CN208201659U - Prestressing force intelligent tensioning work anchor - Google Patents
Prestressing force intelligent tensioning work anchor Download PDFInfo
- Publication number
- CN208201659U CN208201659U CN201820709745.9U CN201820709745U CN208201659U CN 208201659 U CN208201659 U CN 208201659U CN 201820709745 U CN201820709745 U CN 201820709745U CN 208201659 U CN208201659 U CN 208201659U
- Authority
- CN
- China
- Prior art keywords
- work
- work anchor
- hole
- blind hole
- compression
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of prestressing force intelligent tensioning work anchor, including work anchor ring and work collet, the work anchor ring includes backing plate face and pressure-bearing surface, the pressure-bearing surface, which is equipped with, compresses docking blind hole, the work anchor hole for having the work anchor ring is run through at compression docking hole bottom, the work anchor hole internal diameter is biggish open at one end in compression docking blind hole, and the work anchor hole internal diameter is lesser open at one end in the backing plate face;The filing appliance set has the round table-like outer wall being adapted with the work anchor hole inner wall, and the filing appliance set is set in the work anchor hole, and stub end is fallen in the compression docking blind hole.Using the utility model has the beneficial effects that actively pressing work clip sheet by compression boss with the reversed pressure plate cooperation with compression boss, work anchor can be made actively to clamp presstressed reinforcing steel, to reduce the rebound of presstressed reinforcing steel, loss of prestress is reduced, so as to avoid possible excessive tensioning.
Description
Technical field
The utility model relates to build and a kind of tool of field of bridge construction, and in particular to a kind of prestressing force intelligent tensioning
Work anchor.
Background technique
Prestressing stretching technique is widely applied in building and bridge construction, can slow down concrete using pre-stress construction
Crackle occur and extension process, prolong the service life.However, tensioning construction process wants material and construction technology
It asks very high, is easier to the problem of loss of prestress occur.When loss of prestress typically occurs in traditional prestressing force load end,
Since the retraction of presstressed reinforcing steel just makes to fasten between fixture and anchor ring, lost so as to cause the prestressing force of load.It applies at present
It is to solve the problems, such as loss of prestress during work, the method for often requiring to use ultra stretching, even if the maximum of tensioning load is answered
Power is greater than design prestressing force.However ultra stretching method does not often know stress loss amount, it cannot be guaranteed that final stress meets design
It is required that and easily occur breaking or damaging the situation of anchorage, ultra stretching method is simultaneously unreliable.Therefore, prestressed anchor is still needed to be improved
The design of the structure of tool and tensioning system, provides conveniently for tensioning construction.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of prestressing force intelligent tensioning work anchor.
Technical solution is as follows:
A kind of prestressing force intelligent tensioning work anchor, including work anchor ring and work collet, it is critical that the work anchor
Ring includes backing plate face and pressure-bearing surface, and the pressure-bearing surface, which is equipped with, compresses docking blind hole, which docks hole bottom through
State the work anchor hole of work anchor ring, the work anchor hole internal diameter it is biggish it is open at one end in the compression docking blind hole in, the work
Anchor hole internal diameter is lesser open at one end in the backing plate face;Filing appliance set, which has, to be adapted with the work anchor hole inner wall
Round table-like outer wall, the filing appliance set are set in the work anchor hole, and stub end is fallen in the compression docking blind hole.It adopts
With the above design, it the advantage is that compression docking blind hole provides for compression boss and allow bit space, facilitate compression boss actively top
Corresponding work collet is pressed, work anchor can be made actively to clamp presstressed reinforcing steel, to reduce the rebound of presstressed reinforcing steel, reduces prestressing force
Loss, so as to avoid possible excessive tensioning.
As optimal technical scheme, above-mentioned work anchor ring is equipped with location hole, which is blind hole, is opened on described
On pressure-bearing surface.Using the above design, it the advantage is that the convenient anchor ring locating rod on reversed pressure plate cooperates, guidance stabilization is leaned on
Nearly work anchor ring and press work collet.
As optimal technical scheme, above-mentioned pressure-bearing surface is equipped with annular groove, which is disposed around the compression pair
It connects outside blind hole.Using the above design, it the advantage is that annular groove is matched with the outer lateral flange of the support tube on jack, side
Just the reliable installation of two-way jack and work anchor ring.
As optimal technical scheme, above-mentioned work collet center is perforated equipped with presstressed reinforcing steel, and the work collet is by least two
Valve work clip sheet circumferential direction is assembled, and the diameter of the stub end of the work collet is greater than the maximum inner diameter of the work anchor hole and small
In the internal diameter for compressing docking blind hole, the stub end of the work collet falls in the compression docking after stretching out the work anchor hole
In blind hole.Using the above design, the folder realized using simple clip type filing appliance Analysis of Nested Design to presstressed reinforcing steel the advantage is that
It holds.
As optimal technical scheme, the quantity of above-mentioned location hole is three, and three location hole dispersed distributions are in described
It works on anchor ring.Using the above design, it the advantage is that reversed pressure plate stabilization approaches and press work during facilitating press
Intermediate plate.
As optimal technical scheme, above-mentioned work anchor ring is equipped with N number of compression and docks blind hole, and N is positive integer, N number of
The docking blind hole that compresses is uniformly distributed around the center circumferential direction of the work anchor ring, is distinguished at each compression docking blind hole
Equipped with work anchor hole, the work collet is respectively equipped in all work anchor holes.Using the above design, the side of the advantage is that
Just the synchronous tensioning for carrying out more presstressed reinforcing steels.
The utility model has the advantages that using the utility model has the beneficial effects that passing through with the reversed pressure plate cooperation with compression boss
Compression boss actively press work clip sheet, work anchor can be made actively to clamp presstressed reinforcing steel, so that the rebound of presstressed reinforcing steel is reduced,
Loss of prestress is reduced, so as to avoid possible excessive tensioning.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of work anchor ring;
Fig. 3 is the cross-sectional view of A-A ' in Fig. 1;
The prestressed stretch-draw system structure diagram that Fig. 4 is applicable in by the utility model.
Specific embodiment
Below with reference to embodiment and attached drawing, the utility model is described in further detail.
As shown in Figures 1 to 3, a kind of prestressing force intelligent tensioning work anchor, including the work anchor ring a1 and collet a2 that works, it is described
Work anchor ring a1 includes backing plate face and pressure-bearing surface, and the pressure-bearing surface, which is equipped with, compresses docking blind hole a3, which docks blind hole a3
Bottom hole runs through the work anchor hole a4 for having the work anchor ring a1, and the work anchor hole a4 internal diameter is biggish open at one end in the compression
It docks in blind hole a3, the work anchor hole a4 internal diameter is lesser open at one end in the backing plate face.
The work collet a2 has the round table-like outer wall being adapted with the work anchor hole a4 inner wall, the work collet
A2 is set in the work anchor hole a4, and stub end is fallen in the compression docking blind hole a3.
Specifically, the center work collet a2 is perforated equipped with presstressed reinforcing steel, which is worked by least two valves
Intermediate plate circumferential direction is assembled, and the diameter of the stub end of work collet a2 is greater than the maximum inner diameter of the work anchor hole a4 and is less than
The internal diameter for compressing docking blind hole a3, the stub end of work collet a2 fall in the compression after stretching out the work anchor hole a4
It docks in blind hole a3.
The work anchor ring a1 is equipped with location hole a5, and location hole a5 is blind hole, is opened on the pressure-bearing surface, this
In embodiment, the quantity of the location hole a5 is three, and three location hole a5 dispersed distributions are on the work anchor ring a1.
It is additionally provided with annular groove a6 on the pressure-bearing surface, is disposed around outside the compression docking blind hole a3.
For the situation suitable for more presstressed reinforcing steel simultaneous tensions, the work anchor ring a1 is equipped with N number of compression pair
Blind hole a3 is met, N is positive integer, and N number of docking blind hole a3 that compresses is uniformly distributed around the center circumferential direction of the work anchor ring a1,
It is respectively equipped with work anchor hole a4 at each compression docking blind hole a3, is respectively equipped with the work in all work anchor hole a4
Make collet a2.
Above-mentioned work anchor assemblies are suitable for following prestressing force pull system:
As shown in figure 4, a kind of prestressing force intelligent tensioning system, including successively mutually abut and be set in along tensioning direction
Anchor plate component e on presstressed reinforcing steel x, work anchor assemblies a, reversed pressure plate b, jack c and tool anchor assemblies d, described thousand
Jin top c is two-way jack, which is provided with tensioning pars contractilis and press pars contractilis that telescopic direction is parallel to each other.The moveable anchor
Component d is installed on the tensioning pars contractilis of the two-way jack, and the reversed pressure plate b is installed on the two-way jack
It presses on pars contractilis.
The backing plate face of the work anchor ring a1 against the anchor plate component e, the reversed pressure plate b be equipped with it is described
The compression boss b2 that butt hole a3 is matched is compressed, the anchor ring locating rod b4 matched with the location hole a5 is additionally provided with.
The outer cylinder body of press pars contractilis one end of the two-way jack is equipped with support tube c9, support tube c9 outer side edges
The flange of edge abuts the work anchor ring a1, and cooperates with annular groove a6 thereon.
After being installed, pump nozzle on the tensioning pars contractilis pressurizes oiling, and the tensioning pars contractilis carries out tensioning.It reaches
To after predetermined tensioning value, the pump nozzle oil inlet pressed on pars contractilis, to push the reversed pressure plate b, the compression
Boss b2 presses the work collet a2, and the work anchor assemblies is made to clamp presstressed reinforcing steel x.During this, the anchor ring positioning
Bar b4 is matched with location hole a5, and the reversed pressure plate b stabilization is guided to approach and press the work collet a2.After the completion,
Oil liquid returns to grease chamber from the oil return nozzle, and the retracting cylinder resets, and completes stretching process.
Finally, it should be noted that foregoing description is only the preferred embodiment of the utility model, the ordinary skill of this field
Personnel are under the enlightenment of the utility model, under the premise of without prejudice to the utility model aims and claim, can make a variety of
Similar expression, such transformation are each fallen within the protection scope of the utility model.
Claims (6)
1. a kind of prestressing force intelligent tensioning work anchor, including work anchor ring (a1) and work collet (a2), it is characterised in that: described
Work anchor ring (a1) includes backing plate face and pressure-bearing surface, and the pressure-bearing surface, which is equipped with, compresses docking blind hole (a3), and compression docking is blind
Hole (a3) bottom hole runs through the work anchor hole (a4) for having the work anchor ring (a1), and the work anchor hole (a4) is in a circular table shape, the work
Anchor hole (a4) internal diameter is biggish open at one end interior in compression docking blind hole (a3), work anchor hole (a4) internal diameter lesser one
End opening is in the backing plate face;
The work collet (a2) has the round table-like outer wall being adapted with work anchor hole (a4) inner wall, the work collet
(a2) it is set in the work anchor hole (a4), stub end is fallen in compression docking blind hole (a3).
2. prestressing force intelligent tensioning work anchor according to claim 1, it is characterised in that: set on the work anchor ring (a1)
There is location hole (a5), which is blind hole, is opened on the pressure-bearing surface.
3. prestressing force intelligent tensioning work anchor according to claim 2, it is characterised in that: the pressure-bearing surface is equipped with annular
Groove (a6), the annular groove (a6) are disposed around compression docking blind hole (a3) outside.
4. prestressing force intelligent tensioning work anchor according to claim 3, it is characterised in that: work collet (a2) center
It perforates equipped with presstressed reinforcing steel, the work collet (a2) is assembled by least two valve work clip sheet circumferential directions, the work collet (a2)
Stub end diameter be greater than the work anchor hole (a4) maximum inner diameter and be less than it is described compress docking blind hole (a3) internal diameter,
The stub end of the work collet (a2) is fallen in compression docking blind hole (a3) after stretching out the work anchor hole (a4).
5. prestressing force intelligent tensioning work anchor according to claim 2, it is characterised in that: the quantity of the location hole (a5)
It is three, three location hole (a5) dispersed distributions are on the work anchor ring (a1).
6. prestressing force intelligent tensioning work anchor according to claim 3, it is characterised in that: set on the work anchor ring (a1)
There is N number of compression docking blind hole (a3), N is positive integer, and N number of compression docking blind hole (a3) surrounds the work anchor ring
(a1) center circumferential direction is uniformly distributed, and is respectively equipped with work anchor hole (a4), Suo Yousuo at each compression docking blind hole (a3)
It states in work anchor hole (a4) and is respectively equipped with the work collet (a2).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820181206 | 2018-02-01 | ||
CN2018201812062 | 2018-02-01 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208201659U true CN208201659U (en) | 2018-12-07 |
Family
ID=64519844
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820709745.9U Active CN208201659U (en) | 2018-02-01 | 2018-05-14 | Prestressing force intelligent tensioning work anchor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208201659U (en) |
-
2018
- 2018-05-14 CN CN201820709745.9U patent/CN208201659U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205915071U (en) | A high -efficient hydraulic clamping mechanism for milling machine class | |
CN208201659U (en) | Prestressing force intelligent tensioning work anchor | |
CN206399732U (en) | A kind of pull test wire cable clamp | |
CN108468276A (en) | A kind of two-way jack-up system of prestressing force intelligent tensioning | |
CN208202592U (en) | The non-return system of intelligent tensioning presstressed reinforcing steel | |
CN211039002U (en) | Quick valve body and plunger pump for plunger pump of dismantling and equipment | |
CN219796356U (en) | Building construction pipeline fixing mechanism | |
CN2380749Y (en) | Expansion sealing apparatus | |
CN208777736U (en) | Prestressed stretch-draw intellectual monitoring control system | |
CN108408636A (en) | A kind of two-way jacking component of intelligent tensioning | |
CN207211771U (en) | A kind of stopping means for reducing prestressd anchor cable loss | |
CN207418179U (en) | A kind of preceding card punching bridge prestress stretch-draw jack | |
CN208732502U (en) | The two-way jacking component of intelligent tensioning | |
CN207325865U (en) | A kind of flange pneumatic hammer forging auxiliary clamp | |
CN208563115U (en) | Prestressing force intelligent tensioning system | |
CN208563999U (en) | The reversed retention mechanism of intelligent tensioning presstressed reinforcing steel | |
CN208251647U (en) | The reversed pressure plate of prestressing force intelligent tensioning anchorage | |
CN208561544U (en) | Two-way jack for prestressing force intelligent tensioning | |
CN202087104U (en) | Hydraulic tension type cabinet type filter press | |
CN205475231U (en) | Pressure pile head of static pressure stake machine | |
CN108425500A (en) | A kind of non-return system of intelligent tensioning presstressed reinforcing steel | |
CN108612313A (en) | A kind of prestressing force intelligent tensioning autocontrol method | |
CN208251648U (en) | Intelligent tensioning strand tapered anchorage | |
CN208796784U (en) | Core of reactor compressing structure and pressing device | |
CN208847468U (en) | Electro-hydraulic servo dynamic fatigue test machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |