CN208267901U - A kind of lotion gravity flow filling piping and the blocking emergency treatment device that drills - Google Patents

A kind of lotion gravity flow filling piping and the blocking emergency treatment device that drills Download PDF

Info

Publication number
CN208267901U
CN208267901U CN201820506763.7U CN201820506763U CN208267901U CN 208267901 U CN208267901 U CN 208267901U CN 201820506763 U CN201820506763 U CN 201820506763U CN 208267901 U CN208267901 U CN 208267901U
Authority
CN
China
Prior art keywords
gravity flow
lotion
flow filling
gravity
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820506763.7U
Other languages
Chinese (zh)
Inventor
秦杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaihua Xiangxi Gold Mine Design And Research Co ltd
Original Assignee
CHENZHOU MINING INDUSTRY Co Ltd HUNAN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENZHOU MINING INDUSTRY Co Ltd HUNAN filed Critical CHENZHOU MINING INDUSTRY Co Ltd HUNAN
Priority to CN201820506763.7U priority Critical patent/CN208267901U/en
Application granted granted Critical
Publication of CN208267901U publication Critical patent/CN208267901U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model discloses a kind of lotion gravity flow filling piping and drilling blocking emergency treatment devices, including lotion slurry stirring structure, plunger pump, buffering hopper, gravity line, pump pressure pipeline and gravity flow filling borehole, the lotion slurry stirring structure is connected to by major ingredient pipe with buffering hopper, the plunger pump is connected to buffering hopper, the both ends of the gravity line are connected to buffering hopper and gravity flow filling borehole respectively, switching gate valve is provided on gravity line, the both ends of the pump pressure pipeline are also connected to buffering hopper and gravity flow filling borehole respectively.In filling slurry; if there is stopping state; it can realize that slurry flows into the switching of gravity flow filling borehole through gravity line or pump pressure pipeline by the opening and closing of control switching gate valve; it does not need to shut down to dredge gravity line; it does not affect the normal production; the stability and duration for ensureing tailings paste gravity flow filling system are conducive to save human and material resources and financial resources cost.

Description

A kind of lotion gravity flow filling piping and the blocking emergency treatment device that drills
Technical field
The utility model relates to mining area goafs to backfill technical field, and in particular to a kind of lotion gravity flow filling piping and brill Hole plug emergency treatment device.
Background technique
A large amount of solid waste certainly will be generated during the development and utilization of mineral resources, mine is by by remaining solid Waste re-uses as resource and is filled to underground goaf, thus reduce underground goaf cave-in accident generation and The risk of waste environmental pollution.In view of the good superiority of paste body filling technology, paste body filling technology is in government aspect Focus also increasingly increases.Wherein, (property tax (2016) 53) gist of a document " about the notice for pushing forward resources tax reform comprehensively ": From on July 1st, 2016, the mineral resources produced using filling mining mode, resources tax was allowed to reduce 50%, was more advantageous to enterprise's drop Low filling cost.Paste body filling mainly by one or more solid wastes, cementitious material and water by a certain percentage, certain Under the conditions of matched, be configured to the slurry paste with certain stability, mobility, plasticity, pass through applied force (pump Send) or gravity (gravity flow) under in the form of plug flow, be piped to underground goaf complete packing job technology. Paste body filling technology provides optimal path for disposition of solid waste, and not only solid waste turns waste into wealth, but also fills Body provides a supporting role goaf, has ensured the safety of recovery process, reduces the loss and dilution of ore, improves mineral products money The utilization rate in source.
The traditional way of paste body filling industry is: in the case where stowing gradient is able to satisfy lotion gravity flow, preferentially selecting cream Body achievees the purpose that energy saving through the mode of drilling gravity flow.To avoid normally producing because drilling blocking accident influences mine, When lotion gravity flow filling system design generally by the way of designing spare drilling, once drilling blocks, immediately using standby With drilling, then a large amount of human and material resources, financial resources is spent to carry out emptying processing to the filling borehole of blocking.This mode not only to manpower, Material resources and financial resources cause great waste, and cause strong influence to normal production.
Utility model content
In view of this, the purpose of the utility model is to provide a kind of lotion gravity flow filling piping and drilling blocking emergency processings Device is capable of the gravity flow filling piping and drilling of rapid dredge blockage, not only saves human and material resources and financial resources cost, but also not Normal production is influenced, ensures the stabilization of tailings paste gravity flow filling system.
The utility model is solved the above problems by following technological means: a kind of lotion gravity flow filling piping and the blocking that drills Emergency treatment device, including lotion slurry stirring structure, plunger pump, buffering hopper, gravity line, pump pressure pipeline and gravity flow filling Drilling, the lotion slurry stirring structure are connected to by major ingredient pipe with buffering hopper, and the plunger pump is connected to buffering hopper, institute The both ends for stating gravity line are connected to buffering hopper and gravity flow filling borehole respectively, and switching gate valve, institute are provided on gravity line The both ends for stating pump pressure pipeline are also connected to buffering hopper and gravity flow filling borehole respectively.
It further, further include the control system connected with switching gate valve control.
Further, the lotion slurry stirring structure includes level-one stirred tank and second level stirred tank.
Further, lotion slurry buffer pocket, the gravity line and lotion material are communicated with above the gravity flow filling borehole Starch buffer pocket connection.
Further, drilling exhaust apparatus is provided on the lotion slurry buffer pocket.
Further, the pump pressure pipeline is connected to by dismountable bridge piece with gravity flow filling borehole.
The utility model has the beneficial effects that the lotion gravity flow filling piping and drilling blocking emergency treatment device of the application, Including lotion slurry stirring structure, plunger pump, buffering hopper, gravity line, pump pressure pipeline and gravity flow filling borehole, the lotion Slurry stirring structure is connected to by major ingredient pipe with buffering hopper, and the plunger pump is connected to buffering hopper, the gravity line Both ends are connected to buffering hopper and gravity flow filling borehole respectively, and switching gate valve is provided on gravity line, the pump pressure pipeline Both ends are also connected to buffering hopper and gravity flow filling borehole respectively.When slurry normally fills, by self gravitation effect through flowing automatically Pipeline flows into gravity flow filling borehole, if there is the case where gravity line or gravity flow filling borehole blocking, can switch lock by control The opening and closing of valve realizes that slurry flows into the switching of gravity flow filling borehole through gravity line or pump pressure pipeline, then by artificial or plunger pump The pressure dredging gravity line and gravity flow filling borehole of generation, do not need to shut down not affecting the normal production to dredge gravity line, The stability and duration for ensureing tailings paste gravity flow filling system are conducive to save human and material resources and financial resources cost.With filling Pipe Ability of emergency management is crammed, is avoided that the serious financial consequences that mine occurs by filling plugging, using lotion gravity flow filling The mine of technology has greatly advanced, practicability and generalization.
Detailed description of the invention
The utility model is further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the partial assembled schematic diagram of the utility model;
Fig. 3 is the current through line schematic diagram that slurry flows into gravity flow filling borehole through gravity line;
Fig. 4 is the local current through line schematic diagram that slurry flows into gravity flow filling borehole through gravity line;
Fig. 5 is the current through line schematic diagram that slurry flows into gravity flow filling borehole through pump pressure pipeline;
Fig. 6 is the local current through line schematic diagram that slurry flows into gravity flow filling borehole through pump pressure pipeline.
Specific embodiment
The utility model is described in detail below with reference to attached drawing, as shown in Figs. 1-2: a kind of lotion gravity flow filling pipe Road and drilling blocking emergency treatment device, including lotion slurry stirring structure, plunger pump 3, buffering hopper 4, gravity line 6, pump Pressure pipe road 7, gravity flow filling borehole 8 and control system, control system are the prior art, not drawn in the figure, the lotion slurry Stirring structure includes level-one stirred tank 1 and second level stirred tank 2, and the second level stirred tank is connected to by major ingredient pipe 9 with buffering hopper, The buffering hopper is in below second level stirred tank, and buffering hopper has buffer function to slurry, and the plunger pump and buffering are expected Bucket connection, the both ends of the gravity line are connected to buffering hopper and gravity flow filling borehole respectively, are provided with and cut on gravity line Change gate valve 5, the control system and switching gate valve control connect, the both ends of the pump pressure pipeline also respectively with buffering hopper and from Flow filling borehole connection.
To keep above-mentioned technical proposal clearer, the transmission process of lotion slurry is described in detail below.
When slurry normally fills, current through line is as shown in Figures 3 and 4, and control system control switching gate valve is in open shape State, under slurry self gravitation effect, the slurry after stirring flows into buffering hopper through major ingredient pipe, then flows into and flow automatically through gravity line Filling borehole, whole process are not needed to apply additional power, be beneficial to energy conservation, and can be connected to cream above gravity flow filling borehole Body slurry buffer pocket 10, gravity line is connected to lotion slurry buffer pocket, can be with by the buffer function of lotion slurry buffer pocket The probability of blocking is reduced, further, it is also possible to the setting drilling exhaust apparatus 11 on lotion slurry buffer pocket, by what is mixed in slurry Gas is discharged in time, to ensure the flow rate of slurry.
During lotion self-flowing pastefill, since the fluctuation of the factors such as concentration causes gravity line or gravity flow filling borehole blocking When, for the current through line of slurry as it can be seen in figures 5 and 6, control system control switching gate valve is in close state, pump pressure pipeline passes through can The bridge piece 12 of disassembly is connected to gravity flow filling borehole, plunger pump startup, generates pump pressure, the mode by slurry through pump pressure conveying Gravity flow filling borehole is delivered to by pump pressure pipeline, while the gravity flow filling borehole of dredge blockage can be squeezed rapidly, it is ensured that slurry is filled out That fills is normally carried out, meanwhile, it can not be needed to shut down to dredge gravity line, not shadow by the gravity line of artificial dredge blockage Normal production is rung, ensures the stability and duration of tailings paste gravity flow filling system, is conducive to save human and material resources and financial resources Cost.With filling plugging Ability of emergency management, it is avoided that the serious financial consequences that mine occurs by filling plugging, is using cream The mine of body gravity flow filling technique has greatly advanced, practicability and generalization.After gravity line dredging, and it can cut Shift to the state that slurry flows through gravity line.
Finally, it is stated that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng The utility model is described in detail according to preferred embodiment, those skilled in the art should understand that, it can be to this The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model It encloses, should all cover in the scope of the claims of the utility model.

Claims (6)

1. a kind of lotion gravity flow filling piping and drilling blocking emergency treatment device, it is characterised in that: stirred including lotion slurry Structure, plunger pump, buffering hopper, gravity line, pump pressure pipeline and gravity flow filling borehole, the lotion slurry stirring structure pass through Major ingredient pipe is connected to buffering hopper, and the plunger pump is connected to buffering hopper, and the both ends of the gravity line are expected with buffering respectively Bucket be connected to gravity flow filling borehole, is provided with switching gate valve on gravity line, the both ends for being pumped pipeline also respectively with buffering Hopper is connected to gravity flow filling borehole.
2. lotion gravity flow filling piping according to claim 1 and drilling blocking emergency treatment device, it is characterised in that: also Including the control system with switching gate valve control connection.
3. lotion gravity flow filling piping according to claim 2 and drilling blocking emergency treatment device, it is characterised in that: institute Stating lotion slurry stirring structure includes level-one stirred tank and second level stirred tank.
4. lotion gravity flow filling piping and drilling blocking emergency treatment device according to claim 1 to 3, It is characterized in that: being communicated with lotion slurry buffer pocket above the gravity flow filling borehole, the gravity line and lotion slurry buffer Box connection.
5. lotion gravity flow filling piping according to claim 4 and drilling blocking emergency treatment device, it is characterised in that: institute It states and is provided with drilling exhaust apparatus on lotion slurry buffer pocket.
6. lotion gravity flow filling piping according to claim 1 and drilling blocking emergency treatment device, it is characterised in that: institute It states pump pressure pipeline and is connected to by dismountable bridge piece with gravity flow filling borehole.
CN201820506763.7U 2018-04-10 2018-04-10 A kind of lotion gravity flow filling piping and the blocking emergency treatment device that drills Expired - Fee Related CN208267901U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820506763.7U CN208267901U (en) 2018-04-10 2018-04-10 A kind of lotion gravity flow filling piping and the blocking emergency treatment device that drills

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820506763.7U CN208267901U (en) 2018-04-10 2018-04-10 A kind of lotion gravity flow filling piping and the blocking emergency treatment device that drills

Publications (1)

Publication Number Publication Date
CN208267901U true CN208267901U (en) 2018-12-21

Family

ID=64676839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820506763.7U Expired - Fee Related CN208267901U (en) 2018-04-10 2018-04-10 A kind of lotion gravity flow filling piping and the blocking emergency treatment device that drills

Country Status (1)

Country Link
CN (1) CN208267901U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456806A (en) * 2020-05-27 2020-07-28 湖南辰州矿业有限责任公司 A cup joint formula underground conveyor for tailing lotion fills
CN112096450A (en) * 2020-09-23 2020-12-18 中南大学 Device and method for preventing underground filling pipeline from cavitation erosion and vibration
CN112594002A (en) * 2020-12-17 2021-04-02 中煤科工生态环境科技有限公司 Large-multiple-line filling pipeline system for self-flowing delivery of high-concentration slurry
CN114320374A (en) * 2022-01-11 2022-04-12 安徽马钢矿业资源集团姑山矿业有限公司 Conveying system from surface of guniting material to underground

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456806A (en) * 2020-05-27 2020-07-28 湖南辰州矿业有限责任公司 A cup joint formula underground conveyor for tailing lotion fills
CN112096450A (en) * 2020-09-23 2020-12-18 中南大学 Device and method for preventing underground filling pipeline from cavitation erosion and vibration
CN112594002A (en) * 2020-12-17 2021-04-02 中煤科工生态环境科技有限公司 Large-multiple-line filling pipeline system for self-flowing delivery of high-concentration slurry
CN112594002B (en) * 2020-12-17 2023-03-03 中煤科工生态环境科技有限公司 Large-multiple-line filling pipeline system for self-flowing delivery of high-concentration slurry
CN114320374A (en) * 2022-01-11 2022-04-12 安徽马钢矿业资源集团姑山矿业有限公司 Conveying system from surface of guniting material to underground

Similar Documents

Publication Publication Date Title
CN208267901U (en) A kind of lotion gravity flow filling piping and the blocking emergency treatment device that drills
WO2019184079A1 (en) Deep cone thickener capable of rapid automatic regulation of underflow concentration
CN104790962B (en) Method of switching earth pressure tunneling mode into muddy water tunneling mode for shield tunneling machine
CN203925502U (en) The system that a kind of hydraulic coal mining and filling are synchronously carried out
CN105952475A (en) Coal mine residual mining zone falling waste roadway grouting reinforcing technology and method
CN104479650B (en) A kind of mining hole packer sealing material
CN106065783B (en) For the device for filling and its application method of extensive non-metal mine
CN105156067A (en) Coal mine underground hydraulic fracturing drill hole sealing device and method
CN102661170A (en) Process and device for continuously stirring and filling paste-like body for mine manufactured by use of building waste
CN204960882U (en) Underground hydraulic fracturing drill hole sealing device of coal mine
CN204039979U (en) A kind of spilled water hole plugging device
CN207813648U (en) A kind of device of compatible pumping and gravity flow paste body filling
CN209510385U (en) One kind, which is adopted, fills integral type goaf filling system
CN205823327U (en) Device for filling for extensive non-metal mine
CN116378750A (en) Underground dynamic filling method for gangue paste
WO2016065906A1 (en) Ground material feeding system and feeding process for solid backfilling mining of coal mine
CN212898612U (en) Full-tailings cemented filling process system
CN201606112U (en) 300-cubic meter stirring type high-water expanding material filling complete equipment
CN204039994U (en) A kind of buoyancy aid flap valve
CN202529579U (en) U-shaped communicating pipe water carrier coal transportation system
CN208743273U (en) A kind of filling pipe network blocking segmentation quick treatment device
Bazán Design review for a distributed tailings deposition system
CN206590452U (en) It is a kind of to fill intermediate channel and include the drag conveyor of the filling intermediate channel
CN202040464U (en) Quick switching device with materials of slurry conveying pipeline of filling mining method
Snyman Boulby Mine Backfill System

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211230

Address after: Guan Zhuang Zhen Wo Xi Cun, Yuanling County, Huaihua City, Hunan Province 419607

Patentee after: Huaihua Xiangxi gold mine design and Research Co.,Ltd.

Address before: Guan Zhuang Zhen Wo Xi Cun, Yuanling County, Huaihua City, Hunan Province 419607

Patentee before: HUNAN CHENZHOU MINING INDUSTRY Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181221

CF01 Termination of patent right due to non-payment of annual fee