CN208184688U - Mobile mud pit - Google Patents

Mobile mud pit Download PDF

Info

Publication number
CN208184688U
CN208184688U CN201820675931.5U CN201820675931U CN208184688U CN 208184688 U CN208184688 U CN 208184688U CN 201820675931 U CN201820675931 U CN 201820675931U CN 208184688 U CN208184688 U CN 208184688U
Authority
CN
China
Prior art keywords
pipe fitting
mud
cabinet
mud pit
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820675931.5U
Other languages
Chinese (zh)
Inventor
王中华
陈江毅
何天贵
刘爽
李震坤
谭俊
张天赐
周蜀山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority to CN201820675931.5U priority Critical patent/CN208184688U/en
Application granted granted Critical
Publication of CN208184688U publication Critical patent/CN208184688U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses mobile mud pits, including the cabinet for containing mud;For carry cabinet and can transverse shifting cabinet mobile device, mobile device includes for carrying the carrying platform of cabinet, for reducing the rolling mechanism of frictional force, the bindiny mechanism for connecting with traction device between carrying platform and ground, cabinet is placed on the carrying platform, rolling mechanism is mounted on carrying platform lower part, one end of bindiny mechanism is connect with carrying platform, and the other end of bindiny mechanism is connect with traction device.Solve the problems, such as certain construction site mud pit difficult arrangements;Using mobile mud pit, reduce the excavation of mud pit, protect, the work such as backfill reduce working procedure, accelerate duration progress;Using mobile mud pit, because rolling mechanism is mounted on carrying platform lower part, it so that the transhipment of mobile mud pit is convenient, can be used in multiple places for one case, it is more economical relatively to excavate multiple mud pits.

Description

Mobile mud pit
Technical field
The utility model belongs to a kind of construction project technical field, and in particular to mobile mud pit.
Background technique
In bored pile construction, mud has retaining wall, takes the important function such as slag, cooling drilling tool, lubrication, therefore is drilling Before filling pile construction, generally build mud pit, storage mud precipitate dregs to circulating mud.Mud conditioning is always building site A great problem.Brown muddy water is usually seen on building site to flow over everywhere, has both been influenced the image in building site, has also been influenced applying for building site Work, " arch-criminal " therein are exactly this mud.
Conventional mud pond, when construction, need time and cost, after the completion of drilling construction, need to remove and backfill, again when Between and cost, it is often more important that cause environmental pollution and site operation security risk.
Application No. is the patents of CN201520013603.5 to disclose a kind of drilled pile construction environment-protective slurry case, including mud Cabinet frame and the mud wall panel being welded in mud cabinet frame, the mud cabinet frame and mud wall panel collectively form one The mud cabinet of top opening places end in the mud pit and is equipped with inlet pipe mouth, in vitro in mud pit body periphery lower end Equipped with pulp nozzle, it is equipped with valve at the pulp nozzle, is convenient for hanging in being respectively arranged on the left side and the right side for the mud cabinet Fill the lifting lug of mud cabinet.In the patent, need to use the transport apparatus such as tower crane, crane when carrying out the transhipment of mud pit It is hung to mud pit is stated from high-altitude, it is practical in engineering, so heavy mud pit can not be turned from high-altitude substantially Move, so and it is unreasonable, the mobile mud pit for needing research and development department a kind of new is mentioned above to solve the problems, such as.
Summary of the invention
The purpose of this utility model is that solve the above-mentioned problems and provides a kind of mobile mud pit.
The utility model achieves the above object through the following technical schemes:
Mobile mud pit, comprising:
For containing the cabinet of mud;
For carry cabinet and can transverse shifting cabinet mobile device, mobile device includes the carrying for carrying cabinet Platform, for reducing the rolling mechanism of frictional force, the bindiny mechanism for being connect with traction device between carrying platform and ground, Cabinet is placed on the carrying platform, and rolling mechanism is mounted on carrying platform lower part, and one end of bindiny mechanism is connect with carrying platform, The other end of bindiny mechanism is connect with traction device.
Specifically, the first end of cabinet is mud input terminal, water outlet there are two settings on the side wall of cabinet second end, two A water outlet is connected to two outlet valves for mud releasing, its second end is provided with a partition in cabinet and is used to obstruct Cabinet is simultaneously separated into sedimentation basin and follows stock tank by mud dregs, and divider height is less than box height.
Specifically, carrying platform includes more channel steels and two I-steel composition, and two I-steel are parallel to each other installation, more Root channel steel is parallel to each other installation, per adjacent two channel steels between be spaced identical, the both ends of every channel steel are individually positioned in two works Word steel top, and welded with I-steel.
Specifically, rolling mechanism includes multiple universal wheels, and universal wheel includes connecting plate, bearing, connecting shaft, bracket, tire Ontology, tire body is rotatably rack-mount by connecting shaft, and the upper end of bracket is fixedly connected with the outer ring of bearing, axis The inner ring held is fixedly connected with connecting plate bottom, is fixedly connected at the top of connecting plate with the bottom of I-steel.
Specifically, bindiny mechanism includes limited block, the first pipe fitting, the second pipe fitting, third pipe fitting, the 4th pipe fitting, the first pipe The both ends of part are separately fixed on two I-steel, and the second pipe fitting is rotatably sleeved on the first pipe fitting, two limited block peaces On the second pipe fitting and for limiting sliding of second pipe fitting on the first pipe fitting, one end of third pipe fitting and the first pipe fitting Middle part is fixedly connected, and the other end of third pipe fitting is connect with the middle part of the 4th pipe fitting, and the second pipe fitting is vertical with third pipe fitting, and the 4th Pipe fitting is vertical with third pipe fitting, and the 4th pipe fitting is vertical with second, traction device connection and the 4th pipe fitting.
The utility model has the beneficial effects that:
The mobile mud pit of the utility model:
1, using mobile mud pit, certain construction site mud pit difficult arrangements are solved the problems, such as.
2, using mobile mud pit, reducing the excavation of mud pit, protect, the work such as backfill reduce working procedure, Accelerate duration progress.
4, using mobile mud pit, because rolling mechanism is mounted on carrying platform lower part, so that mobile mud Case transhipment it is convenient, one case can it is multiple place use, it is more economical relatively to excavate multiple mud pits;
5, the working method of mobile mud pit carries out raising for entirety using screw jack, and fills in lumps of wood progress Support, the circulation and precipitating for being convenient for mud can stablize progress;After mud conditioning, the movement of mobile mud pit is again It is more convenient quick.
Detailed description of the invention
Fig. 1 is the work in combination structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of cabinet in the utility model;
Fig. 3 is the structural schematic diagram of mobile device in the utility model;
Fig. 4 is the structural schematic diagram of universal wheel in the utility model;
Fig. 5 is the top view of universal wheel in the utility model;
Fig. 6 is the structural schematic diagram of bindiny mechanism in the utility model.
In figure: 11, cabinet;12, outlet valve;13, partition;21, channel steel;22, I-steel;23, bindiny mechanism;231, it limits Block;232, the first pipe fitting;233, the second pipe fitting;234, third pipe fitting;235, the 4th pipe fitting;24, universal wheel;241, connecting plate; 242, bearing;243, connecting shaft;244, bracket;245, tire body;25, the lumps of wood.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
As shown in figs 1 to 6, mobile mud pit, comprising:
For containing the cabinet 11 of mud;
For carry cabinet 11 and can transverse shifting cabinet 11 mobile device, mobile device includes for carrying cabinet 11 Carrying platform, for reducing the rolling mechanism of frictional force, the company for being connect with traction device between carrying platform and ground Connection mechanism 23, cabinet 11 are placed on the carrying platform, and rolling mechanism is mounted on carrying platform lower part, one end of bindiny mechanism 23 with Carrying platform connection, the other end of bindiny mechanism 23 are connect with traction device.
Specifically, the first end of cabinet 11 is mud input terminal, and there are two water outlets for setting on the side wall of 11 second end of cabinet Mouthful, two water outlets are connected to two for the outlet valves 12 that mud is released, in cabinet 11 close to its second end be provided with one every Plate 13 is less than 11 height of cabinet with stock tank, 13 height of partition is followed for obstructing mud dregs and cabinet 11 being separated into sedimentation basin.
Specifically, carrying platform includes that more channel steels 21 and two I-steel 22 form, and two I-steel 22 are parallel to each other Installation, more channel steels 21 are parallel to each other installation, per adjacent two channel steels 21 between be spaced identical, the both ends of every channel steel 21 are distinguished Two 22 tops of I-steel are placed on, and are welded with I-steel 22.
Specifically, rolling mechanism includes multiple universal wheels 24, and universal wheel 24 includes connecting plate 241, bearing 242, connecting shaft 243, bracket 244, tire body 245, tire body 245 are rotatably mounted on bracket 244 by connecting shaft 243, bracket 244 upper end is fixedly connected with the outer ring of bearing 242, and the inner ring of bearing 242 is fixedly connected with 241 bottom of connecting plate, connecting plate 241 tops are fixedly connected with the bottom of I-steel 22.
Specifically, bindiny mechanism 23 includes limited block 231, the first pipe fitting 232, the second pipe fitting 233, third pipe fitting 234, the Four pipe fittings 235, the both ends of the first pipe fitting 232 are separately fixed on two I-steel 22, and the second pipe fitting 233 is rotatably sleeved on On first pipe fitting 232, two limited blocks 231 are mounted on the second pipe fitting 233 and for limiting the second pipe fitting 233 in the first pipe fitting Sliding on 232, one end of third pipe fitting 234 are fixedly connected with the middle part of the first pipe fitting 232, the other end of third pipe fitting 234 It is connect with the middle part of the 4th pipe fitting 235, the second pipe fitting 233 is vertical with third pipe fitting 234, the 4th pipe fitting 235 and third pipe fitting 234 Vertically, the 4th pipe fitting 235 is vertical with second, traction device connection and the 4th pipe fitting 235.
The working method of mobile mud pit, comprising the following steps:
When S1, drilled pile construction, mud circulation is carried out using mobile mud pit, drilling and filling concrete are completed in cooperation Operation;
S2, construction period cooperate mud in manual cleaning movable type mud pit, mud self-unloading with excavator after the completion Automobile Transportation is to designated position;
S3, next job location will be transferred to without the mobile mud pit of mud with traction device.
Specifically, above-mentioned steps S1 also specifically includes the following steps:
2 screw jack are respectively set in C1, two 22 bottoms of I-steel, by integral raising to I-steel 22 away from ground 40cm;
C2, jack neighbouring position fill in 0.5 meter of long, 400mm wide, the lumps of wood 254 of 400mm high make for mud pit The support of used time;
C3, jack is withdrawn from;
C4, mud circulation and precipitating are carried out in mud pit using water inlet discharging device.
Specifically, above-mentioned steps S2 also specifically includes the following steps:
Using the sedimentation basin in excavator cleaning cabinet 11 in D1, use process.
Specifically, above-mentioned steps S3 also specifically includes the following steps:
E1,2 screw jack are respectively set two 22 bottoms of I-steel, by integral raising to I-steel 22 away from ground 40cm pulls out supporting square timber 25, then puts down jack to multiple universal wheels 24 and land;
E2, with after the connecting component of traction device and 235 grafting of the 4th pipe fitting and locking, mud pit is dragged into next apply Building site point.
Preferred embodiment:
Cabinet 11 is 6 meters long, 3 meters wide, 1.5 meters high, is formed by 5mm thick steel plate seamless welding;
It is separated setting 1 meter of high steel plate of one side as partition 13 away from 11 second end of cabinet, 0.7 meter of position, cabinet 11 is divided It is cut into sedimentation basin and follows stock tank.Steel plate has the function that purify mud for obstructing sediment, it is ensured that mud index satisfaction is persistently applied Work requirement;
Two water outlet diameters are 15cm;
I-steel 22 selects 2 root long, 6 meters of H profile steels (HW200*200), and the center spacing of two I-steel 22 is 2.6m;
Channel steel 21 is 12, long 3 meters (10# channel steel 21), adjacent 0.5 meter of two channel steels, 21 spacing;
Bear, anchor bolt fix 6 overweight shaped iron cores at 0.5 meter apart from both ends of I-steel 22 and at span centre position Rubber universal wheel 24 realizes that mobile device can 360 ° of movements;
Mobile mud pit operation:
C1,4 screw jack are respectively set in 1.5 meters away from 22 both ends of I-steel, by integral raising to kingpost baseplate Away from ground 40cm;
C2, jack neighbouring position fill in 400mm wide 400m high 0.5 meter long the lumps of wood 254 to be made for mobile mud pit Used time support;
C3, jack is withdrawn from;
C4, mud circulation and precipitating are carried out in mud pit using water inlet discharging device.
Sedimentation basin is cleared up using excavator in D1, use process.
E1,2 screw jack are respectively set two 22 bottoms of I-steel, by integral raising to I-steel 22 away from ground 40cm pulls out supporting square timber 25, then puts down jack to multiple universal wheels 24 and land;
E2, with after the connecting component of traction device and 235 grafting of the 4th pipe fitting and locking, mud pit is dragged into next apply Building site point.
Actually use situation:
It is described in detail for connecting across the Beijing-Kowloon Railway Grade Separation Project project of highway extension project suddenly.
Project profile
Even suddenly highway extension project across Overpass Bridge of Jingjiu Railway (K78+360.93-K78+597.05), overall length of bridge 236.12m, roadbed position setting abutment support pile is 64 total before away from 0#, 9# abutment, and top is connected by crown beam, left and right half range Crown beam is connected by coupling beam.The long 23m of support pile, diameter 1m, every support pile design amount of concrete is 18.06m3, using reacting cycle Churning driven construction.
Construction site is located at before abutment on existing 13m broad way face, and road surface is that embankment embankment is taken away from 10 meters of ground level The mode of half range construction, left half range are normally open to traffic.Construction site is narrow, and scene, which can not excavate, builds mud pit, and mud is easy Road surface and widened section roadbed are polluted, left half range driving is influenced, it has been decided through consideration that production one mobile mud pit, for solving The certainly problem.
(1) according to construction condition, movable type mud pit size is determined;
Mobile mud pit design meets the following conditions:
1, known single support pile design concrete is 18.06m3, to recycle convenient for mud, mobile mud pit volume is not 18.06m can be less than3
2, mobile mud pit cannot be filled, and mud is avoided to overflow pollution road surface and widening road bed.
3, width of roadway is narrow, and construction machinery is numerous, therefore mobile mud pit length is unsuitable too long, in order to avoid influence equipment It turns and turns around.
4, for convenient for sidewalk transport, mobile mud pit width be should not be too large.
5, consider tire bearing capacity, mobile mud pit is integrally self-possessed cannot be excessive.
6, mud is considered to lateral wall pressure, and mobile mud pit height should not be too large.
7, it is convenient for mud sediment, partition 13 need to be set;13 height of partition should be 0.5m lower than 11 height of cabinet.
8, a pair of of water outlet is set, is recycled for mud;Water outlet height cannot be too low, in order to avoid mud sediment accumulated plugging Intake-outlet.
It is 3 meters wide in conclusion 6 meters long using the production of 0.5cm thickness iron sheet, high 1.5 meters of mud pit carry out mud circulation and Precipitating, water outlet diameter 15cm.
(2) mobile bracket 244 is arranged;
Using two 200*200HW fashioned iron as girder, 2.6 meters of center spacing.Top transverse weld 10# channel steel 2112 Root, spacing 0.5m, both ends cantilever 20cm.The base plate drilling at 0.5 meter of girder H profile steel cantilever and span centre position, anchor bolt fix 6 Overweight shaped iron core rubber universal wheel 24 realizes 360 ° of movements of mobile device.The setting of girder one end forms pull rod using steel-pipe welding, For drawing.Iron sheet cabinet 11 is formed a whole with mobile device.
(3) bindiny mechanism;
Limited block 231 uses reinforcing bar;First pipe fitting 232, the second pipe fitting 233, third pipe fitting 234, the 4th pipe fitting 235 are adopted Use steel pipe.
(4) using and shifting for mud pit is moved;
Using the characteristic of 60 ° of universal wheel mobile rotations when marching into the arena, the adjustment of mud pit position is carried out, can be the half range All support piles of abutment carry out mud circulation.
Mud pit at 1.5 meters of kingpost cantalever in use, be respectively set 4 screw jack, by integral raising to girder For bottom plate away from ground about 40cm, the 4 0.5 meter long 400*400 lumps of wood 25, which is filled in jack position, keeps bracket 244 hanging, then drops Lower jack.The lumps of wood 25 is used to support mobile mud pit self weight and mud load.
Drilled pile reacting cycle construct when, mud is discharged into mud pit from drilling machine, precipitated in sedimentation basin, when mud be higher than every It after plate 13, spills over and follows stock tank, the mud after precipitating is discharged among drilling by water outlet, to recycle.When being poured concrete, The mud overflowed in hole is pumped into the sedimentation basin of cabinet 11 using mud, if mud is excessive in sedimentation basin, should use mud of technological requirement Mud in mud pit is cleared up.
After the completion of construction, slurry liquid in cabinet 11 is taken away using mud of technological requirement and is discharged into designated position;Cooperated with excavator Manually, the inner remaining mud of cabinet 11 is shoveled out, transports to designated position stacking with dump truck and dries;When an abutment support pile After the completion of construction, cabinet 11 is emptied, the lumps of wood 25 is extracted with very heavy top support, universal wheel 24 is made to land, using traction device by case Body 11 is transferred to next abutment, and cooperation carries out the drilling construction of support pile.
The basic principles and main features and advantage of the utility model have been shown and described above.The technical staff of the industry It should be appreciated that the present utility model is not limited to the above embodiments, the above embodiments and description only describe this The principle of utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model also has various change And improvement, these various changes and improvements fall within the scope of the claimed invention.The utility model requires protection scope It is defined by appending claims and equivalents.

Claims (5)

1. mobile mud pit characterized by comprising
For containing the cabinet of mud;
For carry cabinet and can transverse shifting cabinet mobile device, mobile device includes flat for carrying the carrying of cabinet Platform, for reducing the rolling mechanism of frictional force, the bindiny mechanism for being connect with traction device, case between carrying platform and ground Body is placed on the carrying platform, and rolling mechanism is mounted on carrying platform lower part, and one end of bindiny mechanism is connect with carrying platform, even The other end of connection mechanism is connect with traction device.
2. movable type mud pit according to claim 1, it is characterised in that: the first end of cabinet is mud input terminal, case There are two water outlets, two water outlets to be connected to two for the outlet valve that mud is released, cabinet for setting on the side wall of body second end Its interior close second end is provided with a partition and is used to obstruct mud dregs and cabinet is separated into sedimentation basin and follows stock tank, partition Height is less than box height.
3. movable type mud pit according to claim 1, it is characterised in that: carrying platform includes more channel steels and two works Word steel composition, two I-steel are parallel to each other installation, and more channel steels are parallel to each other installation, are often spaced phase between adjacent two channel steels Together, the both ends of every channel steel are individually positioned in two I-steel tops, and weld with I-steel.
4. movable type mud pit according to claim 3, it is characterised in that: rolling mechanism includes multiple universal wheels, universal Wheel includes connecting plate, bearing, connecting shaft, bracket, tire body, and tire body is rotatably mounted on bracket by connecting shaft On, the upper end of bracket is fixedly connected with the outer ring of bearing, and the inner ring of bearing is fixedly connected with connecting plate bottom, at the top of connecting plate with The bottom of I-steel is fixedly connected.
5. it is according to claim 3 movable type mud pit, it is characterised in that: bindiny mechanism include limited block, the first pipe fitting, Second pipe fitting, third pipe fitting, the 4th pipe fitting, the both ends of the first pipe fitting are separately fixed on two I-steel, and the second pipe fitting can turn Dynamic is sleeved on the first pipe fitting, and two limited blocks are mounted on the second pipe fitting and for limiting the second pipe fitting in the first pipe fitting Sliding, be fixedly connected in the middle part of one end of third pipe fitting and the first pipe fitting, in the other end of third pipe fitting and the 4th pipe fitting Portion's connection, the second pipe fitting is vertical with third pipe fitting, and the 4th pipe fitting is vertical with third pipe fitting, and the 4th pipe fitting is vertical with second, traction Device connection and the 4th pipe fitting.
CN201820675931.5U 2018-05-08 2018-05-08 Mobile mud pit Expired - Fee Related CN208184688U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820675931.5U CN208184688U (en) 2018-05-08 2018-05-08 Mobile mud pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820675931.5U CN208184688U (en) 2018-05-08 2018-05-08 Mobile mud pit

Publications (1)

Publication Number Publication Date
CN208184688U true CN208184688U (en) 2018-12-04

Family

ID=64433243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820675931.5U Expired - Fee Related CN208184688U (en) 2018-05-08 2018-05-08 Mobile mud pit

Country Status (1)

Country Link
CN (1) CN208184688U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678693A (en) * 2018-05-08 2018-10-19 中铁八局集团第二工程有限公司 Mobile mud pit and its working method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678693A (en) * 2018-05-08 2018-10-19 中铁八局集团第二工程有限公司 Mobile mud pit and its working method

Similar Documents

Publication Publication Date Title
CN112554177B (en) Construction method of ultra-long small-diameter cast-in-situ bored pile
CN108547641B (en) Substrate reinforcing system of heavy-duty railway tunnel in water-rich weak stratum and construction method thereof
CN110965937A (en) Double-power whole-course pump suction reverse circulation punching equipment and construction process
CN106836191A (en) The construction method of subway building enclosure ground-connecting-wall under a kind of low clearance
CN206071061U (en) Multifunction cement conveyer device
CN108532649A (en) A kind of compressive static load test method of bored concrete pile
CN110939443B (en) Annular arrangement route mining method
WO2014095767A1 (en) Device and method for ground compaction and/or ground stabilization
CN208184688U (en) Mobile mud pit
CN106351180A (en) Full hydraulic opening self-propelled template system for aqueduct
CN107794945B (en) Movable assembly type template mounting and dismounting operation system and construction method thereof
CN108678693A (en) Mobile mud pit and its working method
CN109826235B (en) Replacement method for municipal well lid mounting frame
CN116608323A (en) Quick construction equipment and construction method for fully assembled concrete drainage pipeline
CN207469303U (en) A kind of removable assembled template peace tears operating system open
CN206538737U (en) Aqueduct is all-hydraulic to open self-propelled template system
CN105040700B (en) The equipment removed for the internal sediment of minor diameter pile tube and using method thereof
CN211874383U (en) Double dynamical whole journey pump suction reverse circulation punching equipment
CN205000335U (en) A equipment that is used for inside sediment of minor diameter tubular pile to drive
CN209686889U (en) A kind of concreting chute damping unit
CN114961336A (en) Protective demolition construction method for basement pile foundation next to existing subway line
CN209228405U (en) A kind of system increasing mine sump capacity
CN210341558U (en) Highway curb rubble lateral dispensing device that permeates water
CN115095209B (en) Transportation and positioning method for large-scale earthing tank
CN207244651U (en) Main transformer foundation structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181204