CN208220823U - Suspension device is used in a kind of mining - Google Patents

Suspension device is used in a kind of mining Download PDF

Info

Publication number
CN208220823U
CN208220823U CN201820735883.4U CN201820735883U CN208220823U CN 208220823 U CN208220823 U CN 208220823U CN 201820735883 U CN201820735883 U CN 201820735883U CN 208220823 U CN208220823 U CN 208220823U
Authority
CN
China
Prior art keywords
suspension device
bracket
shaped steel
supporting table
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820735883.4U
Other languages
Chinese (zh)
Inventor
冯松
周权
佘慧娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Nonferrous Metals Vocational and Technical College
Original Assignee
Hunan Nonferrous Metals Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Nonferrous Metals Vocational and Technical College filed Critical Hunan Nonferrous Metals Vocational and Technical College
Priority to CN201820735883.4U priority Critical patent/CN208220823U/en
Application granted granted Critical
Publication of CN208220823U publication Critical patent/CN208220823U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

This patent is related to technical field of mine support, more particularly to a kind of mining suspension device, including U-bracket and supporting table, U-bracket bottom end is fixed in supporting table, U-bracket includes the anchor net that upper layer is arranged in and the U-shaped steel pipe that lower layer is arranged in, and is provided with elastic rubber layer between anchor net and U-shaped steel pipe.By the way that the bracket of three-decker is arranged, the buffer function of good stress can be played, the stability of country rock can be maintained very well, bracket can be prevented by stress rupture.Elastic block rubber in supporting table has buffer function; stress between the timely cushioning supportive platform of energy and U-shaped steel; internal rubber grain concrete can use the big characteristic of its springback capacity and timely discharge crustal stress, can effectively prevent the destruction of top rigid member, extends the service life of device.

Description

Suspension device is used in a kind of mining
Technical field
This patent is related to technical field of mine support, and in particular to suspension device is used in a kind of mining.
Background technique
With the development of colliery industry, development that Roadway Support Technology is advanced by leaps and bounds.Occur in the prior art as The some supports modes such as bolt-mesh-spurting supporting, bolt-mesh-anchor support, U-shaped steel canopy supporting, wherein U type steel shed support is superior by its Supporting performance, country rock it is soft, press in biggish roadway and be widely applied.
However in use, U-shaped steel canopy suspension device in the prior art has the disadvantages that (1) U-shaped steel category In rigid structural, not to the buffer capacity of stress, the stability of country rock cannot be maintained very well;(2) it is used to support the branch of U-shaped steel There is no buffer gear between support platform, with U-shaped steel, crustal stress cannot be discharged in time, support system is be easy to cause to damage, shortening it makes Use the service life.
Utility model content
To solve above-mentioned problems of the prior art, this patent discloses a kind of mining suspension device, specific skills Art scheme is as follows:
A kind of mining suspension device characterized by comprising U-bracket and supporting table, the U shape bracket bottom end are solid It is scheduled in supporting table, the U-bracket includes the anchor net that upper layer is arranged in and the U-shaped steel pipe that lower layer is arranged in, the anchor net and U Be provided with elastic rubber layer between shape steel pipe, the anchor net on upper layer has certain buffer capacity, can buffer suspension device by Stress, the U-shaped steel pipe of lower layer belongs to rigid structure, can play preferable support action, and intermediate elastic rubber layer can buffer The stress that suspension device is subject to plays a protective role to the steel pipe of lower layer, prevents steel pipe from being destroyed.By the way that three-decker is arranged Bracket, the buffer function of good stress can be played, the stability of country rock can be maintained very well, bracket can be prevented by stress It destroys, the service life of extending bracket.It is filled with carbon fiber reinforced concrete in the U-shaped steel pipe, steel pipe resistance can be significantly increased and enclosed The rigid nature of rock pressure power.
Elastic block rubber is provided in the supporting table, the elastic block rubber is arranged in U-bracket bottom end, the support Rubber grain concrete is filled in platform.Elastic block rubber in supporting table has buffer function, can timely cushioning supportive platform and U Stress between fashioned iron, internal rubber grain concrete can use the big characteristic of its springback capacity and timely discharge crustal stress, The destruction that can effectively prevent top rigid member extends the service life of device.
Preferably, the U-bracket bottom end and supporting table junction are provided with early warning scale.Using early warning scale can and When observe the deflection in tunnel, timely analyze the stability in tunnel.
Preferably, the anchor net is woven by wire and high strength fibre.While proof strength, and have good Good elasticity, can play better buffer function.
Preferably, be additionally provided with anchor pole, be provided with fixation hole on the elastic rubber layer, the anchor pole pass through anchor net and Anchor net and elastic rubber layer are fixed on palisades by elastic rubber layer.Fixed effect is more preferable, and structure is more stable.
Preferably, being provided with helical blade on the anchor pole, gathers on the helical blade and is provided with sawtooth projection, Contact area and frictional resistance are increased, anchor force is enhanced, the helical blade outer surface is covered with corrosion-inhibiting coating, dislikes in environment Bad ground can effective protection anchor pole be corroded.
Preferably, being provided with supporting plate and nut on the anchor pole, it is provided with spring between the supporting plate and nut, is passed through Tightening nut can be pressed on the supporting plate on elastic rubber layer.Nut is when in end state is screwed, by spring by institute It states Supporting plate for anchor to be pressed on the palisades of anchor pole insertion, can use the spring that yield strength is equal to required pretightning force, in spring Determine that pretightning force at this time is enough, can intuitively examine the pretightning force of anchor pole whether enough, Jin Ergeng when compressing completely Add easily installation anchor pole.
Preferably, being horizontally arranged with supporting beam on the U-shaped steel pipe.Lateral support action can be played to U-shaped steel pipe, made Entire support system structure more stable strong.
It can be seen that mining described in the utility model passes through the bracket of setting three-decker, Ke Yiqi with suspension device To the buffer function of good stress, the stability of country rock can be maintained very well, bracket can be prevented by stress rupture.And supporting table Interior elastic block rubber has buffer function, and the stress between cushioning supportive platform and U-shaped steel, internal rubber grain are mixed in time for energy Solidifying soil can use the big characteristic of its springback capacity and timely discharge crustal stress, can effectively prevent the broken of top rigid member It is bad, extend the service life of device.It has substantive features and progress compared with prior art, the beneficial effect implemented is also Obviously.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of this patent embodiment 1;
Fig. 2 is the structural schematic diagram of this patent embodiment 2;
Fig. 3 is the structural schematic diagram of anchor pole described in this patent embodiment 2.
In figure, 1: supporting table, 2: anchor net, 3:U shape steel pipe, 4: elastic rubber layer, 5: elastic block rubber, 6: anchor pole, 7: spiral shell Vane piece, 8: sawtooth projection, 9: supporting plate, 10: nut, 11: spring, 12: supporting beam, 13: anti-skid stud.
Specific embodiment
The technical solution of the utility model is further elaborated with below with reference to embodiment, and in conjunction with attached drawing.
Embodiment 1
As shown in Figure 1, a kind of mining suspension device characterized by comprising U-bracket and supporting table 1, the U Shape bracket bottom end is fixed in supporting table 1, and the U-bracket includes the anchor net 2 that upper layer is arranged in and the U-shaped that lower layer is arranged in Steel pipe 3 is provided with elastic rubber layer 4, mixes in the U-shaped steel pipe 3 filled with carbon fiber between the anchor net 2 and U-shaped steel pipe 3 It is solidifying native, elastic block rubber 5 is provided in the supporting table 1, the elastic block rubber 5 is arranged in U-bracket bottom end, the branch It supports and is filled with rubber grain concrete in platform 1.
The carbon fiber reinforced concrete is C30 concrete and adds a certain amount of carbon fiber.The rubber grain concrete is The mixture of C35 concrete and rubber grain.The seamless steel pipe of DN- Ф 150mmx3.0mm can be used in the U-shaped steel pipe.
Embodiment 2
As shown in Fig. 2, a kind of mining suspension device characterized by comprising U-bracket and supporting table 1, the U Shape bracket bottom end is fixed in supporting table 1, and the U-bracket includes the anchor net 2 that upper layer is arranged in and the U-shaped that lower layer is arranged in Steel pipe 3 is provided with elastic rubber layer 4, mixes in the U-shaped steel pipe 3 filled with carbon fiber between the anchor net 2 and U-shaped steel pipe 3 It is solidifying native, elastic block rubber 5 is provided in the supporting table 1, the elastic block rubber 5 is arranged in U-bracket bottom end, the branch It supports and is filled with rubber grain concrete in platform 1.It is additionally provided with anchor pole 6, is provided with fixation hole on the elastic rubber layer 4, it is described Anchor pole 6 passes through anchor net 2 and elastic rubber layer 4, and anchor net 2 and elastic rubber layer 4 are fixed on palisades.On the U-shaped steel pipe 3 It is horizontally arranged with supporting beam 12, lateral support action can be played to U-shaped steel pipe, makes the entire more stable heavily fortified point of support system structure Gu.The U-bracket bottom end and 1 junction of supporting table are provided with early warning scale, can observe tunnel in time using early warning scale Deflection, timely analyze tunnel stability.The anchor net 2 is woven by wire and high strength fibre, the height Strength is glass fibre, basalt fibre or carbon fiber.
As shown in figure 3, being provided with helical blade 7 on the anchor pole 6, gathers on the helical blade 7 and be provided with zigzag Protrusion 8,7 outer surface of helical blade is covered with corrosion-inhibiting coating.Supporting plate 9 and nut 10, the supporting plate are provided on the anchor pole 6 It is provided with spring 11 between 9 and nut 10, the supporting plate 11 can be pressed on elastic rubber layer 4 by tightening nut 10.Institute It states nut 10 and is additionally provided with anti-skid stud 13 close to the side of the anchor bar body end.

Claims (7)

1. a kind of mining suspension device characterized by comprising U-bracket and supporting table (1), the U-bracket bottom end are solid It is scheduled in supporting table (1), the U-bracket includes the anchor net (2) that upper layer is arranged in and the U-shaped steel pipe (3) that lower layer is arranged in, institute It states and is provided between anchor net (2) and U-shaped steel pipe (3) elastic rubber layer (4), carbon fiber coagulation is filled in the U-shaped steel pipe (3) Soil is provided with elastic block rubber (5) in the supporting table (1), and elastic block rubber (5) setting is described in U-bracket bottom end Rubber grain concrete is filled in supporting table (1).
2. mining suspension device according to claim 1, which is characterized in that the U-bracket bottom end and supporting table (1) Junction is provided with early warning scale.
3. mining suspension device according to claim 1, which is characterized in that the anchor net (2) is by wire and high-strength Degree fibrage forms.
4. mining suspension device according to claim 1, which is characterized in that be additionally provided with anchor pole (6), the elasticity rubber Fixation hole is provided on glue-line (4), the anchor pole (6) passes through anchor net (2) and elastic rubber layer (4), by anchor net (2) and elastic rubber Glue-line (4) is fixed on palisades.
5. mining suspension device according to claim 4, which is characterized in that be provided with helical-blade on the anchor pole (6) Piece (7) gathers on the helical blade (7) and is provided with sawtooth projection (8), and helical blade (7) outer surface is covered with anti-corrosion Coating.
6. mining suspension device according to claim 5, which is characterized in that be provided with supporting plate (9) on the anchor pole (6) With nut (10), spring (11) are provided between the supporting plate (9) and nut (10), it can be by the support by tightening nut (10) Plate (9) is pressed on elastic rubber layer (4).
7. -6 any mining suspension device according to claim 1, which is characterized in that on the U-shaped steel pipe (3) laterally It is provided with supporting beam (12).
CN201820735883.4U 2018-05-17 2018-05-17 Suspension device is used in a kind of mining Expired - Fee Related CN208220823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820735883.4U CN208220823U (en) 2018-05-17 2018-05-17 Suspension device is used in a kind of mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820735883.4U CN208220823U (en) 2018-05-17 2018-05-17 Suspension device is used in a kind of mining

Publications (1)

Publication Number Publication Date
CN208220823U true CN208220823U (en) 2018-12-11

Family

ID=64508517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820735883.4U Expired - Fee Related CN208220823U (en) 2018-05-17 2018-05-17 Suspension device is used in a kind of mining

Country Status (1)

Country Link
CN (1) CN208220823U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111022087A (en) * 2019-12-18 2020-04-17 山东科技大学 Post-frame yielding method and device for U-shaped steel support

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111022087A (en) * 2019-12-18 2020-04-17 山东科技大学 Post-frame yielding method and device for U-shaped steel support
CN111022087B (en) * 2019-12-18 2021-03-23 山东科技大学 Post-frame yielding method and device for U-shaped steel support

Similar Documents

Publication Publication Date Title
CN208220823U (en) Suspension device is used in a kind of mining
CN201620902U (en) Plastic expansion-shell-type air bag anchor bolt
CN107988893A (en) The anti-fall girder construction of ball buffering energy-absorbing Antivibration block is leaned in a kind of direction across bridge taper
CN205024701U (en) Adopt initiative protection network of ring
CN206015890U (en) A kind of pneumatic membrane building water bag anchor and pneumatic membrane building
CN106150526B (en) A kind of roadway support device
CN207904861U (en) The anti-tide side slope of hydraulic engineering elasticity
CN207700034U (en) A kind of direction across bridge taper leans on the anti-fall girder construction of ball buffering energy-absorbing Antivibration block
CN207829203U (en) A kind of assembled architecture energy consumption antidetonation component
CN107345454B (en) A kind of building aseismicity ball being mixed in concrete
CN102518460A (en) Preserved anchorage method for prevention and control of rockburst
CN205135648U (en) Rib wall caving anchor
CN107448223A (en) Underground coal mine rectangular shaped roadways branch protecting assembly
CN203856489U (en) Combined energy-releasing anchor rod having characteristics of resilient yielding and large damping
CN207567972U (en) A kind of skyscraper interior wall self-dewatering type steel construction
CN110016937A (en) A kind of prefabricated pipe gallery damping waterproof system
CN2839560Y (en) The coupling integrated device of cable bolting and shed ding support
CN208803461U (en) A kind of building road built pile
CN209636731U (en) A kind of hydraulic engineering slope protection support device
CN206554962U (en) One kind hands over arcuately pressure-relieving achor bar pallet
CN106522639A (en) Oblique-body iron tower for high-voltage power transmission
CN209443477U (en) A kind of staged slope retaining structure
CN208534517U (en) A kind of combined anchor anchor cable support apparatus
CN207944553U (en) The unbonded prestressed reinforced concrete frame to be consumed energy using anchorage bearing
CN208072246U (en) A kind of elasticity energy dissipating tunnel shed hole structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181211

Termination date: 20210517

CF01 Termination of patent right due to non-payment of annual fee