CN208236423U - Operation platform - Google Patents

Operation platform Download PDF

Info

Publication number
CN208236423U
CN208236423U CN201820443304.9U CN201820443304U CN208236423U CN 208236423 U CN208236423 U CN 208236423U CN 201820443304 U CN201820443304 U CN 201820443304U CN 208236423 U CN208236423 U CN 208236423U
Authority
CN
China
Prior art keywords
operation platform
several
guide rail
operating platform
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820443304.9U
Other languages
Chinese (zh)
Inventor
陈向红
王磊
魏刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Construction Industry Group Co Ltd
Original Assignee
China Coal Construction Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Construction Industry Group Co Ltd filed Critical China Coal Construction Industry Group Co Ltd
Priority to CN201820443304.9U priority Critical patent/CN208236423U/en
Application granted granted Critical
Publication of CN208236423U publication Critical patent/CN208236423U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to field of engineering technology, disclose operation platform, structure is lifted including operating platform, several support constructions and several tops, one end of several support constructions is connected with the operating platform, and the other end lifts structure by several tops and is installed on ground.The utility model lifts the top lifting height of structure by adjusting top, and when top act structure top lifting height is consistent, operating platform whole height changes;When the top lifting height that structure is lifted on several tops orderly changes, operating platform generates angle change with respect to ground run-off the straight.The operation platform angle, height are easy to adjust, do not need repeated disassembled and assembled operation platform, improve working efficiency.

Description

Operation platform
Technical field
The utility model relates to field of engineering technology more particularly to a kind of operation platforms.
Background technique
Pipe-roof method is a kind of tunneling supporting construction method, is usually used in tunnel portal and passes through in project, it is set using jacking construction It is standby that more steel pipes are headed into stratum formation underground engineering construction supporting construction, under the supporting of this structure, carry out project dug underground soil Side is excavated, and is finally completed entire underground space structure.In face of increasingly congested traffic, the building structure stood in great numbers and intensive underground Pipeline, pipe-roof method application gradually increase, and it is each side's problem of concern that how highly effective and safe, which carries out the construction of the underground space,.
More steel pipes are needed generally according to Design of Construction Organization while being constructed, and push pipe complex procedures are opened from starting well jacking Begin, is finished receiving to received well, each process is required to carry out auxiliary construction using operation platform, and needs to avoid buried pipe Other facilities of the cities such as road, cable.Current operation platform is mostly the rigid support built according to Specific construction situation, the rigidity Bracket is fixedly connected with the ground, and whole height is fixed, and adjustment is difficult.With the propulsion of engineering, pipe curtain height and pushing tow angle hair Changing needs to build suitable operation platform again at this time, and construction efficiency is low, extends the construction time.
Utility model content
(1) technical problems to be solved
The purpose of the utility model is to provide a kind of operation platforms, to solve operation platform height, angle in the prior art Degree adjusts inconvenient bring construction and takes a long time problem.
(2) technical solution
In order to solve the above-mentioned technical problem, the utility model provides a kind of operation platform, including operating platform, several supports Structure is lifted on structure and several tops, and one end of several columns is connected with the operating platform, and the other end passes through several tops It lifts structure and is installed on ground.
Further, several support constructions form two rows of support groups, two rows of support groups it is arranged in parallel The lower section of the operating platform;The support construction is column or upright wallboard, and it is jack that structure is lifted on the top.
Further, the operation platform further includes cushion cap, slide construction and guide rail, and the support construction bottom passes through institute It states top act structure to be fixedly connected with the cushion cap, the cushion cap is recessed equipped with extending along its length towards the ground side Slot, the slide construction are contained in the groove and are slidably matched with the guide rail, and the guide rail is fixedly installed in the ground.
Further, the cushion cap is arranged in a one-to-one correspondence with the guide rail, and there are two the cushion caps, and the guide rail has two Item, two guide rails are in I-shaped.
Further, the guide rail has several, is parallel to each other between several guide rails, and the cushion cap is a tabular Structure, the cushion cap are equipped with several grooves towards the ground side in parallel, and the groove and the guide rail correspond.
Further, the slide construction is the roller unit of several idler wheels composition.
Further, the operation platform further includes supplementary structure, and the supplementary structure includes supporting leg and fixed plate, described Supporting leg one end is fixedly installed in the ground, and the other end is fixed by the fixed plate and the support construction.
Further, there are two the supplementary structures, the support construction two sides are symmetrically arranged on, the supporting leg is adjustable High supporting leg, the fixed plate longitudinal section are right angled triangle or right-angled trapezium.
Further, the operation platform further includes the rear parados for being fixedly installed in ground, the rear parados and the behaviour Make that several jack are installed between platform.
Further, it is connected between the operating platform and several columns by adjustable split bolt.
(3) beneficial effect
Operation platform provided by the utility model lifts the top lifting height of structure by adjusting top, when act structure jacking in top is high When spending consistent, operating platform whole height changes;When the top lifting height that structure is lifted on several tops orderly changes, operating platform Opposite ground run-off the straight, angle change.The operation platform angle, height are easy to adjust, do not need repeated disassembled and assembled construction Platform improves working efficiency.
Detailed description of the invention
Fig. 1 is the main view of one preferred embodiment of an operation platform in the utility model;
Fig. 2 is the side view diagram of operation platform shown in the utility model Fig. 1.
In figure: 1, operating platform;2, support construction;3, structure is lifted on top;4, cushion cap;41, groove;5, slide construction;6, it leads Rail;7, supplementary structure;71, supporting leg;72, fixed plate.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Example is not intended to limit the scope of the present invention for illustrating the utility model.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
It as shown in Figs. 1-2, is a kind of operation platform provided by the embodiment of the utility model, including operating platform 1, several Structure 3, cushion cap 4, slide construction 5, guide rail 6 and supplementary structure 7 are lifted in support structure 2, several tops.
Specifically, support construction 2 is column, and several support constructions 2 form two support groups, mutually put down between two support groups Row.Several support constructions 2 in same support group form a line.Each 2 top of support construction passes through adjustable with operating platform 1 Split bolt connection unscrews bolt when adjusting the angle of operating platform 1, ties after angle is adjusted in operating platform 1 and support Wedge block is added between structure 2 and tightens bolt again.It should be noted that the top of support construction 2 can also with operating platform 1 it Between it is hinged, after adjusting the angle of operating platform 1, reinforce by wedge block hinged between support construction 2 and operating platform 1 Stability improves integrally-built rigidity.Correspondingly, several tops lift structures 3 and form two tops and lift units, two tops lift units respectively with One support group is fixedly connected.Same top lifts several tops act structure 3 in unit and forms a line, and its quantity is equal to coupled Support group in support construction 2 quantity.I.e. support construction 2 and top are lifted structure 3 and are corresponded.Each top lift 3 one end of structure with 2 bottom of support construction is fixedly connected, and the other end is fixedly connected with cushion cap 4.It should be noted that support construction 2 is also possible to directly Wall body or other supporters are equipped with one or more tops below each support construction 2 and lift structures 3.
Preferably, there are two cushion caps 4, two cushion caps 4 are arranged in parallel below operating platform 1.Two column groups are solid respectively Dingan County is loaded on a cushion cap 4, realizes and corresponds.It is equipped in the side on each cushion cap 4 towards ground and extends along its length Groove 41.Slide construction 5 is the roller group that several idler wheels are formed, and is contained in groove 41, and be slidably matched with guide rail 6.Accordingly , guide rail 6 has two, and each guide rail 6 is in I-shaped, and rail head is connected in groove 41 thereon.
It should be noted that cushion cap 4 or one across two guide rails 6 slab construction, at it towards the side on ground Equipped with two grooves 41 being parallel to each other, slide construction 5 is contained in groove 41, and is slidably matched with guide rail 6.
Preferably, supplementary structure 7 includes supporting leg 71 and fixed plate 72, and supporting leg 71 is adjustable height supporting leg, and one end and ground are solid Fixed connection, the other end are fixedly connected with fixed plate 72, fixed plate 72 and 2 bolt of support construction or are welded and fixed.Fixed plate 72 is Right angle triangle or right-angled trapezium plate, stabilized structure.For convenience of the height of adjustment supporting leg 71, can also supporting leg 71 and ground it Between jack is set.
Further, operation platform further includes the rear parados for being set to ground, which is located at 1 rear of operating platform, Away from push pipe direction.Several jack, the pushing tow direction of these jack and pushing tow are installed between rear parados and operating platform 1 The top power direction of equipment is consistent, the propulsive thrust generated when offsetting push pipe, enhances the stability of operating platform 1.
As can be seen from the above embodiments, the utility model lifts the top lifting height of structure 3 by adjusting top, can be to operation Platform 1 carries out the two-way adjustment of angle, height, meets various push pipe demands.Structure 3, which is lifted, when several tops jacks same height When, the height and position of operating platform 1 changes.When to lift 3 top lifting height of structure identical for the top that forms a line on same cushion cap 4, When 3 top lifting height difference of structure is lifted on top on different cushion caps 4, operating platform 1 is tilted to the direction of a certain cushion cap 4.Preferably, when When support construction 2 is column, the top lifting height that structure 3 is lifted on top on same cushion cap 4 sequentially changes, and operating platform 1 opposite can also be held The extending direction run-off the straight of platform 4.In addition, supplementary structure 7 connects ground and support construction 2, the bending resistance energy of support construction 2 is improved Power further increases the stability of operating platform 1.With the propulsion of engineering, slide construction 5 is slided along guide rail 6 to adjust operation The spatial position of platform 1, without platform is built in disassembly repeatedly again, to improve construction efficiency.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (9)

1. a kind of operation platform, which is characterized in that the operation platform includes that operating platform, several support constructions and several tops are lifted One end of structure, several support constructions is connected with the operating platform, and the other end is lifted structure by several tops and installed In ground;The operation platform further includes cushion cap, slide construction and guide rail, and structure is lifted by the top in the support construction bottom It is fixedly connected with the cushion cap, the cushion cap is equipped with the groove extended along its length, the cunning towards the ground side Dynamic structure is contained in the groove and is slidably matched with the guide rail, and the guide rail is fixedly installed in the ground.
2. operation platform according to claim 1, which is characterized in that several support constructions form two rows of support groups, Two rows of support group lower sections arranged in parallel in the operating platform;The support construction be column or upright wallboard, It is jack that structure is lifted on the top.
3. operation platform according to claim 1, which is characterized in that the cushion cap is arranged in a one-to-one correspondence with the guide rail, There are two the cushion caps, and the guide rail has two, and two guide rails are in I-shaped.
4. operation platform according to claim 1, which is characterized in that the guide rail has several, several guide rails it Between be parallel to each other, the cushion cap is a plate-like structure, and the cushion cap is equipped with several grooves, institute towards the ground side in parallel It states groove and the guide rail corresponds.
5. operation platform according to claim 3 or 4, which is characterized in that the slide construction is several idler wheels composition Roller unit.
6. operation platform according to claim 3, which is characterized in that the operation platform further includes supplementary structure, described Supplementary structure includes supporting leg and fixed plate, and described supporting leg one end is fixedly installed in the ground, and the other end passes through the fixed plate It is fixed with the support construction.
7. operation platform according to claim 6, which is characterized in that there are two the supplementary structures, is symmetrically arranged on institute Support construction two sides are stated, the supporting leg is adjustable height supporting leg, and the fixed plate longitudinal section is right angled triangle or right-angled trapezium.
8. operation platform according to claim 1, which is characterized in that the operation platform further includes being fixedly installed in ground Rear parados, several jack are installed between parados and the operating platform after described.
9. operation platform according to claim 1, which is characterized in that the operating platform and several support constructions it Between connected by adjustable split bolt.
CN201820443304.9U 2018-03-29 2018-03-29 Operation platform Expired - Fee Related CN208236423U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820443304.9U CN208236423U (en) 2018-03-29 2018-03-29 Operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820443304.9U CN208236423U (en) 2018-03-29 2018-03-29 Operation platform

Publications (1)

Publication Number Publication Date
CN208236423U true CN208236423U (en) 2018-12-14

Family

ID=64586559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820443304.9U Expired - Fee Related CN208236423U (en) 2018-03-29 2018-03-29 Operation platform

Country Status (1)

Country Link
CN (1) CN208236423U (en)

Similar Documents

Publication Publication Date Title
CN110552709B (en) Self-advancing type integral station passing method and device suitable for large-diameter shield machine
CN203855866U (en) Large-span frame bridge overhead roof with beams convenient to construct
CN201581899U (en) Hydraulic drive walking type motorized cart of tunnel construction trestle
CN109707430B (en) Temporary support equipment for tunnel excavation working face and use method
CN106193117B (en) A kind of assembling and construction method of the prefabricated pipe gallery in underground
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN203113352U (en) Pre-stressed beam for retaining and protection of foundation pit
CN106968687B (en) Closed type circular ring yielding support device and method for mining roadway of steep coal seam
CN113153355A (en) Construction method for down-penetrating tunnel forepoling curtain
CN213510645U (en) PBA secretly digs platform truck support template system that station side span was just propped up and is encircleed
CN208236423U (en) Operation platform
CN103967052B (en) A kind of method of protecting the new and old frame core-tube system substrate discrepancy in elevation soil body
CN103806374B (en) The overall track erection supplying system of assembly type steel bridge on highway and erection push technique
CN206538687U (en) Cable-stayed bridge end bay beam section construction system
CN106241234B (en) A kind of self-propelled transport assembly car for prefabricated pipe gallery
CN110080787B (en) Construction method for in-station stacked shield station-crossing structural type of underground excavation station
CN110565983B (en) Building jacking and shifting method
CN210660096U (en) Integral station-crossing device of shield tunneling machine
JP5187969B2 (en) Overhead viaduct construction equipment and construction method
CN107227966B (en) Temporary support device for tunnel excavation
CN215252409U (en) Be applied to support mound that T constructs bridge and demolishs
CN201330365Y (en) Bench formwork trolley for construction of two-course pavement structure in tunnel
CN209838445U (en) Tunnel preliminary bracing rapid construction trolley
CN203394541U (en) Flat-top steel mould trolley
CN204185873U (en) The only pile foundation structure of large-span arch bridge ultra-large type tilting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181214

Termination date: 20210329