CN208205387U - mounting bracket - Google Patents

mounting bracket Download PDF

Info

Publication number
CN208205387U
CN208205387U CN201820741964.5U CN201820741964U CN208205387U CN 208205387 U CN208205387 U CN 208205387U CN 201820741964 U CN201820741964 U CN 201820741964U CN 208205387 U CN208205387 U CN 208205387U
Authority
CN
China
Prior art keywords
linking arm
mounting bracket
connecting plate
cantilever beam
supporting part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820741964.5U
Other languages
Chinese (zh)
Inventor
宫笋
陈浩
林剑波
王广友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TCL Air Conditioner Zhongshan Co Ltd
Original Assignee
TCL Air Conditioner Zhongshan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TCL Air Conditioner Zhongshan Co Ltd filed Critical TCL Air Conditioner Zhongshan Co Ltd
Priority to CN201820741964.5U priority Critical patent/CN208205387U/en
Application granted granted Critical
Publication of CN208205387U publication Critical patent/CN208205387U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The utility model discloses a kind of mounting bracket, for installing air conditioner, including mounting rack, the mounting rack includes supporting part to carry the air conditioner and the interconnecting piece connecting with the supporting part, the supporting part offers multiple connecting holes, and the interconnecting piece with building for being fixedly connected;Linking arm, the linking arm, which is spaced apart, is equipped with multiple location holes, and one end of the linking arm selectively passes through a positioning hole by connector and is fixedly connected with the supporting part with a connecting hole;And the other end of the linking arm is connected to building by installation part, the installation part.This mounting bracket for implementing novel offer can adapt to the various installation environments of air conditioner, can satisfy the different installation requirements of user.

Description

Mounting bracket
Technical field
The utility model relates to air-conditioning technical field, in particular to a kind of mounting bracket.
Background technique
Window air conditioner is a kind of packaged air-conditioner that may be mounted on window, in room air conditioner product, window Air conditioner has many advantages, such as that structure is simple, lower production costs, cheap, easy for installation, reliable, still has higher Occupation rate of market.
Existing window air conditioner mounting rack includes two cantilever beams extended along window air device length direction, and Two crossbeams with cantilever beam are connected, cantilever beam is provided with the triangle being fixedly connected with cantilever beam far from the wall surface of window air device Bracket carries window air conditioner by A-frame, to complete its installation.But the mounting bracket of this structure, due to A-frame is fixedly connected with cantilever beam, and shape cannot change, if the installation site of A-frame is by by other east West is taken, and will lead to entire mounting rack can not install, and in other words, existing mounting bracket can not adapt to various mounting rings Border is unable to satisfy the different installation requirements of user.
Utility model content
The main purpose of the utility model is to provide a kind of mounting bracket, can adapt to the various mounting rings of window air conditioner Border can satisfy the different installation requirements of user.
To achieve the above object, mounting bracket provided by the utility model, for installing air conditioner, including mounting rack, institute Stating mounting rack includes supporting part to carry the air conditioner and the interconnecting piece connecting with the supporting part, the supporting part Multiple connecting holes are offered, the interconnecting piece with building for being fixedly connected;Linking arm, the linking arm are spaced apart equipped with more A location hole, one end of the linking arm selectively passed through by connector a positioning hole be fixedly connected with a connecting hole it is described Supporting part;And the other end of the linking arm is connected to building by installation part, the installation part.
Preferably, the linking arm is arranged there are two and is respectively arranged at the opposite sides of the supporting part.
Preferably, the supporting part includes crossbeam and two cantilever beams, and two cantilever beams are arranged parallel, the both ends of the crossbeam It is connect respectively with two cantilever beams far from one end of building, the connecting hole is opened in the cantilever beam.
Preferably, the crossbeam and cantilever beam are structure as a whole.
Preferably, the cross-sectional shape of the crossbeam and cantilever beam is L shape.
Preferably, the bottom wall of the cantilever beam is also provided with leakage hole.
Preferably, the interconnecting piece includes the connecting plate being structure as a whole with the cantilever beam, is opened up on the connecting plate There is locking hole.
Preferably, the installation part includes the first connecting plate and the second connecting plate being connected;First connecting plate with The linking arm connection, first connecting plate are connect with building.
Preferably, first connecting plate and the rotation connection of the second connecting plate.
Preferably, the cross-sectional shape of the installation part is L shape.
Multiple location holes are arranged and multiple connecting holes are arranged on supporting part in the utility model on the connecting arm, connection One end of arm is selectively passed through a positioning hole by connector and is fixedly connected with supporting part, the other end of linking arm with a connecting hole It being connected to building by installation part, it is possible thereby to be not difficult to obtain, on the one hand, linking arm is connected to supporting part by connector, Therefore, by adjusting connector, linking arm, which can be set, also be can be set in the top of supporting part in the lower section of supporting part, thus There are when barrier below mounting rack, linking arm be can be set in the top of mounting rack, when the top of mounting rack exists When barrier, linking arm be can be set in the lower section of mounting rack, is then attached on building, to can reach fixed The effect of air conditioner, so that mounting bracket is adapted to different installation environments;On the other hand, connector selectively passes through In the present embodiment, adjustable linking arm can also be adjusted at a distance from mounting rack and angle for a positioning hole and a connecting hole The installation site of whole mounting rack allows linking arm to need to be arranged to different installation length and established angle according to actual installation Degree, so that mounting bracket is versatile;To sum up, mounting bracket provided in this embodiment can be adapted for a variety of mounting rings Border meets the different use demand of user.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, the structure that can also be shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the structural schematic diagram of the first embodiment of the utility model mounting bracket;
Fig. 2 is the structural schematic diagram of the second embodiment of the utility model mounting bracket;
Fig. 3 is the structural schematic diagram of the 3rd embodiment of the utility model mounting bracket;
Fig. 4 is the assembling schematic diagram of cantilever beam and building in Fig. 1.
Drawing reference numeral explanation:
Label Title Label Title
100 Mounting bracket 70 Linking arm
10 Mounting rack 71 Location hole
30 Supporting part 90 Installation part
31 Cantilever beam 91 First connecting plate
311 Connecting hole 93 Second connecting plate
33 Crossbeam 95 Bolt
50 Interconnecting piece
The embodiments will be further described with reference to the accompanying drawings for the realization, functional characteristics and advantage of the utility model aim.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, fall within the protection scope of the utility model.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute in the utility model embodiment It is only used for explaining in relative positional relationship, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, such as When the fruit particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and cannot understand For its relative importance of indication or suggestion or implicitly indicate the quantity of indicated technical characteristic.Define as a result, " first ", The feature of " second " can explicitly or implicitly include at least one of the features.In addition, the technical side between each embodiment Case can be combined with each other, but must be based on can be realized by those of ordinary skill in the art, when the combination of technical solution Conflicting or cannot achieve when occur will be understood that the combination of this technical solution is not present, also not in the requires of the utility model Protection scope within.
The utility model proposes the mounting brackets 100 of the first embodiment, referring to Fig.1 and Fig. 4, for fixing air conditioner It include mounting rack 10 in building, mounting rack 10 includes supporting part 30 to carry air conditioner and connects with supporting part 30 The interconnecting piece 50 connect, supporting part 30 offer multiple connecting holes 311, and interconnecting piece 50 with building for being fixedly connected;Linking arm 70, linking arm 70, which is spaced apart, is equipped with multiple location holes 71, and one end of linking arm 70 passes through connector (not indicating in figure) selectivity Supporting part 30 is fixedly connected with a connecting hole 311 across a positioning hole 71;And installation part 90, installation part 90 is by linking arm 71 The other end is connected to building.
Multiple positioning are arranged and multiple connecting hole 311 are arranged on supporting part 30 in the utility model on linking arm 70 Hole 71, one end of linking arm 70 are selectively passed through a positioning hole 71 by connector and are fixedly connected with carrying with a connecting hole 311 The other end in portion 30, linking arm 70 is connected to building by installation part 90, it is possible thereby to be not difficult to obtain, on the one hand, linking arm 70 are connected to supporting part 30 by connector, and therefore, by adjusting connector, linking arm 70 be can be set in the upper of supporting part 30 Side also can be set in the lower section of supporting part 30, thus when the lower section of mounting rack 10 is there are when barrier, linking arm 70 can be with The top of mounting rack 10 is set, and when the top of mounting rack 10 is there are when barrier, linking arm 70 be can be set in mounting rack 10 lower section, is then attached on building, to can have the function that fixed air conditioner, so that mounting bracket 100 are adapted to different installation environments;On the other hand, connector selectively passes through a positioning hole 70 and a connecting hole 311, In the present embodiment, adjustable connection, 70 at a distance from mounting rack 10 and angle, can also adjust the installation position of mounting rack 10 It sets, linking arm 70 is allowed to need to be arranged to different installation length and setting angle according to actual installation, so that installation branch Frame 100 is versatile;To sum up, mounting bracket 100 provided in this embodiment can be adapted for a variety of installation environments, meets and use The different use demand in family.In addition, by the way that interconnecting piece 50 is arranged on supporting part 30, and interconnecting piece 50 is fixed on building, So as to further increase the mounting stability of cantilever beam 31, and then guarantee that the fixation of air conditioner is better.
Specifically, in the present embodiment, can be it is hinged be installed on cantilever beam 31, be also possible to dismountable It is installed on cantilever beam 31, so set, linking arm 70 and 31 angulation of cantilever beam can be arbitrarily set, linking arm 70 The side of air conditioner is placed in cantilever beam 31, but relies on the pulling force effect of linking arm 70 to reach the work of fixed air conditioner With;Still further aspect, linking arm 70 is also possible to be located at side of the cantilever beam 31 far from air conditioner, but relies on linking arm 70 Support force effect is to reach fixed air conditioner effect, so that if when there is barrier in the top of mounting bracket 100, so that it may Linking arm 70 to be arranged in the lower section of cantilever beam 31, and when there is barrier in the lower section of mounting bracket 100, so that it may by linking arm 70 are arranged in the top of cantilever beam 31, are influenced so as to be further ensured that linking arm 70 not by installation environment, facilitate air-conditioning The fixation of device.Specifically, in the present embodiment, linking arm 70 is mounted at cantilever beam 31, linking arm 70 and cantilever Beam 31 is connected by screw to, and multiple through-holes are arranged on linking arm 70, and multiple threaded holes are arranged on cantilever beam 31, and screw is worn Cross through-hole and screw in threaded hole, and on linking arm 70 quantity of through-hole can be set to it is multiple, so as to facilitate adjustment spiral shell Nail is across the position of through-hole, to have the function that adjust the distance between linking arm 70 and cantilever beam 31.
More specifically, as shown in Figure 1, in the present embodiment, setting two for linking arm 70 and being respectively arranged at institute The opposite sides of supporting part 30 is stated, so set, the both ends of air conditioner may be implemented all by 70 pulling force of linking arm or support Power further ensures that the stress balance and stabilization of air conditioner, in specific installation process, wherein one of two linking arms 70 Can be stayed mast, i.e., another is bearing rod, i.e. a wherein top for being arranged in cantilever beam 31 for two linking arms 70, And other one lower section that cantilever beam 31 is set;Being also possible to two linking arms 70 is all bearing rod, i.e. two linking arms 70 It is all disposed within the lower section of cantilever beam 31;Certain two linking arms 70 can also all be stayed mast, i.e., two linking arms 70 are all arranged In the top of cantilever beam 31, and in the present embodiment, two linking arms 70 are all stayed masts, i.e., two linking arms 70 are all disposed within The fixation to air conditioner, certain technical staff are realized to pass through the pulling force effect of two linking arms 70 in the top of cantilever beam 31 The mounting means of two linking arms 70 of selection can be carried out according to actual needs, and details are not described herein.
In addition, that is, cantilever beam 31 is arranged it is noted that the cross-sectional shape of crossbeam 33 and cantilever beam 31 is L shape For L-type support, it is mutually perpendicular to including bottom wall and the side wall extended from bottom wall edge to air conditioner direction, bottom wall with side wall, and Leakage hole is offered on the bottom wall of cantilever beam 31, the water accumulated on cantilever beam 31 in inclement weather can be allowed to arrange It removes, to guarantee the normal operation of air conditioner, in addition elastic cushion can also be provided on the bottom wall of cantilever beam 31, to prevent Air conditioner contacts firmly with cantilever beam 31, so that the scratch of air conditioner is caused, in addition, elastic cushion can play antihunt action, from And prevent air-conditioning internal element from falling off or damaging.
It should be noted that as shown in figure 4, specifically, the bottom wall of cantilever beam 31 is arranged in far from crossbeam in interconnecting piece 50 On 33 end face, interconnecting piece 50 is fixed on building.More specifically, interconnecting piece 50 includes being structure as a whole with cantilever beam 31 Connecting plate offers locking hole on connecting plate.So set, on the one hand can be realized by the side wall of cantilever beam 31 to air-conditioning The limit of device, to have the function that fixed air conditioner, still further aspect by the way that connecting plate is arranged on cantilever beam 31, and connects Fishplate bar is fixed on building, so as to further increase the mounting stability of cantilever beam 31, and then guarantees consolidating for air conditioner It is fixed more good.It is worth one, in the present embodiment, interconnecting piece 50 and building can also pass through screw or bolt etc. Structure is fixed, and screw or bolt pass through locking hole and connecting plate are fixed on building, naturally it is also possible to be fixed using other Mode, details are not described herein.
It should be understood that correspondingly, in the present embodiment, setting L-type support for crossbeam 33.It is arranged such, on the one hand, Facilitate the cooperation of crossbeam 33 and cantilever beam 31, still further aspect can reach limit window air conditioner by the side wall of crossbeam 33 The effect of device, so that the installation of window air conditioner is more stable.
It should be noted that in the present embodiment, cantilever beam 31 and crossbeam 33 are integrally formed, so set, can be advantageous In improving the whole intensity of mounting bracket 100, to have the function that preferably to fix window air conditioner.
In addition, it is necessary to explanation, mounting bracket 100 further includes the installation part 90 for connecting linking arm 70 with building, Installation part 90 includes the first connecting plate 91, the second connecting plate 93;First connecting plate 91 is connect with linking arm 70, the second connecting plate 93 It is connect with building, and the first connecting plate 91 can be relatively rotated with the second connecting plate 93.Specifically, in 91 He of the first connecting plate Threaded hole is provided on second connecting plate 93, the first connecting plate 91 and linking arm 70 are fixed by screw, and the second connecting plate 93 It is fixed with building by screw.By the way that installation part 90 to be arranged to the structure of the first connecting plate 91 and the second connecting plate 93, both Linking arm 70 can be made to be stably fixed on building by installation part 90, it can also be by adjusting 91 He of the first connecting plate Angle between linking arm 70 and building is adjusted to arbitrary value to realize by the angle between the second connecting plate 93, thus more It is advantageously implemented the fixed installation of linking arm 70.
Specifically, as shown in Figure 1, in the present embodiment, the first connecting plate 91 and the second connecting plate 93 can mutually hang down Directly, i.e., the cross section of installation part 90 is L shape.So set, the first connecting plate 91 can be made vertical with linking arm 70, and second Connecting plate 93 is arranged to the structure vertical with building, so if the first connecting plate 91 and linking arm 70 are fixed by screw, And the second connecting plate 93 and building are fixed by screw, then the screw connection with the first connecting plate 91 and linking arm 70 respectively Face, the second connecting plate 93 are vertical with the joint face of building, to facilitate the screw-in of screw, to facilitate consolidating for linking arm 70 It is fixed.Certainly, technical staff can also be arranged in other angles with the first connecting plate 91 and the second connecting plate 93, it is only necessary to Facilitate the installation of linking arm 70, details are not described herein.
More specifically, bolt 95 is logical as shown in Figure 1, installation part 90 can also be connect with linking arm 70 by bolt 95 Wherein a positioning hole 71 is crossed to be connected on installation part 90.Pass through the different location holes 71 bolt 95 being fixed on linking arm 70 In, to adjust linking arm 70 at a distance from building and angle, to be conducive to the installation of linking arm 70, while to connect Arm 70 can need to be arranged to different installation length and setting angle according to actual installation, so that mounting bracket 100 is more logical With.
The utility model proposes the mounting brackets 100 of second of embodiment, as shown in Fig. 2, the installation branch of second embodiment The structure of mounting bracket 100 in the structure and first embodiment of frame 100 is substantially the same, only in a second embodiment, two Linking arm 70 wherein one can be stayed mast, i.e., another is bearing rod, i.e., linking arm 70 wherein one setting exist The top of cantilever beam 31, and other one lower section that cantilever beam 31 is set.So set, passing through the drawing of one of linking arm 70 The effect of the load of power and other one has the function that fixed air conditioner.
The utility model proposes the mounting brackets 100 of the third embodiment, as shown in figure 3, the installation branch of 3rd embodiment The structure of mounting bracket 100 in the structure and first embodiment of frame 100 is substantially the same, only in the third embodiment, two Linking arm 70 is all bearing rod, i.e. the lower section that two linking arms 70 are all disposed within cantilever beam 31.So set, passing through two connections The load of arm 70 acts on, and has the function that fixed window air conditioner.
The above is only the preferred embodiment of the present invention, and therefore it does not limit the scope of the patent of the utility model, It is all under the inventive concept of the utility model, equivalent structure made based on the specification and figures of the utility model becomes It changes, or directly/be used in other related technical areas indirectly and be included in the scope of patent protection of the utility model.

Claims (10)

1. a kind of mounting bracket, for installing air conditioner, which is characterized in that the mounting bracket includes:
Mounting rack, the mounting rack include supporting part to carry the air conditioner and the connection connecting with the supporting part Portion, the supporting part offer multiple connecting holes, and the interconnecting piece with building for being fixedly connected;
Linking arm, the linking arm, which is spaced apart, is equipped with multiple location holes, and one end of the linking arm is selectively worn by connector It crosses a positioning hole and is fixedly connected with the supporting part with a connecting hole;And
The other end of the linking arm is connected to building by installation part, the installation part.
2. mounting bracket as described in claim 1, which is characterized in that there are two the linking arm settings and is respectively arranged at institute State the opposite sides of supporting part.
3. mounting bracket as claimed in claim 1 or 2, which is characterized in that the supporting part includes crossbeam and two cantilever beams, and two The cantilever beam is arranged parallel, and the both ends of the crossbeam are connect with two cantilever beams far from one end of building respectively, institute It states connecting hole and is opened in the cantilever beam.
4. mounting bracket as claimed in claim 3, which is characterized in that the crossbeam and the cantilever beam are structure as a whole.
5. mounting bracket as claimed in claim 4, which is characterized in that the cross-sectional shape of the crossbeam and the cantilever beam is equal For L shape.
6. mounting bracket as claimed in claim 3, which is characterized in that the bottom wall of the cantilever beam is also provided with leakage hole.
7. mounting bracket as claimed in claim 3, which is characterized in that the interconnecting piece includes being integrated knot with the cantilever beam The connecting plate of structure offers locking hole on the connecting plate.
8. mounting bracket as described in claim 1, which is characterized in that the installation part include the first connecting plate for being connected and Second connecting plate;First connecting plate is connect with the linking arm, and first connecting plate is connect with building.
9. mounting bracket as claimed in claim 8, which is characterized in that first connecting plate and the rotation of the second connecting plate connect It connects.
10. mounting bracket as described in claim 1, which is characterized in that the cross-sectional shape of the installation part is L shape.
CN201820741964.5U 2018-05-16 2018-05-16 mounting bracket Expired - Fee Related CN208205387U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820741964.5U CN208205387U (en) 2018-05-16 2018-05-16 mounting bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820741964.5U CN208205387U (en) 2018-05-16 2018-05-16 mounting bracket

Publications (1)

Publication Number Publication Date
CN208205387U true CN208205387U (en) 2018-12-07

Family

ID=64518011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820741964.5U Expired - Fee Related CN208205387U (en) 2018-05-16 2018-05-16 mounting bracket

Country Status (1)

Country Link
CN (1) CN208205387U (en)

Similar Documents

Publication Publication Date Title
US6409031B1 (en) Ceiling mounted rack
CN206667649U (en) Wallboard dry-hang top fixing element
US20020023888A1 (en) Ceiling mounted rack
KR20110113652A (en) Mounting clip
CN208205387U (en) mounting bracket
CN203964329U (en) wallboard assembly
US6935600B1 (en) Suspension holding device and method of use
CN207247398U (en) A kind of air conditioner outdoor machine suspension holdfast
CN208441308U (en) Unit glass curtain wall double support multidimensional adjustable connection structure
KR102073525B1 (en) The installation frame of outdoor equipment for air conditioner with folding bridge
CN208633326U (en) The connection structure of type unitized curtain wall and beam sides built-in fitting
CN104074301B (en) A kind of ceiling board mounting structure
CN208815794U (en) Discharge structure
CN208267184U (en) A kind of staggered form tapered end connection otic placode and the glass curtain wall support construction comprising it
CN207944584U (en) A kind of external wall structure with external hanging type wind turbine
CN208534095U (en) A kind of assembled architecture prefabricated board assembly support device
CN207891604U (en) A kind of mounting bracket of clothes airing machine
CN207053113U (en) A kind of support meanss for crane span structure
CN205382755U (en) Tent
JP6276326B2 (en) Universal joint
CN219864256U (en) High formwork supporting structure
CN109163388A (en) A kind of container house air-conditioning fixed frame
CN215888894U (en) Anti-bearing structure of assembled furred ceiling
JP2002364911A (en) Sway-resisting method for apparatus suspended from ceiling and sway-resisting fitting
CN216851206U (en) Prefabricated external wall panel line box installation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207

CF01 Termination of patent right due to non-payment of annual fee