CN208212242U - A kind of bladder irrigation connecting tube - Google Patents
A kind of bladder irrigation connecting tube Download PDFInfo
- Publication number
- CN208212242U CN208212242U CN201720629959.0U CN201720629959U CN208212242U CN 208212242 U CN208212242 U CN 208212242U CN 201720629959 U CN201720629959 U CN 201720629959U CN 208212242 U CN208212242 U CN 208212242U
- Authority
- CN
- China
- Prior art keywords
- bladder irrigation
- connecting tube
- main line
- pillar
- display device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of bladder irrigation connecting tubes, grafting is distinguished including a both ends and is connected to the main line of catheter and bladder irrigation bag, the shorter branch pipeline being connected to main line is extended outward on the pipeline of the side of communication channel urinary catheter, is equipped with leakage proof rubber plug in the free end of branch pipeline;It is equipped in main line between branch pipeline and bladder irrigation bag and flows to display device, flow display device includes the synthetic fibres that one end is fixed on connection inside pipe wall, filametntary tensile elongation is not more than the internal diameter of connecting tube, and an amplifying observation device is being equipped on the connection tube wall right above fiber filament.Medical staff can very intuitively observation flushing liquor whether there is stopping instillation, flows decrease or phenomenon of backflowing by flowing to display device;Medical staff can accumulate the blocking clinical data of bladder irrigation by observing and recording filametntary floating state simultaneously, provide more good nursing to be subsequent and lay the foundation.
Description
Technical field:
The invention belongs to technical field of medical auxiliary equipment, in particular to a kind of bladder irrigation connecting tube.
Background technique:
Rinsing bladder is the clinically used training skill operation of Urology Surgery, and transurethral resection of prostate, Bladder stone are cuted out
Remove, tumor of bladder electrocision, in art, it is postoperative need to be rinsed bladder, remove intravesical blood clot, prostate or wing
Guang Nei remnant tissue keeps urine drainage unobstructed, and the correspondence equipment of bladder irrigation is bladder irrigation device.
Existing bladder irrigation device is blood transfusion apparatus (infusion apparatus), the head end of the connector of drainage bag, drainage bag forms.Doctor
Blood transfusion apparatus end, drainage bag head end are trimmed, connected the two with the connector provided for oneself in drainage bag, then by drainage bag head end
It is inserted into catheter, this device uses inconvenience, if blood clot blocks bladder, doctor must be by this device and catheter
Separation, then pumped out clot with syringe connection catheter, the unobstructed of bladder irrigation could be restored, destroy the close of pipeline
Closing property, while when cystospasm or blood clot blocking bladder, flushing water can be backflowed in infusion bag by flusher, lead to pipe
The retrograde pollution in road.
But since liquid colorless is transparent, and flow velocity is slow, so naked eyes are difficult to observe whether flow velocity changes or block up
Plug, the drop pot of general only equal infusion apparatuses gradually become full could probably know it is following it is underwater do not go, may plug, and drip
Pot, which becomes full, needs certain time accumulation that can find, and blocks and want to restore unobstructed and highly difficult so long
's.
The information disclosed in the background technology section is intended only to increase the understanding to general background of the invention, without answering
When being considered as recognizing or imply that the information constitutes the prior art already known to those of ordinary skill in the art in any form.
Summary of the invention:
The purpose of the present invention is to provide one kind can observe in time drainage whether Liu Chang bladder irrigation connecting tube, thus
Overcome above-mentioned defect in the prior art.
To achieve the above object, the present invention provides a kind of bladder irrigation connecting tubes, including a both ends difference grafting is simultaneously
It is connected to the main line of catheter and bladder irrigation bag, one and supervisor are extended outward on the pipeline of the side of communication channel urinary catheter
The shorter branch pipeline of road connection is equipped with leakage proof rubber plug in the free end of branch pipeline;Branch pipeline is to be used for wing for connecting syringe
After Guang is blocked by clot, aspirate clots are carried out with syringe.
It is equipped in main line between branch pipeline and bladder irrigation bag and flows to display device, flowing to display device includes one
End is fixed on the synthetic fibres of connection inside pipe wall, and synthetic fibres can be floated and be shaken in flushing liquor, thus can be very
Intuitive display flow direction, while the variation of flow velocity can be learnt according to the severe degree of shaking.Filametntary tensile elongation is not
Greater than the internal diameter of connecting tube, this is to facilitate fiber filament that can voluntarily change direction of waving in water (flow) direction transformation, if too long
The actual direction floating of no normal direction will be blocked because of the adherent effect of tube wall.In the connection right above fiber filament
Tube wall is equipped with an amplifying observation device, because fiber filament is very short, very thin, if detecting by an unaided eye is highly difficult something
Feelings, so being observed with magnifying glass just more convenient.
The technical solution that the present invention further limits are as follows:
Preferably, in above-mentioned technical proposal, flowing to display device includes a centre than the pillar that both ends are slightly expanded, the shape
The pillar of shape is can to guarantee firm with main line grafting consolidation, is not in leakage and the possibility that falls;On the top of pillar
Equipped with a circle for the groove of the synthetic fibres setting fastening, groove is opened up for the firm of fiber screw thread bundle, certainly only
Want to detain to fasten to lean on, be arranged a bulge loop or fin etc be also it is complete can with.Be provided in advance on main line diameter with
The comparable through-hole of pillar bottom diameter, this is that pillar is easy to assembly firm with consolidation after assembly for convenience.
Preferably, in above-mentioned technical proposal, the height h of pillar1, main line sidewall thickness h2, main line inner cavity diameter h3
Relationship are as follows: h1-h2< h3/ 5, this is in order to guarantee that pillar does not stop flushing liquor flowing excessively, and also to guarantee fiber
Silk can float in a liquid.
Preferably, in above-mentioned technical proposal, the bottom of pillar is connected with a piece strip silicone band of stream, and the both ends of silicone band are equipped with
The lock mutually fastened, lock are made of salient point and the diameter through-hole compatible with salient point of lens-shaped.This design be for
Amplifying observation device and lock are combined, pillar can be bundled on main line and direct by lock
Filametntary floating state is observed, is killed two birds with one stone.
Preferably, in above-mentioned technical proposal, when in pillar insertion main line, the salient point of silicone band just it is filametntary just
Top fastens through-hole, and for fiber filament just at the focal point of salient point, this is to design observation position and amplifying observation distance.
Preferably, it in above-mentioned technical proposal, in branch pipeline and flows to and is equipped with a list in main line between display device
To valve, when check valve prevents cystospasm, flushing water adverse current enters in flushing pipe and bladder irrigation bag, while can prevent syringe
When aspirate clots, clot is countercurrently to bladder irrigation bag.
Preferably, one is printed in above-mentioned technical proposal, on salient point for positioning the cross of silk thread general orientation, this be for
Medical staff one reference is given, facilitates and compares filametntary floating situation.
Preferably, in above-mentioned technical proposal, it is to record filametntary specific floating that cross, which forms this by dotted line,
Position.
It preferably, further include the registration card for being exclusively used in record fiber filament floating orientation, the record in above-mentioned technical proposal
One and identical cross on salient point are printed on card, this is to facilitate medical staff by observing filametntary floating state come into one
Step learns the change in flow of flushing liquor, takes artificial interference as needed.
Preferably, in above-mentioned technical proposal, cross is made of dotted line, this is that medical staff accurately records for convenience
Filametntary floating state is that better care of patients lays the foundation by accumulation clinical data.
Compared with prior art, the invention has the following beneficial effects:
Medical staff can very intuitively observation flushing liquor whether there is stopping instillation, flow velocity subtracts by flowing to display device
Slow or phenomenon of backflowing, this can help medical staff to restore the unobstructed of bladder irrigation in time, while medical staff can pass through
The blocking clinical data for observing and recording filametntary floating state accumulation bladder irrigation, provides more good nursing to be subsequent
It lays the foundation.
Detailed description of the invention:
Fig. 1 is use state diagram of the invention;
Fig. 2 is the structural schematic diagram for flowing to display device;
Fig. 3 is the structural schematic diagram for flowing to display device;
Fig. 4 is the structural schematic diagram of registration card;
In figure: flow to display device 1, catheter 2, branch pipeline 3, leakage proof rubber plug 4, main line 5, bladder irrigation bag 6, unidirectionally
Valve block 7, silicone band 1.1, pillar 1.2, through-hole 1.3, salient point 1.4, synthetic fibres 1.5, groove 1.6.
Specific embodiment:
Specific embodiments of the present invention will be described in detail below, it is to be understood that protection scope of the present invention is not
It is restricted by specific implementation.
Unless otherwise explicitly stated, otherwise in entire disclosure and claims, term " includes " or its change
Changing such as "comprising" or " including " etc. will be understood to comprise stated element or component, and not exclude other members
Part or other component parts.
Embodiment 1
A kind of bladder irrigation connecting tube, as shown in Figure 1, including that a both ends distinguish grafting and are connected to catheter 2 and bladder
The main line 5 of douche bag 6, extended outward on the pipeline of the side of communication channel urinary catheter 2 one be connected to main line it is shorter
Branch pipeline 3 is equipped with leakage proof rubber plug 4 in the free end of branch pipeline 3;Branch pipeline 3 is for connecting syringe, for bladder by clot
After blocking, aspirate clots are carried out with syringe.
It is equipped in main line 5 between branch pipeline 3 and bladder irrigation bag 6 and flows to display device 1, in branch pipeline and flow direction
A check valve is equipped in main line between display device, when check valve prevents cystospasm, flushing water adverse current enters flushing pipe
In bladder irrigation bag, while when can prevent syringe aspirate clots, clot adverse current is to bladder irrigation bag.
Flow to that display device is as shown in Figures 2 and 3, including a centre than the pillar 1.2 that both ends are slightly expanded, pillar 1.2
Bottom be connected with a piece strip silicone band 1.1 of stream, the both ends of silicone band 1.1 are equipped with the lock mutually fastened, latch by convex lens
The salient point 1.4 and diameter of shape through-hole 1.3 compatible with salient point 1.4 form.
One is printed on salient point for positioning the cross of silk thread general orientation, cross is made of dotted line.
A circle is equipped with for the groove 1.6 of 1.5 setting fastening of synthetic fibres on the top of pillar 1.2, is provided on main line 5 in advance straight
Diameter and the comparable through-hole of 1.2 bottom diameter of pillar.
The height h of pillar 1.21, 5 sidewall thickness h of main line2, 5 inner cavity of main line diameter h3Relationship are as follows: h1-h2<
h3/5
When in pillar insertion main line, the salient point of the silicone band just fasten through-hole in filametntary surface, it is described
Focal point of the fiber filament just at salient point.
As shown in figure 4, further include the registration card for being exclusively used in record fiber filament floating orientation, be printed on registration card one with it is convex
Identical cross on point, the cross are also to be made of dotted line.
Embodiment 2
Main structure and embodiment 1 are consistent, but remove silicone band 1.1, need to only retain one it is convex as disclosed in embodiment 1
Column 1.2,1.5 one end of synthetic fibres are fixed on pillar 1.2, and filametntary tensile elongation is not more than the internal diameter of connecting tube, only
Pillar is inserted into main line, the state of waving of observation synthetic fibres 1.5 can be carried out by external common magnifying glass.
It should be understood that flow to display device in order to allow it is public see it is clearer, so the dimension scale at each position
Not according to actually going to draw, subject to full-size(d) relationship is understood by above-mentioned verbal description.
The aforementioned description to specific exemplary embodiment of the invention is in order to illustrate and illustration purpose.These descriptions
It is not wishing to limit the invention to disclosed precise forms, and it will be apparent that according to the above instruction, can much be changed
And variation.The purpose of selecting and describing the exemplary embodiment is that explaining specific principle of the invention and its actually answering
With so that those skilled in the art can be realized and utilize a variety of different exemplary implementation schemes of the invention and
Various chooses and changes.The scope of the present invention is intended to be limited by claims and its equivalents.
Claims (9)
1. a kind of bladder irrigation connecting tube distinguishes grafting including a both ends and is connected to the supervisor of catheter and bladder irrigation bag
Road, it is characterised in that: extended outward on the pipeline of the side of communication channel urinary catheter one be connected to main line shorter be in charge of
Road is equipped with leakage proof rubber plug in the free end of branch pipeline;It is aobvious that flow direction is equipped in main line between branch pipeline and bladder irrigation bag
Showing device, the display device that flows to includes the synthetic fibres that one end is fixed on connection inside pipe wall, the filametntary stretching
Length is not more than the internal diameter of connecting tube, and an amplifying observation device is being equipped on the connection tube wall right above fiber filament.
2. bladder irrigation connecting tube according to claim 1, it is characterised in that: the display device that flows to includes in one
Between the pillar that is slightly expanded than both ends, be equipped with a circle for the groove of the synthetic fibres setting fastening on the top of the pillar, it is described
Diameter and the comparable through-hole of pillar bottom diameter are provided on main line in advance.
3. bladder irrigation connecting tube according to claim 2, it is characterised in that: the height h of the pillar1, main line side wall
Thickness h2, main line inner cavity diameter h3Relationship are as follows: h1-h2< h3/5。
4. bladder irrigation connecting tube according to claim 2 or 3, it is characterised in that: the bottom of the pillar is connected with stream one
Root strip silicone band, the both ends of the silicone band are equipped with the lock mutually fastened, and the lock is by the salient point of lens-shaped and straight
Diameter through-hole composition compatible with salient point.
5. bladder irrigation connecting tube according to claim 4, it is characterised in that: when the pillar is inserted into main line, institute
The salient point for stating silicone band just fastens through-hole, focal point of the fiber filament just at salient point in filametntary surface.
6. bladder irrigation connecting tube according to claim 1, it is characterised in that: in branch pipeline and flow between display device
Main line in be equipped with a check valve.
7. bladder irrigation connecting tube according to claim 4, it is characterised in that: be printed on one on the salient point for positioning
The cross of silk thread general orientation.
8. bladder irrigation connecting tube according to claim 7, it is characterised in that: the cross is made of dotted line.
9. bladder irrigation connecting tube according to claim 7 or 8, it is characterised in that: further include being exclusively used in record fiber filament
The registration card in orientation is floated, one and identical cross on salient point are printed on the registration card.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720629959.0U CN208212242U (en) | 2017-06-01 | 2017-06-01 | A kind of bladder irrigation connecting tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720629959.0U CN208212242U (en) | 2017-06-01 | 2017-06-01 | A kind of bladder irrigation connecting tube |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208212242U true CN208212242U (en) | 2018-12-11 |
Family
ID=64531867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720629959.0U Expired - Fee Related CN208212242U (en) | 2017-06-01 | 2017-06-01 | A kind of bladder irrigation connecting tube |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208212242U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107224627A (en) * | 2017-06-01 | 2017-10-03 | 南京医科大学第附属医院 | A kind of bladder irrigation connecting tube |
-
2017
- 2017-06-01 CN CN201720629959.0U patent/CN208212242U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107224627A (en) * | 2017-06-01 | 2017-10-03 | 南京医科大学第附属医院 | A kind of bladder irrigation connecting tube |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208641514U (en) | Visual merging ureter sheath | |
CN114699599B (en) | Indwelling needle with slow-release positive pressure device | |
WO2016086832A1 (en) | Indwelling needle having sustained release positive pressure | |
CN104014069A (en) | Visible cerebral ventricle and subdural external drainage system | |
CN206252701U (en) | Multiplex washing pipe light proofing infusion apparatus | |
CN208212242U (en) | A kind of bladder irrigation connecting tube | |
CN201791230U (en) | One-way movable flap side hole guide catheter | |
CN205964577U (en) | Ventricular drainage tube with temperature measurement, pressure measurement, visual and drainage function | |
CN209048886U (en) | A kind of visual portable urethral dilatation device | |
CN107224627A (en) | A kind of bladder irrigation connecting tube | |
CN109498963A (en) | A kind of bladder irrigation catheter | |
CN205434517U (en) | Pancreas gravity intestinal irrigation device | |
CN215961365U (en) | Ureteroscope afterbody flush fluid leak protection drainage device | |
CN205796225U (en) | Urethra dampens catheter special | |
CN102847226A (en) | Safe leakage-proof ureter | |
CN201052291Y (en) | Puncture type one-way enclosed drainage device | |
CN209378262U (en) | A kind of medical catheter and guiding core apparatus | |
CN207745401U (en) | Drainage tube for percutaneous nephrolithotomy | |
CN207575261U (en) | A kind of nerve endoscope flusher | |
CN207575488U (en) | Multi-direction drainage tube | |
CN207708239U (en) | Drainage device for neurosurgery operations | |
CN208448408U (en) | Two-chamber jugular vein intubation both with a kind of high resiliency and flexibility | |
CN202069995U (en) | Unidirectional periosteal flap side-hole guide catheter | |
CN205108491U (en) | Disposable flexible suction aspirator tip | |
CN206482960U (en) | A kind of soft and slender kidney fistulization drainage catheter in end |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181211 Termination date: 20190601 |
|
CF01 | Termination of patent right due to non-payment of annual fee |