- CN208271008U CN208271008U CN201820534154.2U CN201820534154U CN208271008U CN 208271008 U CN208271008 U CN 208271008U CN 201820534154 U CN201820534154 U CN 201820534154U CN 208271008 U CN208271008 U CN 208271008U
- Authority
- CN
- China
- Prior art keywords
- electricity consumption
- relay
- time relay
- maximum demand
- consumption maximum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
Abstract
The utility model discloses a kind of electricity consumption maximum demand automatic monitoring devices, including measure and control device interconnected and electric current relay, and the time relay and intermediate relay, the time relay being electrically connected respectively with electric current relay are in parallel with intermediate relay, intermediate relay is connected with warning device, and the time relay connects extraneous power load circuit.When electricity consumption reaches monitor value, warning device response, when electricity consumption is more than monitor value, the time relay realizes that unranking overloads load, the present apparatus realizes alarming in advance automatically to electricity consumption maximum demand, and the classification of excess load is cut off, it can effectively avoid the expansion of scope of power outage, reduce user's loss.It can satisfy all kinds of requirements monitored automatically to the enterprise of power supply department electricity payment to electricity consumption maximum demand in a manner of " two-shift system ", and small investment, installation period is short, and structure is simple, and easy to maintain, versatility is very strong.Basic charge as per installed capacity expenditure, remarkable in economical benefits can be reduced.
Description
Technical field
The utility model relates to technical field of electric power more particularly to a kind of maximum most amount automatic monitoring devices.
Background technique
Many enterprises to power supply department electricity payment, that is, remove the electricity with kilowatt-hour, friendship kilowatt-hour using " two-shift system " mode
Outside taking, also to be paid according to electricity consumption maximum demand " basic charge as per installed capacity ".If electricity consumption maximum demand exceeds contract provision, exceed portion
Dividing double need to pay the electricity charge.Monitoring to electricity consumption maximum demand is significant for the management of enterprise production and management cost.It crosses
It goes to traditional old-fashioned substation only to measure electricity consumption maximum demand, does not record, alerts and control, currently employed comprehensive automation
The substation of change technology only measures electricity consumption maximum demand, records without alerting and controlling, and monitors and manage maximum electricity consumption
Amount does not still obtain the most fundamental solution.
Utility model content
In view of problem above, the utility model provides a kind of electricity consumption maximum demand automatic monitoring device, can face in arrival
Alarm can be issued when boundary's maximum electricity consumption, when electricity consumption is more than the maximum electricity consumption of setting, can take classification tripping steady automatically
Determine electricity consumption.
In order to achieve the above objectives, using following technical scheme:
A kind of electricity consumption maximum demand automatic monitoring device, including measure and control device interconnected and electric current relay, and point
The time relay and intermediate relay, the time relay and the intermediate relay not being electrically connected with the electric current relay
Device is in parallel, and the intermediate relay is connected with warning device, and the time relay connects extraneous power load circuit.
The time relay is grading control comprising when first time relay, second time relay and third
Between relay, the first time relay controls the first stage load, and second time relay controls the second stage load, institute
State third time relay control third stage load.
The warning device includes electric bell and signal lamp.
The warning device further includes a reset switch, is connect with intermediate relay, and the effect of reset switch ZK is: when
Warning device movement, electric bell sounds, and under the premise of substation person on duty has grasped situation, reset switch ZK can be gone to sky
Position, turns off electric bell in advance;When load revert to normal level, warning device is in monitoring state, and ZK can be gone to work
Position.
Compared with prior art, the utility model has the following beneficial effects:
Main transformer load is monitored with digital electric current relay, can both have been reduced to greatest extent to original measure and control device electric current
The influence in circuit also ensures the measurement accuracy to load, to ensure the reliable of electricity consumption maximum demand automatic monitoring device
Property, and its long service life, failure rate are low, can effectively reduce plant failure rate and operation expense.
With digital time relay timing and triggering, it is greatly improved the sensitivity of measure and control device, can either accurately be opened
Dynamic protective device movement achievees the purpose that reduce load to cut off load, and excessively excision load can be effectively prevented, and causes to stop
The expansion of electric range.
Device element is combined with substation's observing and controlling and protective device, both without increasing substantial contribution and additional erecting bed
Institute, also ensures the security reliability of the original observing and controlling of substation and protective device, and realizes to the automatic of electricity consumption maximum demand
Monitoring function.
The present apparatus realizes alarming in advance automatically to electricity consumption maximum demand, adopts for power scheduling and substation operator on duty
Counter-measure is taken to provide necessary set aside some time.It alleviates substation operator on duty and needs to monitor load indicator table at any time
Many and diverse labour greatly improves the working efficiency of operator on duty.Manual operation is efficiently solved to operate not in time and hastily easily
The problem of making a fault ensure that the economic stability operation of personnel, the safety of equipment and electric system.It realizes to excess load
Classification excision, can effectively avoid the expansion of scope of power outage, reduce user's loss.Can satisfy it is all kinds of in a manner of " two-shift system " to
The requirement that the enterprise of power supply department electricity payment monitors electricity consumption maximum demand automatically, and small investment, installation period is short, structure
Simply, easy to maintain, versatility is very strong.Basic charge as per installed capacity expenditure, remarkable in economical benefits, technology maturation, application prospect can be reduced
It is boundless.
Detailed description of the invention
Fig. 1 is the utility model electricity consumption maximum demand automatic monitoring device work flow diagram.
Fig. 2 is the utility model electricity consumption maximum demand automatic monitoring device functional block diagram.
Fig. 3 is the utility model electricity consumption maximum demand automatic monitoring device circuit diagram.
Fig. 4 is the utility model electricity consumption maximum demand automatic monitoring device circuit connection diagram.
Specific embodiment
The content of the utility model is described in further details with reference to the accompanying drawings and detailed description.
As shown in Figure 1, a kind of electricity consumption maximum demand automatic monitoring device, by electric current relay KA, time relay KT, in
Between relay KM cooperation measure and control device and protective relaying device composition.The automatic monitoring and control to electricity consumption maximum demand may be implemented
System.Apparatus structure is simple, and low manufacture cost, the period is short, easy to maintain, is not take up additional installation site, and stable and reliable operation is led to
It is strong with property.
Measure and control device is electrically connected with electric current relay KA, electric current relay KA respectively with time relay KT and intermediate relay
Device KM connection, time relay KT is in parallel with intermediate relay KM, and intermediate relay KM is connected with warning device, the time relay
The extraneous power load circuit of KT connection.
Warning device includes electric bell DL and signal lamp: green light HG, red light HR connect with intermediate relay KM, work as electricity consumption
When reaching monitor value, electric bell and red light will be switched on, and can issue alarm.Warning device is additionally provided with a reset switch ZK, makees
With are as follows: when warning device acts, electric bell sounds, can be reset switch under the premise of substation person on duty has grasped situation
ZK goes to vacancy, turns off electric bell in advance;When load revert to normal level, warning device is in monitoring state, and can be multiple
Bit switch ZK goes to operating position.
Time relay KT is grading control comprising first time relay KT1, the second time relay KT2 and the
Three time relay KT3, first time relay KT1 control the first stage load, and it is negative that the second time relay KT2 controls the second level
Lotus, third time relay KT3 control third stage load.
It is respectively 120s, 180s and 240s that monitoring device, which was preset there are three the control time,.When electricity consumption is more than monitoring
When value 120s, first time relay KT1 will be disconnected with the first stage load, after the first stage load disconnects, as electricity consumption returns to
Within the scope of monitor value, then the second stage load is powered on third stage load, unaffected;After if the first stage load disconnects, still
It has been more than so monitor value, has been more than the second time relay KT2 and the disconnection of the second stage load after monitor value 180s;If still
It has been more than monitor value, then after being more than monitor value 240s, third time relay KT3 will be switched off with third stage load, until using
Electricity is returned to monitor value or less.
By setting warning device and the time relay, alarming in advance automatically to electricity consumption maximum demand is realized, for electricity
Power scheduling and substation operator on duty take counter-measure to provide necessary set aside some time.Alleviating substation operator on duty needs
The many and diverse labour that monitor load indicator table at any time, greatly improves the working efficiency of operator on duty.Efficiently solve people
Work operation operates the problem of easily making a fault not in time and hastily, ensure that the economy of personnel, the safety of equipment and electric system
Stable operation.The classification excision to excess load is realized, the expansion of scope of power outage is effectively prevented, reduces user's damage to the greatest extent
It loses.It can satisfy and all kinds of in a manner of " two-shift system " electricity consumption maximum demand is monitored automatically to the enterprise of power supply department electricity payment
It is required that and small investment, installation period is short, and structure is simple, and easy to maintain, versatility is very strong.Its remarkable in economical benefits, technology at
Ripe, application prospect is boundless.
Above-listed detailed description is illustrating for the utility model possible embodiments, and the embodiment is not to limit
The scope of the patents of the utility model, all equivalence enforcements or change without departing from carried out by the utility model, is intended to be limited solely by this case
In the scope of the patents.
Claims (4)
1. a kind of electricity consumption maximum demand automatic monitoring device, it is characterised in that: including measure and control device interconnected and electric current after
Electric appliance, and the time relay and intermediate relay, the time relay and the institute that are electrically connected respectively with the electric current relay
Intermediate relay parallel connection is stated, the intermediate relay is connected with warning device, and the time relay connects extraneous power load
Circuit.
2. electricity consumption maximum demand automatic monitoring device according to claim 1, it is characterised in that: the time relay is
Grading control comprising first time relay, second time relay and the third time relay, the first time relay
Device controls the first stage load, and second time relay controls the second stage load, and the third time relay controls third
Stage load.
3. electricity consumption maximum demand automatic monitoring device according to claim 1, it is characterised in that: the warning device includes
Electric bell and signal lamp.
4. electricity consumption maximum demand automatic monitoring device according to claim 1, it is characterised in that: the warning device also wraps
A reset switch is included, is connect with intermediate relay.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820534154.2U CN208271008U (en) | 2018-04-13 | 2018-04-13 | A kind of electricity consumption maximum demand automatic monitoring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820534154.2U CN208271008U (en) | 2018-04-13 | 2018-04-13 | A kind of electricity consumption maximum demand automatic monitoring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208271008U true CN208271008U (en) | 2018-12-21 |
Family
ID=64677324
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820534154.2U Active CN208271008U (en) | 2018-04-13 | 2018-04-13 | A kind of electricity consumption maximum demand automatic monitoring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208271008U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114094594A (en) * | 2021-11-24 | 2022-02-25 | 国网河北省电力有限公司经济技术研究院 | Transformer substation direct current load grading control method and device and terminal equipment |
-
2018
- 2018-04-13 CN CN201820534154.2U patent/CN208271008U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114094594A (en) * | 2021-11-24 | 2022-02-25 | 国网河北省电力有限公司经济技术研究院 | Transformer substation direct current load grading control method and device and terminal equipment |
CN114094594B (en) * | 2021-11-24 | 2024-04-19 | 国网河北省电力有限公司经济技术研究院 | Hierarchical control method and device for direct current load of transformer substation and terminal equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202948040U (en) | Intelligent electric energy meter having power failure monitoring and protection functions | |
CN102830255B (en) | A kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function | |
CN105634138A (en) | Multifunctional three-phase electric power monitoring apparatus | |
CN104658163A (en) | Electric energy metering terminal and electrical fire monitoring method | |
CN204304404U (en) | A kind of intelligent water pump air blower control cabinet | |
CN203759822U (en) | Residual electric current type electrical fire hazard monitoring detector | |
CN203367963U (en) | Intelligent endpoint power supply controller | |
CN109490667A (en) | A kind of distribution transformer monitoring terminal | |
CN201518049U (en) | Distribution transformer monitoring metering terminal | |
CN201345506Y (en) | Intellectualized power distribution cabinet | |
CN208271008U (en) | A kind of electricity consumption maximum demand automatic monitoring device | |
CN106026390A (en) | Distribution network transformer load monitoring system and use method thereof | |
CN111242326A (en) | Intelligent turn-off energy-saving operation and maintenance system for 5G communication base station | |
CN109490708B (en) | Intelligent low-voltage shunt monitoring device | |
CN204425037U (en) | A kind of maintenance-free high frequence Switching Power Supply DC power cabinet | |
CN205509473U (en) | Low -tension motor protection device | |
CN202550664U (en) | Direct current power supply system of non-floating charge type transformer substation based on lithium iron battery | |
CN214506661U (en) | System based on low-voltage transformer area line loss rapid positioning | |
CN205070610U (en) | Real -time on -line monitoring system of low pressure | |
CN112769143B (en) | Intelligent safety management and control method based on ubiquitous power distribution Internet of things | |
CN111725895A (en) | Transformer intelligent terminal | |
CN204536414U (en) | A kind of low-voltage network residual current monitoring system | |
CN202583745U (en) | Automatic power-off system for office | |
CN202405874U (en) | Intelligent remote-control electricity-stealing prevention comprehensive distribution network module | |
CN207490325U (en) | A kind of long-range power distribution cabinet of step down side |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |