CN208196028U - Tower tray bracing ring assembly tooling - Google Patents
Tower tray bracing ring assembly tooling Download PDFInfo
- Publication number
- CN208196028U CN208196028U CN201820598252.2U CN201820598252U CN208196028U CN 208196028 U CN208196028 U CN 208196028U CN 201820598252 U CN201820598252 U CN 201820598252U CN 208196028 U CN208196028 U CN 208196028U
- Authority
- CN
- China
- Prior art keywords
- bracing ring
- tower tray
- tray bracing
- fixed
- assembly tooling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
Used tooling, specially tower tray bracing ring assembly tooling when the utility model relates to weld tower tray bracing ring in tower class chemical industry equipment.It solves the problems, such as to lack special tower tray bracing ring Anti-deformation device for welding.The tower tray bracing ring assembly tooling includes casing, sleeve outer wall is fixed with the central substrate vertical with casing axis, the uniformly distributed telescopic arm of at least three annular sleeves is fixed in central substrate, the free end of each telescopic arm is fixed with the clamp for fixing tower tray bracing ring.The utility model is used for tower tray bracing ring Fast Installation, can guarantee that the installation of tower tray bracing ring is smooth and postwelding tower tray bracing ring still maintains smooth.
Description
Technical field
Used tooling, specially tower tray when the utility model relates to weld tower tray bracing ring in tower class chemical industry equipment
Bracing ring assembly tooling.
Background technique
Tower tray bracing ring is typically welded to tower class equipment inner surface, for fixing for the tower class equipment in chemical industry equipment
Component in the towers such as down-flow plate.In the installation process of tower internals, the installation of tower tray bracing ring is the most key, because tower tray supports
Circle and inner wall of tower welding are the bases for connecting and fixing all tower internals such as descending liquid disk.After the completion of the weldering of tower tray bracing ring installation group
Whether surface is smooth, and whether flatness is up to standard, directly affects the installation effect of component in all towers such as descending liquid disk, and then influence
The using effect of whole tower.Tower tray bracing ring general thickness is relatively thin, and component width is also little, and tower tray bracing ring completes
Inherently some out-of-flatnesses afterwards, the especially bigger deformation of diameter is bigger, generally requires before assembly and smooths to it.Because of tower tray
Bracing ring is relatively thin relatively narrow, and non-deformability is poor after by stress, preapres for an unfavorable turn of events at present due to lacking special tower tray bracing ring welding
Shape dress is set, so stress effect torsional deformation is more serious after general welding, the peace of the subsequent tower internals such as direct image descending liquid disk
Fill effect.
Summary of the invention
The utility model solves the problems, such as the special tower tray bracing ring Anti-deformation device for welding of shortage, provides a kind of tower tray branch
Support ring assembly tooling, the assembly tooling implement effectively support to tower tray bracing ring, the deformation after preventing tower tray bracing ring welding.
The utility model adopts the following technical scheme that realization: tower tray bracing ring assembly tooling, including casing, outside casing
Wall is fixed with the central substrate vertical with casing axis, and uniformly distributed flexible of at least three annular sleeves is fixed in central substrate
Arm, the free end of each telescopic arm are fixed with the clamp for fixing tower tray bracing ring.In use, according to the straight of tower tray bracing ring
Diameter size adjusts the collapsing length of each telescopic arm, and the free end of each telescopic arm is fixed by clamp and tower tray bracing ring, thus
Tower tray bracing ring is supported in the cylinder inboard wall of tower class chemical industry equipment, single track tower tray bracing ring fixes, and then implements welding.
It further include a connecting tube, described sleeve pipe is placed in connecting tube, and screw hole is provided on casing, is screwed with first in screw hole
It is provided with through-hole on jackscrew or casing, the nut around through-hole is fixed on casing outer tube wall, is screwed in nut across through-hole
First jackscrew.It generally uses simultaneously cover the assembly more thus using the welding simultaneously of number set tower tray bracing ring in actual use
Tooling is fixed with the casing that connecting tube penetrates every set tooling, the number set three-dimensional full side of tooling different direction in cylinder
Position supports each tower tray bracing ring, can enhance stability of strutting system.
The utility model is used for tower tray bracing ring Fast Installation, can guarantee that the installation of tower tray bracing ring is smooth and postwelding tower
Disk bracing ring still maintains smooth;After efficiently solving tower tray bracing ring welding, distort serious situation, does not have to weldering
By often correction is reprocessed, labor efficiency is improved, reduces labor intensity, improves productivity effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;,
Fig. 2 is the usage state diagram of the utility model;
Fig. 3 is another usage state diagram of the utility model;
Fig. 4 is the structural schematic diagram of the fixed link in flexible wall;
Fig. 5 is the side view of Fig. 4;
Fig. 6 is the cross-sectional view of Fig. 4;
Fig. 7 is the structural schematic diagram of center substrate;
Fig. 8 is the side view of Fig. 7;
Fig. 9 is the structural schematic diagram of clamp;
Figure 10 is the side view of Fig. 9.
In figure: 1- casing, 2- central substrate, 3- telescopic arm, 31- fixed link, 32- telescopic rod, 33- second are pushed up
Silk, 4- clamp, 41- riser, 42- transverse slat, 43- third jackscrew, the 4th jackscrew of 44-, 5- connecting tube, the first jackscrew of 6-,
7- tower tray bracing ring, 8- cylinder.
Specific embodiment
Tower tray bracing ring assembly tooling, including casing 1,1 outer wall of casing are fixed with the central substrate vertical with casing axis
2, the uniformly distributed telescopic arm 3 of at least three annular sleeves 1 is fixed in central substrate 2, the free end fixation of each telescopic arm 3 is useful
In the clamp 4 for fixing tower tray bracing ring.It further include a connecting tube 5, described sleeve pipe 1 is placed in connecting tube 5, is opened on casing 1
There is screw hole, be screwed in screw hole on the first jackscrew 6 or casing 1 and be provided with through-hole, is fixed on 1 outer tube wall of casing around through-hole
Nut is screwed with the first jackscrew 6 across through-hole in nut.When it is implemented, telescopic arm 3 includes fixed link 31 and telescopic rod 32,
One end of fixed link 31 and central substrate 2 are fixed, and the other end of fixed link 31 is axially provided with telescopic chute or telescopic hole along fixed link,
Telescopic rod 32 is located in telescopic chute or telescopic hole, and screw hole is provided in fixed link 31, is screwed in screw hole for positioning telescopic rod 32
Second jackscrew 33;The more conventional telescopic arm of the structure more advantages of simple of such telescopic arm 3, it is easier to processing and 3 length tune of telescopic arm
It fixes or positions more reliable after section is suitable.The clamp 4 is by two risers 41 and 42 structure of transverse slat being connected between two risers 41
At the transverse slat upper and lower position of the same riser 41 has screw hole, is screwed with third jackscrew 43 and the 4th top in two screw holes respectively
Silk 44.In use, third jackscrew 43 or the 4th jackscrew 44 are for clamping telescopic arm (telescopic rod) end, the 4th jackscrew 44 or the
Three jackscrews 43 are for clamping tower tray bracing ring edge.Further, two risers 41 are the narrow rank of a half-breadth half
Scalariform, and third jackscrew 43 on narrow half or the 4th jackscrew 44 be for clamping telescopic arm (telescopic rod) end, in this way, clamp 4
More reasonable structure, using more convenient.The central substrate 2 is semicircle.Central substrate 2 is two pieces, telescopic arm 3 and center base
When plate 2 is fixed, one end of telescopic arm 2 is held between two central substrates and fixes simultaneously with two central substrates.
Claims (7)
1. a kind of tower tray bracing ring assembly tooling, it is characterised in that including casing (1), casing (1) outer wall is fixed with and quill
The vertical central substrate of line (2) is fixed with the uniformly distributed telescopic arm (3) of at least three annular sleeves (1) in central substrate (2), often
The free end of a telescopic arm (3) is fixed with the clamp (4) for fixing tower tray bracing ring.
2. tower tray bracing ring assembly tooling according to claim 1, it is characterised in that further include a connecting tube (5), institute
It states casing (1) to be placed on connecting tube (5), screw hole is provided on casing (1), the first jackscrew (6) or casing are screwed in screw hole
(1) it is provided with through-hole on, the nut around through-hole is fixed on casing (1) outer tube wall, is screwed in nut across the first top of through-hole
Silk (6).
3. tower tray bracing ring assembly tooling according to claim 1 or 2, it is characterised in that central substrate (2) is semicircle.
4. tower tray bracing ring assembly tooling according to claim 3, it is characterised in that central substrate (2) is two pieces, is stretched
When arm (3) and fixed central substrate (2), one end of telescopic arm (3) is held between two central substrates and same with two central substrates
When fix.
5. tower tray bracing ring assembly tooling according to claim 1 or 2, it is characterised in that telescopic arm (3) includes fixed link
(31) it is fixed with telescopic rod (32), one end and central substrate (2) of fixed link (31), the other end of fixed link (31) is along fixed link
It axially is provided with telescopic chute or telescopic hole, telescopic rod (32) is located in telescopic chute or telescopic hole, and fixed link is provided with screw hole, spiral shell on (31)
The second jackscrew (33) for positioning telescopic rod (32) is screwed in hole.
6. tower tray bracing ring assembly tooling according to claim 1 or 2, it is characterised in that clamp (4) is by two risers
(41) it is constituted with the transverse slat (42) that is connected between two risers (41), the transverse slat upper and lower position of the same riser (41) has
Screw hole is screwed with third jackscrew (43) and the 4th jackscrew (44) in two screw holes respectively.
7. tower tray bracing ring assembly tooling according to claim 6, it is characterised in that two risers (41) are a half-breadth one
Half is narrow ladder-like, and third jackscrew (43) on narrow half or the 4th jackscrew (44) are for clamping telescopic arm end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820598252.2U CN208196028U (en) | 2018-04-25 | 2018-04-25 | Tower tray bracing ring assembly tooling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820598252.2U CN208196028U (en) | 2018-04-25 | 2018-04-25 | Tower tray bracing ring assembly tooling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208196028U true CN208196028U (en) | 2018-12-07 |
Family
ID=64520972
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820598252.2U Active CN208196028U (en) | 2018-04-25 | 2018-04-25 | Tower tray bracing ring assembly tooling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208196028U (en) |
-
2018
- 2018-04-25 CN CN201820598252.2U patent/CN208196028U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2022068703A1 (en) | Thrust transfer apparatus for ignition test of solid rocket engine in form of rear skirt connection | |
CN204771303U (en) | Convenient flange group is to ware | |
CN208196028U (en) | Tower tray bracing ring assembly tooling | |
CN101673649B (en) | Assembling jig of millimeter wave traveling wave tube helix slow wave system and assembling method | |
CN108915278B (en) | Ball node net rack small unit ground welding support splicing jig | |
CN211362195U (en) | Supporting mechanism for metal bent pipe springback measurement | |
CN207280485U (en) | A kind of silo instrument lowering equipment | |
CN208636040U (en) | A kind of stiffness test fixture | |
CN205021270U (en) | Ring gear positioner | |
CN208763327U (en) | A kind of handrail paste pipes supporting element | |
CN207366165U (en) | Auto parts and components General clamp for vibration test | |
CN110788817A (en) | Supporting mechanism for metal bent pipe springback measurement | |
CN216150926U (en) | Aeroengine part sizing device | |
CN207326133U (en) | Notebook circuit board stud welding aided positioning clamping apparatus | |
CN216265481U (en) | Lens group torsion test fixture | |
CN208697243U (en) | A kind of gland multistation locking fixture | |
CN218697962U (en) | Tooling jig for manufacturing circuit board | |
CN218397802U (en) | Clamping tool with adjustable specification | |
CN214405158U (en) | Adjustable straight pipe repairing device | |
CN214834512U (en) | Springboard support for building construction | |
CN110815099B (en) | Precision optical instrument and mounting and positioning mechanism thereof | |
CN115386851B (en) | Clamp and clamping method for thin-walled cylinder workpiece for magnetron sputtering | |
CN209902574U (en) | Manufacturing tool for sliding frame component | |
CN207771320U (en) | A kind of mechanical frock of large scale cylindrical workpiece | |
CN109128665A (en) | A kind of apparatus for welding and positioning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |