CN208183547U - Box girder pre-stressed hole path pressure grouting experimental rig - Google Patents

Box girder pre-stressed hole path pressure grouting experimental rig Download PDF

Info

Publication number
CN208183547U
CN208183547U CN201820608330.2U CN201820608330U CN208183547U CN 208183547 U CN208183547 U CN 208183547U CN 201820608330 U CN201820608330 U CN 201820608330U CN 208183547 U CN208183547 U CN 208183547U
Authority
CN
China
Prior art keywords
valve
pipeline
storing tank
box girder
waste pulp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820608330.2U
Other languages
Chinese (zh)
Inventor
陈维华
支鑫华
钟泉清
刘旺兴
张见会
王安全
金仁东
张卫华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201820608330.2U priority Critical patent/CN208183547U/en
Application granted granted Critical
Publication of CN208183547U publication Critical patent/CN208183547U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of box girder pre-stressed hole path pressure grouting experimental rigs, the left and right end connector including being connected to box girder pre-stressed duct both ends;Left end connector is connect by feed pipe for mortar with mudjack, and the first valve is arranged on stock line;Right end connector is connect with efferent duct, and the efferent duct is connect by three-way valve with vacuum system, waste pulp collection system;Second valve is set on efferent duct;The vacuum system includes slurry storing tank, and the pipeline between slurry storing tank and triple valve is equipped with third valve, and slurry storing tank is controlled to a vacuum pump by pipeline, and the pipeline between vacuum pump and slurry storing tank is equipped with vacuum meter;The waste pulp collection system includes waste pulp bucket, and the pipeline between waste pulp bucket and triple valve is equipped with the 4th valve.The utility model is easy to use, favorable working performance.

Description

Box girder pre-stressed hole path pressure grouting experimental rig
Technical field
The utility model relates to a kind of box girder pre-stressed hole path pressure grouting experimental rigs.
Background technique
After beam section tension of prestressed tendon, pumping of prostressed duct is completed in 48 hours, in case steel strand wires get rusty, simultaneously And guarantee to bond integral important measures between steel beam and concrete.The prior art lacks the box girder pre-stressed duct of profession Mud jacking experimental rig.
Summary of the invention
The purpose of this utility model is to provide a kind of box girder pre-stressed hole path pressure grouting experimental rigs of favorable working performance.
The technical solution of the utility model is:
A kind of box girder pre-stressed hole path pressure grouting experimental rig, it is characterized in that: including being connected to box girder pre-stressed duct both ends Left and right end connector;Left end connector is connect by feed pipe for mortar with mudjack, and the first valve is arranged on stock line;Right end connector with Efferent duct connection, the efferent duct are connect by three-way valve with vacuum system, waste pulp collection system;Second is arranged on efferent duct Valve;The vacuum system includes slurry storing tank, and the pipeline between slurry storing tank and triple valve is equipped with third valve, and slurry storing tank passes through pipeline It is controlled to a vacuum pump, the pipeline between vacuum pump and slurry storing tank is equipped with vacuum meter;The waste pulp collection system includes waste pulp bucket, Pipeline between waste pulp bucket and triple valve is equipped with the 4th valve.
Feed pipe for mortar is anti-pressure ability >=2MPa rubber tube.
The utility model is easy to use, favorable working performance.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the structural schematic diagram of the utility model one embodiment.
Specific embodiment
A kind of box girder pre-stressed hole path pressure grouting experimental rig, the left and right end including being connected to box girder pre-stressed 1 both ends of duct Connector 2,3;Left end connector is connect by feed pipe for mortar 5 with mudjack 4, and the first valve 6 is arranged on stock line;Right end connector and output Pipe 7 connects, and the efferent duct is connect by three-way valve 8 with vacuum system, waste pulp collection system;Second valve is set on efferent duct 9;The vacuum system includes slurry storing tank 10, and the pipeline between slurry storing tank and triple valve is equipped with third valve 11, and slurry storing tank passes through Pipeline is connect with vacuum pump 12, and the pipeline between vacuum pump and slurry storing tank is equipped with vacuum meter 13;The waste pulp collection system packet Waste pulp bucket 14 is included, the pipeline between waste pulp bucket and triple valve is equipped with the 4th valve 15.
Feed pipe for mortar is anti-pressure ability >=2MPa high-pressure rubber hose.
The course of work:
(1) examination vacuumizes
Mud jacking valve (i.e. the first valve), exhaust valve (i.e. the 4th valve) are all closed, vacuum pumping valve (i.e. third valve), the second valve It opens, starting vacuum pump vacuumizes, and observes vacuum pressure meter reading, when the vacuum in pipe maintains -0.08MPa, termination of pumping is about The 1min time, if pressure energy remains unchanged i.e. it is believed that can reach and maintain vacuum.
(2) cement slurry makes
The requirement of cement slurry: not less than 40MPa cooperation, when pertinence can should meet code requirement to 7 days compression strength.
Stirring sequence: the 90% of water → grouting agent → addition cement is added → is added and is stirred with mortar mixer and (stirs 30 slowly Second stirs 30 seconds fastly) → remaining water → stirring (fast stirring 60 seconds) is added → survey fluidity.
It mixes cement before slurry, adds water to dally several minutes, by ponding evacuation, be sufficiently humidified so as to blender inner wall, be stirred Underflow to accomplish to have unloaded to the greatest extent, the material of non-mix must not be put into again before whole underflows are drawn off, can not be discharged using side The method of side charging.
(3) mud jacking
1) cement slurry is added in storage slurry filling and guides to mudjack, open mud jacking valve, the outlet of mudjack high-pressure rubber hose is got Slurry turns off mudjack when these slurry concentrations are as the concentration in mudjack, and by high-pressure rubber hose, this terminates to box beam On the left end connector at prestressed pore passage both ends, fasten.
2) mud jacking valve is closed, vacuum pump is started, when vacuum values reach and maintain -0.06~-0.1MPa value, opens pressure Valve is starched, mudjack is started, starts mud jacking, during mud jacking, vacuum pump keeps continuous work.
3) when having slurry to pass through in the efferent duct (using lucite pipe) for vacuumizing end, the true of vacuum machine front end is closed Empty valve closes vacuum machine, opens the 4th valve, cement slurry can the smooth outflow from the 4th valve automatically, and consistency and the slurry that pours into When suitable, close and take out the second valve.
4) mudjack works on, and pressure reaches 0.7Mpa or so, holds pressure 2min and completes exhaust bleeding, makes slurry in duct It is closely knit full, mud jacking is completed, mudjack and the first valve are closed.

Claims (2)

1. a kind of box girder pre-stressed hole path pressure grouting experimental rig, it is characterized in that: including being connected to box girder pre-stressed duct both ends Left and right end connector;Left end connector is connect by feed pipe for mortar with mudjack, and the first valve is arranged on stock line;Right end connector with it is defeated Outlet pipe connection, the efferent duct are connect by three-way valve with vacuum system, waste pulp collection system;Second is arranged on efferent duct Valve;The vacuum system includes slurry storing tank, and the pipeline between slurry storing tank and triple valve is equipped with third valve, and slurry storing tank passes through pipeline It is controlled to a vacuum pump, the pipeline between vacuum pump and slurry storing tank is equipped with vacuum meter;The waste pulp collection system includes waste pulp bucket, Pipeline between waste pulp bucket and triple valve is equipped with the 4th valve.
2. box girder pre-stressed hole path pressure grouting experimental rig according to claim 1, it is characterized in that: feed pipe for mortar is anti-pressure ability The rubber tube of >=2MPa.
CN201820608330.2U 2018-04-26 2018-04-26 Box girder pre-stressed hole path pressure grouting experimental rig Expired - Fee Related CN208183547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820608330.2U CN208183547U (en) 2018-04-26 2018-04-26 Box girder pre-stressed hole path pressure grouting experimental rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820608330.2U CN208183547U (en) 2018-04-26 2018-04-26 Box girder pre-stressed hole path pressure grouting experimental rig

Publications (1)

Publication Number Publication Date
CN208183547U true CN208183547U (en) 2018-12-04

Family

ID=64431454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820608330.2U Expired - Fee Related CN208183547U (en) 2018-04-26 2018-04-26 Box girder pre-stressed hole path pressure grouting experimental rig

Country Status (1)

Country Link
CN (1) CN208183547U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109795031A (en) * 2019-03-21 2019-05-24 中铁十四局集团第三工程有限公司 A kind of post stretching precast beam automatic benefit sizing device and its application method
CN111997369A (en) * 2020-08-07 2020-11-27 中国建筑第二工程局有限公司 Prestressed long-distance large-diameter multi-curvature pore passage vacuum grouting device and grouting method
CN112227725A (en) * 2020-11-11 2021-01-15 中交第四公路工程局有限公司 Grouting structure of long pore passage of prestressed concrete stiffening beam and construction method thereof
CN112459494A (en) * 2020-11-25 2021-03-09 中国建筑土木建设有限公司 Automatic grouting system and grouting method for prestressed pipeline

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109795031A (en) * 2019-03-21 2019-05-24 中铁十四局集团第三工程有限公司 A kind of post stretching precast beam automatic benefit sizing device and its application method
CN109795031B (en) * 2019-03-21 2024-05-17 中铁十四局集团第三工程有限公司 Automatic slurry supplementing device for post-tensioning prefabricated beam slab and application method of automatic slurry supplementing device
CN111997369A (en) * 2020-08-07 2020-11-27 中国建筑第二工程局有限公司 Prestressed long-distance large-diameter multi-curvature pore passage vacuum grouting device and grouting method
CN112227725A (en) * 2020-11-11 2021-01-15 中交第四公路工程局有限公司 Grouting structure of long pore passage of prestressed concrete stiffening beam and construction method thereof
CN112459494A (en) * 2020-11-25 2021-03-09 中国建筑土木建设有限公司 Automatic grouting system and grouting method for prestressed pipeline
CN112459494B (en) * 2020-11-25 2022-05-17 中国建筑土木建设有限公司 Automatic grouting system and grouting method for prestressed pipeline

Similar Documents

Publication Publication Date Title
CN208183547U (en) Box girder pre-stressed hole path pressure grouting experimental rig
CN103603273A (en) Method for grouting construction of prestressed pipe
CN201865113U (en) Automatic check valve type pressure grouting device
CN101290075B (en) Long conveying pipeline construction method capable of simultaneously clearing pipe and testing pressure
CN204385622U (en) A kind of bridge prestress pipeline pneumatic mortar device
CN109537894B (en) Grouting construction method for assembled wall
CN110130584A (en) Pressure type grout sleeve device suitable for the connection of prefabricated concrete structure reinforcing bar
CN110815547A (en) Prefabricated case roof beam vacuum assisted cycle mud jacking device
CN107631846A (en) A kind of pressure-measuring method of long distance pipeline
CN103257219B (en) Novel pouring device for model test and application method
CN208563315U (en) A kind of pile foundation grouting behind shaft or drift lining constructing device
CN207919360U (en) A kind of vacuum aid grouting system
CN101949273A (en) Method for plugging spring opening in drilling
CN107447747B (en) A kind of construction method of coercion underground continuous wall
JP5824588B1 (en) Vacuum grout injection method
CN204781973U (en) Antiseep plugging device in split bolt hole
CN101550695A (en) Construction method of reinforcing broken stump by using prestress steel twist-beam replacement grouting method
CN207392205U (en) A kind of pile foundation post jacking device
CN215519999U (en) Grouting device for grouting sleeve of prefabricated vertical component
CN208088667U (en) Prefabricated components sleeve grouting metering control
CN102635112A (en) Controlled construction process for compaction grouting piles
CN102296617A (en) Post-grouting reinforcement construction method of flexible joints of diaphragm walls
CN109723466A (en) A kind of tunnel just branch infiltration injecting treatment construction method
CN211541760U (en) Prefabricated case roof beam vacuum assisted cycle mud jacking device
CN113882267A (en) Filling degree enhancing device with slurry storage pipe and slurry observing mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181204