CN208220024U - A kind of automatic snow venting of dust explosion roof system - Google Patents

A kind of automatic snow venting of dust explosion roof system Download PDF

Info

Publication number
CN208220024U
CN208220024U CN201820312441.9U CN201820312441U CN208220024U CN 208220024 U CN208220024 U CN 208220024U CN 201820312441 U CN201820312441 U CN 201820312441U CN 208220024 U CN208220024 U CN 208220024U
Authority
CN
China
Prior art keywords
venting
dust explosion
roof system
profiled sheet
automatic snow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820312441.9U
Other languages
Chinese (zh)
Inventor
朱伟
韦广兵
韦建树
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu juege Industry Group Co.,Ltd.
Original Assignee
JIANGSU DRAGON INDUSTRIES EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU DRAGON INDUSTRIES EQUIPMENT Co Ltd filed Critical JIANGSU DRAGON INDUSTRIES EQUIPMENT Co Ltd
Priority to CN201820312441.9U priority Critical patent/CN208220024U/en
Application granted granted Critical
Publication of CN208220024U publication Critical patent/CN208220024U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a kind of automatic snow venting of dust explosion roof systems comprising: roof system purlin, venting of dust explosion roof system, the venting of dust explosion roof system are fastened on the roof system purlin through several venting of dust explosion connectors;Electric-heating belt, the electric-heating belt are laid on the venting of dust explosion roof system.Compared with venting of dust explosion roof in the prior art, automatic snow venting of dust explosion roof system provided by the utility model is laid with the electric-heating belt for melting accumulated snow thereon, to ensure that venting of dust explosion performance of the venting of dust explosion roof under heavy snow extreme weather.

Description

A kind of automatic snow venting of dust explosion roof system
Technical field
The utility model relates to venting of dust explosion field, specifically a kind of automatic snow venting of dust explosion roof system.
Background technique
Explosion time occurs in workshop, in order to avoid workshop main structure is seriously damaged, the most effective measure taken is just It is pressure release.Since flammable and explosive substance in instant of detonation can generate huge positive pressure of shock wave in workshop, positive pressure of shock wave needs It is released by pressure relief facility to outside workshop, and then guarantees that major structure of construction not will receive big impact and destruction.
Existing common venting of dust explosion roof system is able to satisfy pressure release requirement in normal circumstances, but this extreme when encountering heavy snow When weather, when the accumulated snow on roofing is thicker, even if pressure within doors reaches predetermined pressure release value, venting of dust explosion roof system can not be timely It raises, to generate serious security risk.
Therefore, it is necessary to a kind of venting of dust explosion roof for having automatic snow function be developed, to guarantee it in heavy snow extreme weather Under venting of dust explosion performance.
Utility model content
To achieve the goals above, the utility model provides a kind of automatic snow venting of dust explosion roof system, specific technical solution It is as follows:
A kind of automatic snow venting of dust explosion roof system comprising: roof system purlin, venting of dust explosion roof system, the venting of dust explosion roof system is through several ventings of dust explosion Connector is fastened on the roof system purlin;Electric-heating belt, the electric-heating belt are laid on the venting of dust explosion roof system.
The venting of dust explosion roof system includes hot-galvanized steel silk screen, profiled sheet and fills out as a further improvement of the utility model, Fill the heat insulation layer between the hot-galvanized steel silk screen and the profiled sheet, the hot-galvanized steel silk screen and the roof system Purlin fitting, the electric-heating belt are laid on the profiled sheet.
Several waves to raise upward are intervally distributed on the profiled sheet as a further improvement of the utility model, Slot is formed with hollow installation cavity between the wave trough and the heat insulation layer;The venting of dust explosion connector includes a L shape Connecting bracket and a venting of dust explosion bolt, the connecting bracket include horizontal part and vertical portion, the horizontal position of the connecting bracket in It is bonded in one installation cavity and with the heat insulation layer, the upper end of the vertical portion of the connecting bracket is pierced by described upwards Profiled sheet simultaneously extends the profiled sheet, the screw rod of the venting of dust explosion bolt sequentially pass through the horizontal part of the connecting bracket, It is connected on the roof system purlin after the temperature thermal insulation layer, the hot-galvanized steel silk screen.
The upper end of the vertical portion of the connecting bracket bends downward to be formed with and sting as a further improvement of the utility model, Conjunction portion, the occlusion portion is close to the upper surface of the profiled sheet.
The profiled sheet and the heat insulation layer are towards the die mould steel as a further improvement of the utility model, Post waterproof ventilated membrane in the one side of plate, the heat insulation layer posts aluminium foil in the one side of the hot-galvanized steel silk screen upward.
Galvanized steel wire netting piece, the electricity companion are equipped on the profiled sheet as a further improvement of the utility model, The torrid zone is laid between the steel fabric sheet and the profiled sheet.
Collapsible steel cable, institute are provided with above the profiled sheet as a further improvement of the utility model, The expanded bolt in both ends for stating steel cable is fixed on the gable at roof both ends, and the middle part of the steel cable is equipped with several for receiving The flower basket bolt of the tight steel cable, the electric-heating belt are laid between the steel cable and the profiled sheet.
It further includes traction strand cable as a further improvement of the utility model, and one end of the traction strand cable is connected to On the venting of dust explosion roof system, the other end of the traction strand cable is connected on roof system purlin.
Compared with venting of dust explosion roof in the prior art, automatic snow venting of dust explosion roof system provided by the utility model is laid thereon There is the electric-heating belt for melting accumulated snow, to ensure that venting of dust explosion performance of the venting of dust explosion roof under heavy snow extreme weather.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the automatic snow venting of dust explosion roof system of the utility model in a specific embodiment;
Fig. 2 is the laying schematic diagram of the electric-heating belt in the automatic snow venting of dust explosion roof system in Fig. 1 embodiment;
Fig. 3 is the laying schematic diagram of the electric-heating belt in the automatic snow venting of dust explosion roof system in another embodiment.
Specific embodiment
For make the utility model above objects, features, and advantages, can be more obvious and easy to understand, with reference to the accompanying drawing and tool Body embodiment is described in further detail the utility model.
As shown in Figure 1, in a specific embodiment, automatic snow venting of dust explosion roof system provided by the utility model includes roof system Purlin 1 is fixedly connected on the venting of dust explosion roof system on the roof system purlin 1 through several venting of dust explosion connectors, and the venting of dust explosion room that is laid in The electric-heating belt covered.
After connecting the power supply of the electric-heating belt, electric-heating belt fever is to melt the accumulated snow on venting of dust explosion roof system, to guarantee Venting of dust explosion performance of the venting of dust explosion roof system under heavy snow extreme weather.
When the instantaneous pressure that shock wave within doors generates is more than predetermined value, the venting of dust explosion connector is detached from roof system purlin 1, So that the venting of dust explosion roof system is raised to realize pressure release.
Venting of dust explosion roof system flies away from roof system purlin 1 completely and injures periphery personnel by a crashing object in order to prevent, and the automatic snow in the present embodiment is let out Quick-fried roof system further includes having traction strand cable (not shown), and one end of the traction strand cable is connected on the venting of dust explosion roof system, described to lead The other end for drawing strand cable is connected on roof system purlin 1.
In the present embodiment, the venting of dust explosion roof system includes hot-galvanized steel silk screen 2, profiled sheet 5 and is filled in the hot galvanizing Heat insulation layer 3 between steel wire 2 and the profiled sheet 5, the hot-galvanized steel silk screen 2 are bonded with the roof system purlin 1, The electric-heating belt is laid on the profiled sheet 5.The profiled sheet 5 is single layer die mould colored zinc plated steel, is had Many advantages, such as lightweight, high-strength, antidetonation, fire prevention.The heat insulation layer 3 can play the role of insulation, in the present embodiment The heat insulation layer 3 be mineral wool, with a thickness of 50mm.
As a preferred embodiment, in the present embodiment, the profiled sheet 5 and the heat insulation layer 3 are towards described Waterproof ventilated membrane 4 is posted in the one side of profiled sheet 5, the heat insulation layer 3 is upward in the one side of the hot-galvanized steel silk screen 2 Post aluminium foil.In the present embodiment, the material of the waterproof ventilated membrane 4 is spunbond polyethylene or polypropylene, with a thickness of 0.49mm.
Please continue to refer to shown in Fig. 1, in the present embodiment, the venting of dust explosion connector includes the connecting bracket 6 and one of a L shape Venting of dust explosion bolt 7, the connecting bracket 6 include horizontal part 61 and vertical portion 62.Be intervally distributed on the profiled sheet 5 it is several to The wave trough 51 of upper protrusion is formed with hollow installation cavity between the wave trough 51 and the heat insulation layer 3.
The horizontal part 61 of the connecting bracket 6 is located in the installation cavity and is bonded with the heat insulation layer 3, institute The upper end for stating the vertical portion 62 of connecting bracket 6 is pierced by the profiled sheet 5 upwards and extends the profiled sheet 5, the company The upper end for connecing the vertical portion 62 of bracket 6, which is bent downward, is formed with occlusion portion 63, and the occlusion portion 63 is close to the profiled sheet 5 Upper surface.The screw rod of the venting of dust explosion bolt 7 sequentially passes through the horizontal part 61 of the connecting bracket 6, the temperature thermal insulation layer 3, described It is connected on the roof system purlin 1 after hot-galvanized steel silk screen 2.
The venting of dust explosion connector that the connecting bracket 6 and the venting of dust explosion bolt 7 are constituted realizes in venting of dust explosion roof system between each layer Be fastenedly connected, while the explosion-proof connection between venting of dust explosion roof system and roof system purlin 1 is realized, when the wink that shock wave within doors generates When pressure when being more than the predetermined pressure voltage of venting of dust explosion bolt 7, the venting of dust explosion bolt 7 is detached from roof system purlin 1, so that the venting of dust explosion Roof system is raised to realize pressure release.
It is outer so as to reduce since the venting of dust explosion bolt 7 is completely hidden in the installation space in the wave trough 51 Erosion of portion's environment to venting of dust explosion bolt 7, extends its service life.
Refering to what is shown in Fig. 2, being equipped with galvanized steel wire netting piece 8, the electric tracing on the profiled sheet 5 in the present embodiment Band 10 is laid between the steel fabric sheet 8 and the profiled sheet 5.The electric-heating belt 10 is arranged as waveform, with institute The junction of zinc-coated wire mesh sheet 8 is stated to connect using plastic tied silk, thus ensure that electric-heating belt 10 and zinc-coated wire mesh sheet 8 it Between connective stability, prevent the transposition in use of electric-heating belt 10.
In another embodiment, it please refers to shown in Fig. 3, the top of the profiled sheet 5 is provided with collapsible wirerope Rope 9, the expanded bolt in both ends of the steel cable 9 is fixed on the gable of roof two sides, if the middle part of the steel cable 9 is equipped with Do the flower basket bolt (not shown) for tightening the steel cable 9, the electric-heating belt 10 be laid in the steel cable 9 with it is described Between profiled sheet 5.The electric-heating belt 10 is arranged as waveform, uses plastic tied silk with the junction of the steel cable 9 Connection, to ensure that the connective stability between electric-heating belt 10 and steel cable 9, prevents electric-heating belt 10 in use Transposition.
The description with certain particularity detailed enough has been carried out to the utility model above.It is common in fields It is to be understood by the skilled artisans that the description in embodiment is only exemplary, without departing from the utility model true spirit and All changes are made under the premise of range all should belong to the protection scope of the utility model.The utility model is claimed Range is to be defined by described claims, rather than limited by the foregoing description in embodiment.

Claims (8)

1. a kind of automatic snow venting of dust explosion roof system, characterized in that it comprises:
Roof system purlin,
Venting of dust explosion roof system, the venting of dust explosion roof system are fastened on the roof system purlin through several venting of dust explosion connectors;
Electric-heating belt, the electric-heating belt are laid on the venting of dust explosion roof system.
2. automatic snow venting of dust explosion roof system as described in claim 1, it is characterised in that:
The venting of dust explosion roof system includes hot-galvanized steel silk screen, profiled sheet and is filled in the hot-galvanized steel silk screen and the die mould steel Heat insulation layer between plate, the hot-galvanized steel silk screen are bonded with the roof system purlin, and the electric-heating belt is laid in described On profiled sheet.
3. automatic snow venting of dust explosion roof system as claimed in claim 2, it is characterised in that:
Several wave troughs to raise upward, shape between the wave trough and the heat insulation layer are intervally distributed on the profiled sheet At there is hollow installation cavity;
The venting of dust explosion connector includes the connecting bracket and a venting of dust explosion bolt of a L shape, the connecting bracket include horizontal part and The horizontal position of vertical portion, the connecting bracket is bonded in an installation cavity and with the heat insulation layer, the company The upper end for connecing the vertical portion of bracket is pierced by the profiled sheet upwards and extends the profiled sheet, the spiral shell of the venting of dust explosion bolt Bar sequentially pass through be connected to after the horizontal part, the temperature thermal insulation layer, the hot-galvanized steel silk screen of the connecting bracket it is described On roof system purlin.
4. automatic snow venting of dust explosion roof system as claimed in claim 3, it is characterised in that: the upper end of the vertical portion of the connecting bracket It bends downward and is formed with occlusion portion, the occlusion portion is close to the upper surface of the profiled sheet.
5. automatic snow venting of dust explosion roof system as claimed in claim 2, it is characterised in that: the profiled sheet and the insulation Layer is towards posting waterproof ventilated membrane in the one side of the profiled sheet, the heat insulation layer hot-galvanized steel silk screen upward Aluminium foil is posted on one side.
6. automatic snow venting of dust explosion roof system as claimed in claim 2, it is characterised in that: be equipped with galvanized steel on the profiled sheet Silk netting, the electric-heating belt are laid between the steel fabric sheet and the profiled sheet.
7. automatic snow venting of dust explosion roof system as claimed in claim 2, it is characterised in that: being provided with above the profiled sheet can The steel cable of tightening, the expanded bolt in the both ends of the steel cable is fixed on the gable at roof both ends, in the steel cable Portion is equipped with several for tightening the flower basket bolts of the steel cable, and the electric-heating belt is laid in the steel cable and the die mould Between steel plate.
8. automatic snow venting of dust explosion roof system as described in claim 1, it is characterised in that: it further includes traction strand cable, the traction One end of strand cable is connected on the venting of dust explosion roof system, and the other end of the traction strand cable is connected on the roof system purlin.
CN201820312441.9U 2018-03-07 2018-03-07 A kind of automatic snow venting of dust explosion roof system Active CN208220024U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820312441.9U CN208220024U (en) 2018-03-07 2018-03-07 A kind of automatic snow venting of dust explosion roof system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820312441.9U CN208220024U (en) 2018-03-07 2018-03-07 A kind of automatic snow venting of dust explosion roof system

Publications (1)

Publication Number Publication Date
CN208220024U true CN208220024U (en) 2018-12-11

Family

ID=64530863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820312441.9U Active CN208220024U (en) 2018-03-07 2018-03-07 A kind of automatic snow venting of dust explosion roof system

Country Status (1)

Country Link
CN (1) CN208220024U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905395A (en) * 2018-01-26 2018-04-13 衡水金盾门业有限公司 A kind of venting of dust explosion system
CN110424607A (en) * 2019-08-21 2019-11-08 哈尔滨工业大学建筑设计研究院 It is a kind of for overturning the obturator of folding house roof
CN114908927A (en) * 2022-04-01 2022-08-16 中铁建工集团有限公司 Be applied to steel roof heat insulation construction under high radiation of plateau district sun

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905395A (en) * 2018-01-26 2018-04-13 衡水金盾门业有限公司 A kind of venting of dust explosion system
CN110424607A (en) * 2019-08-21 2019-11-08 哈尔滨工业大学建筑设计研究院 It is a kind of for overturning the obturator of folding house roof
CN114908927A (en) * 2022-04-01 2022-08-16 中铁建工集团有限公司 Be applied to steel roof heat insulation construction under high radiation of plateau district sun

Similar Documents

Publication Publication Date Title
CN208220024U (en) A kind of automatic snow venting of dust explosion roof system
CN205123022U (en) Waterproof fireproof electric power cabinet
CN201238402Y (en) Carbon fiber geothermal cable
CN206800622U (en) A kind of assembled integral concrete shear force wall balcony attachment structure
CN109707084B (en) Flexible curtain wall elastic support and external ribbon system
CN203942223U (en) A kind of wall insulator bracket of supporting
CN207567980U (en) A kind of venting of dust explosion system
CN210640557U (en) Safe and reliable's integrated block terminal
CN107905395A (en) A kind of venting of dust explosion system
CN202194329U (en) Combined high-strength glass-fiber reinforced cement decorating, fireproof and anti-explosion plate
CN213115141U (en) Curtain engineering lightning protection structure
CN206349715U (en) A kind of cable penetration pipe
CN218216484U (en) Hot-dip galvanized sheet cable testing bridge with anticorrosive function
CN206618140U (en) A kind of balcony heat collector is taken shelter from the thunder structure
CN213676426U (en) Wall-hanging electric pile fixing device that fills
CN213846159U (en) L-shaped prefabricated fire-proof groove box suitable for cable trench and tunnel
CN219909647U (en) Lightning protection structure for foam glass vertical serging roof
CN203977730U (en) A kind of joint structure of roofing lightning protection net
CN214428366U (en) Photovoltaic cable with good tensile and flame-retardant properties
CN204551842U (en) A kind of energy saving building curtain wall
CN210156721U (en) Metal framework all-insulation power transformation rack component
CN208001128U (en) A kind of mounting structure of feeder window in communication base station
CN218159726U (en) Extremely cold-resistant anti-cracking cable
CN206678513U (en) Black-bone chicken Tuo Wenshe insulating foam top plates
CN208623104U (en) A kind of metal plate lightning protection band device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 224100 Jiangsu Yancheng City Dafeng Economic Development Zone South of pump valve industrial park

Patentee after: Jiangsu Dragon Industries Equipment Co., Ltd.

Address before: 224100 Jiangsu Yancheng City Economic Development Zone, south of pump valve industrial park.

Patentee before: Jiangsu Dragon Industries Equipment Co., Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 224199 Xikang Road, Dafeng Economic Development Zone, Yancheng City, Jiangsu Province

Patentee after: Jiangsu juege Industry Group Co.,Ltd.

Address before: 224100 Jiangsu Yancheng City Dafeng Economic Development Zone South of pump valve industrial park

Patentee before: JIANGSU DRAGON INDUSTRIAL EQUIPMENT Co.,Ltd.