CN208235437U - A kind of hydraulic engineering ecology support construction - Google Patents
A kind of hydraulic engineering ecology support construction Download PDFInfo
- Publication number
- CN208235437U CN208235437U CN201820395494.1U CN201820395494U CN208235437U CN 208235437 U CN208235437 U CN 208235437U CN 201820395494 U CN201820395494 U CN 201820395494U CN 208235437 U CN208235437 U CN 208235437U
- Authority
- CN
- China
- Prior art keywords
- block
- prefabricated board
- hydraulic engineering
- strut
- cement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of hydraulic engineering ecology support constructions, including matrix, prefabricated board is set on rear side of the lower section of described matrix, the bottom end of the prefabricated board is equipped with sole piece, the upper surface of the sole piece is equipped with link block, the top of the link block is embedded with reinforcing bar, and the inside of the prefabricated board is provided with inner cavity, and the inner wall center of the inner cavity is equipped with block.The hydraulic engineering ecology support construction, round block is configured by the inside in prefabricated board, and round block is fixed on block by kelly, the reinforcing bar on sole piece top effectively is fixed inside the through-hole of round block, it is also convenient to carrying out cement into the inside for being poured into prefabricated board simultaneously, and bar bending is avoided in casting cement, also increase the practicability and compactedness of contoured support structure after casting cement, installation strut is carried out on the top of cement plate simultaneously, sundries in effective hydraulic engineering is stopped, and is convenient to staff and is cleared up.
Description
Technical field
The utility model relates to hydraulic engineering ecology support construction technical field, specially a kind of hydraulic engineering ecology support
Structure.
Background technique
Currently, a kind of fundamental equipments of the hydraulic engineering ecology as socio-economic development, not only industrial and agricultural production,
Resident living and herding provide necessary production or domestic water, while can also play power generation, fishery cultivating, the functions such as flood control,
Such as application No. is 201720510672.6 patent, including matrix, the side of described matrix is provided with wall, the wall
Top is provided with water jet pump, and ecological base is provided at the top of the wall side, and the ecological base upper surface, which is provided with, to be covered
Cap rock, the ecological base are internally provided with anti-slip device, and the lower surface of the ecological base is fixedly connected with rock-soil layer,
The patent is unable to satisfy the compactedness for effectively when using hydraulic engineering support construction, increasing support construction and practical
Property, and when casting cement, cause inner steel bar to be bent, influence the compactedness of support construction, making for user is not achieved
Use demand.
Utility model content
The purpose of this utility model is to provide a kind of hydraulic engineering ecology support constructions, to solve in above-mentioned background technique
The problem of proposition.
To achieve the above object, the utility model provides the following technical solutions: a kind of hydraulic engineering ecology support construction, packet
Matrix is included, prefabricated board is set on rear side of the lower section of described matrix, the bottom end of the prefabricated board is equipped with sole piece, the upper table of the sole piece
Face is equipped with link block, and the top of the link block is embedded with reinforcing bar, and the inside of the prefabricated board is provided with inner cavity, the inner cavity
Inner wall center is equipped with block, and the top of the block is provided with card slot, and the top of the block is equipped with round block, the round block
Bottom end surrounding inserted link is installed, the inserted link is through card slot a part, and the inserted link, which is clamped by fixture block with card slot, to be connected, institute
The top for stating round block is provided with through-hole, and the reinforcing bar runs through through-hole, and the junction of described matrix and prefabricated board is equipped with sand stone layer and water
Mud layer, the sand stone layer and cement layer are fitted closely with matrix and prefabricated board respectively, and the top of described matrix is equipped with cement plate, institute
It states cement plate to fit closely with matrix, the top front and rear sides of the cement plate are mounted on baffle, the top of the cement plate
Left side is equipped with snap-gauge, and the right side of the snap-gauge is equipped with strut, and the strut is connected with cement plate.
Preferably, it is equipped with connecting rod above the right side of the strut, the connecting rod is weldingly connected with strut, the strut
Bottom end be welded with backstop, the backstop and connecting rod are integrally formed, and the outer wall of the strut is equipped with sliding slot, the sliding slot it is interior
Portion is equipped with sliding block, and the sliding block and sliding slot sliding are clamped, and cross bar, the bottom end installation of the cross bar are equipped on the left of the sliding block
There is bearing piece, the bottom end of the bearing piece is equipped with brush holder support.
Preferably, handle is installed on the left of the sliding block.
Preferably, the outer wall of the handle is socketed with grip.
Preferably, bar is installed on the right side of the top of the cement plate.
Compared with prior art, the utility model has the beneficial effects that the hydraulic engineering ecology support construction, by pre-
The inside of making sheet is configured round block, and round block is fixed on block by kelly, effectively make the reinforcing bar on sole piece top into
Row is fixed on inside the through-hole of round block, while being also convenient to carrying out cement into the inside for being poured into prefabricated board, and in casting cement
Avoid bar bending, also increase the practicability and compactedness of contoured support structure after casting cement, while in cement plate
Top carry out installation strut, the sundries in effective hydraulic engineering is stopped, be convenient to staff and clear up, meet
The use demand of user.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the sole piece top steel bar connecting structure schematic diagram of Fig. 1;
Fig. 3 is the prefabricated board schematic diagram of internal structure of Fig. 1;
Fig. 4 is the strut attachment structure schematic diagram of Fig. 1.
In figure: 1, cement plate, 2, baffle, 3, bar, 4, cement layer, 5, sole piece, 6, prefabricated board, 7, sand stone layer, 8, matrix,
9, snap-gauge, 10, strut, 11, inner cavity, 12, block, 13, inserted link, 14, through-hole, 15, round block, 16, card slot, 17, fixture block, 18, steel
Muscle, 19, link block, 20, sliding block, 21, connecting rod, 22, backstop, 23, sliding slot, 24, handle, 25, grip, 26, cross bar, 27, branch
Block, 28, brush holder support.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of hydraulic engineering ecology support construction, including
For fixing prefabricated board 6 prefabricated board 6 is arranged, prefabricated board 6 is for fixing sole piece 5, in advance in matrix 8, matrix 8 on rear side of the lower section of matrix 8
The bottom end of making sheet 6 is equipped with sole piece 5, and for sole piece 5 for being fixedly connected with block 19, the upper surface of sole piece 5 is equipped with link block 19, connection
Block 19 is used for fixed steel bars 18, and the top of link block 19 is embedded with reinforcing bar 18, and reinforcing bar 18 is used to stick into the inside of through-hole 14, prefabricated
The inside of plate 6 is provided with inner cavity 11, and the inner wall center of inner cavity 11 is equipped with block 12, and block 12 is for fixing prefabricated board 6
Inner wall, the top of block 12 are provided with card slot 16, and the top of block 12 is equipped with round block 15, and the bottom end surrounding of round block 15 is equipped with inserted link
13, inserted link 13 is used to stick into the inside of card slot 16, and round block 15 is fixed, and inserted link 13 is through 16 a part of card slot, inserted link 13
It is connected by fixture block 17 with the clamping of card slot 16, the top of round block 15 is provided with through-hole 14, and through-hole 14 is used for fixed steel bars 18, reinforcing bar 18
Through through-hole 14, the junction of matrix 8 and prefabricated board 6 is equipped with sand stone layer 7 and cement layer 4, and sand stone layer 7 and cement layer 4 are for filling out
It is embedded in the junction of matrix 8 Yu prefabricated board 6, sand stone layer 7 and cement layer 4 are fitted closely with matrix 8 and prefabricated board 6 respectively, matrix 8
For fixing cement plate 1, the top of matrix 8 is equipped with cement plate 1, is equipped with bar 3 on the right side of the top of cement plate 1, cement plate 1 with
Matrix 8 fits closely, and cement plate 1 is used for fixed baffle 2, and the top front and rear sides of cement plate 1 are mounted on baffle 2, cement plate 1
Top left hand snap-gauge 9 is installed, snap-gauge 9 is used to be fixed on left side one end of block 2, and the right side of snap-gauge 9 is equipped with strut 10, branch
Bar 10 is connected with cement plate 1, and strut 10 is used for fixed connecting rod 21, is equipped with connecting rod 21, connecting rod above the right side of strut 10
21 for fixing backstop 22, and connecting rod 21 is weldingly connected with strut 10, and the bottom end of strut 10 is welded with backstop 22, and backstop 22 is used for
Sundries is stopped, backstop 22 and connecting rod 21 are integrally formed, and the outer wall of strut 10 is equipped with sliding slot 23, and the inside of sliding slot 23 is set
There is sliding block 20, sliding block 20 in the inside of sliding slot 23 for being moved, and sliding block 20 and the sliding of sliding slot 23 are clamped, the left side of sliding block 20
Cross bar 26 is installed, cross bar 26 on sliding block 20 for being moved, and the bottom end of cross bar 26 is equipped with bearing piece 27, and bearing piece 27 is used for
Fixed brush holder support 28, the bottom end of bearing piece 27 are equipped with brush holder support 28, and brush holder support 28 is sliding for clearing up the sundries being infected on backstop 22
The left side of block 20 is equipped with handle 24, and handle 24 is used for band movable slider 20 and is moved, and the outer wall of handle 24 is socketed with grip 25.
When hydraulic engineering uses support construction, prefabricated board 6 is fixed on the top of sole piece 5 first, prefabricated
The inner wall of plate 6 carries out installation block 12, carries out opening up card slot 16 on the top of block 12, and round block 15 sticks into card by inserted link 13
Round block 15 is fixed in the inside of slot 16, then carries out opening up through-hole 14 on round block 15, effectively sticks into reinforcing bar 18 logical
The inside in hole 14 is convenient to be poured into cement the inside of prefabricated board 6, and the top of prefabricated board 6 is fixed with matrix 8, and body 8
The junction of prefabricated board 6 is provided with cement layer 4 and sand stone layer 7, the effective compactedness for increasing hydraulic engineering support construction, together
When be also effectively convenient to carry out casting cement to the inside of prefabricated board 6, occur the bending of reinforcing bar 18, shadow when reducing casting cement
Then the compactedness of Xiangshui County's benefit ergonomic support structure carries out installation strut 10 on the top of cement plate 1, effectively to hydraulic engineering
On sundries stopped, be convenient to staff and clear up.
In the description of the present invention, it should be understood that term " coaxial ", " bottom ", " one end ", " top ",
The orientation or position of the instructions such as " middle part ", " other end ", "upper", " side ", " top ", "inner", " front ", " center ", " both ends "
Setting relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description, and
It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore
It should not be understood as limiting the present invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ",
The terms such as " fixation ", " being screwed on " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or at one
Body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, can also indirectly connected through an intermediary, it can
To be the interaction relationship of connection or two elements inside two elements, unless otherwise restricted clearly, for this field
Those of ordinary skill for, can understand the concrete meaning of above-mentioned term in the present invention as the case may be.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of hydraulic engineering ecology support construction, including matrix (8), it is characterised in that: set on rear side of the lower section of described matrix (8)
It sets prefabricated board (6), the bottom end of the prefabricated board (6) is equipped with sole piece (5), and the upper surface of the sole piece (5) is equipped with link block
(19), the top of the link block (19) is embedded with reinforcing bar (18), and the inside of the prefabricated board (6) is provided with inner cavity (11), described
The inner wall center of inner cavity (11) is equipped with block (12), and the top of the block (12) is provided with card slot (16), the block
(12) top is equipped with round block (15), and the bottom end surrounding of the round block (15) is equipped with inserted link (13), and the inserted link (13) is run through
Card slot (16) a part, the inserted link (13) are connected by fixture block (17) with card slot (16) clamping, the top of the round block (15)
It is provided with through-hole (14), the reinforcing bar (18) runs through through-hole (14), and the junction of described matrix (8) and prefabricated board (6) is equipped with sandstone
Layer (7) and cement layer (4), the sand stone layer (7) and cement layer (4) are fitted closely with matrix (8) and prefabricated board (6) respectively, institute
The top for stating matrix (8) is equipped with cement plate (1), and the cement plate (1) fits closely with matrix (8), the top of the cement plate (1)
End front and rear sides are mounted on baffle (2), and the top left hand of the cement plate (1) is equipped with snap-gauge (9), the snap-gauge (9)
Right side is equipped with strut (10), and the strut (10) is connected with cement plate (1).
2. a kind of hydraulic engineering ecology support construction according to claim 1, it is characterised in that: the right side of the strut (10)
Upper side is equipped with connecting rod (21), and the connecting rod (21) is weldingly connected with strut (10), the bottom end welding of the strut (10)
Have backstop (22), the backstop (22) and connecting rod (21) are integrally formed, and the outer wall of the strut (10) is equipped with sliding slot (23), institute
The inside for stating sliding slot (23) is equipped with sliding block (20), and the sliding block (20) and sliding slot (23) sliding are clamped, a left side for the sliding block (20)
Side is equipped with cross bar (26), and the bottom end of the cross bar (26) is equipped with bearing piece (27), and the bottom end of the bearing piece (27) is equipped with brush
Bar (28).
3. a kind of hydraulic engineering ecology support construction according to claim 2, it is characterised in that: a left side for the sliding block (20)
Side is equipped with handle (24).
4. a kind of hydraulic engineering ecology support construction according to claim 3, it is characterised in that: outside the handle (24)
Wall is socketed with grip (25).
5. a kind of hydraulic engineering ecology support construction according to claim 1, it is characterised in that: the cement plate (1)
Bar (3) are installed on the right side of top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820395494.1U CN208235437U (en) | 2018-03-22 | 2018-03-22 | A kind of hydraulic engineering ecology support construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820395494.1U CN208235437U (en) | 2018-03-22 | 2018-03-22 | A kind of hydraulic engineering ecology support construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208235437U true CN208235437U (en) | 2018-12-14 |
Family
ID=64589017
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820395494.1U Expired - Fee Related CN208235437U (en) | 2018-03-22 | 2018-03-22 | A kind of hydraulic engineering ecology support construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208235437U (en) |
-
2018
- 2018-03-22 CN CN201820395494.1U patent/CN208235437U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208235437U (en) | A kind of hydraulic engineering ecology support construction | |
CN208155621U (en) | A kind of agricultural soil property sampling apparatus | |
CN206030216U (en) | Taut positioner of steel wire cage in pole mould | |
CN207419850U (en) | A kind of prefabricated building structure column | |
CN204343348U (en) | A kind of spade for building | |
CN107044132A (en) | A kind of construction method of quake-resistant safety ground | |
CN209620307U (en) | A kind of Combined high-strength wall body structure | |
CN207582847U (en) | A kind of facing attachment for building | |
CN201288419Y (en) | Internal stay casing tube for concrete wall thickness support | |
CN201835521U (en) | Template for concrete casting wall | |
CN206034734U (en) | Novel building hollow brick and adopt wall body that this hollow brick made | |
CN203175002U (en) | Integrated plastering plate | |
CN205134729U (en) | Novel i -shaped steel | |
CN205552981U (en) | Damping rubber support combination die | |
CN209806344U (en) | Garden maintenance tool | |
CN206245777U (en) | A kind of supporting construction for building | |
CN206635838U (en) | The husky shovel of one kind building | |
CN214785260U (en) | Building block for hydraulic engineering | |
CN210396050U (en) | Standing terrace construction push broach, trowel or rake and special bracket thereof | |
CN211240690U (en) | Sawtooth spade | |
CN208294446U (en) | Novel rammer bar | |
CN212562561U (en) | Pay-off for building engineering | |
CN218310546U (en) | Auxiliary foundation bottom plate quincuncial rib bending tool | |
CN218862139U (en) | Elongated concrete finishing trowel | |
CN208777722U (en) | A kind of aluminum alloy mould plate pull-tab removal tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181214 |
|
CF01 | Termination of patent right due to non-payment of annual fee |