CN208219385U - A kind of intensive midfeather UHPC box girder bridge - Google Patents

A kind of intensive midfeather UHPC box girder bridge Download PDF

Info

Publication number
CN208219385U
CN208219385U CN201820638209.4U CN201820638209U CN208219385U CN 208219385 U CN208219385 U CN 208219385U CN 201820638209 U CN201820638209 U CN 201820638209U CN 208219385 U CN208219385 U CN 208219385U
Authority
CN
China
Prior art keywords
midfeather
bridge
box girder
intensive
uhpc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820638209.4U
Other languages
Chinese (zh)
Inventor
李传习
冯峥
潘仁胜
聂洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN201820638209.4U priority Critical patent/CN208219385U/en
Application granted granted Critical
Publication of CN208219385U publication Critical patent/CN208219385U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of intensive midfeather UHPC box girder bridges, including being equipped with unilateral longitudinal stiffener from top plate and bottom plate, web, diaphragm plate and the box beam formed along vertical bridge at least 2 midfeathers of arrangement, the web and midfeather.By Optimal Construction details, the lateral anti-bending bearing capacity of web and midfeather is significantly improved, box girder web and midfeather lateral buckling are effectively prevent.Tabula plate spacing between the adjacent support of box girder bridge described in the utility model meets one-way slabs stress characteristic, i.e. the vertical, horizontal stress of bridge is independent of each other, and has given full play to the strength of materials of UHPC at least over 2 times of mediastinum plate spacing in stress;The utility model improves the shear resistant capacity of box beam, increases the longitudinal rigidity of box beam, and then reduce the dosage of longitudinal prestressing reinforcing bar, there is preferable economic benefit by encryption setting midfeather.

Description

A kind of intensive midfeather UHPC box girder bridge
Technical field
The utility model relates to concrete box girder technical fields, more particularly, to a kind of intensive midfeather UHPC box girder bridge.
Background technique
According to statistics, in built prestressed concrete beam bridge, after across footpath is more than 60m, bridge cross-sectional form It is mostly box section.Jia Xiantao is mentioned in " box beam adds the mechanical property research after midfeather and ribbed stiffener ": when bridge it is wide compared with When width, span are larger, midfeather need to be generally set, the longitudinal rigidity of bridge is promoted, improve the holistic resistant behavior of box beam.
Box girder bridge panel is four sides, theoretical according to high bridge structure, when adjacent tabula plate spacing is more than adjacent When 2 times of mediastinum plate spacing or adjacent mediastinum plate spacing are more than 2 times of adjacent tabula plate spacing, the floorings of supported along four sides are single To stressed plate, i.e. box girder bridge mainly considers to indulge bridge to stress, in second, third system computing mainly in the first system calculating Direction across bridge stress or vertical bridge are considered to stress, and the vertical, horizontal stress of bridge is independent of each other.Therefore, according to above-mentioned single load bearing plate Two types, the two kind design methods adaptable with it are as follows: (1) reduce mediastinum plate spacing and increase the spacing of diaphragm plate: should Method will increase the dead load of bridge when bridge span is larger, (not consider substantially when design for normal concrete beam bridge Itself tensile capacity), under the action of the mobile loads such as vehicle, lateral local stress is easy to cause floorings to crack, and needs that cross is arranged Force request is just able to satisfy to presstressed reinforcing steel;(2) less setting midfeather and diaphragm plate is intensively arranged: this method increase transverse directions Bending stiffness reduces box beam distortion effect, but increase to a certain extent bridge dead load and to resist longitudinal sagging moment without Benefit.
With the rapid development of ultra-high performance concrete (referred to as UHPC), the compactness of superelevation and excellent mechanical property Energy (compression strength >=150MPa, flexural strength >=30 MPa, tensile strength >=8 MPa, elasticity modulus >=40GPa) can be substantially Degree reduces the self weight of bridge.Since UHPC itself has certain tensile capacity, so that not configuring any transversely prestressed bars In the case where the intensive midfeather bridge of one-way slabs stress characteristic be possibly realized.
" the unidirectional Prestressed U HPC Continuous Box Girder Bridge conceptual design of Ultra-Long Spans and preliminary experiment " discloses a kind of intensive cross The UHPC box girder bridge of partition, floorings be two-way slab stress characteristic, local calculation analysis in need to calculate vertical bridge to bending Stress is simultaneously overlapped with overall calculation result, longitudinal stress value is increased, to need to be arranged more longitudinal prestressing muscle.
In order to reduce longitudinal prestressing muscle dosage, promoted box beam longitudinal bending stiffness and shear resistant capacity, sufficiently The strength of materials of UHPC is played, this paper presents a kind of intensive midfeather UHPC box girder bridges for having one-way slabs stress characteristic.It is logical Intensive setting midfeather is crossed, diaphragm plate is set at the positions such as pier top position and span centre and is made by the lateral connection of top, bottom plate With, can guarantee the lateral stiffness of bridge, limit box beam distortion deformation.When the thickness of top, bottom plate is guaranteed, pass through The collective effect of midfeather, web, the structure are feasible in stress.
Utility model content
Technical problem to be solved by the utility model is: overcoming the deficiencies of the prior art and provide a kind of longitudinal bending stiffness Greatly, overall calculation and the explicitly intensive midfeather UHPC box girder bridge of local calculation stress.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of intensive midfeather UHPC box girder bridge, Including from top plate and bottom plate, web, diaphragm plate and the box beam formed along vertical bridge at least two midfeather of arrangement, the web It is equipped with unilateral longitudinal stiffener with midfeather, the lateral bending stiffness of web and midfeather is promoted with this, prevents lateral buckling.
Further, it is equipped with short longitudinal rib at the intermediate position of adjacent midfeather and Cantilever Flange Slab, effectively improves box beam Longitudinal rigidity reduces the dosage of longitudinal prestressing reinforcing bar.
It further, is 2 ~ 5m along the spacing of bridge wide direction between adjacent midfeather, adjacent tabula plate spacing requires more than adjacent 2 times (i.e. d > 2e) of mediastinum plate spacing, make floorings meet one-way slabs stress characteristic.
Further, end diaphragm plate is equipped at the support of the box girder bridge and at beam-ends, the diaphragm plate is arranged in bridge span Middle place, and other positions of bridge are according to requiring that diaphragm plate is selectively arranged, the construction measure ensure that box beam laterally just The whole stress-bearing capability of degree and box beam.
Further, intensive midfeather UHPC box girder bridge is in direction across bridge, perpendicular bridge to without configuring presstressed reinforcing steel, it is only necessary to which configuration is vertical To deformed bar, become traditional three dimension prestressing as unidirectional prestressing force.Deformed bar can not only use externally cable, but also can adopt With internal beam.
Further, the box beam top plate in direction across bridge and vertical bridge to can configure common steel bar stress, and to lateral stressed Reinforcing bar carries out appropriate encryption, enhances the anti-crack ability of panel.
Further, to guarantee the bridge joint effect of steel fibre, giving full play to the tensile capacity of UHPC, box beam direction across bridge not Setting connection seam, only vertical bridge to be arranged longitudinal seam.
Further, the handover position of the web, midfeather, short longitudinal rib and headers/footers is equipped with prestressed anchor permanent tooth block, Be conducive to the anchoring to prestressing with bond reinforcing bar and/or external prestressing reinforcing bar, especially when deformed bar uses externally cable When arrangement, prestressed anchor permanent tooth block effectively strengthens anchoring effect.
Further, thickness >=12cm of the web and midfeather, thickness >=10cm of short longitudinal rib, the thickness of diaphragm plate >= 12cm。
A kind of intensive midfeather UHPC box girder bridge of the utility model the utility model has the advantages that
The Thin-walled box beam structure that the box girder bridge uses UHPC design of material to build is full by being intensively arranged in midfeather stress Sufficient one-way slabs stress characteristic mainly considers to indulge bridge to stress, in second, third system computing mainly in the first system calculating Consider direction across bridge stress, the vertical, horizontal stress of bridge is independent of each other, thus reduces the longitudinal stress value of box beam, give full play to The strength of materials of UHPC, and then can reduce the dosage of longitudinal prestressing reinforcing bar.
By Optimal Construction details, the lateral anti-bending bearing capacity of web and midfeather is significantly improved, box beam is effectively prevent Web and midfeather lateral buckling.
The utility model improves the shear resistant capacity of box beam by encryption setting midfeather, increases the vertical of box beam To rigidity, and then reduce the dosage of longitudinal prestressing reinforcing bar, there is preferable economic benefit.
Detailed description of the invention
Fig. 1-is a kind of longitudinal section of intensive midfeather UHPC box girder bridge of the utility model;
Fig. 2-is a kind of cross-sectional view of intensive midfeather UHPC box girder bridge of embodiment 1;
Fig. 3-is a kind of prestress anchoraging schematic diagram of intensive midfeather UHPC box girder bridge of embodiment 1;
Fig. 4-is a kind of cross-sectional view of intensive midfeather UHPC box girder bridge of embodiment 2;
Fig. 5-is a kind of prestress anchoraging schematic diagram of intensive midfeather UHPC box girder bridge of embodiment 2;
1, top plate;2, bottom plate;3, diaphragm plate 4, end diaphragm plate;5, web;6, midfeather;7, longitudinal stiffener;8, short vertical Rib;9, tooth block is anchored;10, deformed bar.
Specific embodiment
The following is a further explanation of the present invention with reference to the accompanying drawings and embodiments.
Embodiment 1
Referring to Fig.1 ~ 3, a kind of intensive midfeather UHPC box girder bridge of the present embodiment, including by top plate 1, bottom plate 2, web 5, Diaphragm plate 3, end diaphragm plate 4 and box beam from vertical bridge to 3 midfeathers 6 of arrangement that formed along, on the web 5 and midfeather 6 Equipped with unilateral longitudinal stiffener 7, the lateral bending stiffness of web 5 and midfeather 6 is promoted with this, prevents lateral buckling.
The UHPC box girder bridge is equipped with end diaphragm plate 4 at support position, and end diaphragm plate increases the lateral stiffness of bridge, and The stress that support can preferably be transmitted guarantees the lateral stiffness of box beam, improves the whole stress-bearing capability of box beam.
It along the spacing of bridge wide direction is 2 ~ 5m between adjacent midfeather 6, and 3 spacing of diaphragm plate has been more than 6 spacing of midfeather 2 times (i.e. d > 2e) so that the local pressure of box girder bridge panel meets one-way slabs stress characteristic, i.e. the vertical, horizontal stress of bridge It is independent of each other, has given full play to the strength of materials of UHPC.
The web 5, midfeather 6 and 1/ bottom plate 2 of top plate handover position be equipped with prestressed anchor permanent tooth block 9, be conducive to pair Deformed bar 10 reaches preferable anchoring effect, especially when deformed bar 10 is arranged using externally cable, anchoring effect Fruit is more preferable.
Intensive midfeather UHPC box girder bridge is in direction across bridge, perpendicular bridge to without configuring presstressed reinforcing steel, it is only necessary to which configuration is longitudinal to answer in advance Power reinforcing bar 10 becomes traditional three dimension prestressing as unidirectional prestressing force.Deformed bar 10 can not only use externally cable, but also can use Internal beam.
The box girder bridge is not provided with connection seam in direction across bridge, gives full play to the bridge joint effect of steel fibre.To increase top plate 1 Anti-crack ability, in 1 direction across bridge of box beam top plate, vertical bridge to being laid with common steel bar stress.
Thickness >=12cm of the web 5 and midfeather 6, thickness >=10cm of short longitudinal rib 8, the thickness of diaphragm plate 3 >= 12cm。
Embodiment 2
Referring to Fig. 4, compared with Example 1, a kind of intensive midfeather UHPC box girder bridge of the present embodiment, there are it is following not It is same:
It is equipped with short longitudinal rib 8 at the intermediate position of adjacent midfeather 6 and Cantilever Flange Slab, effectively improves the longitudinal rigid of box beam Degree reduces the dosage of longitudinal prestressing reinforcing bar 10.
Referring to Fig. 5, the web 5, midfeather 6, short longitudinal rib 8 and the handover position of 1/ bottom plate 2 of top plate are equipped with prestressed anchor Permanent tooth block 9 is conducive to reach preferable anchoring effect to deformed bar 10.

Claims (9)

1. a kind of intensive midfeather UHPC box girder bridge, including from top plate and bottom plate, web, diaphragm plate and along vertical bridge to arrangement The box beam of at least two midfeather composition, which is characterized in that the web and midfeather are equipped with unilateral longitudinal stiffener.
2. intensive midfeather UHPC box girder bridge as described in claim 1, which is characterized in that the intermediate position of adjacent midfeather and hang Short longitudinal rib is equipped at arm flange plate.
3. intensive midfeather UHPC box girder bridge as claimed in claim 1 or 2, which is characterized in that wide along bridge between adjacent midfeather The spacing in direction is 2 ~ 5m, and the tabula plate spacing between adjacent support makes bridge floor at least over 2 times of adjacent mediastinum plate spacing Plate meets one-way slabs stress.
4. intensive midfeather UHPC box girder bridge as claimed in claim 1 or 2, which is characterized in that at the support of the box girder bridge and End diaphragm plate is equipped at beam-ends, the diaphragm plate is arranged in bridge span.
5. intensive midfeather UHPC box girder bridge as claimed in claim 1 or 2, which is characterized in that intensive midfeather UHPC box girder bridge In direction across bridge, perpendicular bridge to without configuring presstressed reinforcing steel, it is only necessary to configure longitudinal prestressing reinforcing bar, it is unidirectional for becoming traditional three dimension prestressing Prestressing force.
6. intensive midfeather UHPC box girder bridge as claimed in claim 1 or 2, which is characterized in that box beam direction across bridge is not provided with connecting Seam only connects seam to setting in vertical bridge.
7. intensive midfeather UHPC box girder bridge as claimed in claim 1 or 2, which is characterized in that the thickness of the web and midfeather Degree >=12cm, thickness >=10cm of short longitudinal rib, thickness >=12cm of diaphragm plate.
8. intensive midfeather UHPC box girder bridge as claimed in claim 1 or 2, which is characterized in that the web, midfeather, short vertical The handover position of rib and headers/footers is equipped with prestressed anchor permanent tooth block.
9. intensive midfeather UHPC box girder bridge as claimed in claim 1 or 2, which is characterized in that the direction across bridge of the box girder bridge is indulged Bridge is to being equipped with common steel bar stress.
CN201820638209.4U 2018-05-02 2018-05-02 A kind of intensive midfeather UHPC box girder bridge Expired - Fee Related CN208219385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820638209.4U CN208219385U (en) 2018-05-02 2018-05-02 A kind of intensive midfeather UHPC box girder bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820638209.4U CN208219385U (en) 2018-05-02 2018-05-02 A kind of intensive midfeather UHPC box girder bridge

Publications (1)

Publication Number Publication Date
CN208219385U true CN208219385U (en) 2018-12-11

Family

ID=64513493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820638209.4U Expired - Fee Related CN208219385U (en) 2018-05-02 2018-05-02 A kind of intensive midfeather UHPC box girder bridge

Country Status (1)

Country Link
CN (1) CN208219385U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396631A (en) * 2018-05-02 2018-08-14 长沙理工大学 A kind of intensive midfeather UHPC box girder bridges

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396631A (en) * 2018-05-02 2018-08-14 长沙理工大学 A kind of intensive midfeather UHPC box girder bridges

Similar Documents

Publication Publication Date Title
KR101022853B1 (en) Composite girder for constructing bridge
CN106638274B (en) A kind of unidirectional prestressing force ultra-high performance concrete Thin-walled Box Girder standard segment
CN203007856U (en) External prestressing reinforcement system for hollow slab girder bridge
CN103362210A (en) Prestress assembly frame structure
CN204715226U (en) External prestressing strengthening based on steel plate-concrete anchor block constructs
CN103556565B (en) A kind of connecting structure of different performance beams of concrete
CN110847007A (en) Section steel-concrete composite beam hogging moment area structure based on high-performance material
CN104831627A (en) Bridge deck slab longitudinal unequal strength steel-concrete composite structure bridge and construction method thereof
CN103074959A (en) Steel plate and high-strength concrete combination connecting beam
CN203593939U (en) Connecting structure of concrete beams differing in performance
CN108330805A (en) A kind of structure promoting combination beam performance
CN206916603U (en) A kind of transverse prestress I-shaped box-beam structure
CN111021227B (en) Steel-concrete composite structure continuous box girder and manufacturing method thereof
CN108396631A (en) A kind of intensive midfeather UHPC box girder bridges
CN208219385U (en) A kind of intensive midfeather UHPC box girder bridge
CN100465377C (en) Baseboard cable horizontal arrangement prestress concrete variable cross-section box girder bridge and construction method thereof
CN211665535U (en) T-beam structure for high-speed railway long-span bridge and long-span bridge
CN102140774A (en) Lateral stiffening construction of concrete cable-stayed bridge box girder
CN110331648B (en) Ultra-high-performance concrete-part section steel composite beam unit, ultra-high-performance concrete-section steel composite beam unit and composite beam
CN204703055U (en) Based on the steel-ultra-high performance concrete combined beam structure of fin-plate type bridge floor
CN204715222U (en) A kind of external prestressing strengthening structure of pier cap beam
CN206337497U (en) A kind of unidirectional prestressing force ultra-high performance concrete Thin-walled Box Girder standard section
CN109811646A (en) Monoblock type web grider and concrete abutment engaging portion construct
CN201762650U (en) Arch bridge with bridge floor having prefabricated, longitudinally-installed and blocked dual suspension cantilever beam
CN107542212A (en) A kind of Prefabricated porous plate being connected and attaching method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181211

Termination date: 20200502