CN208202699U - A kind of fire coal sludge coupled electricity-generation main building - Google Patents

A kind of fire coal sludge coupled electricity-generation main building Download PDF

Info

Publication number
CN208202699U
CN208202699U CN201820663214.0U CN201820663214U CN208202699U CN 208202699 U CN208202699 U CN 208202699U CN 201820663214 U CN201820663214 U CN 201820663214U CN 208202699 U CN208202699 U CN 208202699U
Authority
CN
China
Prior art keywords
desiccation
wet
transportation
dry mud
dry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820663214.0U
Other languages
Chinese (zh)
Inventor
曹志勇
祁本武
刘政艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Zhong Dian Environmental Protection Solid Waste Resource Co Ltd
Original Assignee
Nanjing Zhong Dian Environmental Protection Solid Waste Resource Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Zhong Dian Environmental Protection Solid Waste Resource Co Ltd filed Critical Nanjing Zhong Dian Environmental Protection Solid Waste Resource Co Ltd
Priority to CN201820663214.0U priority Critical patent/CN208202699U/en
Application granted granted Critical
Publication of CN208202699U publication Critical patent/CN208202699U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses a kind of coal-fired sludge coupled electricity-generation main buildings, and plant gate, discharging platform are equipped between discharging;The wet hopper dredger of underground type, the wet mud conveying equipment for being arranged in wet hopper dredger bottom, the exhaust tube being arranged at the top of hopper dredger are configured between wet mud storage and transportation;More desiccation machines, deduster and off-gas condenser and the first dry mud conveying equipment are configured in desiccation;Dry hopper dredger and the second dry mud conveying equipment are configured in dry mud storage and transportation;An at least air-introduced machine is configured in Ventilator Room;Automatically controlled includes between electrical cabinet and electric room and middle control;Each workshop is closely coupled, wherein is arranged side by side between dry mud storage and transportation between desiccation;More desiccation machines parallel arrangement in desiccation, the first dry mud conveying equipment are arranged vertically with each desiccation machine, and between so that the dry mud of each desiccation machine output is sent directly into dry mud storage and transportation by the first dry mud conveying equipment, no setting is required conveys turning point.Workshop sludge conveying is convenient and can save area of mill site, reduce input cost.

Description

A kind of fire coal sludge coupled electricity-generation main building
Technical field
The utility model relates to a kind of arragement constructions of workshop, and in particular to a kind of fire coal sludge coupled electricity-generation main building.
Background technique
China generates 3000~40,000,000 tons of municipal sludges of moisture content 80% or so every year, and annual all in lasting increasing Add.The year two thousand twenty is expected, the municipal sludge yield in China is up to 6000~90,000,000 tons.So many sludge how quickly, Economical and effective processing is a urgent need to solve the problem.Although Sludge landfill processing mode small investment, takes up a large area And it be easy to cause secondary pollution;The investment of sludge composting processing mode is lower, and technically simple, organic matter can be used as fertilizer again after decomposing It utilizes, to reach recycling for resource, but time-consuming, take up a large area, odor pollution, influence and have vulnerable to weather can Nitrogen can be lost.Sludge mixed with power plant soot mix heat processing technique be one kind can quickly, thoroughly realize sludge reduction, Recycling, innoxious final disposal technology.However moisture percentage in sewage sludge is high, calorific value is low, need to drop moisture content by drying and other treatment The burning of power plant's incinerator is sent into as low as that could mix to a certain degree with fire coal.Therefore, drying and other treatment just becomes vital ring Section.
In the design of traditional sludge heat drying main building arrangement structure, each construction of structures of some workshops, equipment are arranged in same On straight line.Its advantage is that simple and beautiful, ventilation is conveniently, but arrange loosely, desiccation machine is installed and overhauls inconvenient, linear formula cloth It sets, is not also suitable for taking up an area limited place.
Utility model content
Area of mill site can be saved, desiccation machine installation is increased and overhauls sky the purpose of the utility model is to provide a kind of Between, sludge conveying is convenient and coal-fired sludge coupled electricity-generation main building that foul smell can be prevented excessive.
The purpose of this utility model is achieved through the following technical solutions:
A kind of fire coal sludge coupled electricity-generation main building includes between discharging, between wet mud storage and transportation, between desiccation, between dry mud storage and transportation, wind Computer room, automatically controlled;Plant gate, discharging platform are equipped between discharging;Between wet mud storage and transportation configured with the wet hopper dredger of underground type, be arranged in it is wet The wet mud conveying equipment of hopper dredger bottom, the exhaust tube being arranged at the top of hopper dredger;More desiccation machines, dedusters are configured in desiccation And off-gas condenser and one first dry mud conveying equipment;It is set in dry mud storage and transportation configured with dry hopper dredger and the second dry mud conveying It is standby;An at least air-introduced machine is configured in Ventilator Room;Automatically controlled includes between electrical cabinet and electric room, middle control;Each workshop is tight It is close to be connected, wherein to be arranged side by side between dry mud storage and transportation between desiccation;More desiccation machines parallel arrangement in desiccation, the first dry mud Conveying equipment is arranged vertically with each desiccation machine, is sent directly into the dry mud of each desiccation machine output by the first dry mud conveying equipment dry Between mud storage and transportation, no setting is required conveys turning point.
As a preferred embodiment, it is additionally provided with car bumper in discharging, for preventing the sludge transport vehicle entered between discharging from falling Enter the wet hopper dredger between wet mud storage and transportation.
As a preferred embodiment, the level-sensing device for monitoring sludge material position automatically, and the material position are additionally provided in wet hopper dredger Meter has height warning function.
As a preferred embodiment, wet mud conveying equipment is using any in screw pump, screw conveyor, drag conveyor It is a kind of.
As a preferred embodiment, desiccation machine selects disk drying equipment, belt-type drying equipment, in blade drying equipment Any one or a few.
As a preferred embodiment, the first dry mud conveying equipment and second uses drag conveyor, bucket elevator, spiral Any one in conveyer.
As a preferred embodiment, automatically controlled be two layers, one layer be electrical cabinet and electric room, two layers between middle control, And between middle control around setting visit channel.
As a preferred embodiment, it is set as positive pressure in automatically controlled, automatically controlled is in pumping negative pressure with exterior domain, smelly to prevent Gas is excessive.
As a preferred embodiment, which is closed bent structure, and house frame uses steel construction, and roof system uses steel Rack, roof boarding use double-layer sandwich steel plate.
Compared with prior art, the utility model has the beneficial effects that:
1) workshop characteristics of compact layout reduces occupied area, and extends conveniently;
2) workshop uses closed type, it is automatically controlled in be set as positive pressure, except automatically controlled with exterior domain and wet mud in workshop Storehouse and dry hopper dredger take out negative pressure, can anti-locking system foul smell it is excessive;
3) wet hopper dredger uses underground type, and sludge transport vehicle dump is not required to climb, and facilitates dump;
4) workshop uses side-by-side arrangement, and desiccation machine space increases, and is conducive to the installation and maintenance of desiccation machine;
5) dry mud conveying equipment is arranged vertically with desiccation machine, is not required to turn round, and conveying is convenient;
6) channel is visited in surrounding setting between control in, can facilitate visit, the entire treatment process of observation and far from jeopardously Section.
Detailed description of the invention
Fig. 1 is a kind of plan view of coal-fired sludge coupled electricity-generation main building in embodiment;
Fig. 2 is a kind of side schematic view 1 of coal-fired sludge coupled electricity-generation main building in embodiment;
Fig. 3 is a kind of side schematic view 2 of coal-fired sludge coupled electricity-generation main building in embodiment;
Appended drawing reference:
1 between discharging, 11 be plant gate, 12 be discharging platform, 13 be Baogang's car bumper (not illustrating in figure);
2 between wet mud storage and transportation, 21 be gate between wet mud storage and transportation, 22 be wet hopper dredger, 221 be wet hopper dredger door, 222 be lattice Grid, 223 be hydraulic balladeur train, 224 be steel construction shelf, 225 be level-sensing device, 226 be exhaust tube, 23 be wet mud conveying equipment;
3 between desiccation, 31 be desiccation machine, 32 be cyclone dust collectors, 33 be off-gas condenser, 34 be crane, 35 be dry Mud conveying equipment;
4 between dry mud storage and transportation, 41 be dry hopper dredger, and 42 be screw conveyor;
5 it is Ventilator Room, 51 is air-introduced machine;
6 be automatically controlled, 61 be electrical cabinet and electric room, 62 is between middle control.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is described in further detail the utility model implementation.
A kind of coal-fired sludge coupled electricity-generation main building is disclosed in embodiment, mainly include between discharging 2 between 1, wet mud storage and transportation, 3 between desiccation, 4, Ventilator Room 5, automatically controlled 6 between dry mud storage and transportation, each workshop is closely coupled to become an entirety.
1 mainly has plant gate 11, discharging platform 12 and Baogang's car stop 13 between the discharging.
2 mainly have gate 21, wet hopper dredger 22 between wet mud storage and transportation, wet mud conveying equipment 23 between the wet mud storage and transportation.Wet hopper dredger 22 be underground type steel storehouse or concrete storehouse, and is furnished with wet hopper dredger door 221, grid 222, hydraulic balladeur train 223 and steel frame Son 224 (containing inspection platform, aisle, railing etc.), wherein hydraulic door can be used in wet hopper dredger door 221.Wet 22 top of hopper dredger It is automatic to monitor sludge material position equipped with level-sensing device 225, and there is height warning function.Exhaust tube is additionally provided at the top of wet hopper dredger 22 226, foul smell in storehouse is detached, so that wet hopper dredger is become negative pressure cabin, prevents peculiar smell from spreading from source.Wet mud conveying equipment 23 is arranged in The bottom of wet hopper dredger 22, such as the conveying equipments such as screw pump, screw conveyor, drag conveyor can be used, it specifically can be according to dirt Mud moisture content selects suitable conveying equipment that sludge is delivered to 3 between desiccation.
The sludge transport vehicle of sealing enters workshop, and plant gate 11 is opened, and vehicle backing enters discharging platform 12, passes through packet The effect of steel car bumper 13 prevent vehicle from falling into wet mud storage and transportation between 2 the wet hopper dredger 22 of underground type;Then plant gate 11 is closed, wet mud Gate 21 is opened between storage and transportation, opens wet hopper dredger door 221 immediately, transport vehicle starts dump.After the completion of dump, wet hopper dredger door 221 close, sludge transport vehicle returns 1 between discharging, and gate 21 is closed between wet mud storage and transportation, and sludge transport vehicle can be by being equipped in it After flusher rinses, plant gate 11 is opened, workshop is sailed out of.
Desiccation machine 31, cyclone dust collectors 32, off-gas condenser 33, crane 34, the conveying of dry mud are equipped in 3 between the desiccation Equipment 35.Electric single-beam bridge crane may be selected in crane 34, the installation and maintenance for equipment.Desiccation machine 31 can be according to tool The drying equipments such as body situation selector disc, belt, blade.Saturated vapor enter after the hot axis and collet of desiccation machine 31 with sludge into In the ranks connect heat transfer, sludge heating, moisture evaporation.Drag conveyor, bucket elevator etc. may be selected in dry mud conveying equipment 35 Conveying equipment, for dry mud to be delivered to 4 between dry mud storage and transportation, and dry mud conveying equipment 35 and the perpendicular arrangement of desiccation machine 31, it does For mud conveying equipment 35 without turning round, conveying is convenient.The exhaust gas that drying process generates passes through cyclone dust collectors 32, off-gas condenser Taken out of 3 between desiccation after 33 processing by air-introduced machine 51, then by pipeline be sent into boiler of power plant burn or by biological deodorizing mode at Manage rear discharge up to standard.The condensed water formed to the steam after sludge heating enters drain tank, then can be pumped into electricity by hydrophobic Factory recycles.
Dry hopper dredger 41 is equipped in 4 between dry mud storage and transportation, the dry hopper dredger 41 is steel storehouse, and helical feed is arranged below dry hopper dredger 41 Dry mud is uniformly delivered on coal conveyer belt of power plant by machine 42, then is sent to power plant's incinerator and burned, to realize sludge most Disposition eventually.In embodiment, 4 are arranged in 3 west sides between desiccation between dry mud storage and transportation, rather than southern side, can make the peace of desiccation machine in this way Dress increases with space for maintenance, facilitates installation and maintenance.In addition, the dry mud that this method arrangement 31 south discharge port of desiccation machine comes out can be into Enter same dry mud conveying equipment 35, dry mud conveying equipment 35 is all respectively set without every desiccation machine.It is possible to increase space, Investment is reduced, and dry mud conveying equipment 35 does not need to turn round, conveying is convenient.
Several air-introduced machines 51 are arranged according to air quantity in Ventilator Room 5, and the exhaust gas that drying process generates is delivered to boiler of power plant It burns or rear discharge up to standard is handled by biological deodorizing mode.In addition, the modes such as metal composite acoustic board also can be used to blower Room 5 carries out sound insulation processing.
Automatically controlled 6 includes two layers, and one layer is electrical cabinet and electric room 61, two layers 62 between middle control, and between middle control Settable visit channel around 62.Positive pressure is set as in automatically controlled 6, automatically controlled 6 with exterior domain and wet hopper dredger 22 and dry hopper dredger 41 take out negative pressure.Foul smell be sent into after collecting boiler of power plant burn or by biological deodorizing mode handle it is up to standard after discharge.
The main building is closed bent structure, and roof truss uses steel construction, and roof system uses Elements of Space Grid Truss, and roof boarding is using double-deck Sandwich steel plate.
It can be seen that a kind of main factory of coal-fired sludge coupled electricity-generation provided by the utility model from the technical solution of above-mentioned offer Room arragement construction is simple, occupied area is small, dump is easy, wet mud and the conveying of dry mud are convenient, foul smell is not excessive, desiccation machine has foot Enough installations and space for maintenance, and extend conveniently.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art can readily occur in the technical scope that the utility model discloses Change or replacement, should be covered within the scope of the utility model.Therefore, the protection scope of the utility model should It is subject to the protection scopes of claims.

Claims (9)

1. a kind of fire coal sludge coupled electricity-generation main building, including between discharging, between wet mud storage and transportation, between desiccation, between dry mud storage and transportation, blower Room and it is automatically controlled between, it is characterised in that:
Plant gate, discharging platform are equipped between the discharging;Between the wet mud storage and transportation configured with the wet hopper dredger of underground type, be arranged in it is wet The wet mud conveying equipment of hopper dredger bottom, the exhaust tube being arranged at the top of hopper dredger;It is configured with more desiccation machines in the desiccation, removes Dirt device and off-gas condenser and the first dry mud conveying equipment;Dry hopper dredger and the second dry mud are configured in the dry mud storage and transportation Conveying equipment;An at least air-introduced machine is configured in the Ventilator Room;Described automatically controlled include electrical cabinet and electric room, in Between control;
Each workshop is closely coupled, wherein is arranged side by side between dry mud storage and transportation between desiccation;The parallel cloth of more desiccation machines in desiccation It sets, the first dry mud conveying equipment is arranged vertically with each desiccation machine, sets the dry mud of each desiccation machine output by the first dry mud conveying Standby to be sent directly between dry mud storage and transportation, no setting is required conveys turning point.
2. fire coal sludge coupled electricity-generation main building according to claim 1, which is characterized in that be additionally provided in the discharging Car bumper, for preventing the sludge transport vehicle entered between discharging from falling into the wet hopper dredger between wet mud storage and transportation.
3. fire coal sludge coupled electricity-generation main building according to claim 1, which is characterized in that be additionally provided in the wet hopper dredger For monitoring the level-sensing device of sludge material position automatically, and the level-sensing device has height warning function.
4. fire coal sludge coupled electricity-generation main building according to claim 1, which is characterized in that the wet mud conveying equipment is adopted With any one in screw pump, screw conveyor, drag conveyor.
5. fire coal sludge coupled electricity-generation main building according to claim 1, which is characterized in that the desiccation machine selects disk Drying equipment, belt-type drying equipment, any one or a few in blade drying equipment.
6. fire coal sludge coupled electricity-generation main building according to claim 1, which is characterized in that the first dry mud conveying is set It is standby and second using drag conveyor, bucket elevator, any one in screw conveyor.
7. fire coal sludge coupled electricity-generation main building according to claim 1, which is characterized in that described automatically controlled is two layers, One layer be electrical cabinet and electric room, two layers for middle control between, and between middle control around be arranged visit channel.
8. fire coal sludge coupled electricity-generation main building according to claim 1, which is characterized in that setting is positive in automatically controlled Pressure, automatically controlled is in pumping negative pressure with exterior domain, to prevent foul smell excessive.
9. fire coal sludge coupled electricity-generation main building according to any one of claims 1 to 8, which is characterized in that the main factory Room is closed bent structure, and house frame uses steel construction, and roof system uses Elements of Space Grid Truss, and roof boarding uses double-layer sandwich steel plate.
CN201820663214.0U 2018-05-07 2018-05-07 A kind of fire coal sludge coupled electricity-generation main building Active CN208202699U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820663214.0U CN208202699U (en) 2018-05-07 2018-05-07 A kind of fire coal sludge coupled electricity-generation main building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820663214.0U CN208202699U (en) 2018-05-07 2018-05-07 A kind of fire coal sludge coupled electricity-generation main building

Publications (1)

Publication Number Publication Date
CN208202699U true CN208202699U (en) 2018-12-07

Family

ID=64519706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820663214.0U Active CN208202699U (en) 2018-05-07 2018-05-07 A kind of fire coal sludge coupled electricity-generation main building

Country Status (1)

Country Link
CN (1) CN208202699U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112944363A (en) * 2021-03-18 2021-06-11 中国电力工程顾问集团华东电力设计院有限公司 Sludge drying and incinerating system with high-position arranged drying machine
CN114460983A (en) * 2022-01-26 2022-05-10 浙江浙能嘉华发电有限公司 Sludge co-combustion proportion control method based on comprehensive humidity factor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112944363A (en) * 2021-03-18 2021-06-11 中国电力工程顾问集团华东电力设计院有限公司 Sludge drying and incinerating system with high-position arranged drying machine
CN114460983A (en) * 2022-01-26 2022-05-10 浙江浙能嘉华发电有限公司 Sludge co-combustion proportion control method based on comprehensive humidity factor
CN114460983B (en) * 2022-01-26 2023-07-28 浙江浙能嘉华发电有限公司 Comprehensive humidity factor-based sludge blending proportion control method

Similar Documents

Publication Publication Date Title
CN100439839C (en) Device for drying products such as in particular purifying station sludge
CN102816575B (en) The device of biomass destructive distillation cracking process and process
CN103322574B (en) Utilize method and the treatment system thereof of tunnel kiln brick sintering production line cooperative disposal house refuse
CN208202699U (en) A kind of fire coal sludge coupled electricity-generation main building
EP2788701B1 (en) Process for drying sludge
CN204338559U (en) Municipal refuse and mud total system
CN111578292A (en) Coal-fired coupled sludge direct blending combustion system and control method thereof
CN203333455U (en) Multilayer greenhouse type hot air combined solar sludge drying shed
CN104690073A (en) Garage type biological drying method
CN111998363A (en) Negative-pressure totally-enclosed sludge blending combustion system and working method thereof
CN205673355U (en) The biological dewatered dewatering system of house refuse
CN212319741U (en) Direct mixed burning system of coal-fired coupling mud
CN107325830A (en) A kind of rubbish and pyrolyzing sludge system and refuse disposal system
CN108405549B (en) Method and device for preventing and treating scaling blockage of refuse landfill by utilizing furnace slag and landfill gas
CN105859080A (en) Aerobiotic ventilated aeration drying equipment for sludge and aeration drying method thereof
CN105330119A (en) Method and system for drying sludge by means of solar energy and flue gas waste heat
CN101456660A (en) Sludge treater and method
CN101891364B (en) Star wheel sludge drying system utilizing zero-carbon heat sources
CN208532581U (en) A kind of novel sludge treating system
CN205299539U (en) System for utilize cement kiln to deal with domestic waste in coordination
CN112943394A (en) System and method for sludge drying and incineration coupled gas-steam combined cycle unit
CN102788352B (en) Moveable integrated device for processing aged garbage and processing method thereof
CN209567976U (en) A kind of sludge drying and incineration system
CN203625217U (en) Novel sludge dryer
CN205860719U (en) Multiple field aqueous solid organic waste desiccation apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant