CN208237232U - Non- go into the well of one kind installs drainage pipeline networks bracket - Google Patents

Non- go into the well of one kind installs drainage pipeline networks bracket Download PDF

Info

Publication number
CN208237232U
CN208237232U CN201820705039.7U CN201820705039U CN208237232U CN 208237232 U CN208237232 U CN 208237232U CN 201820705039 U CN201820705039 U CN 201820705039U CN 208237232 U CN208237232 U CN 208237232U
Authority
CN
China
Prior art keywords
buckle
vertical duct
bracket
vertical
drainage pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820705039.7U
Other languages
Chinese (zh)
Inventor
张杰武
陈德莉
吴秋明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Navigation Instrument Equipment Co Ltd
Original Assignee
Shanghai Navigation Instrument Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Navigation Instrument Equipment Co Ltd filed Critical Shanghai Navigation Instrument Equipment Co Ltd
Priority to CN201820705039.7U priority Critical patent/CN208237232U/en
Application granted granted Critical
Publication of CN208237232U publication Critical patent/CN208237232U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses non-go into the well of one kind to install drainage pipeline networks bracket, including vertical duct, two fixing seats, two movable buckles and an equipment mounting base;Fixing seat includes vertical mounting plate, horizontal fagging, installation bolt and buckle cylinder;Horizontal fagging is vertically and fixedly arranged on vertical mounting plate;Buckle cylinder is vertically fixed on horizontal fagging;Installation bolt is for being vertically fixedly mounted vertical mounting plate;Movable buckle includes anchor ear, fixing bolt and buckle casing;Anchor ear is removably mounted on vertical duct by fixing bolt;Buckle casing is fixed on anchor ear;Buckle cylinder is inserted into corresponding buckle casing;Equipment mounting base is mounted on the lower end of vertical duct;It stretches on the upper end of vertical duct and is provided with lift-pull handle.Non- go into the well installs drainage pipeline networks bracket using two fixing seats and two detachable installations of movable buckles realization, can facilitate installation and later maintenance.

Description

Non- go into the well of one kind installs drainage pipeline networks bracket
Technical field
The utility model relates to a kind of pipe network bracket, especially non-always go into the well to install drainage pipeline networks bracket.
Background technique
Underground drainage facilities installation at present is typically all to use two methods: first is that lower arrive shaft bottom operation in pipeline;Two It is in vertical shaft section setscrew fixed plate or pipe hanging device.
First method: lower well operations.This method required the age of worker, no more than 45 years old;It must take appointment with certificate; The one-stop operation time does not surpass 60 minutes;Pipeline inside processing is not can enter.Worker needs to wear positive-pressure type ventilator ability shaft bottom work Industry, narrow space carry the risk of electrification tool operation increase electric shock.The mounting bracket in shaft bottom usually requires to pacify in pipeline It fills, is difficult hot line job when having water in pipeline;Installation is easily destroyed pipeline configuration in tube wall, and bracket is fixed to require height, otherwise sets It is standby to be easy to be washed out.
Second method: vertical shaft section is fixed with expansion thread.This method is relatively lower to be arrived for the operation of shaft bottom, highly-safe, but Problem is to need to go into the well again when safeguarding in hoistway wall due to securing the stand to dismantle expansion thread or fixed device, maintenance cost It is high.
Summary of the invention
Purpose of utility model: a kind of non-go into the well facilitating installation and maintenance is provided, drainage pipeline networks bracket is installed.
Technical solution: non-go into the well described in the utility model installs drainage pipeline networks bracket, including vertical duct, two fixations Seat, two movable buckles and an equipment mounting base;Fixing seat include vertical mounting plate, horizontal fagging, installation bolt and Buckle cylinder;Horizontal fagging is vertically and fixedly arranged on vertical mounting plate;Buckle cylinder is vertically fixed on horizontal fagging; Installation bolt is for being vertically fixedly mounted vertical mounting plate;Movable buckle includes anchor ear, fixing bolt and buckle casing;Anchor ear It is removably mounted on vertical duct by fixing bolt;Buckle casing is fixed on anchor ear;Two two fixing seats difference It is corresponding with the installation site of two movable buckles;Buckle cylinder is inserted into corresponding buckle casing;The installation of equipment mounting base On the lower end of vertical duct;It stretches on the upper end of vertical duct and is provided with lift-pull handle.
Further, cone boss is equipped in the upper end of buckle cylinder;The upper surface diameter of cone boss is less than buckle set The internal diameter of pipe.
Further, lateral gusset and longitudinal gusset, and lateral gusset are vertically provided on the downside of horizontal fagging One side edge be vertically fixed on vertical mounting plate;Lateral gusset and longitudinal gusset are in the lower section right-angled intersection for buckling cylinder.
Further, semicircular notch is equipped in the side edge of horizontal fagging;The outer wall of vertical duct is stuck in semicircular notch On.
Further, lift-pull handle is made of bend pipe and transverse tube;One end of bend pipe is docked with the upper end of vertical duct, the other end It is docked with transverse tube.
Further, equipment mounting base includes L-shaped installing plate, fastening nut and butt tube;Butt tube is vertically fixed on L At the top of the level board of shape mounting plate, and external screw thread is equipped on the outer wall of butt tube;It is set on the lower end internal wall of pipe orifice of vertical duct There is internal screw thread;Fastening nut screws on the external screw thread of butt tube;The external screw thread of butt tube is screwed in vertical duct lower end nozzle On internal screw thread;Equipment mounting hole is equipped on the level board of L-shaped installing plate and vertical plate.
Further, be arranged with annulus on the upper end outer wall of vertical duct, annulus lower section and be located at vertical duct Outer wall is equipped with limit flange collar;L shape is equipped on annulus to link up with.
The utility model compared with prior art, the beneficial effect is that: can according to installation need by installation bolt will The vertical mounting plate of two fixing seats is fixedly mounted at the upper and lower position of infield, and utilizes fixing bolt by two activities The anchor ear of buckle is mounted on vertical duct;The buckle casing of two movable buckles after installation is just set in two of fixing seat It buckles on cylinder, while the outer wall of vertical duct is stuck in semicircular notch and is limited;Monitoring device is mounted on the installation of L shape again On plate, the angular adjustment that monitoring device is carried out on the internal screw thread of vertical duct lower end nozzle is screwed using the external screw thread of butt tube, Locking positioning is carried out by the lower end of the upward rotary squeezing vertical duct of fastening nut simultaneously;The connecting line of monitoring device passes sequentially through Butt tube and vertical duct carry out threading installation;Equipment for telecommunication can be linked up with to be installed on L shape hook.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the fixing seat overlooking structure diagram of the utility model.
Specific embodiment
Technical solutions of the utility model are described in detail with reference to the accompanying drawing, but the protection scope of the utility model It is not limited to the embodiment.
Embodiment 1:
As illustrated in fig. 1 and 2, described in the utility model non-to go into the well that install drainage pipeline networks bracket include: vertical duct 1, two Fixing seat, two movable buckles and an equipment mounting base;Fixing seat includes vertical mounting plate 6, horizontal fagging 7, installation spiral shell Bolt 12 and buckle cylinder 10;Horizontal fagging 7 is vertically and fixedly arranged on vertical mounting plate 6;Vertically fixation is set buckle cylinder 10 It sets on horizontal fagging 7;Installation bolt 12 is for being vertically fixedly mounted vertical mounting plate 6;Movable buckle includes anchor ear 3, fixes Bolt 4 and buckle casing 5;Anchor ear 3 is removably mounted on vertical duct 1 by fixing bolt 4;Casing 5 is buckled to be fixedly installed On anchor ear 3;Two two fixing seats are corresponding with the installation site of two movable buckles respectively;Buckle cylinder 10 is inserted into pair In the buckle casing 5 answered;Equipment mounting base is mounted on the lower end of vertical duct 1;It stretches and is arranged on the upper end of vertical duct 1 There is lift-pull handle.
Further, cone boss 11 is equipped in the upper end of buckle cylinder 10;The upper surface diameter of cone boss 11 is less than Buckle the internal diameter of casing 5.It is capable of the suit of convenient card retaining ring pipe 5 using cone boss 11.
Further, lateral gusset 8 and longitudinal gusset 9, and horizontal bar are vertically provided on the downside of horizontal fagging 7 The one side edge of plate 8 is vertically fixed on vertical mounting plate 6;Lateral gusset 8 and longitudinal gusset 9 are in the lower section ten of buckle cylinder 10 Word intersects.The downside of horizontal fagging 7 is set using the lateral gusset 8 and longitudinal gusset 9 of right-angled intersection, can effectively enhance water Support the support strength of plate 7.
Further, semicircular notch 21 is equipped in the side edge of horizontal fagging 7;The outer wall of vertical duct 1 is stuck in semicircle On notch 21.Vertical duct 1 is limited using semicircular notch 21, prevents vertical duct 1 after installation from shaking.
Further, lift-pull handle is made of bend pipe 17 and transverse tube 2;One end of bend pipe 17 is docked with the upper end of vertical duct 1, The other end is docked with transverse tube 2.Lift-pull handle is constituted using bend pipe 17 and transverse tube 2, facilitates and is directly extracted vertically when installation and maintenance Pipe 1.
Further, equipment mounting base includes L-shaped installing plate 15, fastening nut 14 and butt tube 13;Butt tube 13 is perpendicular To the level board top for being fixed on L-shaped installing plate 15, and equipped with external screw thread on the outer wall of butt tube 13;Under vertical duct 1 Internal wall of pipe orifice is held to be equipped with internal screw thread;Fastening nut 14 screws on the external screw thread of butt tube 13;The external screw thread of butt tube 13 revolves It closes on the internal screw thread of 1 lower end nozzle of vertical duct;Equipment mounting hole is equipped on the level board of L-shaped installing plate 15 and vertical plate 16.It is installed, and angle locking positioning is carried out by fastening nut 14, is realized using the lower thread of butt tube 13 and vertical duct 1 The setting angle of monitoring device is adjusted.
Further, be arranged with annulus 19 on the upper end outer wall of vertical duct 1, annulus 19 lower section and be located at vertical The outer wall of pipe 1 is equipped with limit flange collar 18;L shape hook 20 is equipped on annulus 19.Communication is conveniently used for using L shape hook 20 to set Standby carry installation.
Non- go into the well described in the utility model installs drainage pipeline networks bracket when in use, installs first in L-shaped installing plate 15 One camera, for observing situation in well in advance, if all right carry out subsequent installation again;It needs to pass through peace further according to installation The vertical mounting plate 6 of two fixing seats is fixedly mounted at the upper and lower position of infield by dress bolt 12;Recycle fixed spiral shell The anchor ear 3 of two movable buckles is mounted on vertical duct 1 by bolt 4, and the buckle casing 5 of two after installation movable buckle just covers It is located on two buckle cylinders 10 of fixing seat, while the outer wall of vertical duct 1 is stuck in semicircular notch 21 and is limited;Again will Monitoring device is mounted in L-shaped installing plate 15, screws the internal screw thread in 1 lower end nozzle of vertical duct using the external screw thread of butt tube 13 The upper angular adjustment for carrying out monitoring device, while being locked by the lower end of the upward rotary squeezing vertical duct 1 of fastening nut 14 Positioning;The connecting line of monitoring device passes sequentially through butt tube 13 and vertical duct 1 carries out threading installation;Equipment for telecommunication It can link up with and be installed on L shape hook 20.
As described above, although the utility model has been indicated and described referring to specific preferred embodiment, it must not It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define Under the premise of, it can various changes can be made in the form and details to it.

Claims (7)

1. a kind of non-go into the well installs drainage pipeline networks bracket, it is characterised in that: including vertical duct (1), two fixing seats, two activities Buckle and an equipment mounting base;Fixing seat includes vertical mounting plate (6), horizontal fagging (7), installation bolt (12) and blocks It detains cylinder (10);Horizontal fagging (7) is vertically and fixedly arranged on vertical mounting plate (6);Cylinder (10) are buckled vertically to be fixedly installed On horizontal fagging (7);Installation bolt (12) is for being vertically fixedly mounted vertical mounting plate (6);Movable buckle includes anchor ear (3), fixing bolt (4) and buckle casing (5);Anchor ear (3) is removably mounted on vertical duct (1) by fixing bolt (4); Buckle casing (5) is fixed on anchor ear (3);Two two fixing seats are opposite with the installation site of two movable buckles respectively It answers;Buckle cylinder (10) is inserted into corresponding buckle casing (5);Equipment mounting base is mounted on the lower end of vertical duct (1); It stretches on the upper end of vertical duct (1) and is provided with lift-pull handle.
2. non-go into the well according to claim 1 installs drainage pipeline networks bracket, it is characterised in that: in the upper of buckle cylinder (10) End is equipped with cone boss (11);The upper surface diameter of cone boss (11) is less than the internal diameter of buckle casing (5).
3. non-go into the well according to claim 1 installs drainage pipeline networks bracket, it is characterised in that: under horizontal fagging (7) Be vertically provided with lateral gusset (8) and longitudinal gusset (9) on side, and the one side edge of lateral gusset (8) be vertically fixed on it is perpendicular To on mounting plate (6);Lateral gusset (8) and longitudinal gusset (9) are in the lower section right-angled intersection for buckling cylinder (10).
4. non-go into the well according to claim 1 installs drainage pipeline networks bracket, it is characterised in that: in the side of horizontal fagging (7) Edge is equipped with semicircular notch (21);The outer wall of vertical duct (1) is stuck on semicircular notch (21).
5. non-go into the well according to claim 1 installs drainage pipeline networks bracket, it is characterised in that: lift-pull handle is by bend pipe (17) It is constituted with transverse tube (2);One end of bend pipe (17) is docked with the upper end of vertical duct (1), and the other end is docked with transverse tube (2).
6. non-go into the well according to claim 1 installs drainage pipeline networks bracket, it is characterised in that: equipment mounting base includes L shape Mounting plate (15), fastening nut (14) and butt tube (13);Butt tube (13) is vertically fixed on the level of L-shaped installing plate (15) At the top of plate, and external screw thread is equipped on the outer wall of butt tube (13);Interior spiral shell is equipped on the lower end internal wall of pipe orifice of vertical duct (1) Line;Fastening nut (14) screws on the external screw thread of butt tube (13);The external screw thread of butt tube (13) screws under vertical duct (1) On the internal screw thread of end pipe mouth;Equipment mounting hole (16) are equipped on the level board of L-shaped installing plate (15) and vertical plate.
7. non-go into the well according to claim 1 installs drainage pipeline networks bracket, it is characterised in that: in the upper end of vertical duct (1) It is arranged with annulus (19) on portion's outer wall, limit flange collar is equipped on the lower section in annulus (19) and the outer wall positioned at vertical duct (1) (18);L shape hook (20) is equipped on annulus (19).
CN201820705039.7U 2018-05-13 2018-05-13 Non- go into the well of one kind installs drainage pipeline networks bracket Active CN208237232U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820705039.7U CN208237232U (en) 2018-05-13 2018-05-13 Non- go into the well of one kind installs drainage pipeline networks bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820705039.7U CN208237232U (en) 2018-05-13 2018-05-13 Non- go into the well of one kind installs drainage pipeline networks bracket

Publications (1)

Publication Number Publication Date
CN208237232U true CN208237232U (en) 2018-12-14

Family

ID=64582612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820705039.7U Active CN208237232U (en) 2018-05-13 2018-05-13 Non- go into the well of one kind installs drainage pipeline networks bracket

Country Status (1)

Country Link
CN (1) CN208237232U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110848518A (en) * 2019-11-19 2020-02-28 无锡航征科技有限公司 Urban drainage pipe network on-line monitoring equipment mounting bracket
CN110977271A (en) * 2019-12-12 2020-04-10 江苏显赫智能装备有限公司 Fast-assembling interchanging device of welding robot
CN112524457A (en) * 2020-11-27 2021-03-19 无锡航征科技有限公司 Multi-angle adjustable support device and using method thereof
CN112524456A (en) * 2020-11-27 2021-03-19 无锡航征科技有限公司 Split type support device and using method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110848518A (en) * 2019-11-19 2020-02-28 无锡航征科技有限公司 Urban drainage pipe network on-line monitoring equipment mounting bracket
CN110848518B (en) * 2019-11-19 2021-04-13 无锡航征科技有限公司 Urban drainage pipe network on-line monitoring equipment mounting bracket
CN110977271A (en) * 2019-12-12 2020-04-10 江苏显赫智能装备有限公司 Fast-assembling interchanging device of welding robot
CN112524457A (en) * 2020-11-27 2021-03-19 无锡航征科技有限公司 Multi-angle adjustable support device and using method thereof
CN112524456A (en) * 2020-11-27 2021-03-19 无锡航征科技有限公司 Split type support device and using method thereof

Similar Documents

Publication Publication Date Title
CN208237232U (en) Non- go into the well of one kind installs drainage pipeline networks bracket
CN204396431U (en) A kind of service sink
CN106437846B (en) Down-hole pipe mounting assembly
CN109186002A (en) Portable air-conditioning mounting bracket
JP4493803B2 (en) How to install the gas meter
CN206397167U (en) Heavy in section girder steel connecting plate installation servicing unit
CN207098498U (en) wire fixer
CN205669308U (en) A kind of wall-connecting piece without cutting
CN207648405U (en) A kind of external wall pick-up head mounting structure
CN207620417U (en) Skirt guardrail insertion connector is faced in a kind of construction
CN210397943U (en) Through floor pipe sleeve positioning device
CN207582597U (en) It is a kind of to be used to face the Wash Units built in applying
CN209179204U (en) The attachment device for hanging bracket and structural beams of pipeline
CN107670198A (en) Novel safety belt fixing device
CN205544141U (en) Distribution rack ground connection wire sleeve fixing device
CN206591845U (en) Suitable for the safety belt suspension device of scaffold
CN207063003U (en) A kind of easy-to-mount well lid of modular segment energy safety manhole
CN206986976U (en) A kind of pre-buried cartridge module
CN210033334U (en) Oil-water well operation derrick alignment observation device
CN218671615U (en) Semi-automatic gas valve distributor box
CN209398926U (en) A kind of portable adjustable support frame
JP6765625B2 (en) Manhole contaminant remover
CN211226318U (en) Lower-mounted crane pipe with dry valve
CN210629692U (en) Building construction management supervisory equipment
CN207599142U (en) A kind of universal take-up clip