CN208212857U - A kind of absorption tower for the out of stock system of desulfurization - Google Patents

A kind of absorption tower for the out of stock system of desulfurization Download PDF

Info

Publication number
CN208212857U
CN208212857U CN201820536073.6U CN201820536073U CN208212857U CN 208212857 U CN208212857 U CN 208212857U CN 201820536073 U CN201820536073 U CN 201820536073U CN 208212857 U CN208212857 U CN 208212857U
Authority
CN
China
Prior art keywords
absorption tower
supporting block
collets
groove
fixedly installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820536073.6U
Other languages
Chinese (zh)
Inventor
赵国美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China carbon energy (Jiangsu) Co., Ltd
Original Assignee
赵国美
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 赵国美 filed Critical 赵国美
Priority to CN201820536073.6U priority Critical patent/CN208212857U/en
Application granted granted Critical
Publication of CN208212857U publication Critical patent/CN208212857U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Burglar Alarm Systems (AREA)

Abstract

The utility model discloses a kind of absorption towers for the out of stock system of desulfurization, including absorption tower ontology, the side of the absorption tower ontology is fixedly installed with the first supporting block, first supporting block offers the first groove close to the side of absorption tower ontology, the first collets are fixedly installed in first groove, first collets are fixedly installed with the first copper billet close to the side of absorption tower ontology, first copper billet is equipped with the second collets being slidably mounted in the first groove far from the side of the first collets, second collets are fixedly installed with the second copper billet close to the side of the first copper billet, absorption tower ontology offers first through hole on the side inner wall of the first supporting block, the second supporting block is fixedly installed in first through hole.The utility model of simple structure and strong practicability can cross the explosion of ambassador's pipeline junction in the excessive alarm of the intrinsic pressure in absorption tower so as to avoid because of the intrinsic pressure in absorption tower.

Description

A kind of absorption tower for the out of stock system of desulfurization
Technical field
The utility model relates to absorption tower technical field more particularly to a kind of absorption towers for the out of stock system of desulfurization.
Background technique
Absorption tower is the equipment for realizing absorption operation, is divided into three classes by the gas-liquid form that is in contact, the first kind is gas with gas Plate column, bubble absorbing tower, the stirring bubble absorbing tower of form dispersion in the liquid phase are steeped, the second class is that liquid is dispersed with droplet-like Injector, Venturi tube, spray tower in the gas phase, third class are the packing material absorbing that liquid is contacted with membranaceous movement with gas phase Tower and film-falling absorption tower, in tower the type of flow of gas-liquid two-phase can adverse current can also cocurrent, generally use counter-current operation, absorbent It being flowed from above to below with tower top addition, is contacted with the gas flowed from bottom to top, the liquid for absorbing absorbent is discharged from tower bottom, Purified gas is discharged from tower top.
The absorption tower for the out of stock system of desulfurization currently on the market does not have warning function mostly, the pressure in absorption tower It when power is excessive, is easy that pipeline junction is made to burst, to cause any property loss, or even will cause the injures and deaths of personnel, therefore we A kind of absorption tower for the out of stock system of desulfurization is proposed for solving the above problems.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and the one kind proposed is de- for desulfurization The absorption tower of pin system.
To achieve the goals above, the utility model adopts the technical scheme that
The side on a kind of absorption tower for the out of stock system of desulfurization, including absorption tower ontology, the absorption tower ontology is fixed First supporting block is installed, the first supporting block offers the first groove close to the side of absorption tower ontology, fixes in the first groove First collets are installed, the first collets are fixedly installed with the first copper billet close to the side of absorption tower ontology, and the first copper billet is remote Side from the first collets is equipped with the second collets being slidably mounted in the first groove, and the second collets are close to the first copper billet Side be fixedly installed with the second copper billet, absorption tower ontology offers first through hole on the side inner wall of the first supporting block, The second supporting block is fixedly installed in first through hole, the side of the second supporting block offers the second through-hole, sliding in the second through-hole It is sealed and installed with third supporting block, third supporting block is fixedly installed with push rod close to the side of the first supporting block;
Third supporting block is equipped with the 4th supporting block being fixedly mounted in the second through-hole close to the side of the first supporting block, pushes away The one end of bar far from third supporting block is slidably connected through the 4th supporting block and with the 4th supporting block, and push rod is far from third supporting block One end extend in the first groove, be set on the outside of push rod is fixedly installed between third supporting block and the 4th supporting block One spring.
Preferably, the top and bottom of first supporting block are fixedly installed with alarm and battery respectively, and alarm Device, the first copper billet, battery and the second copper billet are successively electrically connected and constitute a circuit.
Preferably, the second groove, the second collets are offered in the top inner wall and bottom interior wall of first groove Top and bottom be fixedly installed with the first sliding block, the first sliding block is slidably connected with the inner wall of corresponding first sliding groove.
Preferably, first sliding block is welded with second spring far from the side of absorption tower ontology, and second spring is far from phase One end of corresponding first sliding block is fixedly mounted on corresponding second groove far from the side inner wall of absorption tower ontology.
Preferably, the side of the 4th supporting block is provided with third through-hole, the top inner wall and bottom interior wall of third through-hole On be fixedly installed with the second sliding block, the top and bottom of push rod offer third groove, the second sliding block and corresponding The inner wall of three grooves is slidably connected.
Preferably, the bottom symmetrical of the absorption tower ontology is fixedly mounted there are four lower margin, and the bottom of lower margin is fixedly mounted There is non-slip mat.
Compared with prior art, the utility model has the beneficial effects that
Pass through absorption tower ontology, the first supporting block, the first groove, the first collets, the first copper billet, the second collets, Two copper billets, first through hole, the second supporting block, the second through-hole, third supporting block, push rod, the 4th supporting block and the first spring match It closes, third supporting block pushes pushrod movement, and the first spring compressed, and so that push rod is in contact with the second collets, push rod promotion the Two collets are dynamic, and second spring is compressed, and the second collets push the movement of the second copper billet, and the second copper billet is made to connect with the first copper billet Touching makes the first copper billet, the second copper billet, alarm and battery constitute a closed circuit, and alarm starts to alarm, to avoid Pipeline junction is set to burst because the intrinsic pressure in absorption tower is excessive, the utility model of simple structure and strong practicability can be The excessive alarm of the intrinsic pressure in absorption tower, so as to avoid to cross ambassador's pipeline junction quick-fried because of the intrinsic pressure in absorption tower It splits.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of absorption tower for the out of stock system of desulfurization schematic cross-sectional view;
Fig. 2 be the utility model proposes a kind of enlarged structure of part A on absorption tower for the out of stock system of desulfurization show It is intended to.
In figure: 1 absorption tower ontology, 2 first supporting blocks, 3 first grooves, 4 first collets, 5 first copper billets, 6 second are absolutely Edge block, 7 second copper billets, 8 first through hole, 9 second supporting blocks, 10 second through-holes, 11 third supporting blocks, 12 push rods, 13 the 4th Bracer, 14 first springs.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-2, a kind of absorption tower for the out of stock system of desulfurization, including absorption tower ontology 1, absorption tower ontology 1 Side is fixedly installed with the first supporting block 2, and the first supporting block 2 offers the first groove 3 close to the side of absorption tower ontology 1, the The first collets 4 are fixedly installed in one groove 3, the first collets 4 are fixedly installed with first close to the side of absorption tower ontology 1 Copper billet 5, the first copper billet 5 are equipped with the second collets 6 being slidably mounted in the first groove 3 far from the side of the first collets 4, the Two collets 6 are fixedly installed with the second copper billet 7 close to the side of the first copper billet 5, and absorption tower ontology 1 is close to the first supporting block 2 First through hole 8 is offered on the inner wall of side, and the second supporting block 9, the side of the second supporting block 9 are fixedly installed in first through hole 8 The second through-hole 10 is offered, is slidingly sealed in the second through-hole 10 and third supporting block 11 is installed, third supporting block 11 is close to first The side of supporting block 2 is fixedly installed with push rod 12;Third supporting block 11 is equipped with close to the side of the first supporting block 2 and is fixedly mounted on The 4th supporting block 13 in second through-hole 10, the one end of push rod 12 far from third supporting block 11 is through the 4th supporting block 13 and with the Four supporting blocks 13 are slidably connected, and push rod 12 extends in the first groove 3 far from one end of third supporting block 11, third supporting block 11 It is fixedly installed with the first spring 14 for being set in 12 outside of push rod between the 4th supporting block 13, passes through absorption tower ontology 1, first Supporting block 2, the first groove 3, the first collets 4, the first copper billet 5, the second collets 6, the second copper billet 7, first through hole 8, second Supporting block 9, the second through-hole 10, third supporting block 11, push rod 12, the 4th supporting block 13 and the first spring 14 match, third branch Bracer 11 pushes push rod 12 to move, and the first spring 14 is compressed, and push rod 12 is made to be in contact with the second collets 6, and push rod 12 pushes Second collets 6 are dynamic, and second spring is compressed, and the second collets 6 push the movement of the second copper billet 7, make the second copper billet 6 and the first bronze medal Block 4 is in contact, and the first copper billet 5, the second copper billet 7, alarm and battery is made to constitute a closed circuit, and alarm starts to report It is alert, so that pipeline junction is burst so as to avoid because the pressure in absorption tower ontology 1 is excessive, the utility model structure is simple, It is practical, it can be in the excessive alarm of pressure in absorption tower ontology 1, so as to avoid because of the pressure mistake in absorption tower ontology 1 The explosion of ambassador's pipeline junction.
In the utility model, the top and bottom of the first supporting block 2 are fixedly installed with alarm and battery respectively, and report Alert device, the first copper billet 5, battery and the second copper billet 7 are successively electrically connected and constitute a circuit, in the top of the first groove 3 The second groove is offered on wall and bottom interior wall, the top and bottom of the second collets 6 are fixedly installed with the first sliding block, the One sliding block is slidably connected with the inner wall of corresponding first sliding groove, and the first sliding block is welded with far from the side of absorption tower ontology 1 Two springs, second spring are fixedly mounted on corresponding second groove far from absorption tower far from one end of corresponding first sliding block On the side inner wall of ontology 1, the side of the 4th supporting block 13 is provided with third through-hole, the top inner wall and bottom interior wall of third through-hole On be fixedly installed with the second sliding block, the top and bottom of push rod 12 offer third groove, the second sliding block with it is corresponding The inner wall of third groove is slidably connected, and there are four lower margins for the bottom symmetrical fixed installation of absorption tower ontology 1, and the bottom of lower margin is fixed Non-slip mat is installed, absorption tower ontology 1, the first supporting block 2, the first groove 3, the first collets 4, the first copper billet 5, second are passed through Collets 6, the second copper billet 7, first through hole 8, the second supporting block 9, the second through-hole 10, third supporting block 11, push rod 12, the 4th Bracer 13 and the first spring 14 match, and third supporting block 11 pushes push rod 12 to move, and the first spring 14 is compressed, and make push rod 12 It is in contact with the second collets 6, push rod 12 pushes the second collets 6 dynamic, and second spring is compressed, and the second collets 6 push the The movement of two copper billets 7, makes the second copper billet 6 be in contact with the first copper billet 4, makes the first copper billet 5, the second copper billet 7, alarm and battery A closed circuit is constituted, alarm starts to alarm, and connects pipeline so as to avoid because the pressure in absorption tower ontology 1 is excessive Place's explosion is connect, the utility model of simple structure and strong practicability can be in the excessive alarm of pressure in absorption tower ontology 1, to keep away Exempt to cross the explosion of ambassador's pipeline junction because of the pressure in absorption tower ontology 1.
Working principle: when the pressure in absorption tower ontology 1 is excessive, under the pressure effect in absorption tower ontology 1, third Supporting block 11 move in the second through-hole 10 to close to the direction of the first supporting block 2, and the promotion push rod 12 of third supporting block 11 is to leaning on The direction of nearly second collets 6 moves, and the first spring 14 is compressed, when push rod 12 is in contact with the second collets 6, push rod 12 The second collets 6 are pushed to slide in the first groove 3, the second collets 6 drive the first sliding block to slide in the second groove, and second Spring is compressed, and the second collets 6 push the second copper billet 7 to move in the first groove 3, until the second copper billet 6 and the first copper billet 4 It being in contact, the first copper billet 5, the second copper billet 7, alarm and battery constitute a closed circuit at this time, and alarm starts to alarm, To remind staff to take measures, keep pipeline junction quick-fried so as to avoid because the pressure in absorption tower ontology 1 is excessive It splits.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of absorption tower for the out of stock system of desulfurization, including absorption tower ontology (1), which is characterized in that the absorption tower sheet The side of body (1) is fixedly installed with the first supporting block (2), and the first supporting block (2) is offered close to the side of absorption tower ontology (1) First groove (3), the first groove (3) is interior to be fixedly installed with the first collets (4), and the first collets (4) are close to absorption tower ontology (1) side is fixedly installed with the first copper billet (5), and the first copper billet (5) is equipped with far from the side of the first collets (4) and is slidably installed The second collets (6) in the first groove (3), the second collets (6) are fixedly installed with the close to the side of the first copper billet (5) Two copper billets (7), absorption tower ontology (1) offer first through hole (8) on the side inner wall of the first supporting block (2), and first is logical It is fixedly installed with the second supporting block (9) in hole (8), the side of the second supporting block (9) offers the second through-hole (10), the second through-hole (10) it is slidingly sealed and is equipped with third supporting block (11) in, third supporting block (11) is fixed close to the side of the first supporting block (2) Push rod (12) are installed;
Third supporting block (11) is equipped with the 4th be fixedly mounted in the second through-hole (10) close to the side of the first supporting block (2) Bracer (13), push rod (12) far from third supporting block (11) one end through the 4th supporting block (13) and with the 4th supporting block (13) Be slidably connected, push rod (12) extends in the first groove (3) far from the one end of third supporting block (11), third supporting block (11) with The first spring (14) being set on the outside of push rod (12) is fixedly installed between 4th supporting block (13).
2. a kind of absorption tower for the out of stock system of desulfurization according to claim 1, which is characterized in that first support The top and bottom of block (2) are fixedly installed with alarm and battery, and alarm, the first copper billet (5), battery and respectively Two copper billets (7) are successively electrically connected and constitute a circuit.
3. a kind of absorption tower for the out of stock system of desulfurization according to claim 1, which is characterized in that first groove (3) the second groove is offered in top inner wall and bottom interior wall, the top and bottom of the second collets (6) are fixedly mounted There is the first sliding block, the first sliding block is slidably connected with the inner wall of corresponding first sliding groove.
4. a kind of absorption tower for the out of stock system of desulfurization according to claim 3, which is characterized in that first sliding block Side far from absorption tower ontology (1) is welded with second spring, and second spring is fixed far from one end of corresponding first sliding block It is mounted on side inner wall of corresponding second groove far from absorption tower ontology (1).
5. a kind of absorption tower for the out of stock system of desulfurization according to claim 1, which is characterized in that the 4th support The side of block (13) is provided with third through-hole, is fixedly installed with the second sliding block in the top inner wall and bottom interior wall of third through-hole, The top and bottom of push rod (12) offer third groove, and the second sliding block is slided with the inner wall of corresponding third groove to be connected It connects.
6. a kind of absorption tower for the out of stock system of desulfurization according to claim 1, which is characterized in that the absorption tower sheet There are four lower margins for the bottom symmetrical fixed installation of body (1), and the bottom of lower margin is fixedly installed with non-slip mat.
CN201820536073.6U 2018-04-16 2018-04-16 A kind of absorption tower for the out of stock system of desulfurization Active CN208212857U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820536073.6U CN208212857U (en) 2018-04-16 2018-04-16 A kind of absorption tower for the out of stock system of desulfurization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820536073.6U CN208212857U (en) 2018-04-16 2018-04-16 A kind of absorption tower for the out of stock system of desulfurization

Publications (1)

Publication Number Publication Date
CN208212857U true CN208212857U (en) 2018-12-11

Family

ID=64529372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820536073.6U Active CN208212857U (en) 2018-04-16 2018-04-16 A kind of absorption tower for the out of stock system of desulfurization

Country Status (1)

Country Link
CN (1) CN208212857U (en)

Similar Documents

Publication Publication Date Title
CN206816574U (en) A kind of oil tank liquid level alarm
CN207641159U (en) A kind of not hardened dedusting packed tower
CN208212857U (en) A kind of absorption tower for the out of stock system of desulfurization
CN212622545U (en) Water environment current situation monitoring device based on Internet of things
BRPI0418981A (en) strut bar for reformer exercise machine and trolley limiter assembly
CN112702864B (en) Self-sealing heat dissipation hole type fireproof electrical cabinet capable of reducing internal oxygen content
CN111391738B (en) Buffering bus handle
CN203213203U (en) Multifunctional anti-negative pressure valve
CN112186575A (en) Moisture-proof distribution box capable of preventing water vapor from entering
CN111781036A (en) A sealed sampling collection device for toxic gas detects
CN203403393U (en) Automatic flood discharging device for reservoir warning water level
CN211425594U (en) Water conservancy monitoring and early warning device
CN209311435U (en) A kind of detection device of toxic gas
CN209624557U (en) A kind of wasted nickel catalyst device being easily installed
CN207944073U (en) A kind of desulfurizer
CN207924456U (en) It is a kind of to be used to acquire the device for preventing student to be trapped in school bus
CN208260731U (en) A kind of multi-functional chemical engineering experiment consersion unit
CN201829028U (en) Flood-prevention warner
CN207405702U (en) Constant pressure water supply control platform
CN206259618U (en) A kind of guide frame for high-low pressure cabinet
CN207113137U (en) One kind carries monitoring purification of air bellows
CN210873294U (en) Department of respiration sputum adsorbs clearing device
CN216524263U (en) Water level monitoring device for hydraulic engineering
CN204493824U (en) A kind of safety valve
CN214748225U (en) Intelligent water meter with alarm function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190521

Address after: 261000 No. 006067, West Street of the Yellow River, Weifang Binhai Economic Development Zone, Shandong Province

Patentee after: Medium Carbon Energy (Shandong) Co., Ltd.

Address before: 311800 666, Zhao Jia Cun, Jiyang street, Zhuji, Shaoxing, Zhejiang

Patentee before: Zhao Guomei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200826

Address after: 222100 west side of Lanhai Road, Haizhou Bay Biotechnology Park, Daxingzhuang village, Haitou Town, Ganyu District, Lianyungang City, Jiangsu Province

Patentee after: China carbon energy (Jiangsu) Co., Ltd

Address before: 261000 No. 006067, West Street of the Yellow River, Weifang Binhai Economic Development Zone, Shandong Province

Patentee before: Medium Carbon Energy (Shandong) Co.,Ltd.

TR01 Transfer of patent right