CN208271008U - A kind of electricity consumption maximum demand automatic monitoring device - Google Patents

A kind of electricity consumption maximum demand automatic monitoring device Download PDF

Info

Publication number
CN208271008U
CN208271008U CN201820534154.2U CN201820534154U CN208271008U CN 208271008 U CN208271008 U CN 208271008U CN 201820534154 U CN201820534154 U CN 201820534154U CN 208271008 U CN208271008 U CN 208271008U
Authority
CN
China
Prior art keywords
electricity consumption
relay
time relay
maximum demand
consumption maximum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820534154.2U
Other languages
Chinese (zh)
Inventor
俞志荣
肖红辉
肖志强
陈前忠
宋无转
陶纪东
陈潮俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG GUANGYE YUNLIU MINING CO Ltd
Original Assignee
GUANGDONG GUANGYE YUNLIU MINING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG GUANGYE YUNLIU MINING CO Ltd filed Critical GUANGDONG GUANGYE YUNLIU MINING CO Ltd
Priority to CN201820534154.2U priority Critical patent/CN208271008U/en
Application granted granted Critical
Publication of CN208271008U publication Critical patent/CN208271008U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier

Abstract

The utility model discloses a kind of electricity consumption maximum demand automatic monitoring devices, including measure and control device interconnected and electric current relay, and the time relay and intermediate relay, the time relay being electrically connected respectively with electric current relay are in parallel with intermediate relay, intermediate relay is connected with warning device, and the time relay connects extraneous power load circuit.When electricity consumption reaches monitor value, warning device response, when electricity consumption is more than monitor value, the time relay realizes that unranking overloads load, the present apparatus realizes alarming in advance automatically to electricity consumption maximum demand, and the classification of excess load is cut off, it can effectively avoid the expansion of scope of power outage, reduce user's loss.It can satisfy all kinds of requirements monitored automatically to the enterprise of power supply department electricity payment to electricity consumption maximum demand in a manner of " two-shift system ", and small investment, installation period is short, and structure is simple, and easy to maintain, versatility is very strong.Basic charge as per installed capacity expenditure, remarkable in economical benefits can be reduced.

Description

A kind of electricity consumption maximum demand automatic monitoring device
Technical field
The utility model relates to technical field of electric power more particularly to a kind of maximum most amount automatic monitoring devices.
Background technique
Many enterprises to power supply department electricity payment, that is, remove the electricity with kilowatt-hour, friendship kilowatt-hour using " two-shift system " mode Outside taking, also to be paid according to electricity consumption maximum demand " basic charge as per installed capacity ".If electricity consumption maximum demand exceeds contract provision, exceed portion Dividing double need to pay the electricity charge.Monitoring to electricity consumption maximum demand is significant for the management of enterprise production and management cost.It crosses It goes to traditional old-fashioned substation only to measure electricity consumption maximum demand, does not record, alerts and control, currently employed comprehensive automation The substation of change technology only measures electricity consumption maximum demand, records without alerting and controlling, and monitors and manage maximum electricity consumption Amount does not still obtain the most fundamental solution.
Utility model content
In view of problem above, the utility model provides a kind of electricity consumption maximum demand automatic monitoring device, can face in arrival Alarm can be issued when boundary's maximum electricity consumption, when electricity consumption is more than the maximum electricity consumption of setting, can take classification tripping steady automatically Determine electricity consumption.
In order to achieve the above objectives, using following technical scheme:
A kind of electricity consumption maximum demand automatic monitoring device, including measure and control device interconnected and electric current relay, and point The time relay and intermediate relay, the time relay and the intermediate relay not being electrically connected with the electric current relay Device is in parallel, and the intermediate relay is connected with warning device, and the time relay connects extraneous power load circuit.
The time relay is grading control comprising when first time relay, second time relay and third Between relay, the first time relay controls the first stage load, and second time relay controls the second stage load, institute State third time relay control third stage load.
The warning device includes electric bell and signal lamp.
The warning device further includes a reset switch, is connect with intermediate relay, and the effect of reset switch ZK is: when Warning device movement, electric bell sounds, and under the premise of substation person on duty has grasped situation, reset switch ZK can be gone to sky Position, turns off electric bell in advance;When load revert to normal level, warning device is in monitoring state, and ZK can be gone to work Position.
Compared with prior art, the utility model has the following beneficial effects:
Main transformer load is monitored with digital electric current relay, can both have been reduced to greatest extent to original measure and control device electric current The influence in circuit also ensures the measurement accuracy to load, to ensure the reliable of electricity consumption maximum demand automatic monitoring device Property, and its long service life, failure rate are low, can effectively reduce plant failure rate and operation expense.
With digital time relay timing and triggering, it is greatly improved the sensitivity of measure and control device, can either accurately be opened Dynamic protective device movement achievees the purpose that reduce load to cut off load, and excessively excision load can be effectively prevented, and causes to stop The expansion of electric range.
Device element is combined with substation's observing and controlling and protective device, both without increasing substantial contribution and additional erecting bed Institute, also ensures the security reliability of the original observing and controlling of substation and protective device, and realizes to the automatic of electricity consumption maximum demand Monitoring function.
The present apparatus realizes alarming in advance automatically to electricity consumption maximum demand, adopts for power scheduling and substation operator on duty Counter-measure is taken to provide necessary set aside some time.It alleviates substation operator on duty and needs to monitor load indicator table at any time Many and diverse labour greatly improves the working efficiency of operator on duty.Manual operation is efficiently solved to operate not in time and hastily easily The problem of making a fault ensure that the economic stability operation of personnel, the safety of equipment and electric system.It realizes to excess load Classification excision, can effectively avoid the expansion of scope of power outage, reduce user's loss.Can satisfy it is all kinds of in a manner of " two-shift system " to The requirement that the enterprise of power supply department electricity payment monitors electricity consumption maximum demand automatically, and small investment, installation period is short, structure Simply, easy to maintain, versatility is very strong.Basic charge as per installed capacity expenditure, remarkable in economical benefits, technology maturation, application prospect can be reduced It is boundless.
Detailed description of the invention
Fig. 1 is the utility model electricity consumption maximum demand automatic monitoring device work flow diagram.
Fig. 2 is the utility model electricity consumption maximum demand automatic monitoring device functional block diagram.
Fig. 3 is the utility model electricity consumption maximum demand automatic monitoring device circuit diagram.
Fig. 4 is the utility model electricity consumption maximum demand automatic monitoring device circuit connection diagram.
Specific embodiment
The content of the utility model is described in further details with reference to the accompanying drawings and detailed description.
As shown in Figure 1, a kind of electricity consumption maximum demand automatic monitoring device, by electric current relay KA, time relay KT, in Between relay KM cooperation measure and control device and protective relaying device composition.The automatic monitoring and control to electricity consumption maximum demand may be implemented System.Apparatus structure is simple, and low manufacture cost, the period is short, easy to maintain, is not take up additional installation site, and stable and reliable operation is led to It is strong with property.
Measure and control device is electrically connected with electric current relay KA, electric current relay KA respectively with time relay KT and intermediate relay Device KM connection, time relay KT is in parallel with intermediate relay KM, and intermediate relay KM is connected with warning device, the time relay The extraneous power load circuit of KT connection.
Warning device includes electric bell DL and signal lamp: green light HG, red light HR connect with intermediate relay KM, work as electricity consumption When reaching monitor value, electric bell and red light will be switched on, and can issue alarm.Warning device is additionally provided with a reset switch ZK, makees With are as follows: when warning device acts, electric bell sounds, can be reset switch under the premise of substation person on duty has grasped situation ZK goes to vacancy, turns off electric bell in advance;When load revert to normal level, warning device is in monitoring state, and can be multiple Bit switch ZK goes to operating position.
Time relay KT is grading control comprising first time relay KT1, the second time relay KT2 and the Three time relay KT3, first time relay KT1 control the first stage load, and it is negative that the second time relay KT2 controls the second level Lotus, third time relay KT3 control third stage load.
It is respectively 120s, 180s and 240s that monitoring device, which was preset there are three the control time,.When electricity consumption is more than monitoring When value 120s, first time relay KT1 will be disconnected with the first stage load, after the first stage load disconnects, as electricity consumption returns to Within the scope of monitor value, then the second stage load is powered on third stage load, unaffected;After if the first stage load disconnects, still It has been more than so monitor value, has been more than the second time relay KT2 and the disconnection of the second stage load after monitor value 180s;If still It has been more than monitor value, then after being more than monitor value 240s, third time relay KT3 will be switched off with third stage load, until using Electricity is returned to monitor value or less.
By setting warning device and the time relay, alarming in advance automatically to electricity consumption maximum demand is realized, for electricity Power scheduling and substation operator on duty take counter-measure to provide necessary set aside some time.Alleviating substation operator on duty needs The many and diverse labour that monitor load indicator table at any time, greatly improves the working efficiency of operator on duty.Efficiently solve people Work operation operates the problem of easily making a fault not in time and hastily, ensure that the economy of personnel, the safety of equipment and electric system Stable operation.The classification excision to excess load is realized, the expansion of scope of power outage is effectively prevented, reduces user's damage to the greatest extent It loses.It can satisfy and all kinds of in a manner of " two-shift system " electricity consumption maximum demand is monitored automatically to the enterprise of power supply department electricity payment It is required that and small investment, installation period is short, and structure is simple, and easy to maintain, versatility is very strong.Its remarkable in economical benefits, technology at Ripe, application prospect is boundless.
Above-listed detailed description is illustrating for the utility model possible embodiments, and the embodiment is not to limit The scope of the patents of the utility model, all equivalence enforcements or change without departing from carried out by the utility model, is intended to be limited solely by this case In the scope of the patents.

Claims (4)

1. a kind of electricity consumption maximum demand automatic monitoring device, it is characterised in that: including measure and control device interconnected and electric current after Electric appliance, and the time relay and intermediate relay, the time relay and the institute that are electrically connected respectively with the electric current relay Intermediate relay parallel connection is stated, the intermediate relay is connected with warning device, and the time relay connects extraneous power load Circuit.
2. electricity consumption maximum demand automatic monitoring device according to claim 1, it is characterised in that: the time relay is Grading control comprising first time relay, second time relay and the third time relay, the first time relay Device controls the first stage load, and second time relay controls the second stage load, and the third time relay controls third Stage load.
3. electricity consumption maximum demand automatic monitoring device according to claim 1, it is characterised in that: the warning device includes Electric bell and signal lamp.
4. electricity consumption maximum demand automatic monitoring device according to claim 1, it is characterised in that: the warning device also wraps A reset switch is included, is connect with intermediate relay.
CN201820534154.2U 2018-04-13 2018-04-13 A kind of electricity consumption maximum demand automatic monitoring device Active CN208271008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820534154.2U CN208271008U (en) 2018-04-13 2018-04-13 A kind of electricity consumption maximum demand automatic monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820534154.2U CN208271008U (en) 2018-04-13 2018-04-13 A kind of electricity consumption maximum demand automatic monitoring device

Publications (1)

Publication Number Publication Date
CN208271008U true CN208271008U (en) 2018-12-21

Family

ID=64677324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820534154.2U Active CN208271008U (en) 2018-04-13 2018-04-13 A kind of electricity consumption maximum demand automatic monitoring device

Country Status (1)

Country Link
CN (1) CN208271008U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114094594A (en) * 2021-11-24 2022-02-25 国网河北省电力有限公司经济技术研究院 Transformer substation direct current load grading control method and device and terminal equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114094594A (en) * 2021-11-24 2022-02-25 国网河北省电力有限公司经济技术研究院 Transformer substation direct current load grading control method and device and terminal equipment
CN114094594B (en) * 2021-11-24 2024-04-19 国网河北省电力有限公司经济技术研究院 Hierarchical control method and device for direct current load of transformer substation and terminal equipment

Similar Documents

Publication Publication Date Title
CN202948040U (en) Intelligent electric energy meter having power failure monitoring and protection functions
CN102830255B (en) A kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function
CN105634138A (en) Multifunctional three-phase electric power monitoring apparatus
CN104658163A (en) Electric energy metering terminal and electrical fire monitoring method
CN204304404U (en) A kind of intelligent water pump air blower control cabinet
CN203759822U (en) Residual electric current type electrical fire hazard monitoring detector
CN203367963U (en) Intelligent endpoint power supply controller
CN109490667A (en) A kind of distribution transformer monitoring terminal
CN201518049U (en) Distribution transformer monitoring metering terminal
CN201345506Y (en) Intellectualized power distribution cabinet
CN208271008U (en) A kind of electricity consumption maximum demand automatic monitoring device
CN106026390A (en) Distribution network transformer load monitoring system and use method thereof
CN111242326A (en) Intelligent turn-off energy-saving operation and maintenance system for 5G communication base station
CN109490708B (en) Intelligent low-voltage shunt monitoring device
CN204425037U (en) A kind of maintenance-free high frequence Switching Power Supply DC power cabinet
CN205509473U (en) Low -tension motor protection device
CN202550664U (en) Direct current power supply system of non-floating charge type transformer substation based on lithium iron battery
CN214506661U (en) System based on low-voltage transformer area line loss rapid positioning
CN205070610U (en) Real -time on -line monitoring system of low pressure
CN112769143B (en) Intelligent safety management and control method based on ubiquitous power distribution Internet of things
CN111725895A (en) Transformer intelligent terminal
CN204536414U (en) A kind of low-voltage network residual current monitoring system
CN202583745U (en) Automatic power-off system for office
CN202405874U (en) Intelligent remote-control electricity-stealing prevention comprehensive distribution network module
CN207490325U (en) A kind of long-range power distribution cabinet of step down side

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant