CN208266956U - A kind of WR and hydropower construction water channel Accrete clearing device - Google Patents

A kind of WR and hydropower construction water channel Accrete clearing device Download PDF

Info

Publication number
CN208266956U
CN208266956U CN201820543158.7U CN201820543158U CN208266956U CN 208266956 U CN208266956 U CN 208266956U CN 201820543158 U CN201820543158 U CN 201820543158U CN 208266956 U CN208266956 U CN 208266956U
Authority
CN
China
Prior art keywords
box shell
shell
fixedly installed
end outer
settling tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820543158.7U
Other languages
Chinese (zh)
Inventor
何春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820543158.7U priority Critical patent/CN208266956U/en
Application granted granted Critical
Publication of CN208266956U publication Critical patent/CN208266956U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of WR and hydropower construction water channel Accrete clearing devices, including box shell and settling tank, the leading exterior surface of the box shell is provided with water inlet and water outlet, and water inlet is located at the side of water outlet, the lower end outer surface edge position of the box shell is movably installed with universal wheel, and the outer surface of universal wheel is fixedly installed with right cylinder, one side external surface of the box shell is provided with mud mouth, another side external surface of the box shell is fixedly installed with push-and-pull handrail close to top position, and the upper end outer surface two sides of the box shell are fixedly installed with hanging ring.A kind of WR and hydropower construction water channel Accrete clearing device described in the utility model, equipped with box shell, slush pump shell and settling tank, the movement and transport of device can be facilitated, and energy raining working, the labor intensity of construction personnel is reduced, the mud containing large quantity of moisture can be separated, can thoroughly carry out dredging, dredging effect is significant, brings better prospect of the application.

Description

A kind of WR and hydropower construction water channel Accrete clearing device
Technical field
The utility model relates to a kind of water channel Accrete clearing device field, in particular to a kind of WR and hydropower construction water channel dredging Device.
Background technique
Field irrigation often utilizes the water of rivers, introduces farmland, and water channel is the water channel manually dug, and is divided into trunk canal, branch canal, Trunk canal is generally built up with barnacle or cement with branch canal, and water channel easily blocks;Existing WR and hydropower construction water channel Accrete clearing device There are certain drawbacks when in use, it has not been convenient to mobile and transport, and cannot increase construction personnel's in raining working The water content of labor intensity, mud is larger, and is in liquid-plastic state, can not easily be discharged, can not carry out thorough dredging, For this purpose, it is proposed that a kind of WR and hydropower construction water channel Accrete clearing device.
Utility model content
The main purpose of the utility model is to provide a kind of WR and hydropower construction water channel Accrete clearing devices, can effectively solve Certainly the problems in background technique.
To achieve the above object, the technical solution that the utility model is taken are as follows:
A kind of WR and hydropower construction water channel Accrete clearing device, including box shell and settling tank, the leading exterior surface of the box shell It is provided with water inlet and water outlet, and water inlet is located at the side of water outlet, the lower end outer surface edge position of the box shell is equal It is movably installed with universal wheel, and the outer surface of universal wheel is fixedly installed with right cylinder, a side external surface of the box shell is provided with out Another side external surface of mud mouth, the box shell is fixedly installed with push-and-pull handrail, the upper end appearance of the box shell close to top position Face two sides are fixedly installed with hanging ring, and the back end outer surface of the box shell is movably installed with case lid, and case lid close to top position Leading exterior surface be fixedly installed with shaft, the upper end outer surface two sides of the case lid are provided with groove, the box shell it is interior Portion is movably installed with slush pump shell close to a side position, and the lower end outer surface of the slush pump shell is fixedly installed with pedestal, And the lower end outer surface of pedestal is fixedly installed with fixing seat, a side external surface of the slush pump shell is movably installed with rotor, And a side external surface of rotor is movably installed with bearing housing, a side external surface of the bearing housing is fixedly installed with water inlet pipe, institute The upper end outer surface for stating settling tank is movably installed with baffle, and settling tank is located at the inside other side of box shell, the baffle it is upper End outer surface is movably installed with mud scraper vehicle, and the outer surface of the mud scraper vehicle is movably installed with cleaning shoe, the settling tank It is internally provided with scum trough and bucket, and bucket is located at the lower section of scum trough, a side external surface of the bucket is movably installed with One side external surface of sludge pipe, the settling tank is movably installed with outlet pipe.
Preferably, the quantity of the universal wheel and right cylinder is four groups, and universal wheel and right cylinder are isodistantly spaced placement.
Preferably, the outer surface of the water inlet and the inner surface of water outlet are provided with sealing ring, the push-and-pull handrail Outer surface be fixedly installed with Anti-slip cover.
Preferably, the case lid is flexibly connected by shaft with box shell, and the lower end outer surface of the slush pump shell passes through Fixing seat is flexibly connected with the inner surface of box shell.
Preferably, position of the rotor between bearing housing and slush pump shell, the bearing housing be located at rotor with Position between water inlet pipe.
Preferably, the outer surface of the settling tank is connected close to lower position by the side activity of sludge pipe and mud mouth It connects, the upper end outer surface of the baffle is provided with sliding slot.
Compared with prior art, the utility model has the following beneficial effects: the WR and hydropower construction is filled with water channel dredging It sets, by the box shell of setting, the installation and removal of whole device can be facilitated, be readily transported and mobile, and facilitate raining working, drop The low labor intensity of construction personnel can tentatively be come out the impurity absorptions such as mud by the slush pump shell of setting, convenient The contamination precipitations such as mud can be gone down and be separated by the settling tank of setting by secondary dredging, be obtained clean clear Water, device dredging effect is significant, and whole device is simple, and easy to operate, using effect is more preferable relative to traditional approach.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model.
Fig. 2 is that the slush pump shell of the utility model combines view with fixing seat.
Fig. 3 is the settling tank structural schematic diagram of the utility model.
Fig. 4 is that the box shell of the utility model combines view with case lid.
In figure: 1, box shell;2, water inlet;3, sealing ring;4, universal wheel;5, right cylinder;6, outlet pipe;7, water outlet;8, go out Mud mouth;9, hanging ring;10, settling tank;11, mud scraper vehicle;12, fixing seat;13, slush pump shell;14, handrail is pushed and pulled;15, anti-skidding Set;16, baffle;17, sludge pipe;18, scum trough;19, cleaning shoe;20, bucket;21, rotor;22, bearing housing;23, water inlet pipe; 24, pedestal;25, case lid;26, groove;27, shaft.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below In conjunction with specific embodiment, the utility model is further described.
As shown in Figs 1-4, a kind of WR and hydropower construction water channel Accrete clearing device, including box shell 1 and settling tank 10, box shell 1 Removing and installing for device is facilitated, is also convenient for transporting and the mobile device, the leading exterior surface of box shell 1 is provided with water inlet 2 With water outlet 7, and water inlet 2 is located at the side of water outlet 7, and the lower end outer surface edge position of box shell 1 is movably installed with ten thousand To wheel 4, and the outer surface of universal wheel 4 is fixedly installed with right cylinder 5, and right cylinder 5, which facilitates, is used to fix universal wheel 4, outside the side of box shell 1 Surface is provided with mud mouth 8, and another side external surface of box shell 1 is fixedly installed with push-and-pull handrail 14 close to top position, facilitates shifting Dynamic device, the upper end outer surface two sides of box shell 1 are fixedly installed with hanging ring 9, convenient transportation mobile device, outside the rear end of box shell 1 Surface is movably installed with case lid 25 close to top position, and case lid 25 can prevent rainwater from entering, and facilitates raining working, and case lid 25 Leading exterior surface be fixedly installed with shaft 27, the upper end outer surface two sides of case lid 25 are provided with groove 26, the inside of box shell 1 It is movably installed with slush pump shell 13 close to a side position, for tentatively clearing up mud, the lower end outer surface of slush pump shell 13 Pedestal 24 is fixedly installed with, and the lower end outer surface of pedestal 24 is fixedly installed with fixing seat 12, outside the side of slush pump shell 13 Surface activity is equipped with rotor 21, and a side external surface of rotor 21 is movably installed with bearing housing 22, outside the side of bearing housing 22 Surface is fixedly installed with water inlet pipe 23, and the upper end outer surface of settling tank 10 is movably installed with baffle 16, and settling tank 10 is used to precipitate Mud with more water, and settling tank 10 is located at the inside other side of box shell 1, the upper end outer surface activity installation of baffle 16 There is mud scraper vehicle 11, the outer surface of mud scraper vehicle 11 is movably installed with cleaning shoe 19, and settling tank 10 is internally provided with scum trough 18 with bucket 20, and bucket 20 is located at the lower section of scum trough 18, and a side external surface of the bucket 20 is movably installed with sludge pipe 17, a side external surface of settling tank 10 is movably installed with outlet pipe 6.
The quantity of universal wheel 4 and right cylinder 5 is four groups, and universal wheel 4 and right cylinder 5 are isodistantly spaced placement;Water inlet 2 The inner surface of outer surface water outlet 7 is provided with sealing ring 3, and sealing ring 3 prevents water inlet in cabinet, pushes and pulls the appearance of handrail 14 Face is fixedly installed with Anti-slip cover 15, and Anti-slip cover 15 is used to increasing friction force, protects hand;The case lid 25 passes through shaft 27 and case Shell 1 is flexibly connected, and the lower end outer surface of slush pump shell 13 is flexibly connected by fixing seat 12 with the inner surface of box shell 1;Rotor 21 position between bearing housing 22 and slush pump shell 13, position of the bearing housing 22 between rotor 21 and water inlet pipe 23 It sets;The outer surface of settling tank 10 is flexibly connected by sludge pipe 17 with the side of mud mouth 8 close to lower position, baffle 16 it is upper End outer surface is provided with sliding slot, moves thereon convenient for mud scraper vehicle 11.
It should be noted that the utility model is a kind of WR and hydropower construction water channel Accrete clearing device, in use, firstly, Water pipe is connected to the water inlet 2 protected in box shell 1 with sealing ring 3, hanging ring 9 is used for hoisting device to channel, by holding band There is the push-and-pull handrail 14 of Anti-slip cover 15, in the case where the universal wheel 4 with right cylinder 5 is mobile, device is moved to required position, clearly When silt, sewage enters in water inlet pipe 23 from water inlet 2, under the action of rotor 21 and bearing housing 22, starts realization first clearly Then silt process will be realized first wherein the pedestal 24 with fixing seat 12 protects entire slush pump by outlet pipe 6 The sewage of process discharges into settling tank 10, and under the movement of mud scraper vehicle 11, cleaning shoe 19, which starts for sludge to be separated from water, to come, will Silt is sent into bucket 20, and fraction floats object is sent into scum trough 18, then by sludge pipe 17 and mud mouth 8 by silt discharger, Case lid 25 with shaft 27 when the rainy day, can be closed, hanging ring 9 is stuck in groove 26 by the second operation work for completing dredging with box shell 1 Inside, facilitate raining working, it is more practical.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (6)

1. a kind of WR and hydropower construction water channel Accrete clearing device, including box shell (1) and settling tank (10), it is characterised in that: described The leading exterior surface of box shell (1) is provided with water inlet (2) and water outlet (7), and water inlet (2) is located at the side of water outlet (7), The lower end outer surface edge position of the box shell (1) is movably installed with universal wheel (4), and the outer surface of universal wheel (4) is fixed It is equipped with right cylinder (5), a side external surface of the box shell (1) is provided with mud mouth (8), the other side appearance of the box shell (1) Face is fixedly installed with push-and-pull handrail (14) close to top position, and the upper end outer surface two sides of the box shell (1) are fixedly installed with The back end outer surface of hanging ring (9), the box shell (1) is movably installed with case lid (25) close to top position, and before case lid (25) End outer surface is fixedly installed with shaft (27), and the upper end outer surface two sides of the case lid (25) are provided with groove (26), described The inside of box shell (1) is movably installed with slush pump shell (13) close to a side position, outside the lower end of the slush pump shell (13) Surface is fixedly installed with pedestal (24), and the lower end outer surface of pedestal (24) is fixedly installed with fixing seat (12), the slush pump One side external surface of shell (13) is movably installed with rotor (21), and a side external surface of rotor (21) is movably installed with bearing housing (22), a side external surface of the bearing housing (22) is fixedly installed with water inlet pipe (23), the upper end appearance of the settling tank (10) Face is movably installed with baffle (16), and settling tank (10) is located at the inside other side of box shell (1), outside the upper end of the baffle (16) Surface activity is equipped with mud scraper vehicle (11), and the outer surface of the mud scraper vehicle (11) is movably installed with cleaning shoe (19), described Settling tank (10) is internally provided with scum trough (18) and bucket (20), and bucket (20) is located at the lower section of scum trough (18), institute The side external surface for stating bucket (20) is movably installed with sludge pipe (17), the side external surface activity installation of the settling tank (10) There are outlet pipe (6).
2. a kind of WR and hydropower construction water channel Accrete clearing device according to claim 1, it is characterised in that: the universal wheel It (4) is four groups with the quantity of right cylinder (5), and universal wheel (4) and right cylinder (5) are isodistantly spaced placement.
3. a kind of WR and hydropower construction water channel Accrete clearing device according to claim 1, it is characterised in that: the water inlet (2) inner surface of outer surface and water outlet (7) is provided with sealing ring (3), and the outer surface of push-and-pull handrail (14) is fixed Anti-slip cover (15) are installed.
4. a kind of WR and hydropower construction water channel Accrete clearing device according to claim 1, it is characterised in that: the case lid (25) it is flexibly connected by shaft (27) with box shell (1), the lower end outer surface of the slush pump shell (13) passes through fixing seat (12) it is flexibly connected with the inner surface of box shell (1).
5. a kind of WR and hydropower construction water channel Accrete clearing device according to claim 1, it is characterised in that: the rotor (21) position between bearing housing (22) and slush pump shell (13), the bearing housing (22) are located at rotor (21) and enter water Manage the position between (23).
6. a kind of WR and hydropower construction water channel Accrete clearing device according to claim 1, it is characterised in that: the settling tank (10) outer surface is flexibly connected by sludge pipe (17) with the side of mud mouth (8) close to lower position, the baffle (16) Upper end outer surface be provided with sliding slot.
CN201820543158.7U 2018-04-17 2018-04-17 A kind of WR and hydropower construction water channel Accrete clearing device Expired - Fee Related CN208266956U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820543158.7U CN208266956U (en) 2018-04-17 2018-04-17 A kind of WR and hydropower construction water channel Accrete clearing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820543158.7U CN208266956U (en) 2018-04-17 2018-04-17 A kind of WR and hydropower construction water channel Accrete clearing device

Publications (1)

Publication Number Publication Date
CN208266956U true CN208266956U (en) 2018-12-21

Family

ID=64677034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820543158.7U Expired - Fee Related CN208266956U (en) 2018-04-17 2018-04-17 A kind of WR and hydropower construction water channel Accrete clearing device

Country Status (1)

Country Link
CN (1) CN208266956U (en)

Similar Documents

Publication Publication Date Title
CN105317103B (en) With the rainwater regulating pondage system from abatement functions
CN205116250U (en) Sediment removal device of reservoir among hydraulic engineering
CN201810346U (en) Real-time automatic dredging device for coal-mine underground water sump
CN209025186U (en) A kind of environment-friendly type road drainage system in civil engineering
CN204098107U (en) Strand suction channel cleanout device
CN106049390B (en) A kind of sand setting suitable for river controlling projects blocks dirty integrated apparatus
CN205742498U (en) Rainwater-collecting and the savings with self-operating function utilize system
CN208266956U (en) A kind of WR and hydropower construction water channel Accrete clearing device
CN100501132C (en) System for cleaning water sump settling down well
CN205688564U (en) Construction site rainwater reuse device
CN207073156U (en) Riverway waste cleaning ship
CN208121951U (en) A kind of municipal works preventing sewers from blocking plug device
CN208884695U (en) A kind of anti-block apparatus of the pre-buried pipeline of water conservancy
CN108911359A (en) A kind of multi-functional storage row Rain Garden device
CN107165212A (en) A kind of hydraulic engineering silt-clearing vehicle with classification feature
CN206512818U (en) A kind of plastic stone rockery construction waste water drainage system device
CN207376396U (en) A kind of civil engineering road draining device
CN205907805U (en) High -order rainwater regulation pond silt rinse -system
CN206980290U (en) A kind of anti-spill-over kitchen debris is automatically separated collection device
CN206495259U (en) A kind of cell generates electricity and water supply system
CN107034983A (en) A kind of pipeline pump mud device
CN207016579U (en) A kind of rainwater precipitates filter
CN206570868U (en) A kind of mountain area rain collector
CN104963383B (en) A kind of pressure conduit inverted siphon hydraulic automatism erosion and deposition device
CN205637097U (en) Tubing pump mud device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181221

Termination date: 20190417