CN208232055U - The whole pre- bundle mould of the movable prefabricated T beam steel that can be shared - Google Patents

The whole pre- bundle mould of the movable prefabricated T beam steel that can be shared Download PDF

Info

Publication number
CN208232055U
CN208232055U CN201721814391.6U CN201721814391U CN208232055U CN 208232055 U CN208232055 U CN 208232055U CN 201721814391 U CN201721814391 U CN 201721814391U CN 208232055 U CN208232055 U CN 208232055U
Authority
CN
China
Prior art keywords
mould
advance
bundle
interconnecting piece
shared
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721814391.6U
Other languages
Chinese (zh)
Inventor
孙运全
廖维贵
王辉
宋柏瑜
汪鸿
袁诗涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinyun Emgineering Co Ltd of China Railway No 2 Engineering Group Co Ltd
Original Assignee
Xinyun Emgineering Co Ltd of China Railway No 2 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinyun Emgineering Co Ltd of China Railway No 2 Engineering Group Co Ltd filed Critical Xinyun Emgineering Co Ltd of China Railway No 2 Engineering Group Co Ltd
Priority to CN201721814391.6U priority Critical patent/CN208232055U/en
Application granted granted Critical
Publication of CN208232055U publication Critical patent/CN208232055U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the whole pre- bundle moulds of movable prefabricated T beam steel that one kind can share, including prick mould in advance, and walking mechanism is installed in pre- mould bottom of pricking, and pre- bundle mould can be moved to outside canopy by walking mechanism from reinforcing steel processing shed.

Description

The whole pre- bundle mould of the movable prefabricated T beam steel that can be shared
Technical field
The utility model relates to box girder technical field, especially a kind of movable prefabricated T beam steel that can be shared is whole Body pricks mould in advance.
Background technique
With the development of the beam prefabricated technique of railroad bridge engineering T, and raising of the country to the beam prefabricated quality requirement of T, mesh During preceding T is beam prefabricated, the binding of beam body reinforcing bar is carried out on bundle mould in advance.Existing pre- bundle mould uses fixed arrangement, General outdoor layout is set in reinforcing steel processing shed.If outdoor layout, inevitably, construction personnel will be in rainy day or daylight It constructs under strong state of weather, neither can guarantee construction quality, and be unsatisfactory for occupational health requirement.Therefore, to prevent from constructing Personnel are caught in the rain in reinforcing bar process of binding or solarization, will prick mould in advance and be arranged in reinforcing steel processing shed, construction personnel is in reinforcing bar Reinforcing bar binding work is carried out in machining shed, then transfers the pre- reinforcing bar pricked and completed, this kind of mode by hanging devices such as gantry cranes Can ground guarantee all weather operations of reinforcing bar binding construction, but transferred since gantry crane needs to enter in reinforcing steel processing shed Operation, the effective height and width of reinforcing steel processing shed, which must satisfy gantry crane, can enter safely the requirement of machining shed, gantry crane Size must be strictly corresponding with effective headroom of reinforcing steel processing shed, versatility is lower.
In addition, T beam beam type produced for part beam making field is more, the beam body reinforcing bar type that need to be bound is more, to protect Demonstrate,proving every kind of beam type has enough pre- bundle moulds to meet the requirement of construction speed, and a variety of pre- bundle tires need to be arranged at the construction field (site) Tool, take up an area it is more, be unfavorable for beam body integral layout, increase the land used quantity of reinforcing steel processing shed, cause to face build and the pre- mutual aid system devised for poor peasants dress Investment it is larger.Simultaneously as pricking in advance, mould is more, and institute's Precast T-Beam type does not ensure that each pre- bundle mould can connect Continuous to use, part pre- bundle mould standby time is more, and the pre- utilization rate for pricking mould is low, is not able to satisfy wanting for engineering construction economy It asks.
Utility model content
The movable prefabricated T beam steel that can be shared the technical problem to be solved by the utility model is to provide one kind is integrally pre- Mould is pricked, pre- mould of pricking is able to carry out independent ambulation, and can be applicable in the box girder of different beam type.
The technical scheme adopted by the utility model is the whole pre- bundle mould of the movable prefabricated T beam steel that can be shared, packet Pre- bundle mould is included, walking mechanism is installed in pre- mould bottom of pricking, and pre- bundle mould can be moved to by walking mechanism from reinforcing steel processing shed Outside canopy.
Further, the interconnecting piece being provided on mould for connecting different beam type reinforcing bars is pricked in advance, which can enclose Axis around interconnecting piece rotates, and being provided with the limit card slot gluten for fixing different beam type reinforcing bars, to prick mould gluten in advance pre- Mould is pricked, by rotating junction, the pre- interconnecting piece for pricking mould can be matched connection with pre- beam type reinforcing bar of pricking is needed.
Further, walking mechanism includes guide rail, traveling wheel, wheel shaft, and traveling wheel is mounted on wheel shaft, and gluten pricks mould in advance It is fixed on wheel shaft, traveling wheel can walk about along guide rail, and guide rail is fixed on terrace, ensure that pre- bundle mould gluten pricks mould energy in advance Enough independent ambulations.
Further, bundle mould, interconnecting piece gluten are pricked between mould in advance using pin connection in advance, prick mould company in advance convenient for gluten The conversion of socket part different model reinforcing bar limit card slot.
The beneficial effects of the utility model are:
1, in advance prick mould can independent ambulation, the reinforcing bar pricked in advance in reinforcing steel processing shed can be moved to outside canopy, be realized Reinforcing bar binding is constructed in canopy, not by it is various it is boisterous influence, avoid construction personnel drench with rain, solarization, while also reducing Gantry crane with the size of reinforcing steel processing shed matches requirement.
2, it can be applicable in the box girder of a variety of different beam type, reduce the pre- configuration quantity for pricking frame, to save steel Material and construction land tenure, save cost, improve economic benefit.
3, the connection conversion that gluten pricks mould difference beam type reinforcing bar in advance simply, fast, improves construction efficiency.
Detailed description of the invention
Fig. 1 is that main reinforcement pricks the sectional view after mould installation interconnecting piece in advance.
Fig. 2 is that gluten pricks the sectional view after mould installation interconnecting piece in advance.
Fig. 3 is sectional side view when interconnecting piece uses an angle steel.
Fig. 4 is that gluten pricks the main view after mould installation interconnecting piece in advance.
Fig. 5 is that main reinforcement pricks the main view after mould installation interconnecting piece in advance.
In the figure, it is marked as 1- main reinforcement pricks mould in advance, 2- traveling wheel, 3- wheel shaft, 4- guide rail, 5- interconnecting piece, 6- gluten pricks in advance Mould, 7- limit card slot, 8- angle steel, 9- shaft.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and examples.
Embodiment 1:
As shown in figure 1, figure 2, figure 3, figure 4 and figure 5, the movable prefabricated T beam steel shared of the utility model is integrally pre- Mould is pricked, including pricks mould in advance, existing pre- bundle mould includes that main reinforcement pricks mould 1, gluten in advance and pricks mould 6 in advance, i.e., existing Main reinforcement pricks the bottom connection wheel shaft 3 that mould 1, gluten prick mould 6 in advance in advance, and traveling wheel 2, walking are installed by bearing in 3 both ends of wheel shaft Wheel 2 can walk along guide rail 4, be used as guide rail 4 using the rail of 24kg/m, when construction by the straight rail embedment of LFM signal In the concrete of level ground, only expose terraces for the 2 to 3cm of rail surface, can guarantee to walk line in use process indeformable, can also protect Card construction equipment can smoothly enter into box girder area and hoisting area;Traveling wheel 2 uses iron idler wheel, can effectively reduce travelling wheel Frictional resistance reduces frictional force, and reduction construction personnel carries out the pre- intensity for pricking mould, after the completion of reinforcing bar is bound on bundle mould in advance, Reinforcing bar and pre- mould gross weight of pricking reach 5000kg, only can easily be pushed by 3 to 4 people, being not required to setting electrical equipment etc., other are dynamic Power device, convenience for construction are higher.
Main reinforcement pricks mould 1, gluten in advance and pricks the main body frame of mould 6 in advance using [channel steel of 160*65*8.5 and < 45*45*6 Angle steel 8 make, ensure that the pre- overall stiffness for pricking mould meets and do not sent out in the case where bearing self weight and the load situations such as reinforcing bar weight Change shape, while ensure that the deformation such as be not distorted during implementation, it is ensured that construction quality and safety.The utility model The pre- interconnecting piece 5 for pricking mould, is made of multiple angle steel 8, pre- as needed for the difference of different beam type steel-bar arrangements position The beam type quantity of bundle the limit card slot 7 of different beam type is arranged on the side of required amount of angle steel 8, the both sides of each angle steel 8 The limit card slot 7 of different beam type can be respectively set, angle steel 8 each in this way can be used for two distinct types of box girder, then The welded corner joint of multiple angle steel 8 is formed into interconnecting piece 5 in the same shaft 9, makes multiple identical interconnecting pieces 5, then again will Shaft 9 is installed to main reinforcement by bearing and pricks the corresponding position that mould 1, gluten prick the main body frame of mould 6 in advance in advance, in angle steel 8 Position corresponding with main body frame is provided with location hole on side.When assembling reinforcement, according to the beam type reinforcing bar of required binding, select respectively Corresponding reinforcing bar limit card slot 7 is taken, then angle steel 8 and main body frame are fixed using pin, corresponding beam type can be carried out Reinforcing bar binding construction pulls up pin if you need to bind the reinforcing bar of other beam type, and rotating shaft 9 will after going to the side of required angle steel 8 Limit card slot 7 on reinforcing bar and the angle steel 8 is fixed.Main reinforcement prick in advance mould 1 angle steel 8 and main body frame it is fixed after as Fig. 1, Shown in Fig. 5, gluten prick in advance mould 6 angle steel 8 and main body frame it is fixed after as shown in Figure 2, Figure 4 shows.

Claims (3)

1. the whole pre- bundle mould of the movable prefabricated T beam steel that can be shared, including mould is pricked in advance, it is characterised in that: mould is pricked in advance Walking mechanism is installed in bottom, pre- to prick the interconnecting piece (5) being provided on mould for connecting different beam type reinforcing bars, the interconnecting piece (5) It can be rotated around the axis of interconnecting piece (5), be provided with the limit card slot (7) for fixing different beam type reinforcing bars, pass through The pre- interconnecting piece for pricking mould can be matched connection with pre- beam type reinforcing bar of pricking is needed by rotating junction.
2. the whole pre- bundle mould of the movable prefabricated T beam steel that can be shared as described in claim 1, it is characterised in that: walking Mechanism includes guide rail (4), traveling wheel (2), wheel shaft (3), and traveling wheel (2) is mounted on wheel shaft (3), and pre- mould of pricking is fixed on wheel shaft (3) on, traveling wheel (2) can walk along guide rail (4), and guide rail (4) is fixed on terrace.
3. the whole pre- bundle mould of the movable prefabricated T beam steel that can be shared as claimed in claim 1 or 2, it is characterised in that: pre- It pricks and uses pin connection between mould, interconnecting piece (5).
CN201721814391.6U 2017-12-22 2017-12-22 The whole pre- bundle mould of the movable prefabricated T beam steel that can be shared Expired - Fee Related CN208232055U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721814391.6U CN208232055U (en) 2017-12-22 2017-12-22 The whole pre- bundle mould of the movable prefabricated T beam steel that can be shared

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721814391.6U CN208232055U (en) 2017-12-22 2017-12-22 The whole pre- bundle mould of the movable prefabricated T beam steel that can be shared

Publications (1)

Publication Number Publication Date
CN208232055U true CN208232055U (en) 2018-12-14

Family

ID=64578080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721814391.6U Expired - Fee Related CN208232055U (en) 2017-12-22 2017-12-22 The whole pre- bundle mould of the movable prefabricated T beam steel that can be shared

Country Status (1)

Country Link
CN (1) CN208232055U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110315637A (en) * 2019-04-01 2019-10-11 中铁大桥局集团有限公司 A kind of mobile steel moulding bed and preparation method thereof for making framework of steel reinforcement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110315637A (en) * 2019-04-01 2019-10-11 中铁大桥局集团有限公司 A kind of mobile steel moulding bed and preparation method thereof for making framework of steel reinforcement

Similar Documents

Publication Publication Date Title
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN203834739U (en) End steel board connection, positioning and assembly type shear wall structure
CN104727227B (en) A kind of whole segmental erection method of uncovered lattice girder steel of half-through steel box tied arch bridge
CN208380592U (en) On the contignation across existing proximity tunnel
CN109610509A (en) A kind of the adjustable die system and construction method of pipe gallery automatic control section
CN208232055U (en) The whole pre- bundle mould of the movable prefabricated T beam steel that can be shared
CN208415013U (en) track fast dismounting device
CN209603182U (en) A kind of adjustable die system of pipe gallery automatic control section
CN206986644U (en) A kind of tunnel track simply removes device
CN208684247U (en) A kind of prefabricated subsection hanging apparatus
CN201152176Y (en) Existed electrified railroad tunnel lengthened section structure
CN204873485U (en) River course is bridge crane usefulness walking portal frame for pier
CN214456325U (en) Gantry crane beam lifting machine with high legs and low legs
CN201932887U (en) Crawler-typed moving lifting platform special for greenhouse
CN212583040U (en) Prefabricated concrete pi-shaped beam for railway passenger station fabricated concrete canopy
CN209685126U (en) A kind of steel vestibule integrally promotes lifting lug device
CN208792167U (en) The moving cantilever type Bridge Erector of full precast pier, cushion cap and beam body prefabricated construction
CN204023368U (en) The rolling device of groove is formed for backroad construction
CN210214575U (en) Portal crane walking turns to device
CN202508770U (en) Front portion anchoring device used for climbing crane
CN207538439U (en) A kind of stable type operating platform
CN208594493U (en) A kind of bridge floor widened structure
CN201857575U (en) Longitudinal and transverse movement conversion mechanism of bridge girder erection machine
CN205315010U (en) Be used for big section push pipe side direction to open big entrance to a cave type section of jurisdiction structure
CN111502119A (en) Prefabricated concrete pi-shaped beam for railway passenger station fabricated concrete canopy

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181214

Termination date: 20211222