CN208205806U - A kind of sintering furnace and its burner hearth of sintered samarium cobalt magnetic material - Google Patents

A kind of sintering furnace and its burner hearth of sintered samarium cobalt magnetic material Download PDF

Info

Publication number
CN208205806U
CN208205806U CN201721921877.XU CN201721921877U CN208205806U CN 208205806 U CN208205806 U CN 208205806U CN 201721921877 U CN201721921877 U CN 201721921877U CN 208205806 U CN208205806 U CN 208205806U
Authority
CN
China
Prior art keywords
graphite
pipe
burner hearth
block
electrode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721921877.XU
Other languages
Chinese (zh)
Inventor
周建斌
马汉云
张武
盛明忠
吴承祖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Ninggang Permanent Magnetic Materials Co Ltd
Original Assignee
Ningbo Ninggang Permanent Magnetic Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Ninggang Permanent Magnetic Materials Co Ltd filed Critical Ningbo Ninggang Permanent Magnetic Materials Co Ltd
Priority to CN201721921877.XU priority Critical patent/CN208205806U/en
Application granted granted Critical
Publication of CN208205806U publication Critical patent/CN208205806U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Details (AREA)

Abstract

The utility model discloses the sintering furnace and its burner hearth of a kind of sintered samarium cobalt magnetic material, including inboard wall of burner hearth, three-phase electricity electrode and three groups of fever routes, the inboard wall of burner hearth includes upper inner wall, lower inner wall, left inside wall and right inner wall, three-phase electricity electrode includes the first burner hearth electrode, second burner hearth electrode and third burner hearth electrode, pass through one group of fever connection between the first burner hearth electrode and the second burner hearth electrode, pass through one group of fever connection between the first burner hearth electrode and third burner hearth electrode, pass through one group of fever connection between the second burner hearth electrode and third burner hearth electrode.The utility model is by being arranged the first burner hearth electrode, the second burner hearth electrode and third burner hearth electrode in burner hearth, and pass through three groups of the first burner hearth of fever connection electrodes, the second burner hearth electrode and third burner hearth electrode, three groups of fever routes are distributed in upper inner wall, lower inner wall, left inside wall and the right inner wall of burner hearth, are evenly heated to four orientation up and down of SmCo magnetic material.

Description

A kind of sintering furnace and its burner hearth of sintered samarium cobalt magnetic material
Technical field
The utility model relates to the sintering furnace of sintering furnace technical field more particularly to a kind of sintered samarium cobalt magnetic material and its Burner hearth.
Background technique
In field of material processing, many metal materials require to carry out heat treatment process and cooling process; Pass through vacuum-sintering only in heat treatment process, and could be obtained in cooling process by being quickly cooled down Optimal material property.By taking SmCo magnetic material as an example, its heat treatment process requirement vacuum degree is good, temperature deviation is small, Its cooling process requires cooling velocity fast, therefore the Equipment for Heating Processing needs for carrying out the two process can be to constant temperature Heating chamber carry out high accuracy temperature control so that heated at constant temperature it is intracavitary temperature it is uniform.
Existing Chinese patent notification number is a kind of external-heat vacuum sintering gas quenching furnace of CN202322922U comprising furnace body It is interior to be equipped with heated at constant temperature chamber, external heating component is equipped with outside the furnace body of corresponding heated at constant temperature chamber;Vacuum evacuation device passes through pumping Vacuum line is connected to heated at constant temperature chamber;Blower passes through backwind tube and discharge pipe respectively and is connected to the front and back end of heated at constant temperature chamber; Temperature-measuring part is set to the central part of heated at constant temperature chamber, and is electrically connected by conducting wire with main control module;Main control module and heater The electrical connection of structure driving part, and external heating component is driven by heating mechanism driving part.Above-mentioned external-heat vacuum is burnt Knot air-quenching furnace passes through left half calandria and right half calandria is set to the outside of corresponding this part furnace body of heated at constant temperature chamber, is used for pair Heated at constant temperature chamber is heated, so, heated at constant temperature chamber first be heated again to SmCo magnetic material heat, heating efficiency compared with It is low, meanwhile, heated at constant temperature chamber is not heater, and in thermal histories, heated at constant temperature chamber, which is difficult to ensure, to be heated evenly, and constant temperature is being passed through When heating chamber again heats SmCo magnetic product, SmCo magnetic product can not be allowed to be heated evenly.
Existing Chinese patent is disclosed as the Multifunction vacuum furnace of CN106500503A comprising heating room, before heating room Portion is movably set with front left and right air door, is symmetrically installed rear left and right commutation air door, each air door cylinder peace at heating outdoor, air duct end Outside furnace shell, cylinder piston rod by sealing structure pass through furnace shell connect with air door pin shaft;When advantage is to heat, front left and right Air door closes air door, and no venthole avoids energy loss during heating, energy conservation, while guaranteeing heating more evenly;? When cooling, it is big that front left and right air door opens wide amplitude, while rear left and right air door can be switched, i.e., air-flow is inside and outside heating room, left and right Alternately commutation flowing, commutating period can set.But above-mentioned Multifunction vacuum furnace heats not uniform enough, burner hearth pair to product Product heating, does not heat product from the upper inner wall of burner hearth, lower inner wall, left inside wall and right inner wall, and product cannot be from each A direction is heated, while when being heated by burner hearth to product, often heating from several heat generating spots to product, product It is difficult to be heated evenly.
Summary of the invention
The technical problem to be solved by the utility model is to propose that one kind can for the above-mentioned deficiency of the prior art Allow the sintering furnace and its burner hearth of the product sintered samarium cobalt magnetic material of thermally equivalent up and down.
The utility model solves its technical problem the technical solution adopted is that a kind of sintering furnace of sintered samarium cobalt magnetic material And its burner hearth characterized by comprising
Inboard wall of burner hearth, including upper inner wall, lower inner wall, left inside wall and right inner wall;
Three-phase electricity electrode, including the first burner hearth electrode, the second burner hearth electrode and third burner hearth electrode, the first burner hearth electricity In the upper inner wall, the left inside wall is arranged in the second burner hearth electrode for pole setting, and the third burner hearth electrode is arranged described Right inner wall;
Three groups of fever routes, every group of fever route include multiple graphite-pipes and multiple graphite blocks;The graphite-pipe and graphite It is connected between pipe by graphite block;The total length of heating strip in every group of fever route is consistent;
Wherein, between the first burner hearth electrode and the second burner hearth electrode by one group of fever connection, described first Pass through one group of fever connection, the second burner hearth electrode and third burner hearth electrode between burner hearth electrode and third burner hearth electrode Between pass through one group of fever connection.
Further, the length of each graphite-pipe is consistent.
Further, the outer diameter at each graphite-pipe both ends is less than the outer diameter at position among the graphite-pipe.
Further, the multiple graphite-pipe is spaced and parallel is set to inboard wall of burner hearth, passes through graphite between adjoining graphite pipe Block head and the tail concatenate.
Further, multiple graphite-pipes include the first graphite-pipe, the second graphite-pipe, third graphite in three groups of fever routes Pipe, the 4th graphite-pipe, the 5th graphite-pipe, the 6th graphite-pipe, the 7th graphite-pipe, the 8th graphite-pipe, the 9th graphite-pipe, the tenth graphite Pipe, the 11st graphite-pipe, the 12nd graphite-pipe, the 13rd graphite-pipe, the 14th graphite-pipe, the 15th graphite-pipe, the 16th stone Mo Guan, the 17th graphite-pipe and the 18th graphite-pipe;
Multiple graphite blocks include the first graphite block, the second graphite block, third graphite block, the 4th graphite in three groups of fever routes Block, the 5th graphite block, the 6th graphite block, the 7th graphite block, the 8th graphite block, the 9th graphite block, the tenth graphite block, the 11st stone Ink stick, the 12nd graphite block, the 13rd graphite block, the 14th graphite block, the 15th graphite block, the 16th graphite block, the 17th Graphite block and the 18th graphite block;
The centre of first graphite block is connected with the first burner hearth electrode, one end of first graphite block and the 18th stone The front end of black pipe, the other end are connected with the front end of first graphite-pipe;One end of second graphite block and described first The rear end of graphite-pipe, the other end are connected with the rear end of second graphite-pipe;One end of the third graphite block and described the The front end of two graphite-pipes, the other end are connected with the front end of the third graphite-pipe;One end of 4th graphite block with it is described The rear end of third graphite-pipe, the other end are connected with the rear end of the 4th graphite-pipe;One end of 5th graphite block and institute The front end of the 4th graphite-pipe is stated, the other end is connected with the front end of the 5th graphite-pipe;One end of 6th graphite block with The rear end of 5th graphite-pipe, the other end are connected with the rear end of the 6th graphite-pipe;The centre of 7th graphite block Be connected with the second burner hearth electrode, the front end of one end of the 7th graphite block and the 6th graphite-pipe, the other end with it is described The front end of 7th graphite-pipe is connected;The rear end of one end of the 8th graphite block and seven graphite-pipe, the other end with it is described The rear end of 8th graphite-pipe is connected;One end of 9th graphite block and the front end of the 8th graphite-pipe, the other end and institute The front end for stating the 9th graphite-pipe is connected;The rear end of one end of the tenth graphite block and the 9th graphite-pipe, the other end with The rear end of tenth graphite-pipe is connected;One end of 11st graphite block and the front end of the tenth graphite-pipe, it is another End is connected with the front end of the 11st graphite-pipe;Behind one end of 12nd graphite block and the 11st graphite-pipe End, the other end are connected with the rear end of the 12nd graphite-pipe;The centre of 13rd graphite block and third burner hearth electrode It is connected, one end of the 13rd graphite block and the front end of the 12nd graphite-pipe, the other end and the 13rd graphite The front end of pipe is connected;The rear end of one end of the 14th graphite block and the 13rd graphite-pipe, the other end and described the The rear end of 14 graphite-pipes is connected;One end of 15th graphite block and the front end of the 14th graphite-pipe, the other end It is connected with the front end of the 15th graphite-pipe;One end of 16th graphite block and the rear end of the 15th graphite-pipe, Its other end is connected with the rear end of the 16th graphite-pipe;One end of 17th graphite block and the 16th graphite-pipe Front end, the other end is connected with the front end of the 17th graphite-pipe;One end and the described tenth of 18th graphite block The rear end of seven graphite-pipes, the other end are connected with the rear end of the 18th graphite-pipe.
Further, each graphite block is provided with fixing seat, and the fixing seat is fixed on the inboard wall of burner hearth.
Further, further include the burner hearth frame that the end face of burner hearth is set, the burner hearth frame be carbon fibre materials or Molybdenum materials matter.
A kind of sintering furnace of sintered samarium cobalt magnetic material, the sintering furnace have the burner hearth.
The utility model is led to by the way that the first burner hearth electrode, the second burner hearth electrode and third burner hearth electrode is arranged in burner hearth Three groups of the first burner hearth of fever connection electrodes, the second burner hearth electrode and third burner hearth electrode, three groups of fever routes are crossed to be distributed in Upper inner wall, lower inner wall, left inside wall and the right inner wall of burner hearth uniformly add to four orientation up and down of SmCo magnetic material Heat.
Detailed description of the invention
Fig. 1 is the overall schematic of sintering furnace;
Fig. 2 is the structural representation of furnace shell and burner hearth;
Fig. 3 is the structural schematic diagram of hinged fire door;
Fig. 4 is the overall schematic of electrode connecting structure;
Fig. 5 is the structural schematic diagram of fever route;
Fig. 6 is the structural schematic diagram of light reflecting board;
Fig. 7 is the structural schematic diagram of cylinder;
Fig. 8 is the partial sectional view of cylinder.
Specific embodiment
It is specific embodiment of the utility model and in conjunction with attached drawing below, the technical solution of the utility model is made further Description, but the utility model is not limited to these examples.
Please refer to Fig. 1-Fig. 8, the utility model a kind of sintering furnace and its burner hearth of sintered samarium cobalt magnetic material, sintering furnace packet Include furnace body, vacuum system, cooling system and PLC intelligence control system.
Furnace body, including furnace shell 100 and the burner hearth 200 being arranged in furnace shell 100;Furnace shell both ends are respectively arranged with stationary furnace Door, hinged fire door;The inside of hinged fire door 300 is equipped with the burner hearth pad 310 for closed furnace 200;The fixed fire door is fixed One end of furnace shell is closed in one end of furnace shell, the other end of furnace shell and the hinged fire door are hinged;The burner hearth 200 is leaned to one side Equipped with left ventilation opening 210 and right ventilation opening 220, the burner hearth 200, which is additionally provided with, is respectively used to close left ventilation opening 210, right ventilation The left air door 230 and right air door 240 of mouth 220, the inner wall of the burner hearth 200, which is respectively equipped with, covers left ventilation opening 210 and right ventilation The left light reflecting board 250 and right light reflecting board 250 of mouth 220.
With the air duct 150 that air feed is current in the furnace shell 100.
Vacuum system makes burner hearth 200 be in vacuum state for pumping the air in burner hearth 200.
Cooling system includes the blower 140 in furnace shell 100 and the heat exchanger 110 in furnace shell 100, the heat exchange There is interval 170, heat exchanger 110 is between blower 140 and burner hearth 200 between device 110 and burner hearth 200.The interval 170 Both ends are respectively provided with the first commutation air door 120 and the second commutation air door 130, the first commutation air door 120 and the second commutation wind Door 130 can be with the flow direction of 100 movable contact of furnace shell and then change wind on air duct 150.
Cooling system is for cooling down SmCo magnetic material, by controlling left air door 230, the commutation air door of right air door 240, first 120 and second commutation air door 130 opening and closing, starting blower 140 make cooling gas air duct 150, burner hearth 200 and heat exchange It is circulated between device 110, and then cooling SmCo magnetic material.
The air duct 150 is in the outside of burner hearth 200 and heat exchanger 110, and wind can be on the left of air duct 150 be outside burner hearth 200 To the external right side of burner hearth 200, or the outer left side from 200 external right side of burner hearth to burner hearth 200.
PLC intelligence control system, for controlling the operation of vacuum system and cooling system.
The furnace body is additionally provided with multiple electrodes connection structure 400, and one end setting of each electrode connecting structure 400 exists Outside furnace shell 100 and external power supply, the other end protrude into burner hearth 200;The inner wall of burner hearth 200 is equipped with multiple fever routes 260, described The both ends of fever route 260 respectively connect an electrode connecting structure 400.
The electrode connecting structure 400 includes ceramic tube 410, graphite electrode 430 and mains connection 420;The ceramics Pipe 410 passes through the side wall of burner hearth and protrudes into burner hearth 200;The graphite electrode 430 is in ceramic tube 410;Its both ends is stretched out The one end at the both ends of ceramic tube 410, the mains connection 420 is in outside furnace shell 100, and the other end penetrates furnace shell 100 and furnace It is connected between thorax 200 and with graphite electrode 430.Ceramic tube 410 insulate, and allows graphite electrode 430 and the burner hearth 200 without direct Contact avoids generating electric spark.
400 external power supply of electrode connecting structure is simultaneously powered for the fever route 260 in burner hearth 200, meanwhile, electrode connection knot Structure 400 can be cooled down by cooling tube 440.
The graphite electrode 430 also covers that there are two be respectively held against the graphite nut 450 at ceramic tube both ends.
One end of the mains connection 420 is in outside furnace shell 100, and the other end penetrates between furnace shell 100 and burner hearth 200 And it is connected with graphite electrode 430.
Graphite electrode 430 is not directly contacted with the burner hearth 200, is avoided generating spark, be existed by 450 sets of graphite nut To fix ceramic tube 410 on graphite electrode 430, the graphite high temperature resistant is unlikely to deform, is easily worked simultaneously.
The mains connection 420 includes copper bar 421, connector 422 and conductive seat 423, and the connector 422 connects copper Bar 421 and graphite electrode 430, the conductive seat 423 connects copper bar 421, and is pierced by between furnace shell 100 and burner hearth 200 to furnace Outside shell 100;The conductive seat 423 can be Ginza, copper seat or aluminium seat, and conductive seat 423 is mainly used for conduction, and connector 422 is used for Connect copper bar 421 and graphite electrode 430.
The connector 422 can be molybdenum block or tungsten block, and the molybdenum block is pressed by multiple molybdenum sheets, and the tungsten block is by multiple leaf It is pressed into;The thermal expansion coefficient of molybdenum block and tungsten block high temperature resistant, molybdenum and tungsten is very low, in graphite electrode 430 when for the power supply of burner hearth 200, The temperature of the graphite electrode 430 is very high, and molybdenum block or tungsten block are hardly expanded touching 430 bring heat of electrode, in this way Copper bar 421 and graphite electrode 430 will not be damaged.
One end that furnace shell 100 is pierced by the conductive seat 423 is equipped with hollow groove, and hollow groove is passed through for cold water, and hollow groove is simultaneously Non- through slot, cold water, which enters in hollow groove, to flow back, and main purpose is that the heat of conductive seat 423 is taken away by cold water, wherein copper bar 421 are connected with the conductive seat 423, and the hollow groove can be passed through in copper bar 421, cool down copper bar 421 by water in hollow groove.
The electrode connecting structure 400 further includes cooling tube 440, including tube head 441 and hollow cooling mouth 442;Institute It states cooling 442 one end of mouth to protrude into tube head 441, the other end protrudes into the hollow groove;The inner wall of the tube head 441 and cooling mouth There is liquid gap 443 between 442 outer wall;
The tube head 441 is equipped with inlet 441a and liquid outlet 441b, and the inlet 441a and the cooling mouth 442 connect Logical, the liquid outlet 441b is connected to liquid gap 443 out.It is injected in hollow groove by injection cold water, to cool down conductive seat 423, Avoid 423 temperature of conductive seat excessively high.
Cold water enters in hollow groove and flows back, and is gone out liquid gap 443 and arrives liquid outlet 441b outflow again.
The conductive seat 423 is equipped with connector 423b, and the tube head 441 is equipped with the fixation for being in 443 periphery of liquid gap out Edge 444, the fixed edge are connected along 444 with the connector 423b.
The cooling tube 440 is additionally provided with the sealing ring for being in the connector 423b and the fixed edge between 444, Cooling water is avoided to overflow by sealing ring sealing.
The conductive seat 423 is additionally provided with the fixed disc 423a for being fixed on 100 outer wall of furnace shell, and fixed disc 423a is used for Fixed conductive seat 423, is connect with facilitating with external power supply.
The graphite electrode 430 protruded into burner hearth 200 is three, respectively the first burner hearth electrode 431, the second burner hearth electrode 432 and third burner hearth electrode 433.
Fever route 260 in 200 inner wall of burner hearth is three groups, and one group of fever route 260 connects the first burner hearth electrode 431 With the second burner hearth electrode 432, one group of fever route 260 connects the second burner hearth electrode 432 and third burner hearth electrode 433, one group of hair Hot line road 260 connects the first burner hearth electrode 431 and third burner hearth electrode 433.
For three groups of fever routes 260 for generating heat, the three-phase electricity electrode external power supply is three groups of fever routes 260 confession Electricity, three-phase electricity electrode include the first burner hearth electrode 431, the second burner hearth electrode 432 and third burner hearth for being distributed in 200 inner wall of burner hearth Electrode 433;The burner hearth 200 further includes three groups of fever routes 260, and one group of fever route 260 connects 431 He of the first burner hearth electrode Second burner hearth electrode 432, one group of fever route 260 connect the second burner hearth electrode 432 and third burner hearth electrode 433, one group of fever Route 260 connects the first burner hearth electrode 431 and third burner hearth electrode 433.
Three groups of fever routes 260 are distributed in upper inner wall, lower inner wall, left inside wall and the right inner wall of burner hearth 200.
The burner hearth pad 310 is equipped with the first burner hearth pad electrode 311, the second burner hearth pad electrode 312 and fever circuit 320, institute It states fever circuit 320 and connects the first burner hearth pad electrode 311 and the second burner hearth pad electrode 312;The outside of the hinged fire door 300 is in Spheric.
For generating heat, the first burner hearth pad electrode 311, the second burner hearth pad electrode 312 are used for as institute in fever circuit 320 Fever circuit 320 is stated to power.
When hinged fire door 300 closes furnace shell 100, the burner hearth pad 310 closes the both ends of the burner hearth 200;At this point, can It is generated heat by the fever route 260 in burner hearth 200, the fever circuit 320 on burner hearth pad 310.
SmCo magnetic material is placed in burner hearth 200, the front and back up and down of SmCo magnetic material is by three groups of fevers It is heated in route 260 and fever circuit 320, so that SmCo magnetic material is heated evenly.
It may make the heating of burner hearth 200 more evenly by light reflecting board 250, cooling is more uniform.
The light reflecting board 250 is equipped with a plurality of gap 251 arranged in parallel, and the light reflecting board 250 is additionally provided in seam The reserved edge 252 of 251 periphery of gap;The gap 251 of light reflecting board 250 after sintering furnace sintered products, needs to produce for divulging information Product are cooling, lead to cold SmCo magnetic material by opening left air door 230 or right air door 240.
One light reflecting board 250 covers left ventilation opening 210 and is in the right side of left air door 230, and another light reflecting board 250 covers Right ventilation opening 220 and the left side for being in right air door 240, light reflecting board 250 are used for the thermal energy reflected in burner hearth 200, and sintering furnace exists When heating product, the temperature of burner hearth 200 is very high, and a large amount of thermal energy can be generated in burner hearth 200;By light reflecting board 250 can accumulation of heat, and The heat in burner hearth 200 is reflected, so as to improve the heating efficiency of sintering furnace, while by the heat in reflection burner hearth 200, makes furnace Temperature in thorax 200 is more uniform, and the light reflecting board 250, which is equipped with a plurality of gap arranged in parallel, can make burner hearth uniform ventilation 251。
The light reflecting board 250 be graphite material, can high temperature resistant, be unlikely to deform.
The quantity of the light reflecting board 250 is two, and in the present embodiment, it is anti-that two light reflecting boards 250 can be divided into left light Plate and right light reflecting board are penetrated, left air door 230 and right air door 240, described two 250 bilateral symmetries of light reflecting board are covered each by.
The a plurality of gap 251 longitudinal arrangement or transversely arranged, equal longitudinal arrangement or balanced mutually arrangement, are conducive to uniformly logical Wind makes the cooling effect of SmCo magnetic material more preferable.
The distance between adjacent slits 251 are equal, can be uniformly logical through light reflecting board 250 in the burner hearth 200 when ventilation Wind.
The light reflecting board 250 is additionally provided with multiple fixing bolts, and multiple fixing bolts are surrounded along the reserved edge 252 One circle, multiple fixing bolts both pass through reserved edge 252 and are fixedly linked with the burner hearth 200.
The light reflecting board 250 is in rectangle, and the shape of the light reflecting board 250 can be according to left ventilation opening 210, right ventilation opening 220 shape setting.
SmCo magnetic material is placed in burner hearth 200,310 closed furnaces 200 are padded by burner hearth, to SmCo magnetic material When heating, need to close left air door 230 or right air door 240.The heating efficiency of burner hearth 200 can be improved by light reflecting board 250.
Left air door 230, the commutation air door 120 of right air door 240, first and the second commutation air door 130 are driven by cylinder:
The sintering furnace is provided with multiple cylinders 500, and in this embodiment, sintering furnace is equipped with a cylinder 500 and is used for Left air door 230 is driven, one end of the cylinder 500 is fixed on the left side of furnace shell 100, and the other end is connected with the left air door 230.It burns Freezing of a furnace is additionally provided with another cylinder 500, and for driving right air door 240, one end of the cylinder 500 is fixed on the right side of furnace shell 100, separately One end is connected with the right air door 240.The sintering furnace respectively drives the first commutation air door 120, second commutation wind there are two setting The cylinder 500 of door 130.
Pass through cooling system control the first commutation commutation of air door 120, second air door 130, left air door 230 and right air door 240 Opening and closing so that cooled hearth 200.
The cylinder 500 includes cylinder barrel 510, cylinder head 520, cylinder bottom 530 and piston rod 540, and the both ends of cylinder barrel 510 are distinguished Connection cylinder head 520 and cylinder bottom 530, the piston rod 540 protrude into cylinder barrel 510, and it is close that the piston rod 540 is arranged with the first cylinder Seal 541 and the second cylinder seal circle 542, the second cylinder seal circle 542 are in cylinder barrel 510 and touch cylinder head 520;Institute It states cylinder 500 and passes through the left air door 230 of flexible driving or right air door 240 of piston rod 540 or the first commutation air door 120 or the Two commutation air doors 130.
There is annular space 560 between the first cylinder seal circle 541 and the second cylinder seal circle 542;The cylinder barrel 510 vacuumize hole 512 equipped with what is be connected to the annular space 560, and for piston 540 in activity, air is possibly into the annular Space 560 eventually enters into burner hearth 200, by pumping the air of annular space 560, allows annular space 560 always in true Dummy status, and then prevent air from entering in burner hearth 200.
The cylinder barrel 510 is equipped with air inlet 511.
The outer wall of the cylinder barrel 510 is equipped with the air inlet pipe 514 being connected to air inlet 511.
The outer wall of the cylinder barrel 510 is equipped with and the vacuum-pumping tube 513 for vacuumizing hole 512 and being connected to, the vacuum-pumping tube 513 are circumscribed with vacuum evacuation device, pump the air that vacuum plant extracts annular space 560, locate the annular space 560 always In vacuum state.
The cylinder bottom 530 is equipped with the cylinder fixed disk 531 being fixed on furnace shell 100, the piston rod 540 and the air door Hingedly;The air door can be above-mentioned left air door 230, the commutation air door 120 of right air door 240, first and the second commutation air door 130.
Specifically, left air door 230, the commutation air door 120 of right air door 240, first and the second commutation are controlled in cooling system When the closing and unlatching of air door 130, pass through the left air door 230 of the flexible driving of cylinder 500, the commutation air door of right air door 240, first 120 and second commutation air door 130 closing and unlatching, the piston rod 540 of the cylinder 500 extends so that the air door is closed, Piston rod 540 bounces back, and opens air door.
When being sintered stove heating product, to allow product to be heated evenly;
In upper inner wall, the second burner hearth electrode 432 is arranged in the left inside wall for the setting of first burner hearth electrode 431, The third burner hearth electrode 433 is arranged in the right inner wall, and the left inside wall and right inner wall are symmetrical.
Every group of fever route 260 includes multiple graphite-pipes 261 and multiple graphite blocks 262, and the multiple graphite-pipe 261 is spaced It is arranged in parallel in the upper inner wall, lower inner wall, left inside wall and right inner wall;Pass through between the graphite-pipe 261 and graphite-pipe 261 Graphite block 262 is connected.
It is distributed the position of the first burner hearth electrode 431, the second burner hearth electrode 432 and third burner hearth electrode 433 in this way, The first burner hearth electrode 431, the second burner hearth electrode 432 and third burner hearth electrode 433 are being connected by fever route 260;So that hair Hot line road 260 more uniform can be distributed on 200 inner wall of burner hearth.
In this embodiment, the first burner hearth electrode 431 is in the middle position of the upper inner wall front end, and described Two burner hearth electrodes 432 are in the position of the left side wall front end on the lower, before the third burner hearth electrode 433 is in the right side wall The position of end on the lower.
Specifically, multiple graphite-pipes 261 include the first graphite-pipe, the second graphite-pipe, third in three groups of fever routes 260 Graphite-pipe, the 4th graphite-pipe, the 5th graphite-pipe, the 6th graphite-pipe, the 7th graphite-pipe, the 8th graphite-pipe, the 9th graphite-pipe, the tenth Graphite-pipe, the 11st graphite-pipe, the 12nd graphite-pipe, the 13rd graphite-pipe, the 14th graphite-pipe, the 15th graphite-pipe, the tenth Six graphite-pipes, the 17th graphite-pipe and the 18th graphite-pipe;
Multiple graphite blocks 262 include the first graphite block, the second graphite block, third graphite block, the in three groups of fever routes 260 Four graphite blocks, the 5th graphite block, the 6th graphite block, the 7th graphite block, the 8th graphite block, the 9th graphite block, the tenth graphite block, 11 graphite blocks, the 12nd graphite block, the 13rd graphite block, the 14th graphite block, the 15th graphite block, the 16th graphite block, 17th graphite block and the 18th graphite block;
The centre of first graphite block is connected with the first burner hearth electrode 431, one end of first graphite block and the described tenth The front end of eight graphite-pipes, the other end are connected with the front end of first graphite-pipe;One end of second graphite block with it is described The rear end of first graphite-pipe, the other end are connected with the rear end of second graphite-pipe;One end of the third graphite block and institute The front end of the second graphite-pipe is stated, the other end is connected with the front end of the third graphite-pipe;One end of 4th graphite block with The rear end of the third graphite-pipe, the other end are connected with the rear end of the 4th graphite-pipe;One end of 5th graphite block With the front end of the 4th graphite-pipe, the other end is connected with the front end of the 5th graphite-pipe;The one of 6th graphite block The rear end at end and the 5th graphite-pipe, the other end are connected with the rear end of the 6th graphite-pipe;7th graphite block Centre is connected with the second burner hearth electrode 432, one end of the 7th graphite block and the front end of the 6th graphite-pipe, the other end It is connected with the front end of the 7th graphite-pipe;One end of 8th graphite block and the rear end of seven graphite-pipe, the other end It is connected with the rear end of the 8th graphite-pipe;One end of 9th graphite block and the front end of the 8th graphite-pipe, it is another End is connected with the front end of the 9th graphite-pipe;One end of tenth graphite block and the rear end of the 9th graphite-pipe, it is another One end is connected with the rear end of the tenth graphite-pipe;One end of 11st graphite block and the front end of the tenth graphite-pipe, Its other end is connected with the front end of the 11st graphite-pipe;One end of 12nd graphite block and the 11st graphite-pipe Rear end, the other end is connected with the rear end of the 12nd graphite-pipe;The centre of 13rd graphite block and third burner hearth Electrode 433 is connected, one end of the 13rd graphite block and the front end of the 12nd graphite-pipe, the other end and the described tenth The front end of three graphite-pipes is connected;The rear end of one end of the 14th graphite block and the 13rd graphite-pipe, the other end with The rear end of 14th graphite-pipe is connected;One end of 15th graphite block and the front end of the 14th graphite-pipe, The other end is connected with the front end of the 15th graphite-pipe;One end of 16th graphite block and the 15th graphite-pipe Rear end, the other end are connected with the rear end of the 16th graphite-pipe;One end and the described 16th of 17th graphite block The front end of graphite-pipe, the other end are connected with the front end of the 17th graphite-pipe;One end of 18th graphite block and institute The rear end of the 17th graphite-pipe is stated, the other end is connected with the rear end of the 18th graphite-pipe.
Wherein, the length of each graphite-pipe 261 is consistent, the total length of multiple graphite-pipes of every group of fever route 260 Unanimously.Three groups of fever routes 260 can be allowed in adstante febre in this way, the resistance of every group of fever route 260 is similar, so that every The heating effect of fever route 260 is similar.Graphite-pipe high temperature resistant, it is indeformable in the case of a high temperature.The graphite-pipe is described in The axial setting of burner hearth 200, the length of the graphite-pipe 261 are slightly shorter than the length of burner hearth 200, each 261 both ends of graphite-pipe Outer diameter be less than the outer diameter at the intermediate position of the graphite-pipe 261, among the resistance ratio graphite-pipe 261 at each 261 both ends of graphite-pipe The resistance at position is big, and the heat of generation is more, and making up 261 both ends of graphite-pipe in this way from SmCo magnetic material leads to heating not farther out Equal defect, when such three groups of fever routes 260 heat product, three groups of fever routes 260 are covered with the interior of entire burner hearth 200 Wall, in this way, SmCo magnetic material is when heated, it up and down can thermally equivalent.
Each graphite block 262 is provided with fixing seat, and the fixing seat is fixed on 200 inner wall of burner hearth.
In this embodiment, the fever circuit 320 includes multiple lateral graphite bars 321 and multiple longitudinal graphite bars 322, the multiple transverse direction graphite bar 321 is connected with the multiple longitudinal graphite bar 322 makes the fever circuit 320 in a string Join circuit, the both ends in the fever circuit 320 are separately connected the first burner hearth pad electrode 311 and the second burner hearth pad electrode 312.
Multiple transverse direction graphite bars 321 include the first lateral graphite bar, the second lateral graphite bar, third transverse direction graphite bar, the Four lateral graphite bars, the 5th lateral graphite bar, the 6th lateral graphite bar and the 7th lateral graphite bar;Multiple longitudinal direction graphite bars 322 Including first longitudinal direction graphite bar, second longitudinal direction graphite bar, third longitudinal direction graphite bar, the 4th longitudinal graphite bar, the 5th longitudinal graphite Article and the 6th longitudinal graphite bar;One end of the first lateral graphite bar connects the first burner hearth and pads electrode 311, other end connection the The upper end of one longitudinal graphite bar;The lower end of one end connection first longitudinal direction graphite bar of described second lateral graphite bar, the other end connect Connect the lower end of second longitudinal direction graphite bar;The upper end of one end connection second longitudinal direction graphite bar of the third transverse direction graphite bar, it is another The upper end of end connection third longitudinal direction graphite bar;The lower end of one end connection third longitudinal direction graphite bar of described 4th lateral graphite bar, The lower end of the longitudinal graphite bar of other end connection the 4th;The longitudinal graphite bar of one end connection the 4th of the lateral graphite bar of described the 5th Upper end, the upper end of the longitudinal graphite bar of other end connection the 5th;The longitudinal graphite of one end connection the 5th of described 6th lateral graphite bar The lower end of item, the lower end of the longitudinal graphite bar of other end connection the 6th;The longitudinal graphite of one end connection the 6th of 7th lateral graphite bar The upper end of item, the other end connect the second burner hearth and pad electrode 312.
The second longitudinal direction graphite bar, third longitudinal direction graphite bar, the length of the 4th longitudinal graphite bar and the 5th longitudinal graphite bar Degree is consistent;The first longitudinal direction graphite bar length is equal to the length of the 6th longitudinal graphite bar, and is greater than second longitudinal direction graphite bar Length.
At described second lateral graphite bar, the 4th lateral graphite bar and the 6th lateral graphite bar on the same line.
Symmetrically, the gap between adjacent longitudinal direction graphite bar 322 is equal in the fever circuit 320.
The fever circuit 320 is generated heat by multiple lateral graphite bars 321, longitudinal graphite bar 322, and the fever circuit 320 bilateral symmetries, lateral graphite bar 321, longitudinal graphite bar 322 are distributed on burner hearth pad 310, when the fever pair of fever circuit 320 When SmCo magnetic material heats, burner hearth pad 310 is not given off heat from any to SmCo magnetic material, and one piece of region is to production Product give off heat, so that product is heated evenly.
The hinged fire door can be contacted with burner hearth end face, and the burner hearth end face contacted with hinged fire door is equipped with burner hearth frame, institute Stating burner hearth frame 270 can be carbon fibre materials or molybdenum materials matter;The burner hearth pad 310 is equipped with connecting frame 313, the connecting frame 313 It can be carbon fibre materials or molybdenum materials matter;When burner hearth pads 310 closed furnace 200, the connecting frame 313 and the burner hearth frame 270 contacts.
The transverse direction graphite bar 321 and longitudinal graphite bar 322 are the graphite that section is rectangle, the lateral stone of graphite material Ink-stick 321 and longitudinal graphite bar 322 are stable under high temperature environment, are unlikely to deform.
The burner hearth pad 310 is equipped with multiple fixing pieces, and the multiple fixing piece is arranged on burner hearth pad, and with fever circuit 320 are fixedly linked.
In this way, SmCo magnetic material is placed in burner hearth 200, and closed furnace 200, SmCo magnetic material is heated When, the fever circuit 320 on three groups of fever routes 260, burner hearth pad 310 generates heat, and the front and back up and down of SmCo magnetic material is Can be heated, burner hearth 200 can be improved in this way and heat the efficiency of product, and SmCo magnetic material can be allowed to be uniformly heated.
Hinged fire door 300 can be made to seal furnace shell 100 by shutdown mechanism, and burner hearth pad 310 can be made to seal burner hearth simultaneously 200。
Furnace shell 100 need to be closed by hinged fire door 300,310 closed furnaces 200 are padded by burner hearth, then pass through vacuum system System pumps the air of burner hearth 200.
The hinged fire door 300 is equipped with burner hearth pad 310 with closed furnace 200, and the hinged fire door 300 is equipped with furnace frame 330, The both ends of the furnace shell 100 are equipped with 100 end face of furnace shell that can be contacted with furnace frame 330, and 100 end face of furnace shell is sealed equipped with furnace shell Circle 150, when hinged fire door 300 closes furnace shell 100, the burner hearth pads 310 closed furnaces 200, at this point, the furnace frame 330 with Furnace shell sealing ring 150 is affixed, and the burner hearth pad 310 is affixed with 200 end face of burner hearth.Hinged fire door 300 is synchronous with burner hearth pad 310 It is acted, closes hinged fire door 300, hinged 300 closed furnace body of fire door, also closed furnace 200 of burner hearth pad 310.
In this embodiment, the inside of hinged fire door 300 has burner hearth pad 310, and the inside of hinged fire door 300 is substantially in Circle, the substantially spherical shape in the outside of hinged fire door 300, the furnace body is generally cylindrical, and the burner hearth pad 310 is in rectangle, The burner hearth 200 is hollow cuboid.
The hinged fire door 300 be additionally provided with it is multiple along hinged fire door 300 radially outward and the first latching tooth that forms a circle 340, the first latching tooth 340 is in the periphery of furnace frame 330.
The shutdown mechanism further includes the cutting ferrule 160 covered in the furnace shell 100, and the cutting ferrule 160 is equipped with multiple along furnace shell 100 radially inwards and the second latch 161 for forming a circle, second latch 161 and the first latching tooth 340 1 it is a pair of It answers, clamping gap is equipped between 100 end face of second latch 161 and the furnace shell, when hinged fire door 300 closes furnace shell 100 When, the first latching tooth 340 is in clamping gap.
When closing hinged fire door 300, first latching tooth 340 is passed through from the slot between the second adjacent latch 161, then Cutting ferrule 160 is rotated, so that the second latch 161 is in contact with first latching tooth 340, the first latching tooth 340 enters the second latch 161 With the clamping gap of 100 end face of furnace shell.
The cutting ferrule 160 is equipped with multiple pulleys 162, and the outer wall of multiple pulleys 162 and the furnace shell 100 can be in rolling contact, In rotation, the pulley 162 rolls the cutting ferrule 160 on furnace shell 100, and the effect of pulley 162 is to facilitate 160 turns of cutting ferrule It is dynamic, to facilitate the hinged fire door 300 of closing.
When hinged fire door 300 closes furnace shell 100, the cutting ferrule 160 can be by the rolling of pulley 162 in furnace shell It is rotated on 100 outer wall, the first latching tooth 340 is in contact with second latch 161, the first latching tooth 340 and second Latch 161 respectively has contact surface, and the contact surface of the first latching tooth 340 or the second latch 161 is inclined-plane.
When first latching tooth 340 and the second latch 161 are in contact, first latching tooth 340 and the mutual clamping of the second latch 161.
By sintering furnace sintered samarium cobalt magnetic material, SmCo magnetic material is placed in burner hearth 200, vacuum system is passed through The air in furnace shell 100 is extracted, so that being vacuum state in furnace shell 100.Pass through fever route 260, the burner hearth in burner hearth 200 Fever circuit 320 on pad 310 generates heat, and then heats to SmCo magnetic material, the heating strip 261 in the route 260 that generates heat It is made of the graphite of tubulose or plate, graphite high temperature resistant is indeformable, also, graphite will not generate the product of cobalt magnetic material It influences.
The light reflecting board 250 of burner hearth 200 plays accumulation of heat, and fever route, the hair of burner hearth are accumulated by light reflecting board 250 The heat that hot loop generates improves the efficiency of heating SmCo magnetic material and keeps the temperature in burner hearth more uniform.
Pass through the method for sintering furnace sintered samarium cobalt magnetic material, which is characterized in that comprising steps of
SmCo magnetic material is placed in burner hearth 200 by S1, and pumping the gas in burner hearth 200 makes to reach in burner hearth 200 Predetermined vacuum degree;
S2, heat up sintered samarium cobalt magnetic material;After temperature in burner hearth 200 reaches preset temperature, heat preservation sintering SmCo magnetic Property material, and inert gas is filled with into burner hearth 200, the sintered samarium cobalt magnetic material under the atmosphere of inert gas,;
S3, cooling SmCo magnetic material.
In step S2, before the sintered samarium cobalt magnetic material that heats up, pre-burning SmCo magnetic material, to SmCo magnetic material into Row electrified regulation is to remove moisture and gasoline.
In step S3, when cooling SmCo magnetic material, left air door 230 is controlled, right air door 240, first commutates wind 120 and the The opening and closing of two commutation air doors 130, starting blower 140 make cooling gas in air duct 150, burner hearth 200 and heat exchanger 110 Between circulate.
Specifically, when sintering starts, first SmCo magnetic material is pushed into burner hearth 200, furnace is pumped by vacuum system Air in thorax 200, when making vacuum degree required for reaching production in burner hearth 200, to ensure SmCo magnetic material in sintering At energy under vacuum conditions.When vacuum degree reaches 1.0 × 10-1When Pa, the low temperature presintering stage is initially entered, to samarium in burner hearth 200 Cobalt magnetic material carries out electrified regulation processing, excludes some remaining moisture and gasoline, vacuum system quickly take exhaust gas away.When When temperature reaches 400 DEG C~600 DEG C or so, into heating sintering stage, continues to heat SmCo magnetic material, exclude difficult volatilization Object improves the vacuum degree in burner hearth 200, and temperature reaches 1100~1220 DEG C of progress heat preservation sinterings, is filled with argon gas into furnace at this time, It is sintered SmCo magnetic material under the atmosphere of inert gas, vacuum degree and temperature is made to keep uniform and stable.
Into cooling stage, left air door 230 is controlled by cooling system, right air door 240 first commutates air door 120 and the Two commutation air doors 130 opening and closing, starting blower 140 make cooling gas air duct 150, burner hearth 200 and heat exchanger 110 it Between circulate.
More specifically, quick in furnace shell 100 by starting blower 140 by the cooling SmCo magnetic material of cooling system It is filled with cooling gas, reaches setting pressure, while right air door 240 is closed, blocks air duct 150, left air door 230 is opened, and wind is opened wide Road 150, blower 140 start, gas flow approach: as 110 → blower of heat exchanger, 140 → cold air is changed from left air door 230 → the first It is after a certain period of time (time can set), left to 120 → SmCo of air door magnetic material → second commutation 130 → heat exchanger of air door 110 Air door 230 is closed, and air duct 150 is blocked, and right air door 240 is opened, and air duct 150 is opened wide, and changes gas flow approach: heat exchanger 110 → blower 140 → the commutation of right air door 240 → the second 130 → SmCo of air door magnetic material → first commutation 120 → heat exchanger of air door 110, keep left air door 230 and the alternately opening and closing of right air door 240 in this way, so that cooling gas commutation cycle, SmCo magnetism material Expect that each position is cooling more evenly, deformation is small, and cooling velocity is faster.
When SmCo magnetic material is cooled to certain temperature, SmCo magnetic material can be taken out.
The specific embodiments described herein are merely examples of the spirit of the present invention.The utility model institute Belonging to those skilled in the art can make various modifications or additions to the described embodiments or using similar Mode substitute, but without departing from the spirit of the present application or beyond the scope of the appended claims.

Claims (8)

1. a kind of sintering furnace burner hearth of sintered samarium cobalt magnetic material characterized by comprising
Inboard wall of burner hearth, including upper inner wall, lower inner wall, left inside wall and right inner wall;
Three-phase electricity electrode, including the first burner hearth electrode, the second burner hearth electrode and third burner hearth electrode, the first burner hearth electrode are set It sets in the upper inner wall, the left inside wall is arranged in the second burner hearth electrode, and the third burner hearth electrode setting is in the right side Wall;
Three groups of fever routes, every group of fever route include multiple graphite-pipes and multiple graphite blocks;The graphite-pipe and graphite-pipe it Between pass through graphite block connect;The total length of heating strip in every group of fever route is consistent;
Wherein, pass through one group of fever connection, first burner hearth between the first burner hearth electrode and the second burner hearth electrode By one group of fever connection between electrode and third burner hearth electrode, between the second burner hearth electrode and third burner hearth electrode Pass through one group of fever connection.
2. a kind of sintering furnace burner hearth of sintered samarium cobalt magnetic material according to claim 1, it is characterised in that: each described The length of graphite-pipe is consistent.
3. a kind of sintering furnace burner hearth of sintered samarium cobalt magnetic material according to claim 1, it is characterised in that: each described The outer diameter at graphite-pipe both ends is less than the outer diameter at position among the graphite-pipe.
4. a kind of sintering furnace burner hearth of sintered samarium cobalt magnetic material according to claim 1, it is characterised in that: the multiple Graphite-pipe is spaced and parallel to be set to inboard wall of burner hearth, is concatenated between adjoining graphite pipe by graphite block head and the tail.
5. a kind of sintering furnace burner hearth of sintered samarium cobalt magnetic material according to claim 4, it is characterised in that: three groups of fevers Multiple graphite-pipes include the first graphite-pipe, the second graphite-pipe, third graphite-pipe, the 4th graphite-pipe, the 5th graphite-pipe, the in route Six graphite-pipes, the 7th graphite-pipe, the 8th graphite-pipe, the 9th graphite-pipe, the tenth graphite-pipe, the 11st graphite-pipe, the 12nd graphite Pipe, the 13rd graphite-pipe, the 14th graphite-pipe, the 15th graphite-pipe, the 16th graphite-pipe, the 17th graphite-pipe and the 18th stone Mo Guan;
In three groups of fever routes multiple graphite blocks include the first graphite block, the second graphite block, third graphite block, the 4th graphite block, 5th graphite block, the 6th graphite block, the 7th graphite block, the 8th graphite block, the 9th graphite block, the tenth graphite block, the 11st graphite Block, the 12nd graphite block, the 13rd graphite block, the 14th graphite block, the 15th graphite block, the 16th graphite block, the 17th stone Ink stick and the 18th graphite block;
The centre of first graphite block is connected with the first burner hearth electrode, one end of first graphite block and the 18th graphite-pipe Front end, the other end is connected with the front end of first graphite-pipe;One end of second graphite block and first graphite The rear end of pipe, the other end are connected with the rear end of second graphite-pipe;One end of the third graphite block and second stone The front end of black pipe, the other end are connected with the front end of the third graphite-pipe;One end of 4th graphite block and the third The rear end of graphite-pipe, the other end are connected with the rear end of the 4th graphite-pipe;One end of 5th graphite block and described the The front end of four graphite-pipes, the other end are connected with the front end of the 5th graphite-pipe;One end of 6th graphite block with it is described The rear end of 5th graphite-pipe, the other end are connected with the rear end of the 6th graphite-pipe;The centre of 7th graphite block and the Two burner hearth electrodes are connected, one end of the 7th graphite block and the front end of the 6th graphite-pipe, the other end and the described 7th The front end of graphite-pipe is connected;One end of 8th graphite block and the rear end of seven graphite-pipe, the other end and the described 8th The rear end of graphite-pipe is connected;The front end of one end of the 9th graphite block and the 8th graphite-pipe, the other end and described the The front end of nine graphite-pipes is connected;The rear end of one end of the tenth graphite block and the 9th graphite-pipe, the other end with it is described The rear end of tenth graphite-pipe is connected;The front end of one end of the 11st graphite block and the tenth graphite-pipe, the other end with The front end of 11st graphite-pipe is connected;One end of 12nd graphite block and the rear end of the 11st graphite-pipe, The other end is connected with the rear end of the 12nd graphite-pipe;The centre of 13rd graphite block is connected with third burner hearth electrode, Before the front end of one end of the 13rd graphite block and the 12nd graphite-pipe, the other end and the 13rd graphite-pipe End is connected;One end of 14th graphite block and the rear end of the 13rd graphite-pipe, the other end and the 14th stone The rear end of black pipe is connected;The front end of one end of the 15th graphite block and the 14th graphite-pipe, the other end with it is described The front end of 15th graphite-pipe is connected;One end of 16th graphite block and the rear end of the 15th graphite-pipe, it is another End is connected with the rear end of the 16th graphite-pipe;Before one end of 17th graphite block and the 16th graphite-pipe End, the other end are connected with the front end of the 17th graphite-pipe;One end of 18th graphite block and the 17th stone The rear end of black pipe, the other end are connected with the rear end of the 18th graphite-pipe.
6. a kind of sintering furnace burner hearth of sintered samarium cobalt magnetic material according to claim 1, it is characterised in that: each described Graphite block is provided with fixing seat, and the fixing seat is fixed on the inboard wall of burner hearth.
7. a kind of sintering furnace burner hearth of sintered samarium cobalt magnetic material according to claim 1, it is characterised in that: further include setting The burner hearth frame in the end face of burner hearth is set, the burner hearth frame is carbon fibre materials or molybdenum materials matter.
8. a kind of sintering furnace of sintered samarium cobalt magnetic material, it is characterised in that: the sintering furnace has claim 1 to 7 any Burner hearth described in.
CN201721921877.XU 2017-12-30 2017-12-30 A kind of sintering furnace and its burner hearth of sintered samarium cobalt magnetic material Active CN208205806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721921877.XU CN208205806U (en) 2017-12-30 2017-12-30 A kind of sintering furnace and its burner hearth of sintered samarium cobalt magnetic material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721921877.XU CN208205806U (en) 2017-12-30 2017-12-30 A kind of sintering furnace and its burner hearth of sintered samarium cobalt magnetic material

Publications (1)

Publication Number Publication Date
CN208205806U true CN208205806U (en) 2018-12-07

Family

ID=64491278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721921877.XU Active CN208205806U (en) 2017-12-30 2017-12-30 A kind of sintering furnace and its burner hearth of sintered samarium cobalt magnetic material

Country Status (1)

Country Link
CN (1) CN208205806U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108151539A (en) * 2017-12-30 2018-06-12 宁波宁港永磁材料有限公司 A kind of sintering furnace burner hearth, the sintering furnace of sintered samarium cobalt magnetic material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108151539A (en) * 2017-12-30 2018-06-12 宁波宁港永磁材料有限公司 A kind of sintering furnace burner hearth, the sintering furnace of sintered samarium cobalt magnetic material

Similar Documents

Publication Publication Date Title
CN103398577B (en) Samarium cobalt permanent magnet vacuum sintering furnace
CN205262173U (en) Double -deck sintering furnace
CN106123497B (en) Drying device
CN208026056U (en) A kind of sintering furnace of sintered samarium cobalt magnetic material
CN207975985U (en) The sintering furnace and its hinged fire door of a kind of sintered samarium cobalt magnetic material
CN100470177C (en) Vacuum sintering furnace
CN208205806U (en) A kind of sintering furnace and its burner hearth of sintered samarium cobalt magnetic material
CN101968312A (en) Debinding furnace
CN108317857A (en) A kind of sintering furnace and its sintering method of sintered samarium cobalt magnetic material
CN203478929U (en) Vacuum sintering furnace for samarium-cobalt permanent magnet
CN208026057U (en) A kind of sintering furnace of sintered samarium cobalt magnetic material
CN208012355U (en) A kind of sintering furnace and its electrode connecting structure of sintered samarium cobalt magnetic material
CN208026041U (en) A kind of sintering furnace and its light reflecting board of sintered samarium cobalt magnetic material
CN207936762U (en) A kind of sintering furnace and its cylinder of sintered samarium cobalt magnetic material
CN207922864U (en) A kind of sintering furnace and its shutdown mechanism of sintered samarium cobalt magnetic material
CN108151539A (en) A kind of sintering furnace burner hearth, the sintering furnace of sintered samarium cobalt magnetic material
CN108151540A (en) A kind of sintering furnace of sintered samarium cobalt magnetic material
CN108120271A (en) A kind of sintered samarium cobalt sintering magnetic materials stove electrode connecting structure, sintering furnace
CN207891379U (en) High-efficiency vacuum tempering furnace
CN204880999U (en) Rapid heating up case of convenient maintenance
CN206310906U (en) Multifunction vacuum furnace
US20130098115A1 (en) Molten Silica Roll with Heating System for Glass Tempering and Thermal Treatment of Materials
CN105112611A (en) Metal heat treatment furnace
CN110513970A (en) It is a kind of energy conservation shoes industry production use baking oven
CN106500503A (en) Multifunction vacuum furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant