior, so that plastic part A1 is installed in place;Then the shell A2 and plastic part A1 that group installs are picked up and is led to using sucker 561 It crosses the first shifting material cylinder 52 and second and moves material cylinder 54 for its shipper pole to next station;Then pass through the mobile material strip of shipper pole block 27, So that the shell A2 on mounting groove 11 is supplemented, and it is so constantly reciprocal, realize the installation of shell A2 and plastic part A1.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this Within novel design concept, any modification, equivalent replacement, improvement and so on should be included in the protection of the utility model Within the scope of.

Claims (8)

1. a kind of network connecting head mounting device, including mounting rack (1), the mounting rack (1) is equipped with mounting groove (11), special Sign is: the front side of the mounting groove (11) is equipped with for the tape-feed (2) to mounting groove (11) push material strip, the installation The rear side of slot (11) is equipped with for the feeding mechanism (3) to mounting groove (11) conveying plastic part (A1), and the mounting groove (11) is interior It is equipped with material cutting mechanism (4), the top of the mounting groove (11) is equipped with the shifting for assembled material to be moved into subsequent processing Expect mechanism (5);The feeding mechanism (3) includes stock support (31), and stock support (31) is fixedly arranged above delivery sheet (32), institute It states delivery sheet (32) and is equipped with chute feeder, be equipped on the delivery sheet (32) for the plastic part (A1) in chute feeder to be inserted into The top of the moving assembly of shell (A2), the mounting groove (11) is equipped with accessory plate (37), and accessory plate (37) direction send band The side of mechanism (2) is equipped with chamfering (371), and the width of the accessory plate (37) is greater than the distance between two side baffles (A22), It is fixed on the delivery sheet (32) for so that the auxiliary body that accessory plate (37) slides back and forth along mounting groove (11).
2. a kind of network connecting head mounting device according to claim 1, it is characterised in that: the chute feeder includes opening up The level being interconnected on delivery sheet (32) moves hopper (321) and longitudinal shifting hopper (322), longitudinal shifting hopper (322) Position is corresponding with mounting groove (11), and the delivery sheet (32) is fixedly arranged above cover board (36), and the auxiliary body includes fixing Assistant cylinder (39) on cover board (36), the accessory plate (37) are threaded through below cover board (36), the assistant cylinder (39) Piston rod on be fixed with linkage block (38), the linkage block (38) is fixedly connected with the rear end of accessory plate (37).
3. a kind of network connecting head mounting device according to claim 2, it is characterised in that: the moving assembly includes setting The air cylinder supporting structure (33) on the right side of stock support (31) is set, is fixed with straight feeding cylinder on the air cylinder supporting structure (33) (331), it is fixed with straight feeding bar (34) on the piston rod of the straight feeding cylinder (331), the straight feeding bar (34) Positioned at the horizontal right side for moving hopper (321), longitudinal move in hopper (322) slidably connects push rod (35), the push rod (35) connect far from longitudinal one end for moving hopper (322) with the piston rod for being fixed on longitudinal feeding cylinder (323) on delivery sheet (32) It connects.
4. a kind of network connecting head mounting device according to claim 1, it is characterised in that: tape-feed (2) packet The overhead gage (22) for including two support plates (21) and being fixed on support plate (21), the overhead gage (22) are worn equipped with feed strip That crosses send trough of belt (221), described to send trough of belt (221) corresponding with mounting groove (11) position, and the overhead gage (22) is fixedly arranged above Shutter (23), set on the shutter (23) there are two with send the trough of belt shipper pole hole (231) that (221) are connected to, the shutter (23) top slidably connects transfer block (24), and the transfer block (24) is equipped with far from the side of mounting rack (1) and send band cylinder (25), described that the piston rod with cylinder (25) is sent to be fixedly connected with transfer block (24), the lower end of the transfer block (24) is equipped with two A groove (241), the groove (241) is interior to be rotatably connected to swinging block (26), and the upper end of the swinging block (26) is close to send band The side of cylinder (25) is fixed with limited block (261), and the upper end of the swinging block (26) is separate to send the side with cylinder (25) solid Surely have reset spring (262), the other end and groove (241) bottom of the reset spring (262) are fixed, the swinging block (26) Lower end be fixed with shipper pole block (27), the shipper pole block (27) is right angled triangle and bevel edge towards sending band cylinder (25), described Shipper pole block (27) is threaded through in shipper pole hole (231).
5. a kind of network connecting head mounting device according to claim 4, it is characterised in that: the mounting rack (1) includes Erecting bed (12) and (12) two positioning plates (13) of erecting bed are used to support, the mounting groove (11) is provided with erecting bed (12) Upper surface;The material cutting mechanism (4) includes two strippings and slicings (41) being threaded through on erecting bed (12), two strippings and slicings (41) difference positions In the left and right sides of mounting groove (11), the rear end of the stripping and slicing (41) is equipped with blade (42), the opposite one side of two strippings and slicings (41) It is equipped with the grooving (45) for waste material section (A3) insertion, is connected with what driving stripping and slicing (41) moved up and down below stripping and slicing (41) Driving mechanism.
6. a kind of network connecting head mounting device according to claim 5, it is characterised in that: the driving mechanism includes position Blank cylinder (43) below overhead gage (22) is hinged with drive rod (44), the biography on the piston rod of blank cylinder (43) Hingedly, the middle part of the drive rod (44) and adjacent support plate (21) are cut with scissors for the other end of lever (44) and two strippings and slicings (41) It connects.
7. a kind of network connecting head mounting device according to claim 1, it is characterised in that: Material moving device (5) packet Shifting material frame (51) is included, the first shifting material cylinder (52) is fixed on shifting material frame (51), first moves the piston rod of material cylinder (52) On be fixed with and move flitch (53), be fixed with the second shifting material cylinder (54) on the shiftings flitch (53), second moves and expect cylinder (54) Piston rod downward and is fixed with link block (55), is fixed with briquetting (56) on the link block (55), the briquetting (56) it is upper End is equipped with sucker (561), and sucker (561) upper end is connect with air extractor.
8. a kind of network connecting head mounting device according to claim 1, it is characterised in that: the mounting groove (11) it is upper Side is equipped with feeding pressure mechanism, is equipped with and rushes block (57) in the mounting groove (11), and the lower end for rushing block (57) is connected with driving punching The punching mechanism moved up and down fastly.
CN201820705875.5U 2018-05-11 2018-05-11 A kind of network connecting head mounting device Expired - Fee Related CN208272335U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820705875.5U CN208272335U (en) 2018-05-11 2018-05-11 A kind of network connecting head mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820705875.5U CN208272335U (en) 2018-05-11 2018-05-11 A kind of network connecting head mounting device

Publications (1)

Publication Number Publication Date
CN208272335U true CN208272335U (en) 2018-12-21

Family

ID=64681734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820705875.5U Expired - Fee Related CN208272335U (en) 2018-05-11 2018-05-11 A kind of network connecting head mounting device

Country Status (1)

Country Link
CN (1) CN208272335U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113471793A (en) * 2021-07-01 2021-10-01 鼎捷自动化科技有限公司 Six-type network module assembling production line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113471793A (en) * 2021-07-01 2021-10-01 鼎捷自动化科技有限公司 Six-type network module assembling production line
CN113471793B (en) * 2021-07-01 2023-03-24 鼎捷自动化科技有限公司 Six-type network module assembling production line

Similar Documents

Publication Publication Date Title
CN107770715B (en) Full-automatic kludge of hanging earphone drain pan part
CN107959216B (en) Automatic assembling equipment for RJ45 connector
CN104836095A (en) Automatic continuous terminal machine
CN113471792B (en) Pin inserting machine
CN208272335U (en) A kind of network connecting head mounting device
CN204538441U (en) Automatic continuous terminal machine
CN209709239U (en) A kind of connector and its assembling equipment
CN113948941B (en) Earphone socket assembling equipment
CN112355125B (en) Workpiece stamping device
CN211495922U (en) Automatic feeding device
CN209844175U (en) Terminal punching and assembling mechanism of automatic wire harness assembling machine
CN111152508A (en) Full-automatic rubber band threading machine
CN212220799U (en) Fresh-keeping box assembling machine
CN212265121U (en) Assembling device of thermal protector
CN209217405U (en) A kind of terminal machine structure
CN214111321U (en) Blanking mechanism with unilateral water gap cutting function
CN113460418A (en) Separation mechanism of automatic disassembly and separation system for recycling mobile phone packages
CN113547037A (en) Special-shaped elastic sheet processing equipment capable of detecting stretching height
CN209921720U (en) Multi-column type prefabricated bag packaging machine's opening bag mechanism
CN220316841U (en) Adhesive film cutting and laying device
CN207925877U (en) A kind of terminal automatic moulding machine
CN111558831A (en) Assembling device and assembling method of thermal protector
CN218193583U (en) Stainless steel elastic piece and plastic part assembling device
CN110356026A (en) A kind of automatic demoulding takes contact lens
CN219429044U (en) Feeder of cascaded material loading

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181221