CN208203163U - A kind of drill rod centering device for Drilling trolley drilling construction - Google Patents

A kind of drill rod centering device for Drilling trolley drilling construction Download PDF

Info

Publication number
CN208203163U
CN208203163U CN201820757457.0U CN201820757457U CN208203163U CN 208203163 U CN208203163 U CN 208203163U CN 201820757457 U CN201820757457 U CN 201820757457U CN 208203163 U CN208203163 U CN 208203163U
Authority
CN
China
Prior art keywords
drilling
righting mechanism
rod
flange
centering device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820757457.0U
Other languages
Chinese (zh)
Inventor
兰渊国
耿冰
邬义雄
田辉
明陈
秦俊
黄家权
胡贻涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Original Assignee
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Three Gorges Construction Engineering Co Ltd filed Critical China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority to CN201820757457.0U priority Critical patent/CN208203163U/en
Application granted granted Critical
Publication of CN208203163U publication Critical patent/CN208203163U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

A kind of drill rod centering device for Drilling trolley drilling construction, including the first righting mechanism and the second righting mechanism, first righting mechanism and the second righting mechanism, which is socketed, to be arranged on drilling rod, drilling rod one end is equipped with drill bit, first righting mechanism is movably arranged on drilling rod, second righting mechanism is fixed at drilling-rod external wall on one end of drill bit, and the second righting mechanism is fixed with drill bit.Using the above structure, be able to solve drilling rod into drilling the problem of soft stratum partial offset, avoid the insertion of anchor pole caused by hole deviation that from can not carrying out and perforate, collapse hole the case where generation.

Description

A kind of drill rod centering device for Drilling trolley drilling construction
Technical field
The utility model relates to drilling construction apparatus field, especially a kind of drilling rod for Drilling trolley drilling construction is helped Equipment.
Background technique
Multi-arm drilling tool has the features such as penetration rate is fast, effect is high, but the easily generation drilling of multi-arm brill is not straight, and drilling rock slag is not easy Discharge largely increases support cost phenomena such as causing multi-arm brill drilling tool stuck or can not take out.In addition, generate Useless hole also seriously affects the generation of integer support safety of structure, and it is difficult that hole deviation will also increase subsequent handling (anchor pole) construction Degree causes anchor pole insertion not in place, influences support engineering quality.The especially engineering that required precision is high, the spacing of wells is small, if Hole deviation phenomena such as by the perforation between adjacent drilling, collapse hole is caused, seriously affects subsequent handling construction and integral construction matter Amount.
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of drilling rod rightings for Drilling trolley drilling construction Device is able to solve drilling rod and the problem of soft stratum partial offset, anchor pole caused by hole deviation is avoided to be inserted into drilling Can not carry out and perforate, collapse hole the case where generation.
It is a kind of for the drilling of Drilling trolley that in order to solve the above technical problems, the technical scheme adopted by the utility model is: The drill rod centering device of construction, including the first righting mechanism and the second righting mechanism, first righting mechanism and second are helped Positive mechanism, which is socketed, to be arranged on drilling rod, and drilling rod one end is equipped with drill bit, and first righting mechanism is movably arranged on drilling rod, Second righting mechanism is fixed at drilling-rod external wall on one end of drill bit, and the second righting mechanism and drill bit are solid It is fixed.
In preferred scheme, first righting mechanism includes cylinder and the flange that cylinder one end is arranged in, flange On be equipped at least three support rods, support rod one end is located in flange, and the other end is located at outside flange, the support in flange Bar one end is equipped with the support plate of arc.
In preferred scheme, using being threadedly coupled between the support rod and flange, lead between support rod and support plate Bearing flexible connection is crossed, rotation support rod can adjust position of the support plate in flange.
In preferred scheme, the support rod is located at one end outside flange equipped with butterfly knob.
In preferred scheme, the flange is equipped with multiple first dump tanks.
In preferred scheme, second righting mechanism uses the tubular structure of both ends open, and the second righting mechanism leans on Inner wall is equipped with silk thread mouth on one end of nearly drill bit, and the second righting mechanism is fixed on drilling rod by silk thread mouth.
In preferred scheme, second righting mechanism is equipped with multiple drilling rod locating pieces far from one end of drill bit, bores Bar locating piece uses L shape arc plate, and wherein one section of fitting is fixed on the outer wall of the second righting mechanism drilling rod locating piece, Ling Yiduan It extends on the second righting mechanism end face far from drill bit and is parallel to the end face.
In preferred scheme, the two neighboring drilling rod locating piece is bonded fixed part with the second righting mechanism outer wall Between form the second dump tank.
Cylinder sectional dimension and the second righting mechanism section ruler in preferred scheme, in first righting mechanism It is very little, drill bit largest cross-sectional sized is identical, the flange sectional dimension in first righting mechanism be greater than cylinder sectional dimension.
In preferred scheme, the part that the drilling rod locating piece is located at second righting mechanism one end end face uses ring flat-plate, Diameter corresponding to the inside cambered surface of drilling rod locating piece is identical as drilling rod diameter of section.
A kind of drill rod centering device for Drilling trolley drilling construction provided by the utility model, by using above-mentioned Structure has the advantages that
(1) by the first righting mechanism and the second righting mechanism of setting, guiding can be carried out to the drilling rod in drilling and is helped Just, the case where effectively solving hole deviation caused by drilling rod deviates occurs, and is subsequent to guarantee the quality of drilling construction operation It plugs anchor pole and advantage is provided;
(2) it can guarantee that the drilling rod of borehole port position is stablized by the first righting mechanism, and the brill of drilling rod can be observed If position, it can guarantee the stabilization of bit location by the second righting mechanism, it, can be to the full extent by two righting mechanisms Guarantee the stability of drilling rod.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawings and examples:
Fig. 1 is the overall structure diagram of the utility model.
Fig. 2 is the first righting mechanism structural schematic diagram of the utility model.
Fig. 3 is the second righting mechanism structural schematic diagram of the utility model.
In figure: drilling rod 1, drill bit 2, the first righting mechanism 3, the second righting mechanism 4, cylinder 5, flange 6, support rod 7, butterfly Knob 8, support plate 9, the first dump tank 10, drilling rod locating piece 11, silk thread mouth 12, the second dump tank 13.
Specific embodiment
Embodiment 1:
As in Fig. 1-3, a kind of drill rod centering device for Drilling trolley drilling construction, including 3 He of the first righting mechanism Second righting mechanism 4 is arranged on drilling rod 1 it is characterized in that: first righting mechanism 3 and the second righting mechanism 4 is socketed, 1 one end of drilling rod is equipped with drill bit 2, and first righting mechanism 3 is movably arranged on drilling rod 1, and second righting mechanism 4 is solid 1 outer wall of drilling rod is set on one end of drill bit 2 calmly, and the second righting mechanism 4 and drill bit 2 are fixed.
Embodiment 2:
Such as Fig. 2, on the basis of embodiment 1, first righting mechanism 3 includes cylinder 5 and is arranged in cylinder 5 one The flange 6 at end is equipped at least three support rods 7 on flange 6, and 7 one end of support rod is located in flange 6, and the other end is located at flange 6 Outside, 7 one end of support rod in flange 6 is equipped with the support plate 9 of arc.
In preferred scheme, using being threadedly coupled between the support rod 7 and flange 6, support rod 7 and support plate 9 it Between by bearing be flexibly connected, rotation support rod 7 can adjust position of the support plate 9 in flange 6.
In preferred scheme, the support rod 7 is located at one end outside flange 6 equipped with butterfly knob 8.
In preferred scheme, the flange 6 is equipped with multiple first dump tanks 10.
Embodiment 3:
Such as Fig. 3, on the basis of embodiment 1, second righting mechanism 4 uses the tubular structure of both ends open, the Two righting mechanisms 4 inner wall on one end of drill bit 2 is equipped with silk thread mouth 12, and the second righting mechanism 4 is solid by silk thread mouth 12 It is scheduled on drilling rod 1.
In preferred scheme, second righting mechanism 4 is equipped with multiple drilling rod locating pieces far from one end of drill bit 2 11, drilling rod locating piece 11 uses L shape arc plate, and wherein one section of fitting is fixed on the outer of the second righting mechanism 4 to drilling rod locating piece 11 On wall, another section extends on 4 end face of the second righting mechanism far from drill bit 2 and is parallel to the end face.
In preferred scheme, the two neighboring drilling rod locating piece 11 is bonded fixed with 4 outer wall of the second righting mechanism The second dump tank 13 is formed between part.
5 sectional dimension of cylinder and 4 section of the second righting mechanism in preferred scheme, in first righting mechanism 3 Size, 2 largest cross-sectional sized of drill bit are identical, and 6 sectional dimension of flange in first righting mechanism 3 is greater than 5 section of cylinder Size.
In preferred scheme, the drilling rod locating piece 11 is located at the part of 4 one end end face of the second righting mechanism using ring Plate, diameter corresponding to the inside cambered surface of drilling rod locating piece 11 are identical as 1 diameter of section of drilling rod.
The specific working principle is as follows for the present apparatus:
Before carrying out drilling construction operation, first the first righting mechanism 3 is set on drilling rod 1, then by the second righting Mechanism 4 is fixed at drilling rod 1 on one section of drill bit 2 by silk thread mouth 12, then installs drill bit, applies carrying out drilling Before work, the hole of certain depth is drilled on cavern's palisades in advance, it is deep-controlled in 20cm or so, then by the first righting mechanism 3 are fixed on hole end, are located at cylinder 5 in hole, and guarantee being bonded for flange 6 and hole, then carry out bore operation ?.
It using the above structure, can be to the drilling rod in drilling by the first righting mechanism of setting and the second righting mechanism The case where carrying out righting-oriented, effectively solving hole deviation caused by drilling rod deviates occurs, to guarantee drilling construction operation Quality provides advantage for the subsequent anchor pole that plugs;It can guarantee that the drilling rod of borehole port position is steady by the first righting mechanism It is fixed, and can observe drilling rod is drilled with position, can guarantee the stabilization of bit location by the second righting mechanism, be helped by two Positive mechanism can guarantee the stability of drilling rod to the full extent.

Claims (10)

1. a kind of drill rod centering device for Drilling trolley drilling construction, including the first righting mechanism (3) and the second centering guide machine Structure (4) is arranged on drilling rod (1) it is characterized in that: first righting mechanism (3) and the second righting mechanism (4) are socketed, and bores Bar (1) one end is equipped with drill bit (2), and first righting mechanism (3) is movably arranged on drilling rod (1), second righting Mechanism (4) is fixed at drilling rod (1) outer wall on one end of drill bit (2), and the second righting mechanism (4) and drill bit (2) are solid It is fixed.
2. a kind of drill rod centering device for Drilling trolley drilling construction according to claim 1, it is characterised in that: institute The first righting mechanism (3) stated includes the flange (6) of cylinder (5) and setting in cylinder (5) one end, and flange is equipped on (6) At least three support rods (7), support rod (7) one end are located in flange (6), and the other end is located at flange (6) outside, are located at flange (6) Interior support rod (7) one end is equipped with the support plate (9) of arc.
3. a kind of drill rod centering device for Drilling trolley drilling construction according to claim 2, it is characterised in that: institute Using being threadedly coupled between the support rod (7) stated and flange (6), connected between support rod (7) and support plate (9) by bearing activity It connects, rotation support rod (7) can adjust position of the support plate (9) in flange (6).
4. a kind of drill rod centering device for Drilling trolley drilling construction according to claim 2, it is characterised in that: institute The support rod (7) stated is located at the one end of flange (6) outside equipped with butterfly knob (8).
5. a kind of drill rod centering device for Drilling trolley drilling construction according to claim 2, it is characterised in that: institute The flange (6) stated is equipped with multiple first dump tanks (10).
6. a kind of drill rod centering device for Drilling trolley drilling construction according to claim 2, it is characterised in that: institute The second righting mechanism (4) stated uses the tubular structure of both ends open, and the second righting mechanism (4) is on the one end of drill bit (2) Inner wall is equipped with silk thread mouth (12), and the second righting mechanism (4) is fixed on drilling rod (1) by silk thread mouth (12).
7. a kind of drill rod centering device for Drilling trolley drilling construction according to claim 6, it is characterised in that: institute The second righting mechanism (4) stated is equipped with multiple drilling rod locating pieces (11) far from the one end of drill bit (2), and drilling rod locating piece (11) is adopted With L shape arc plate, wherein one section of fitting is fixed on the outer wall of the second righting mechanism (4) drilling rod locating piece (11), and another section is prolonged It extends on the second righting mechanism (4) end face far from drill bit (2) and is parallel to the end face.
8. a kind of drill rod centering device for Drilling trolley drilling construction according to claim 7, it is characterised in that: phase Drilling rod locating piece (11) described in two adjacent is bonded between fixed part with the second righting mechanism (4) outer wall and forms the second deslagging Slot (13).
9. a kind of drill rod centering device for Drilling trolley drilling construction according to claim 7, it is characterised in that: institute Cylinder (5) sectional dimension and the second righting mechanism (4) sectional dimension, drill bit (2) maximum section in the first righting mechanism (3) stated Face size is identical, and flange (6) sectional dimension in first righting mechanism (3) is greater than cylinder (5) sectional dimension.
10. a kind of drill rod centering device for Drilling trolley drilling construction according to claim 9, it is characterised in that: The drilling rod locating piece (11) is located at the part of the second righting mechanism (4) one end end face using ring flat-plate, drilling rod locating piece (11) Inside cambered surface corresponding to diameter it is identical as drilling rod (1) diameter of section.
CN201820757457.0U 2018-05-21 2018-05-21 A kind of drill rod centering device for Drilling trolley drilling construction Expired - Fee Related CN208203163U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820757457.0U CN208203163U (en) 2018-05-21 2018-05-21 A kind of drill rod centering device for Drilling trolley drilling construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820757457.0U CN208203163U (en) 2018-05-21 2018-05-21 A kind of drill rod centering device for Drilling trolley drilling construction

Publications (1)

Publication Number Publication Date
CN208203163U true CN208203163U (en) 2018-12-07

Family

ID=64518783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820757457.0U Expired - Fee Related CN208203163U (en) 2018-05-21 2018-05-21 A kind of drill rod centering device for Drilling trolley drilling construction

Country Status (1)

Country Link
CN (1) CN208203163U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111185777A (en) * 2020-01-21 2020-05-22 梁育娟 Fastener drilling auxiliary device capable of guaranteeing concentric precision
CN111485834A (en) * 2020-05-22 2020-08-04 朱善淼 Oil field sucker rod adjusting device
CN112727369A (en) * 2021-01-04 2021-04-30 常州机电职业技术学院 Dedicated drilling rod stabilizing mean of broken rock machinery of laser

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111185777A (en) * 2020-01-21 2020-05-22 梁育娟 Fastener drilling auxiliary device capable of guaranteeing concentric precision
CN111485834A (en) * 2020-05-22 2020-08-04 朱善淼 Oil field sucker rod adjusting device
CN111485834B (en) * 2020-05-22 2021-06-25 朱善淼 Oil field sucker rod adjusting device
CN112727369A (en) * 2021-01-04 2021-04-30 常州机电职业技术学院 Dedicated drilling rod stabilizing mean of broken rock machinery of laser

Similar Documents

Publication Publication Date Title
CN208203163U (en) A kind of drill rod centering device for Drilling trolley drilling construction
CN203669921U (en) Soft and broken coal seam gas extraction hole drilling with casing device
CN206643380U (en) A kind of steel tube drilling machine
CN208040308U (en) A kind of reaming bit and drilling machine
CN206693919U (en) Drill hole of drilling machine reaming bit
CN201763241U (en) Bushing & drilling-in dual purpose drilling machine
CN109267572B (en) Good ground anchor structure of stability
CN208587155U (en) A kind of drilling tool conveying storage type logger hanger
CN206495642U (en) A kind of drill bit for being adapted to different drilling rods
CN105220682A (en) A kind of single-wheel groove milling equipment of continuous wall trench underground and construction method thereof
CN203114173U (en) Inverted plumb line hole constructing device
CN102322229B (en) Righting mechanism, drilling rod structure and engineering machine using same
CN203248102U (en) Bearing-type centering device
CN102966306B (en) System and operation method for drilling hole on hard rock in one attempt
CN206374042U (en) Adjustable openings device drill bit
CN207776795U (en) A kind of chambering device structure
CN205078173U (en) Adjustable light -duty down --hole bores with stabilize drilling cramp
CN205387911U (en) Guide bracket of drilling wedge cut eye
CN102322228B (en) Centralizer and drill rod and engineering machine applying same
CN202970456U (en) System for boring hard rock for once
CN208152945U (en) It is a kind of to bore Self-sinking type borehole wall guard system certainly
CN105041217A (en) Anti-sloughing drilling tool for surrounding rocks of tunnel
CN209067140U (en) A kind of novel reusable benefit coal device
CN207728364U (en) The broken rock and depthkeeping Sampling driller of integrated drilling machine are repaired in a kind of soil sample
CN207453871U (en) The three axis slotting of coal rock tunnel is punchinged broken rock device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207

CF01 Termination of patent right due to non-payment of annual fee