CN208237218U - For the interim pipe holder in place of pipeline - Google Patents

For the interim pipe holder in place of pipeline Download PDF

Info

Publication number
CN208237218U
CN208237218U CN201820519930.1U CN201820519930U CN208237218U CN 208237218 U CN208237218 U CN 208237218U CN 201820519930 U CN201820519930 U CN 201820519930U CN 208237218 U CN208237218 U CN 208237218U
Authority
CN
China
Prior art keywords
cross bar
pipeline
fixed
small cross
sunpender
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820519930.1U
Other languages
Chinese (zh)
Inventor
姚大伟
王永召
刘超
鹿胜楠
刘立范
余明淦
黄海
庄宏昌
李国伟
崔爱娥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Original Assignee
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Offshore Oil Engineering Co Ltd, Offshore Oil Engineering Qingdao Co Ltd filed Critical Offshore Oil Engineering Co Ltd
Priority to CN201820519930.1U priority Critical patent/CN208237218U/en
Application granted granted Critical
Publication of CN208237218U publication Critical patent/CN208237218U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of pipe holder temporarily in place for pipeline, include: the small cross bar of several carryings being horizontally fixed in jacket H profile steel respectively, be fixed on upper and lower two sunpenders carried on small cross bar, wherein, a square framework type structure is formed between the small cross bar of several carryings and the sunpender being fixed on the small cross bar of upper and lower two carryings;The frame of limit cross bar and bottom bar is respectively fixed on sunpender;It is equipped with chock on bottom bar, the target pipeline being supported is installed on chock.The problem of the utility model, as supporting point, simplifies structure by girder steel, consumes a large amount of manpower and material resources when not only solving pipeline installation, improves work efficiency;Moreover, the problem of also solving pollution existing structure and equipment;Different-diameter pipeline is met in different trends and the interim needs in place of absolute altitude.

Description

For the interim pipe holder in place of pipeline
Technical field
The utility model relates to pipe holder more particularly to a kind of pipe holders temporarily in place for pipeline.Belong to ocean work Pipeline installing area in journey equipment.
Background technique
Currently, being influenced in marine engineering equipment manufacturing industry by equipment and pipeline arrival, based on the need for shortening construction period It wants, the needs of part pipeline are temporarily in place, the row installation again after equipment or other pipelines are in place.In addition, the pipeline needs that evening arrives Interspersed main structure installation, it is narrow that this " trying to make a match " way is often limited to working space, needs to build interim pipeline support. In general, using L-type H profile steel as temporary support, cut off after pipeline is installed, then by temporary support.But the above method It has the disadvantage in that
(1), since the pipeline temporarily installed in place is numerous, temporary support is done using H profile steel and needs to consume a large amount of steel construction And welding material;
(2), since the caliber of pipeline is different, absolute altitude and coordinate are various, many kinds of of interim H profile steel support is caused;
(3), due to needing to carry out polishing derusting before welding temporary support, a large amount of manpower and material resources are not only consumed, moreover, it is polished Generated clast can also be polluted in modeling block;
(4) after pipeline is installed, it is also necessary to cut off the temporary support of welding, and polish flat again;
(5) polishing position (paint has been destroyed) is also needed to carry out coating again.
Utility model content
The main purpose of the utility model is to overcome disadvantages mentioned above of the existing technology, and provide a kind of for pipeline Interim pipe holder in place simplifies structure by girder steel as supporting point, and consumption is a large amount of when not only solving pipeline installation Manpower and material resources the problem of, improve work efficiency;Moreover, the problem of also solving pollution existing structure and equipment;It meets Different-diameter pipeline is in different trends and the interim needs in place of absolute altitude.
The purpose of this utility model is realized by the following technical solutions:
A kind of pipe holder temporarily in place for pipeline, it is characterised in that: include: to be horizontally fixed on jacket H-type respectively The small cross bar of several carryings on steel, the sunpenders being fixed on the small cross bar of upper and lower two carryings, wherein the small cross bars of several carryings and A square framework type structure is formed between the sunpender being fixed on the small cross bar of upper and lower two carryings;Limit is respectively fixed on sunpender The frame of position cross bar and bottom bar;It is equipped with chock on bottom bar, the target pipeline being supported is installed on chock.
Upper and lower two small cross bars of carrying and sunpender fix by right-angle coupler, and the upper and lower of right-angle coupler divides It She You not safety fastener.
The utility model has the beneficial effects that the utility model is due to the adoption of the above technical scheme, by girder steel as branch The problem of support point simplifies structure, consumes a large amount of manpower and material resources when not only solving pipeline installation, improves work efficiency; Moreover, the problem of also solving pollution existing structure and equipment;Different-diameter pipeline is met to face in different trends and absolute altitude When needs in place.
Detailed description of the invention
Fig. 1-1 is the fixed small cross bar schematic front view of carrying below the utility model H profile steel.
Fig. 1-2 is the fixed small cross bar schematic side view of carrying below the utility model H profile steel.
Fig. 2-1 is the fixed schematic front view of the utility model sunpender.
Fig. 2-2 is the fixed schematic side view of the utility model sunpender.
Fig. 3-1 is the fixed schematic front view of the utility model bottom bar.
Fig. 3-2 is the fixed schematic side view of the utility model bottom bar.
Fig. 4-1 is that the utility model pipeline arranges schematic front view.
Fig. 4-2 is that the utility model pipeline arranges schematic side view.
Fig. 4-3 is the partial enlargement diagram in Fig. 4-2.
Fig. 5-1 is that the utility model limits the fixed schematic front view of cross bar.
Fig. 5-2 is that the utility model limits the fixed schematic side view of cross bar.
Fig. 6-1 is the fixed small cross bar schematic front view of carrying below the utility model H profile steel.
Fig. 6-2 is the fixed small cross bar schematic side view of carrying below the utility model H profile steel.
Fig. 7-1 is the fixed schematic front view of the utility model sunpender.
Fig. 7-2 is the fixed schematic side view of the utility model sunpender.
Fig. 8-1 is the fixed schematic front view of the utility model bottom bar.
Fig. 8-2 is the fixed schematic side view of the utility model bottom bar.
Fig. 9-1 is that the utility model pipeline arranges schematic front view.
Fig. 9-2 is that the utility model pipeline arranges schematic side view.
Figure 10-1 is that the utility model limits the fixed schematic front view of cross bar.
Figure 10-2 is that the utility model limits the fixed schematic side view of cross bar.
Major Symbol illustrates in figure:
1.H fashioned iron;2. fastener of hanging oneself from a beam;3. carrying small cross bar;4. safety fastener;5. right-angle coupler;6. sunpender;7. limit is horizontal Bar;8. target pipeline;9. chock;10. bottom bar.
Specific embodiment
As shown in Fig. 1-Figure 10-2, the utility model includes: to be horizontally fixed on jacket H-type respectively using overarm fastener 2 The small cross bar 3 (the present embodiment is upper and lower two) of several carryings on steel 1 is fixed on upper and lower two carryings by right-angle coupler 5 Sunpender 6 on small cross bar 3, wherein be respectively fixed on sunpender 6 by several right-angle couplers 5 (the present embodiment is upper and lower two) Limit the frame of cross bar 7 and bottom bar 10;It is equipped with chock 9 on bottom bar 10, the target being supported is installed on chock 9 Pipeline 8.
A side is formed between above-mentioned several sunpenders 6 for carrying small cross bar 3 and being fixed on the small cross bar 3 of upper and lower two carryings Shape tower structure.
The upper and lower of above-mentioned right-angle coupler 5 is respectively equipped with safety fastener 4.
When the utility model is used, using following steps:
It is horizontally fixed on H profile steel beam 1 step 1: small cross bar 3 will be carried;
Step 2: sunpender 6 is fixed on the small cross bar 3 of upper and lower two carryings;
In order to increase the bearing capacity of sunpender 6, a safety fastener 4, safety fastener are added in the top for being close to right-angle coupler 5 4 can replace with dedicated safety fastener or with right-angle coupler;
Step 3: bottom bar 10 is fixed on sunpender 6, bottom bar 10 fixes position according to the position of target pipeline 8 Set determination;
In order to increase the bearing capacity of sunpender 6, a safety fastener 4, safety fastener are added in the lower section for being close to right-angle coupler 5 4 can replace with dedicated safety fastener or with right-angle coupler.
Step 4: chock 9 is placed on bottom bar 10, convenient for the uniform power transmission of target pipeline 8 in bottom bar 10.
Step 5: being fixed on sunpender 6 using two right-angle couplers 5 by cross bar 7 is limited after pre-positioned target pipeline 8.Limit The fixation position of cross bar 7 is determined according to the position of target pipeline 8.
Above-mentioned H profile steel, overarm fastener, right-angle coupler, safety fastener are the prior art, and the technology of not specified (NS) is existing skill Art, so it will not be repeated.
The above descriptions are merely preferred embodiments of the present invention, not makees in any form to the utility model Limitation, it is made by the above technical examples according to the technical essence of the present invention it is any it is simple modification, equivalent variations with Modification, is still within the scope of the technical solutions of the present invention.

Claims (2)

1. a kind of for the interim pipe holder in place of pipeline, it is characterised in that: include: to be horizontally fixed on jacket H profile steel respectively On the small cross bar of several carryings, the sunpenders that are fixed on the small cross bar of upper and lower two carryings, wherein small cross bars of several carryings and solid A square framework type structure is formed between the sunpender being scheduled on the small cross bar of upper and lower two carryings;Limit is respectively fixed on sunpender The frame of cross bar and bottom bar;It is equipped with chock on bottom bar, the target pipeline being supported is installed on chock.
2. according to claim 1 for the interim pipe holder in place of pipeline, it is characterised in that: described upper and lower two are held It carries small cross bar and sunpender is fixed by right-angle coupler, the upper and lower of right-angle coupler is respectively equipped with safety fastener.
CN201820519930.1U 2018-04-13 2018-04-13 For the interim pipe holder in place of pipeline Expired - Fee Related CN208237218U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820519930.1U CN208237218U (en) 2018-04-13 2018-04-13 For the interim pipe holder in place of pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820519930.1U CN208237218U (en) 2018-04-13 2018-04-13 For the interim pipe holder in place of pipeline

Publications (1)

Publication Number Publication Date
CN208237218U true CN208237218U (en) 2018-12-14

Family

ID=64583207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820519930.1U Expired - Fee Related CN208237218U (en) 2018-04-13 2018-04-13 For the interim pipe holder in place of pipeline

Country Status (1)

Country Link
CN (1) CN208237218U (en)

Similar Documents

Publication Publication Date Title
CN209066791U (en) A kind of wall surface dry-hang device
CN104060746B (en) The anti-engineering method that supports of a kind of furred ceiling angle bar frame
CN202187457U (en) Suspension apparatus of lower suspended ceiling of steel grating
CN204993169U (en) Float floated counter weight support of photovoltaic
CN208237218U (en) For the interim pipe holder in place of pipeline
CN203868523U (en) Pipeline fixing structure of support and hanger assembly
CN203961091U (en) The anti-bracing or strutting arrangement of a kind of furred ceiling angle bar frame and ceiling structure thereof
CN105587058A (en) Perforated aluminum plate curtain wall of external wall
CN205223390U (en) Electrophoresis hanger
CN203248841U (en) Supporting device for pipeline surface anticorrosion treatment
CN203514799U (en) Back arris clamp for combined aluminum formwork
CN205894577U (en) Bulky heavy stone material flip -chip structure
CN204585528U (en) A kind of hook connecting production for building aerating sheet material
CN203905257U (en) Detachable hidden installation system of glass fiber ceiling decorative sheet
CN203569833U (en) Novel dry hanging system for building outer decoration and insulation integrated boards
CN202159860U (en) Simple installation type lightning protection belt support and assembly mould thereof
CN204692771U (en) A kind of integrated steel pipe
CN210369511U (en) Aluminum profile mounting structure
CN202543294U (en) Cooling device for hot galvanizing system
CN203383459U (en) Ceramic tile back fastening hanging part
CN204898506U (en) Can make pipeline follow case girder construction that bridge laid
CN202868246U (en) Test-piece fixing frame for absorbent thickness expansion rate detection of floor board and the like
CN204326341U (en) Metal honeycomb plate buckle ceiling structure
CN203797288U (en) Support for suspending guide wheel
CN203890856U (en) Wharf pontoon easy to dismantle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181214