CN208245021U - The preparation system of proton membrane fuel battery membrane electrode - Google Patents

The preparation system of proton membrane fuel battery membrane electrode Download PDF

Info

Publication number
CN208245021U
CN208245021U CN201820384289.5U CN201820384289U CN208245021U CN 208245021 U CN208245021 U CN 208245021U CN 201820384289 U CN201820384289 U CN 201820384289U CN 208245021 U CN208245021 U CN 208245021U
Authority
CN
China
Prior art keywords
membrane electrode
preparation system
delivery platform
catalyst suspension
spray equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820384289.5U
Other languages
Chinese (zh)
Inventor
卢毅
谢光有
李婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongfang Electric Chengdu Hydrogen Fuel Cell Technology Co ltd
Original Assignee
Dongfang Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongfang Electric Corp filed Critical Dongfang Electric Corp
Priority to CN201820384289.5U priority Critical patent/CN208245021U/en
Application granted granted Critical
Publication of CN208245021U publication Critical patent/CN208245021U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/50Fuel cells
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Inert Electrodes (AREA)
  • Fuel Cell (AREA)

Abstract

The utility model provides a kind of preparation system of proton membrane fuel battery membrane electrode.The preparation system includes delivery platform, spray unit, turnover device and heating unit.Delivery platform is used for transport membrane electrode slice;The top of delivery platform is arranged in spray unit, for spraying catalyst suspension to membrane electrode piece;Turnover device is internally provided with cavity, and delivery platform passes through cavity, and membrane electrode piece can be made to overturn 180 ° in the cavities;Heating unit is for heating the membrane electrode piece for being coated with catalyst suspension, so that solvent volatilizees.When preparing proton membrane fuel battery membrane electrode using above-mentioned preparation system, the process for smearing catalyst suspension in membrane electrode on piece can not only be made to realize automatic smearing and mass production.Whole preparation process can also be made to realize automation simultaneously, to be conducive to further decrease the labor intensity of operator, shorten the production cycle.

Description

The preparation system of proton membrane fuel battery membrane electrode
Technical field
The utility model relates to fuel cell preparation fields, in particular to a kind of proton membrane fuel battery membrane electrode Preparation system.
Background technique
Proton Exchange Membrane Fuel Cells (PEMFC) has efficient, advantages of environment protection, but expensive platinum catalyst becomes Its major obstacle for being commercialized process.In order to which production cost is effectively reduced, pt utilization is improved, the preparation of membrane electrode can be optimized Technique improves the structure of membrane electrode.
The method that the preparation of membrane electrode catalytic layer generally uses at present has scraper coating, silk-screen printing, spraying plating, sputtering, surpasses The modes such as sound spraying.Scraper coating is with silk-screen printing it is difficult to ensure that the uniformity of thin layer Catalytic Layer.Spraying plating, sputtering may be implemented thin Layer Catalytic Layer coating, but it is difficult to large-scale production.And ultrasound spraying is a kind of novel method for preparing fuel cell membrane electrode, it can The good Catalytic Layer of thin and uniformity is prepared, membrane electrode cost is effectively reduced.
But the preparation that ultrasound spraying technology is applied to membrane electrode at present is only limitted in laboratory, and the commercialization of fuel cell Have to by realize membrane electrode product mass, based on automated production.The utility model provides a kind of using ultrasonic Spraying technology realizes the preparation process of membrane electrode mass, automation.
Utility model content
The main purpose of the utility model is to provide a kind of preparation systems of proton membrane fuel battery membrane electrode, to solve It is existing prepare during proton membrane fuel battery membrane electrode can not mass production provide the good catalysis of thin and uniformity The problem of electrode of layer.
To achieve the goals above, a kind of preparation system of proton membrane fuel battery membrane electrode is provided according to the utility model System, which includes: delivery platform, is used for transport membrane electrode slice;Delivery platform is arranged in spray unit, spray unit Top, for spraying catalyst suspension to membrane electrode piece;Turnover device, turnover device are internally provided with cavity, and conveying is flat Platform passes through cavity, and turnover device can make membrane electrode piece overturn 180 ° in above-mentioned cavity;Heating unit, heating unit are used for The membrane electrode piece for being coated with catalyst suspension is dried.
Further, above-mentioned preparation system further includes automatic conveyor, and automatic conveyor is for passing membrane electrode piece It send to delivery platform.
Further, multiple fixed devices are provided on automatic conveyor, fixed device is used to fix membrane electrode piece, and Fixed device is detachably connected with automatic conveyor.
Further, membrane electrode piece is bonded or is threadedly coupled for riveting, magnetic force with the fixed form of fixed device.
Further, above-mentioned preparation system further includes product collecting device, and product collecting device is flat from conveying for collecting The proton membrane fuel battery membrane electrode of platform output.
Further, spray unit includes: catalyst suspension feeding mechanism, and catalyst suspension feeding mechanism is provided with Catalyst suspension supply opening;Gas supply device, gas supply device are provided with gas delivery outlet;First spray equipment, Along the conveying direction of membrane electrode piece, the upstream of turnover device, and the arrival end of the first spray equipment point is arranged in the first spray equipment It is not connected with catalyst suspension supply opening and gas delivery outlet;And second spray equipment, along the conveying side of membrane electrode piece To the downstream of turnover device is arranged in the second spray equipment, and the arrival end of the second spray equipment is supplied with catalyst suspension respectively Mouth and gas delivery outlet is answered to be connected.
Further, spray unit further includes the first vacuum absorption device, which is arranged in the first spray equipment Below corresponding delivery platform.
Further, spray unit further includes the second vacuum absorption device, which is arranged in the first spray equipment Below corresponding delivery platform.
Using the technical solution of the utility model, membrane electrode piece is delivered in spray unit through delivery platform, and remote at it One side from delivery platform sprays catalyst suspension.Its heated unit is subjected to first time heating, so that above-mentioned catalyst Solvent volatilization in suspension, while catalyst is fixed on membrane electrode on piece.Then one side is coated with to the membrane electrode of catalyst Piece, which is delivered in turnover device, carries out 180 ° of overturnings.Catalyst suspension is coated in the another side of membrane electrode piece, it is then that its is defeated It send into heating unit and carries out second of heating, so that catalyst is fixed, to obtain proton membrane fuel battery membrane electrode.Using When above-mentioned preparation system prepares proton membrane fuel battery membrane electrode, it can not only make to smear catalyst suspension in membrane electrode on piece Process realize automatic smear and mass production.Whole preparation process can also be made to realize automation simultaneously, to be conducive to The labor intensity of operator is further decreased, the production cycle is shortened.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide a further understanding of the present invention, this is practical Novel illustrative embodiments and their description are not constituteed improper limits to the present invention for explaining the utility model. In the accompanying drawings:
Fig. 1 shows the proton membrane fuel battery membrane electrode that a kind of typical embodiment according to the present utility model provides The structural schematic diagram of preparation system.
Wherein, the above drawings include the following reference numerals:
10, delivery platform;20, spray unit;21, catalyst suspension feeding mechanism;211, catalyst suspension is supplied Mouthful;22, gas supply device;221, gas delivery outlet;23, the first spray equipment;24, the second spray equipment;30, overturning dress It sets;40, heating unit;41, first heater;42, secondary heating mechanism;50, automatic conveyor;60, product collects dress It sets;70, the first vacuum absorption device;80, the second vacuum absorption device.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
As described in background technique, it is existing prepare proton membrane fuel battery membrane electrode during can not mass The problem of producing the electrode for the Catalytic Layer for having thin and uniformity good.In order to solve the above-mentioned technical problem, this application provides A kind of preparation system of proton membrane fuel battery membrane electrode, as shown in Figure 1, the preparation system includes delivery platform 10, spraying list Member 20, turnover device 30 and heating unit 40.Delivery platform 10 is used for transport membrane electrode slice;The setting of spray unit 20 is flat in conveying The top of platform 10, for spraying catalyst suspension to membrane electrode piece;Turnover device 30 is internally provided with cavity, delivery platform 10 pass through cavity, and turnover device 30 can make membrane electrode piece overturn 180 ° in above-mentioned cavity;Heating unit 40 is used for spray The membrane electrode piece for being coated with catalyst suspension is dried.
When preparing proton membrane fuel battery membrane electrode using above-mentioned preparation system, membrane electrode piece is delivered to through delivery platform 10 In spray unit 20, and catalyst suspension is sprayed in its one side far from delivery platform 10.Its heated unit 40 is carried out It heats for the first time, so that the solvent in above-mentioned catalyst suspension volatilizees, while catalyst is fixed on membrane electrode on piece.Then will The membrane electrode piece coated with catalyst, which is delivered in turnover device 30, on one side carries out 180 ° of overturnings.It is applied in the another side of membrane electrode piece Catalyst suspension is covered, is then sent in heating unit 40 and carries out second of heating, so that solvent volatilizees, catalyst is solid It is scheduled on membrane electrode on piece, to obtain proton membrane fuel battery membrane electrode.
When preparing proton membrane fuel battery membrane electrode using above-mentioned preparation system, it can not only make to smear in membrane electrode on piece The process of catalyst suspension realizes automatic smearing and mass production.Whole preparation process can also simultaneously realized automatic Change, to be conducive to further decrease the labor intensity of operator, shortens the production cycle.
In a preferred embodiment, as shown in Figure 1, above-mentioned preparation system further includes automatic conveyor 50, from Dynamic transmission device 50 is used to membrane electrode piece being sent to delivery platform 10.After automatic conveyor 50 is arranged, operator is only needed Membrane electrode piece to be processed is put into automatic conveyor 50, automatic conveyor 50 is according to the setting transport membranes of pre-set programs Electrode slice.And the process for eliminating operator's dispensing reduces labor intensity to further liberate labour.
In a preferred embodiment, as shown in Figure 1, being provided with multiple fixed devices on automatic conveyor 50, Fixed device is for fixing membrane electrode piece, and fixed device is detachably connected with automatic conveyor 50.
During storage, membrane electrode piece is fixed by fixing device and is stored in automatic conveyor 50, fixed device with Automatic conveyor 50 is detachably connected, so that when automatic conveyor 50 transmits membrane electrode piece, it can be by fixed device It is delivered on delivery platform 10 as a whole with membrane electrode piece.This is made in whole preparation process, membrane electrode have compared with Good planarization, to be conducive to improve the uniformity that catalyst is smeared.Preferably, fixed device includes but is not limited to metal clip Tool.Preferably, membrane electrode piece is including but not limited to riveted with the fixed form of fixed device, magnetic force is bonded or is threadedly coupled.
Preferably, above-mentioned preparation system further includes product collecting device 60, as shown in Figure 1, product collecting device 60 is used for Collect the product exported from delivery platform 10.
In a preferred embodiment, as shown in Figure 1, spray unit 20 includes: catalyst suspension feeding mechanism 21, gas supply device 22, the first spray equipment 23 and the second spray equipment 24.Catalyst suspension feeding mechanism 21 is provided with Catalyst suspension supply opening 211;Gas supply device 22 is provided with gas delivery outlet 221;Along the conveying side of membrane electrode piece To the upstream of turnover device 30 is arranged in the first spray equipment 23, and the arrival end of the first spray equipment 23 is outstanding with catalyst respectively Supernatant liquid supply opening 211 and gas delivery outlet 221 are connected;And the conveying direction along membrane electrode piece, the second spray equipment 24 are set Set the downstream of turnover device 30, and the arrival end of the second spray equipment 24 respectively with catalyst suspension supply opening 211 and gas Delivery outlet 221 is connected.
Catalyst suspension feeding mechanism 21 and gas supply device 22 are set, at the same make its respectively with the first spray equipment 23 are connected with the second spray equipment 24, the smearing process of catalyst can be made to realize automation, and then be conducive to further drop The labor intensity of low operator.
In a preferred embodiment, as shown in Figure 1, above-mentioned preparation system further includes the first vacuum absorption device 70.First vacuum absorption device 70 is arranged below the corresponding delivery platform 10 of the first spray equipment 23.
First vacuum absorption device 70 is set below the corresponding delivery platform 10 of the first spray equipment 23, can accelerate to urge The evaporation rate of solvent in agent suspension, to be conducive to further shorten manufacturing cycle.
In a preferred embodiment, as shown in Figure 1, above-mentioned preparation system further includes the second vacuum absorption device 80, the second vacuum absorption device 80 is arranged below the corresponding delivery platform 10 of the first spray equipment 23.
Second vacuum absorption device 80 and the second heating are set below the corresponding delivery platform 10 of the second spray equipment 24 Device 42, can further speed up the evaporation rate of solvent in catalyst suspension, to be conducive to further shorten preparation week Phase.
Preferably, heating unit 40 includes first heater 41 and secondary heating mechanism 42, and first heater 41 is set It sets below the delivery platform 10 between the first vacuum absorption device 25 and turnover device 30, the setting of secondary heating mechanism 42 is the 10 lower section of delivery platform between two vacuum absorption devices 80 and product collecting device 60.
On the other hand the application additionally provides a kind of continuous production method of proton membrane fuel battery membrane electrode, in use Preparation system is stated to be prepared.
When preparing proton membrane fuel battery membrane electrode using above-mentioned preparation system, it can not only make to smear in membrane electrode on piece The process of catalyst suspension realizes automatic smearing and mass production.Whole preparation process can also simultaneously realized automatic Change, to be conducive to further decrease the labor intensity of operator, shortens the production cycle.
The application is described in further detail below in conjunction with specific embodiment, these embodiments should not be understood as limitation originally Apply for range claimed.
Embodiment 1
Proton membrane fuel battery membrane electrode is prepared using device as shown in Figure 1.Detailed process is as follows:
Membrane electrode piece is transmitted on delivery platform 10 by automatic conveyor 50.
Membrane electrode piece is delivered to below the first spray equipment 23 through delivery platform 10, will catalysis by the first spray equipment 23 One side of the agent suspension spray in the separate delivery platform 10 of membrane electrode piece.After spraying, start the first vacuum absorption device 25, the solvent that will be sprayed in the catalyst suspension on membrane electrode piece surface carries out preliminary adsorption process, then by film electricity Pole piece is delivered in first heater 41 and is thermally dried, so that solvent is further volatilized.First spray equipment 23 It is provided with the catalyst suspension in the second spray equipment 24 by catalyst suspension feeding mechanism 21, which exists It is sprayed under the promotion for the gas that gas supply device 22 provides.
After membrane electrode piece is dry, it is transported to the overturning of 180 ° of progress in turnover device 30.
Then above-mentioned membrane electrode piece is delivered to the lower section of the second spray equipment 24, by the second spray equipment 24 by catalyst Another side of the suspension spray in membrane electrode piece.After spraying, start the second vacuum absorption device 80, film electricity will be sprayed at Solvent in catalyst suspension in pole piece carries out preliminary adsorption process, and membrane electrode piece is then delivered to the second heating It is thermally dried in device 42, so that solvent is further volatilized.Required proton membrane fuel is obtained after being completely dried Cell membrane-electrode.The proton membrane fuel battery membrane electrode prepared is delivered in product collecting device 60 through delivery platform to be stored up It deposits.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (8)

1. a kind of preparation system of proton membrane fuel battery membrane electrode, which is characterized in that the preparation system includes:
Delivery platform (10) is used for transport membrane electrode slice;
Spray unit (20), spray unit (20) setting is in the top of the delivery platform (10), for electric to the film Pole piece sprays catalyst suspension;
Turnover device (30), the turnover device (30) are internally provided with cavity, and the delivery platform (10) passes through the sky Chamber, and the turnover device (30) can make the membrane electrode piece overturn 180 ° in the cavity;
Heating unit (40), the heating unit (40) is for doing the membrane electrode piece for being coated with catalyst suspension It is dry.
2. preparation system according to claim 1, which is characterized in that the preparation system further includes automatic conveyor (50), the automatic conveyor (50) is used to the membrane electrode piece being sent to the delivery platform (10).
3. preparation system according to claim 2, which is characterized in that be provided on the automatic conveyor (50) multiple Fixed device, the fixed device is for fixing the membrane electrode piece, and the fixed device and the automatic conveyor (50) it is detachably connected.
4. preparation system according to claim 3, which is characterized in that the fixation of the membrane electrode piece and the fixed device Mode is riveting, magnetic force fitting or is threadedly coupled.
5. preparation system according to claim 1, which is characterized in that the preparation system further includes product collecting device (60), the product collecting device (60) is used to collect the proton membrane fuel battery film electricity exported from delivery platform (10) Pole.
6. preparation system according to any one of claim 1 to 5, which is characterized in that the spray unit (20) includes:
Catalyst suspension feeding mechanism (21), the catalyst suspension feeding mechanism (21) are provided with catalyst suspension confession Answer mouth (211);
Gas supply device (22), the gas supply device (22) are provided with gas delivery outlet (221);
First spray equipment (23) turns over described in the first spray equipment (23) setting along the conveying direction of the membrane electrode piece The upstream of rotary device (30), and the arrival end of first spray equipment (23) respectively with the catalyst suspension supply opening (211) and the gas delivery outlet (221) is connected;And
Second spray equipment (24) turns over described in the second spray equipment (24) setting along the conveying direction of the membrane electrode piece The downstream of rotary device (30), and the arrival end of second spray equipment (24) respectively with the catalyst suspension supply opening (211) and the gas delivery outlet (221) is connected.
7. preparation system according to claim 6, which is characterized in that the preparation system further includes the first vacuum suction dress It sets (70), first vacuum absorption device (70) is arranged in the corresponding delivery platform of first spray equipment (23) (10) lower section.
8. preparation system according to claim 6, which is characterized in that the preparation system further includes the second vacuum suction dress It sets (80), second vacuum absorption device (80) is arranged in the corresponding delivery platform of first spray equipment (23) (10) lower section.
CN201820384289.5U 2018-03-20 2018-03-20 The preparation system of proton membrane fuel battery membrane electrode Active CN208245021U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820384289.5U CN208245021U (en) 2018-03-20 2018-03-20 The preparation system of proton membrane fuel battery membrane electrode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820384289.5U CN208245021U (en) 2018-03-20 2018-03-20 The preparation system of proton membrane fuel battery membrane electrode

Publications (1)

Publication Number Publication Date
CN208245021U true CN208245021U (en) 2018-12-18

Family

ID=64608654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820384289.5U Active CN208245021U (en) 2018-03-20 2018-03-20 The preparation system of proton membrane fuel battery membrane electrode

Country Status (1)

Country Link
CN (1) CN208245021U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109647656A (en) * 2019-01-21 2019-04-19 安徽明天氢能科技股份有限公司 A kind of fuel cell membrane electrode production catalyst spraying equipment
CN110433985A (en) * 2019-09-11 2019-11-12 洺源科技(大连)有限公司 A kind of fuel cell membrane electrode production catalyst continuous spray device
CN114204045A (en) * 2021-10-26 2022-03-18 东风汽车集团股份有限公司 Preparation equipment and system of fuel cell membrane electrode

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109647656A (en) * 2019-01-21 2019-04-19 安徽明天氢能科技股份有限公司 A kind of fuel cell membrane electrode production catalyst spraying equipment
CN109647656B (en) * 2019-01-21 2020-12-22 安徽明天氢能科技股份有限公司 Catalyst spraying equipment for fuel cell membrane electrode production
CN110433985A (en) * 2019-09-11 2019-11-12 洺源科技(大连)有限公司 A kind of fuel cell membrane electrode production catalyst continuous spray device
CN114204045A (en) * 2021-10-26 2022-03-18 东风汽车集团股份有限公司 Preparation equipment and system of fuel cell membrane electrode
CN114204045B (en) * 2021-10-26 2023-08-22 东风汽车集团股份有限公司 Preparation equipment and system of fuel cell membrane electrode

Similar Documents

Publication Publication Date Title
CN208245021U (en) The preparation system of proton membrane fuel battery membrane electrode
CN103165858B (en) The manufacture method of electrode
CN105103339B (en) Electrode surface roughness control for the spray coating technique of lithium ion battery
CN100530797C (en) Preparation technique for membrane electrode of proton exchange film fuel cell
CN104979567B (en) A kind of preparation method of membrane electrode of fuel batter with proton exchange film
CN106684413A (en) Preparation method of proton exchange membrane fuel cell membrane electrode (CCM)
CN103943877A (en) Membrane electrode of direct alcohol type fuel battery and preparation method thereof
CN106861958B (en) A kind of electrostatic spraying apparatus preparing fuel cell membrane electrode
CN103769086B (en) A kind of preparation method of fuel-cell catalyst
CN101667643B (en) Preparation method of catalyst coated film electrode of proton exchange membrane fuel cell
KR101889236B1 (en) Method of manufacturing a lithium-ion secondary battery electrode sheet based on an active material dry powder
CN201708207U (en) Accumulator plate curing chamber
CN109524676A (en) A kind of fuel cell catalyst layer electrode of three-dimensional and preparation method thereof
CN101543810A (en) Device and method for fuel battery coating
CN104425829B (en) Preparation method of membrane electrode with transition layer for basic anion-exchange membrane fuel battery
CN109411789A (en) Roll-to-roll coating system for fuel cell membrane electrode preparation
CN107146891A (en) A kind of MEA preparation methods of noble metal catalyst particles distribution gradient
CN102769141A (en) Membrane electrode assembly of proton exchange membrane fuel cell and manufacturing method of membrane electrode assembly
CN104821406A (en) Batch preparation method of solid oxide fuel cell alloy connector cathode side coating
CN102593471B (en) Preparation method of electrode of proton exchange membrane fuel cell and proton exchange membrane fuel cell
CN102522570A (en) Method for preparing enhanced membrane electrode (MEA) of proton exchange membrane fuel cell (PEMFC)
CN109904469A (en) A kind of method for preparing membrane electrode optimizing cathode catalysis layer structure
CN104009245B (en) A kind of preparation method of gas diffusion layer for fuel cell idiosome
CN102569747A (en) Atomized-type coating reinforced membrane-based process and device for preparing nickel battery positive plate
CN210646954U (en) Multilayer coating device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200821

Address after: 610000 No. 18 West core road, hi tech Zone, Chengdu, Sichuan

Patentee after: Dongfang Electric (Chengdu) Hydrogen Fuel Cell Technology Co.,Ltd.

Address before: 611731, No. 18, West core road, hi tech West District, Sichuan, Chengdu

Patentee before: DONGFANG ELECTRIC Corp.

TR01 Transfer of patent right