CN208238658U - Tunnel excavation Blasting shock wave protective device - Google Patents
Tunnel excavation Blasting shock wave protective device Download PDFInfo
- Publication number
- CN208238658U CN208238658U CN201820558429.6U CN201820558429U CN208238658U CN 208238658 U CN208238658 U CN 208238658U CN 201820558429 U CN201820558429 U CN 201820558429U CN 208238658 U CN208238658 U CN 208238658U
- Authority
- CN
- China
- Prior art keywords
- arch ring
- shock wave
- rubber slab
- tunnel excavation
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model discloses a kind of tunnel excavation Blasting shock wave protective devices, belong to tunnel excavation construction field, the protective device is mounted at the arch ring of tunnel portal, and shock wave and slungshot for being generated when protecting tunnel excavation, its structure includes rubber slab, steel plate, bolt, railing and sandbag etc., rubber slab is equipped with a plurality of, every slat gum plate, which is hung from above, to be mounted between arch ring vault and ground, and top is fixed with arch ring, it is pushed down by sandbag lower part, adjacent rubber slab partly overlaps between each other, so as to form being completely covered by tunnel excavation section, and the spring protective structure for the shock wave and slungshot that Excavation blasting generates in tunneling boring shielding tunnel.This protective device has many advantages, such as simple structure, operation convenience, cost savings, safe and reliable, it cooperates corresponding operation method, also has the handling characteristics such as recycling, energy conservation and environmental protection, therefore can ensure that engineering construction safety, noise pollution is reduced, economic benefit and social benefit are significant.
Description
Technical field
The utility model relates to a kind of tunnel excavation construction field, in particular to tunnel excavation Blasting shock wave protection dresses
It sets.
Background technique
When tunnel excavation explosive charge, the utilization rate of explosion energy only accounts for a few percent that explosive charge is released energy and arrives
30 or so percent, best standing at most also only accounts for 50 or so percent, remaining is converted into shock wave along tunnel
Wall is propagated outward;Meanwhile Blasting shock wave carries native stone splashing secretly, influences Tunnel Blasting construction safety and causes ambient noise dirty
Dye.Therefore, the tunnel excavation Blasting shock wave protective device of simple and efficient is needed to develop and be applied.
Summary of the invention
There is provided the technical problem to be solved by the utility model is to overcome the deficiencies of existing technologies a kind of simple structure,
Operation convenience, cost savings, safe and reliable, recycling, energy-saving and environment-friendly tunnel excavation Blasting shock wave protective device.
The technical issues of the utility model, is achieved through the following technical solutions:
A kind of tunnel excavation Blasting shock wave protective device, the arch ring including tunnel portal, the arch ring vault and ground
The a plurality of rubber slab for hanging installation from above is equipped between face, every slat gum plate top is fixed with arch ring, every slat gum plate lower part
Pushed down by sandbag, adjacent rubber slab partly overlaps between each other, and formed be completely covered by tunnel excavation section elasticity it is anti-
Protection structure, the spring protective structure tunneling boring shield the shock wave and slungshot that Excavation blasting generates in tunnel.
Every slat gum plate is flexible material board, only by pulling force without bearing torque, the width of every slat gum plate
It is b, is arranged at the vault center of arch ring as longest rubber slab, the calculating covered at the top of arch ring between lower edge and ground is long
Degree is L, remaining rubber slab is successively symmetrical arranged centered on longest rubber slab, and along arch ring two sides, and length is under arch ring top
Height between edge and ground, a plurality of rubber slab are P by the pressure of Blasting shock wave;Every slat gum plate top with
The connection of arch ring upper limb, every slat gum plate lower part is connect with the sandbag bottom on ground.
Every slat gum plate top is pushed down with arch ring upper limb top surface with steel plate, then is joined with bolts, every
Rubber slab lower part is equipped with the bundling belt being adhesively fixed.
The arch ring be reinforced concrete structure, railing is installed between the vault and vault slope of arch ring, the railing with
The space for collapsing storage after the completion of the rubber slab explosion upwards is formd between vault slope.
The sandbag is packed sandstone, which is equipped with suspension hook.
Compared with prior art, the utility model major design is a kind of for protecting the dress of tunnel excavation Blasting shock wave
It sets, which is mounted at the arch ring of tunnel portal, and structure includes rubber slab, steel plate, bolt, railing and sandbag etc.,
And rubber slab be equipped with it is a plurality of, every slat gum plate, which is hung from above, to be mounted between arch ring vault and ground, and top with arch ring carry out
Fixed, lower part is pushed down by sandbag, and adjacent rubber slab partly overlaps between each other, so as to form tunnel excavation is completely covered by
The spring protective structure of section, and the shock wave that Excavation blasting generates in spring protective structure energy tunneling boring shielding tunnel
And slungshot.This protective device has many advantages, such as simple structure, operation convenience, cost savings, safe and reliable, and cooperation is corresponding
Operating method also has the handling characteristics such as recycling, energy conservation and environmental protection, therefore can ensure that engineering construction safety, reduces noise pollution,
Economic benefit and social benefit are significant.
Detailed description of the invention
Fig. 1 is the structural facades schematic diagram of the utility model.
Fig. 2 is the I-I sectional view of Fig. 1.
Specific embodiment
It will elaborate again by above-mentioned attached drawing to the utility model embodiment below.
As shown in Figure 1 and Figure 2,1. ground, 11. explosion faces, 2. arch rings, 3. vault slopes, 4. railings, 5. rubber slabs, 51. weights
Folded portion, 52. bundling belts, 6. steel plates, 7. bolts, 8. sandbags, 81. suspension hooks.
Tunnel excavation Blasting shock wave protective device and operating method as shown in Figure 1 and Figure 2 are mainly used for that tunnel is protected to open
The shock wave and slungshot generated when explosion by explosion face 11 is dug, which is mounted at the arch ring 2 of tunnel portal, comes with this
Guarantee the safety of tunnel excavation blast working, and avoids the noise pollution on periphery.
The protective device includes a plurality of rubber slab 5 for hanging from above and being mounted between 2 vault of arch ring and ground 1, the rubber
Plate is flexible material production, is only b without bearing torque, every width by pulling force, length by position vault and ground
The height in face 1 determines, is located at the vault center of arch ring 5 as longest rubber slab, cover 2 top lower edge of arch ring and ground 1 it
Between computational length be L, and the total length of every slat gum plate 5 also needs to push down length plus vault anchorage length and ground sandbag 8;
Remaining rubber slab 5 is successively symmetrical arranged centered on longest rubber slab, and along 2 two sides of arch ring, length be arch ring at the top of lower edge with
Height between ground pushes down length plus vault anchorage length and ground sandbag 8, and a plurality of rubber slab 5 is by Blasting shock wave
Pressure is P.
The top of every slat gum plate 5 connect and fixes, specific structure with 2 upper limb of arch ring are as follows: every slat gum
5 top of plate is first pushed down with steel plate 6 with 2 upper limb top surface of arch ring, then is connected and fixed with bolt 7, and the quantity of bolt 7 passes through related calculate
It determines.
Every 5 lower part of slat gum plate is equipped with the bundling belt 52 being adhesively fixed, which connect with 8 bottom of sandbag on ground 1
And fix, specific structure are as follows: sandbag 8 is packed sandstone, and every bag of weight on sandbag 8 by being equipped with suspension hook depending on easy to operate
81, it is caught on for forklift, after sandbag 8 pushes down 5 lower part of rubber slab, which can be with the binding that is bonded in 5 lower part of rubber slab
Band 52 makees bundled fixed, plays the role of fixed sandbag 8.
Meanwhile adjacent rubber slab 5 partly overlaps between each other, then there is overlapping portion 51 between every two slat gums plate,
And the spring protective structure for being completely covered by tunnel excavation section is formd by these overlapping portions 51, the spring protective structure energy
Tunneling boring shields the shock wave and slungshot that Excavation blasting generates in tunnel.
Safety devices of the steel railing as operator, the railing are installed between 2 vault of arch ring and vault slope 3
Parking space is formd between 4 and vault slope 3, can be used for collapsing interim storage upwards for the rubber slab 5 after the completion of explosion.
Embodiment described in the utility model is merely to illustrate the utility model rather than limitation the scope of the utility model.
It should be further understood that after reading the content taught by the present invention, those skilled in the art can be to the utility model
It makes various changes or modifications, it is interior that these equivalent forms also fall within the scope of the appended claims of the present application.
Claims (5)
1. a kind of tunnel excavation Blasting shock wave protective device, the arch ring (2) including tunnel portal, it is characterised in that the arch
Enclose between (2) vault and ground (1) equipped with a plurality of rubber slab (5) for hanging installation from above, every slat gum plate top with arch ring (2) into
Row is fixed, and every slat gum plate lower part is pushed down by sandbag (8), and adjacent rubber slab (5) partly overlaps between each other, and has been formed
The spring protective structure of complete hiding tunnel excavation section, the spring protective structure tunneling boring shield what Excavation blasting in tunnel generated
Shock wave and slungshot.
2. tunnel excavation Blasting shock wave protective device according to claim 1, it is characterised in that every slat gum
Plate (5) is flexible material board, and only by pulling force without bearing torque, the width of every slat gum plate (5) is b, is arranged in arch ring
It (2) is longest rubber slab at vault center, covering the computational length at the top of arch ring (2) between lower edge and ground (1) is L,
Remaining rubber slab (5) is successively symmetrical arranged centered on longest rubber slab, and along arch ring (2) two sides, and length is at the top of arch ring (2)
Height between lower edge and ground (1), a plurality of rubber slab (5) are P by the pressure of Blasting shock wave;Every slat gum plate
(5) top is connect with arch ring (2) upper limb, and every slat gum plate (5) lower part is connect with sandbag (8) bottom of ground (1).
3. tunnel excavation Blasting shock wave protective device according to claim 1, it is characterised in that every slat gum
Plate (5) top is pushed down with arch ring (2) upper limb top surface with steel plate (6), then is connected and fixed with bolt (7), under every slat gum plate (5)
Portion is equipped with the bundling belt (52) being adhesively fixed.
4. tunnel excavation Blasting shock wave protective device according to claim 1, it is characterised in that the arch ring (2) is
Reinforced concrete structure installs railing (4) between the vault and vault slope (3) of arch ring (2), the railing and vault slope (3) it
Between form space for collapsing storage after the completion of the rubber slab (5) explosion upwards.
5. tunnel excavation Blasting shock wave protective device according to claim 1, it is characterised in that the sandbag (8) is
Packed sandstone, the sandbag are equipped with suspension hook (81).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820558429.6U CN208238658U (en) | 2018-04-19 | 2018-04-19 | Tunnel excavation Blasting shock wave protective device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820558429.6U CN208238658U (en) | 2018-04-19 | 2018-04-19 | Tunnel excavation Blasting shock wave protective device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208238658U true CN208238658U (en) | 2018-12-14 |
Family
ID=64584659
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820558429.6U Active CN208238658U (en) | 2018-04-19 | 2018-04-19 | Tunnel excavation Blasting shock wave protective device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208238658U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108444353A (en) * | 2018-04-19 | 2018-08-24 | 宁波交通工程建设集团有限公司 | Tunnel excavation Blasting shock wave protective device and operating method |
CN111473707A (en) * | 2020-04-14 | 2020-07-31 | 中国五冶集团有限公司 | Tunnel blasting construction protection shed |
-
2018
- 2018-04-19 CN CN201820558429.6U patent/CN208238658U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108444353A (en) * | 2018-04-19 | 2018-08-24 | 宁波交通工程建设集团有限公司 | Tunnel excavation Blasting shock wave protective device and operating method |
CN108444353B (en) * | 2018-04-19 | 2023-11-28 | 宁波交通工程建设集团有限公司 | Tunnel excavation blasting shock wave protection device and operation method |
CN111473707A (en) * | 2020-04-14 | 2020-07-31 | 中国五冶集团有限公司 | Tunnel blasting construction protection shed |
CN111473707B (en) * | 2020-04-14 | 2023-07-18 | 中国五冶集团有限公司 | Tunnel blasting construction protection canopy |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105735995B (en) | A kind of loose roof cuts the gob-side entry retaining method under top | |
CN105317459B (en) | A kind of subregion placement method for being used to control tight roof large area caving disaster | |
CN208238658U (en) | Tunnel excavation Blasting shock wave protective device | |
CN108444353A (en) | Tunnel excavation Blasting shock wave protective device and operating method | |
WO2011103620A1 (en) | A method of reducing subsidence or windblast impacts from longwall mining | |
CN102720498B (en) | Gob-side entry retaining mining process for coal face | |
CN102852552A (en) | High-water material filling column and construction method thereof | |
CN103147793A (en) | Non-chain-pillar roadway protection method adopting filling beside thin coal seam roadway | |
CN104033151A (en) | Safe mining method of ten million-ton mine under complicated conditions of dual-system coal seams | |
CN109899109B (en) | Grouting filling method for irregular goaf | |
CN211975051U (en) | Filling equipment for open-air end slope coal-pressing filling mining | |
CN110307034B (en) | Strip type grouting filling method for goaf | |
CN117418873A (en) | Temporary reinforcing and supporting device for coal mine tunnel in coal mining tunneling | |
CN209991886U (en) | Blasting construction well head protector | |
CN107587878A (en) | Pit shaft and shaft station attachment structure | |
CN105937400B (en) | It is a kind of once to tunnel Liu Sheshuan lanes digging operation production line | |
CN212692711U (en) | Safety protection device for blasting demolition of supporting beam | |
CN203821443U (en) | Cave opening protecting device for blasting excavation at light and shade junction part of subway tunnel | |
CN213574165U (en) | Coal mine tunneling and supporting device | |
CN211178169U (en) | Protection device for small-size tunnel blasting construction in city | |
CN208220841U (en) | A kind of goaf shock resistance entirety barricade | |
CN106884670A (en) | A kind of support method for underground goaf roof of coal mine | |
CN101806150A (en) | Effective and safe anti-slide pile construction method | |
CN112483134A (en) | Method for treating roof fall of roadway | |
CN206514739U (en) | Standard combination modular structure is used in a kind of blast working covering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |