CN208202539U - Construction formwork for placing - Google Patents

Construction formwork for placing Download PDF

Info

Publication number
CN208202539U
CN208202539U CN201820661057.XU CN201820661057U CN208202539U CN 208202539 U CN208202539 U CN 208202539U CN 201820661057 U CN201820661057 U CN 201820661057U CN 208202539 U CN208202539 U CN 208202539U
Authority
CN
China
Prior art keywords
templates
template
pieces
fixedly installed
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820661057.XU
Other languages
Chinese (zh)
Inventor
周浩然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Building And Mounting Engineering Co Ltd No12 Bureau Ministry Of Railways
Original Assignee
Building And Mounting Engineering Co Ltd No12 Bureau Ministry Of Railways
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Building And Mounting Engineering Co Ltd No12 Bureau Ministry Of Railways filed Critical Building And Mounting Engineering Co Ltd No12 Bureau Ministry Of Railways
Priority to CN201820661057.XU priority Critical patent/CN208202539U/en
Application granted granted Critical
Publication of CN208202539U publication Critical patent/CN208202539U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Construction formwork for placing is symmetrically arranged with two pieces of No. two templates, and No. two template-setups are in the left and right sides of No.1 template the utility model relates to construction equipment technical field between two pieces of No.1 templates;Several studs are vertically fixedly installed on the two sides up and down of No. two templates;No.1 template is made of two pieces of No. three templates sockets;The two sides of No. three template front-rear side walls are symmetrically arranged with several location holes, and location hole is equipped with stud;Several studs of No. two template two sides are threaded through several positioning holes respectively, and are connected and fixed by fastening nut;Convex block is fixedly installed at the top of No. three templates;The bottom of No. three templates is fixedly installed the groove matched with convex block, installation and disassembly of the construction personnel in construction to template can be facilitated, installation capability is high, it can be recycled, cost has been saved, the waste of human resources is reduced, template overall stability is good, the security risk in construction is avoided, practicability is stronger.

Description

Construction formwork for placing
Technical field
The utility model relates to construction equipment technical fields, and in particular to construction formwork for placing.
Background technique
With the continuous development of China's economy the urbanization process in China is also constantly being accelerated, people are to quality of life Requirement it is also higher and higher, various buildings rising sheer from level ground as emerging rapidly in large numbersBamboo shoots after a spring rain, and when construction sometimes because save Time laborsaving reason be easy to cause a large amount of wastes of construction equipment, directly results in construction cost increase, causes indirectly Room rate it is surging, do not meet completely modern society save, green rhythm of life, be cast in civil engineering and refer to concrete Equal materials, which are poured into mould, is made predetermined body, to use a process in construction;Present common building exists The template largely used when concrete construction be all it is disposable, it is more wasteful using direct waste treatment after terminating, and And present template installation is mostly the plank sheathing direct splicing installation used, installs people that is more complicated, and needing Power resource is relatively more, influences the progress of construction, increases construction cost, it would be highly desirable to improve.
Utility model content
The purpose of this utility model is that in view of the drawbacks of the prior art and insufficient, provide that a kind of structure is simple, and design is closed Reason, construction formwork for placing easy to use can facilitate installation and disassembly of the construction personnel in construction to template, peace It is high to fill performance, can be recycled, save cost, reduce the waste of human resources, template overall stability is good, avoids Security risk in construction, practicability are stronger.
In order to achieve the above purposes, the technical solution adopted by the utility model is: it include No.1 template, it is No. two templates, tight Gu nut, No.1 pin shaft;Two pieces of No. two templates are symmetrically arranged between two pieces of No.1 templates, and No. two template-setups are in No.1 mould The left and right sides of plate;Several studs are vertically fixedly installed on the two sides up and down of No. two templates;No.1 template is by two pieces No. three Template socket is constituted;The two sides of No. three template front-rear side walls are symmetrically arranged with several location holes, and location hole and stud It is equipped with;Several studs of No. two template two sides are threaded through several positioning holes respectively, and are connected by fastening nut Connect fixation;Convex block is fixedly installed at the top of No. three templates, and convex block is an integral structure with No. three templates;Described The bottom of No. three templates is fixedly installed the groove matched with convex block;The top of No. three templates is equipped with pin hole, pin hole It is interior to be equipped with No.1 pin shaft, and No.1 pin shaft is threaded through in the pin hole of two pieces of No. three templates up and down of No.1 template.
Further, the diameter of the location hole is greater than the diameter of stud.
Further, fixing sleeve is equipped with sealing ring between the fastening nut and location hole.
Further, the bottom of No. two templates and No. three templates is fixedly installed elastic sealing gasket.
Further, the No.1 pin shaft replaces with No. two pin shafts;The side of No. two pin shafts is equipped with positive stop strip, The upper end of positive stop strip is connected and fixed by the upper end of link block and No. two pin shafts, and positive stop strip setting is opposite in two pieces of No.1 templates Face on;The bottom of the positive stop strip is fixedly connected by bolt with No.1 template.
Further, No. four templates are vertically fixedly installed between two pieces of No.1 templates;No. four templates Two sides be fastened on positive stop strip.
After adopting the above structure, the utility model has the beneficial effect that construction formwork for placing described in the utility model, Construction personnel's installation and disassembly to template in construction can be facilitated, installation capability is high, can be recycled, saved at This, reduces the waste of human resources, template overall stability is good, avoids the security risk in construction, practicability is more By force, the advantages that the utility model has structure simple, and setting is reasonable, low manufacture cost.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the left view of Fig. 1.
Fig. 3 is the structural schematic diagram of No.1 template.
Fig. 4 is the structural schematic diagram of No. two templates.
Fig. 5 is the structural schematic diagram of specific embodiment two.
Fig. 6 is the attachment structure schematic diagram of positive stop strip, link block and No. two pin shafts.
Description of symbols:
1, No. three template 1-1 of No.1 template, location hole 1-2, convex block 1-3, groove 1-4, pin hole 1-5, No. two templates 2, spiral shells Column 3, fastening nut 4, No.1 pin shaft 5, sealing ring 6, the pin shaft 8, four of elastic sealing gasket 7, two template 9, positive stop strip 10, connection Block 11.
Specific embodiment
The utility model will be further described below with reference to the accompanying drawings.
Specific embodiment 1:
Referring to as Figure 1-Figure 4, present embodiment the technical solution adopted is that: it includes No.1 template 1, two Template 2, fastening nut 4, No.1 pin shaft 5;Two pieces of No. two templates 2, and No. two templates are symmetrically arranged between two pieces of No.1 templates 1 2 are arranged in the left and right sides of No.1 template 1;Vertically there are six stud 3, spiral shells for fixed setting on the two sides up and down of No. two templates 2 Column 3 and No. two templates 2 are using integrally formed;No.1 template 1 is made of two pieces of No. three template 1-1 sockets;Described No. three The two sides of template 1-1 front-rear side walls are symmetrically opened up there are three location hole 1-2, and location hole 1-2 is equipped with stud 3;It is described Several studs 3 of No. two 2 two sides of template be threaded through in several location hole 1-2 respectively, and be connected and fixed by fastening nut 4; Convex block 1-3 is fixedly installed at the top of No. three template 1-1, and convex block 1-3 and No. three template 1-1 are integrally formed;Institute The bottom of No. three template 1-1 stated is fixedly installed the groove 1-4 matched with convex block 1-3;The top of No. three template 1-1 Portion is equipped with pin hole 1-5, is equipped with No.1 pin shaft 5 in pin hole 1-5, and No.1 pin shaft 5 is threaded through two pieces No. three up and down of No.1 template 1 In the pin hole 1-5 of template 1-1, facilitates and fix two pieces of No. three template 1-1.
Further, the diameter of the location hole 1-2 is greater than the diameter of stud 3, and stud 3 is facilitated to pass through location hole 1-2.
Further, fixing sleeve is equipped with sealing ring 6, mortar leakage prevention between the fastening nut 4 and location hole 1-2.
Further, the bottom of No. two templates 2 and No. three template 1-1 fixation is adhesive with elastic sealing gasket 7, prevents The only position spillage of template bottom and ground face contact.
Further, the No.1 template 1 and No. two templates 2 are all made of rigid plastics, and material is lighter, conveniently applies Work.
The working principle of this specific embodiment:: several studs 3 at No. two 2 both ends of template are successively injected into No.1 template 1 Location hole 1-2 in, it is fixed by fastening nut 4 again then to cover upper seal 6, and No.1 pin shaft 5 is plugged into No.1 template 1 In pin hole 1-5, it can be poured after fixing,
After adopting the above structure, present embodiment has the beneficial effect that construction described in present embodiment Formwork for placing can facilitate installation and disassembly of the construction personnel in construction to template, and installation capability is high, and can recycle makes With having saved cost, reduced the waste of human resources, template overall stability is good, and the safety avoided in construction is hidden The advantages that trouble, practicability is stronger, and the utility model has structure simple, and setting is reasonable, low manufacture cost.
Specific embodiment 2:
Referring to as shown in Fig. 5-Fig. 6, present embodiment and specific embodiment one the difference is that: it is described No.1 pin shaft 5 replaces with No. two pin shafts 8;The side of No. two pin shafts 8 is equipped with positive stop strip 10, and the upper end of positive stop strip 10 passes through Link block 11 and the upper end of No. two pin shafts 8 are connected and fixed, and one end of link block 11 and positive stop strip 10 pass through hot-melt adhesive paste, the other end Upper end with No. two pin shafts 8 is by hot-melt adhesive paste, and positive stop strip 10 is arranged on two pieces of opposite faces of No.1 template 1;Described The bottom of positive stop strip 10 is fixedly connected by bolt with No.1 template 1;It is vertically fixedly installed between two pieces of No.1 templates 1 There are No. four templates 9;The two sides of No. four templates 9 are fastened on positive stop strip 10;When needing small area to pour by No.1 pin Axis 5 takes out, and No. two pin shafts 8 are inserted into, and positive stop strip 10, which is stretched, to be located between two pieces of No.1 templates 1, then inserts No. four slidings of template 9 It is located between two pieces of No.1 templates 1, can be poured, the working principle of remaining part is same as the specific embodiment one.
The above is merely intended for describing the technical solutions of the present application, but not for limiting the present application, those of ordinary skill in the art couple The other modifications or equivalent replacement that the technical solution of the utility model is made, without departing from technical solutions of the utility model Spirit and scope should all cover in the scope of the claims of the utility model.

Claims (6)

1. construction formwork for placing, it is characterised in that: it include No.1 template (1), No. two templates (2), fastening nut (4), No.1 pin shaft (5);Two pieces of No. two templates (2) are symmetrically arranged between two pieces of No.1 templates (1), and No. two template (2) settings exist The left and right sides of No.1 template (1);Several studs (3) are vertically fixedly installed on the two sides up and down of No. two templates (2);No.1 Template (1) is made of two pieces of No. three templates (1-1) sockets;The two sides of No. three template (1-1) front-rear side walls are symmetrical arranged Have several location holes (1-2), and location hole (1-2) is equipped with stud (3);No. two template (2) two sides it is several Stud (3) is threaded through respectively in several location holes (1-2), and is connected and fixed by fastening nut (4);No. three templates It is fixedly installed at the top of (1-1) convex block (1-3), and convex block (1-3) is an integral structure with No. three templates (1-1);Described The bottom of No. three templates (1-1) is fixedly installed the groove (1-4) matched with convex block (1-3);No. three templates (1-1) Top be equipped with pin hole (1-5), be equipped with No.1 pin shaft (5) in pin hole (1-5), and No.1 pin shaft (5) is threaded through No.1 template (1) Two pieces of No. three templates (1-1) up and down pin hole (1-5) in.
2. construction formwork for placing according to claim 1, it is characterised in that: the diameter of the location hole (1-2) Greater than the diameter of stud (3).
3. construction formwork for placing according to claim 1, it is characterised in that: the fastening nut (4) and positioning Fixing sleeve is equipped with sealing ring (6) between hole (1-2).
4. construction formwork for placing according to claim 1, it is characterised in that: No. two templates (2) and No. three The bottom of template (1-1) is fixedly installed elastic sealing gasket (7).
5. construction formwork for placing according to claim 1, it is characterised in that: the No.1 pin shaft (5) replaces with No. two pin shafts (8);The side of No. two pin shafts (8) is equipped with positive stop strip (10), and the upper end of positive stop strip (10) passes through link block (11) upper end with No. two pin shafts (8) is connected and fixed, and positive stop strip (10) is arranged on the opposite face of two pieces of No.1 templates (1); The bottom of the positive stop strip (10) is fixedly connected by bolt with No.1 template (1).
6. construction formwork for placing according to claim 5, it is characterised in that: two pieces of No.1 templates (1) it Between be vertically fixedly installed No. four templates (9);The two sides of No. four templates (9) are fastened on positive stop strip (10).
CN201820661057.XU 2018-05-05 2018-05-05 Construction formwork for placing Expired - Fee Related CN208202539U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820661057.XU CN208202539U (en) 2018-05-05 2018-05-05 Construction formwork for placing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820661057.XU CN208202539U (en) 2018-05-05 2018-05-05 Construction formwork for placing

Publications (1)

Publication Number Publication Date
CN208202539U true CN208202539U (en) 2018-12-07

Family

ID=64519570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820661057.XU Expired - Fee Related CN208202539U (en) 2018-05-05 2018-05-05 Construction formwork for placing

Country Status (1)

Country Link
CN (1) CN208202539U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114263112A (en) * 2021-11-26 2022-04-01 中建二局土木工程集团有限公司 High-strength lightweight template of bridge cylindrical pier

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114263112A (en) * 2021-11-26 2022-04-01 中建二局土木工程集团有限公司 High-strength lightweight template of bridge cylindrical pier
CN114263112B (en) * 2021-11-26 2024-01-23 中建二局土木工程集团有限公司 High-strength light-weight template for bridge cylindrical pier

Similar Documents

Publication Publication Date Title
CN208202539U (en) Construction formwork for placing
CN205653902U (en) Floor entrance to a cave block structure
CN208792616U (en) Assembled wallboard and its connection structure
CN209556366U (en) A kind of building aluminum dipping form back cord yin-yang angle reinforces link system
CN209113353U (en) A kind of novel compositions beam lifting lug device
CN206468009U (en) A kind of form for construction engineering
CN210685361U (en) Template connection structure for building
CN209413300U (en) A kind of connection locking device of building template
CN212478541U (en) A building templates for building engineering's composite erection of being convenient for
CN209293280U (en) A kind of novel high-strength composite floor
CN209620590U (en) A kind of back cord inner corner trim connection fastener
CN209261350U (en) A kind of detachable guard rail connector
CN211499810U (en) Building construction wall connecting assembly
CN208220192U (en) A kind of exterior wall Corner boarding
CN205296814U (en) Novel concrete form structure
CN111058372A (en) Mortise and tenon socket joint formula steel trestle crossbeam and steel-pipe pile connected node
CN214739926U (en) Building template convenient to disassemble and assemble
CN220203377U (en) Novel connecting piece for climbing frame
CN203977850U (en) A kind of plastics add fiber through tempering Combined type building template
CN207761281U (en) A kind of building template of anti-alice
CN209670322U (en) A kind of building template easy to disassemble
CN208501910U (en) A kind of i-steel component connector
CN209620591U (en) A kind of back cord external corner connection fastener
CN210195258U (en) Reinforcing member of light-duty explosion-proof mould
CN215593677U (en) Bridge deck connection fastener

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207