CN208174065U - A kind of new electric energy batch meter - Google Patents
A kind of new electric energy batch meter Download PDFInfo
- Publication number
- CN208174065U CN208174065U CN201820380235.1U CN201820380235U CN208174065U CN 208174065 U CN208174065 U CN 208174065U CN 201820380235 U CN201820380235 U CN 201820380235U CN 208174065 U CN208174065 U CN 208174065U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- electrical energy
- metering tank
- energy metering
- tank ontology
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Measuring Volume Flow (AREA)
Abstract
The utility model relates to electrical energy metering tank technical fields, and disclose a kind of new electric energy batch meter, including electrical energy metering tank ontology, the right wall of the electrical energy metering tank ontology is fixedly connected to fixed block in two sides up and down, and the bottom of the fixed block is fixedly connected with swingle.The utility model solves in the market that electrical energy metering tank is when in use, observer is in the inconvenience to check the electric meter, and internal unit place when, hardly possible disassembly, cause to repair difficult problem, the utility model cooperates upper door-plate using the sleeve that the intermediate position of swingle is socketed, and it is used as the overturning of end of door plate, the left wall of its middle door-plate is to weld the transparency window being respectively fixedly connected in the inner left wall that shape is located at electrical energy metering tank ontology and closure blocks in sleeve, wherein the effect of transparency window is that the equipment on plaid matching baffle is observed, closure of the closure blocks to equipment placing box, and the bottom interior wall that equipment placing box is located at electrical energy metering tank ontology carries out sliding shape.
Description
Technical field
The utility model relates to electrical energy metering tank technical field, specially a kind of new electric energy batch meter.
Background technique
Electrical energy metering tank is mainly made of combination transformer and watt-hour meter box two parts, and combination transformer is by two or three
Single-phase potential transformer and current transformer composition, make dielectric with 25# transformer oil, first and second leading-out terminal uses insulator
Pipe is mounted on panel.Watt-hour meter box is mounted in combination transformer side, by an active watt-hour meter and a wattless component watt-hour meter group
At having many advantages, such as that measuring accuracy is high, light-weight, easy for installation, anti-electricity-theft.
But electrical energy metering tank in the market currently on the market is when in use, observer is in the not side to check the electric meter
Just, and internal unit when placing, hardly possible disassembly causes maintenance difficult.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of new electric energy batch meter, solves market and powers on
Can batch meter when in use, observer in the inconvenience to check the electric meter, and internal unit when placing, difficulty is torn open
It unloads, causes to repair difficult problem.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions:A kind of new electric energy batch meter, including electric energy
The right wall of batch meter ontology, the electrical energy metering tank ontology is fixedly connected to fixed block, the bottom of the fixed block in two sides up and down
Portion is fixedly connected with swingle, and the intermediate position of the swingle is fixedly connected with sleeve, the back of the electrical energy metering tank ontology
It has been respectively fixedly connected with lattice baffle and equipment placing box on the inner wall of face, has been fixedly connected with cable tube at the top of the lattice baffle, it is described
Equipment holder is fixedly connected on the inner wall of equipment placing box, the inside of the equipment holder is fixedly connected with equipment group
Part is fixedly connected with welding block in the inner left wall of the electrical energy metering tank ontology, is hinged in the left wall of the welding block
Hollow plate, the intermediate position of the hollow plate are fixedly connected with transparency window, fix under the inner left wall of the electrical energy metering tank ontology
Closure blocks are connected with, the outer wall of the sleeve is hinged with door-plate, and door-plate front upside is fixedly connected with glass window, described
Gate placing groove is offered on the back side of door-plate, and gate member ontology is fixedly connected on the gate placing groove back side, it is described
It is fixedly connected with bolt at the top of electrical energy metering tank ontology, is fixedly connected on the right side inner wall of the electrical energy metering tank ontology scattered
Hot device.
Preferably, the quantity of the fixed block is two, and the structure size of two fixed blocks is all the same, the fixed block
It is square.
Preferably, the quantity of the spool is four, and the structure size of four spools is all the same.
Preferably, the quantity of the hollow plate is three, and the structure size of three hollow plates is all the same.
Preferably, the closure blocks and equipment placing box are adapted, and the closure blocks are square.
Preferably, the glass window is adapted with transparency window, and the glass window is rectangle.
Working principle:The utility model is located at fixed block using the fixed block connected in the right wall of electrical energy metering tank ontology
Between the swingle that is arranged, and cooperate upper door-plate in the sleeve of the intermediate position of swingle socket, and be used as turning over for end of door plate
Turn, the left wall of middle door-plate is saturating in being respectively fixedly connected in the inner left wall that sleeve be that welding shape is located at electrical energy metering tank ontology
Bright window and closure blocks, wherein the effect of transparency window is that the equipment on plaid matching baffle is observed, and closure blocks are to equipment placing box
Closure, and the bottom interior wall that equipment placing box is located at electrical energy metering tank ontology carries out sliding shape.
(3) beneficial effect
The utility model provides a kind of new electric energy batch meter.Has following beneficial effect:
(1) the utility model is using the fixed block connected in the right wall of electrical energy metering tank ontology, between fixed block
The swingle of setting, and cooperate upper door-plate in the sleeve of the intermediate position of swingle socket, and it is used as the overturning of end of door plate, wherein
The left wall of door-plate in sleeve be weld in the inner left wall that shape is located at electrical energy metering tank ontology the transparency window that is respectively fixedly connected with
Closure blocks, wherein the effect of transparency window is that the equipment on plaid matching baffle is observed, closure blocks to the closure of equipment placing box,
And the bottom interior wall that equipment placing box is located at electrical energy metering tank ontology carries out sliding shape;
Solve in the market electrical energy metering tank ontology when in use, observer in the inconvenience to check the electric meter, and
Internal unit when placing, hardly possible disassembly causes maintenance difficult.
(2) the utility model is by equipment placing box on lattice baffle fit, by being fixedly connected on the front of lattice baffle
Cable tube, wherein spool is penetration state, runs through lattice baffle by spool, and be connected to equipment placing box, and facilitates operator
In early period, the winding displacement of installation is more convenient.
Detailed description of the invention
Fig. 1 is the utility model electrical energy metering tank body interior structural schematic diagram;
Fig. 2 is the utility model electrical energy metering tank body construction schematic diagram.
In figure:1 electrical energy metering tank ontology, 2 spools, 3 lattice baffles, 4 fixed blocks, 5 swingles, 6 sleeves, 7 glass windows, 8
Equipment holder, 9 apparatus assemblies, 10 equipment placing boxes, 11 closure blocks, 12 bolts, 13 hollow plates, 14 transparency windows, 15 welding
Block, 16 radiators, 17 gate placing grooves, 18 gate member ontologies, 19 door-plates.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figs. 1-2, the utility model provides a kind of technical solution:A kind of new electric energy batch meter, including electric energy meter
The right wall of measuring tank ontology 1, electrical energy metering tank ontology 1 is fixedly connected to fixed block 4 in two sides up and down, and the bottom of fixed block 4 is fixed
It is connected with swingle 5, the intermediate position of swingle 5 is fixedly connected with sleeve 6, divides on the back side inner wall of electrical energy metering tank ontology 1
It is not fixedly connected with lattice baffle 3 and equipment placing box 10, the top of lattice baffle 3 is fixedly connected with cable tube 2, equipment placing box 10
Equipment holder 8 is fixedly connected on inner wall, the inside of equipment holder 8 is fixedly connected with apparatus assembly 9, electrical energy metering tank sheet
It is fixedly connected with welding block 15 in the inner left wall of body 1, hollow plate 13 is hinged in the left wall of welding block 15, hollow plate 13
Intermediate position is fixedly connected with transparency window 14, and closure blocks 11, sleeve are fixedly connected under the inner left wall of electrical energy metering tank ontology 1
6 outer wall is hinged with door-plate 19, and 19 front upside of door-plate is fixedly connected with glass window 7, offers lock on the back side of door-plate 19
Door placing groove 17, is fixedly connected with gate member ontology 18, the top of electrical energy metering tank ontology 1 on 17 back side of gate placing groove
It is fixedly connected with bolt 12, radiator 16, the quantity of fixed block 4 are fixedly connected on the right side inner wall of electrical energy metering tank ontology 1
It is two, and the structure size of two fixed blocks 4 is all the same, fixed block 4 is square, and the quantity of spool 2 is four, and four
The structure size of a spool 2 is all the same, and the quantity of hollow plate 13 is three, and the structure size of three hollow plates 13 is all the same,
Closure blocks 11 and equipment placing box 10 are adapted, and closure blocks 11 are square, and glass window 7 is adapted with transparency window 14, glass
Window 7 is rectangle.
The electric elements occurred in this article are electrically connected with extraneous main controller and 220V alternating current, and main controller can be meter
Calculation machine etc. plays the conventionally known equipment of control.
Working principle:The utility model is located at and is fixed using the fixed block 4 connected in the right wall of electrical energy metering tank ontology 1
The swingle 5 being arranged between block 4, and cooperate upper door-plate 19 in the sleeve 6 of the intermediate position of swingle 5 socket, and be used as pair
The overturning of door-plate 19, the left wall of middle door-plate 19 are to weld to divide in the inner left wall that shape is located at electrical energy metering tank ontology 1 in sleeve 6
The transparency window 14 and closure blocks 11 not being fixedly connected, wherein the effect of transparency window 14 is that the equipment on plaid matching baffle 3 is seen
Examine, closure blocks 11 to the closure of equipment placing box 10, and equipment placing box 10 be located at the bottom interior wall of electrical energy metering tank ontology 1 into
Row sliding shape.
It can to sum up obtain, the utility model is located at and is fixed using the fixed block 4 connected in the right wall of electrical energy metering tank ontology 1
The swingle 5 being arranged between block 4, and cooperate upper door-plate 19 in the sleeve 6 of the intermediate position of swingle 5 socket, and be used as pair
The overturning of door-plate 19, the left wall of middle door-plate 19 are to weld to divide in the inner left wall that shape is located at electrical energy metering tank ontology 1 in sleeve 6
The transparency window 14 and closure blocks 11 not being fixedly connected, wherein the effect of transparency window 14 is that the equipment on plaid matching baffle 3 is seen
Examine, closure blocks 11 to the closure of equipment placing box 10, and equipment placing box 10 be located at the bottom interior wall of electrical energy metering tank ontology 1 into
Row sliding shape, the utility model, with equipment placing box 10 is closed, are connected by lattice baffle 3 by fixed on the front of lattice baffle 3
It is connected to spool 2, wherein spool 2 is penetration state, lattice baffle 3 is run through by spool 2, and be connected to equipment placing box 10, and facilitate
The winding displacement that operator installs in early period is more convenient.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence " including a reference structure ", is not arranged
Except there is also other identical elements in the process, method, article or apparatus that includes the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of new electric energy batch meter, including electrical energy metering tank ontology (1), it is characterised in that:The electrical energy metering tank ontology
(1) right wall is fixedly connected to fixed block (4) two sides up and down, and the bottom of the fixed block (4) is fixedly connected with swingle
(5), the intermediate position of the swingle (5) is fixedly connected with sleeve (6), the back side inner wall of the electrical energy metering tank ontology (1)
On be respectively fixedly connected with lattice baffle (3) and equipment placing box (10), be fixedly connected with cable tube at the top of the lattice baffle (3)
(2), it is fixedly connected with equipment holder (8) on the inner wall of the equipment placing box (10), the inside of the equipment holder (8)
It is fixedly connected with apparatus assembly (9), is fixedly connected with welding block (15) in the inner left wall of the electrical energy metering tank ontology (1),
It is hinged with hollow plate (13) in the left wall of the welding block (15), the intermediate position of the hollow plate (13) is fixedly connected with transparent
Window (14) is fixedly connected with closure blocks (11) under the inner left wall of the electrical energy metering tank ontology (1), the sleeve (6) it is outer
Wall is hinged with door-plate (19), and door-plate (19) front upside is fixedly connected with glass window (7), the back side of the door-plate (19)
On offer gate placing groove (17), be fixedly connected with gate member ontology (18), institute on gate placing groove (17) back side
It states and is fixedly connected at the top of electrical energy metering tank ontology (1) bolt (12), on the right side inner wall of the electrical energy metering tank ontology (1)
It is fixedly connected with radiator (16).
2. a kind of new electric energy batch meter according to claim 1, it is characterised in that:The quantity of the fixed block (4) is
Two, and the structure size of two fixed blocks (4) is all the same, the fixed block (4) is square.
3. a kind of new electric energy batch meter according to claim 1, it is characterised in that:The quantity of the spool (2) is four
It is a, and the structure size of four spools (2) is all the same.
4. a kind of new electric energy batch meter according to claim 1, it is characterised in that:The quantity of the hollow plate (13) is
Three, and the structure size of three hollow plates (13) is all the same.
5. a kind of new electric energy batch meter according to claim 1, it is characterised in that:The closure blocks (11) and equipment are put
It sets case (10) to be adapted, the closure blocks (11) are square.
6. a kind of new electric energy batch meter according to claim 1, it is characterised in that:The glass window (7) with it is transparent
Window (14) is adapted, and the glass window (7) is rectangle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820380235.1U CN208174065U (en) | 2018-03-20 | 2018-03-20 | A kind of new electric energy batch meter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820380235.1U CN208174065U (en) | 2018-03-20 | 2018-03-20 | A kind of new electric energy batch meter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208174065U true CN208174065U (en) | 2018-11-30 |
Family
ID=64375247
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820380235.1U Expired - Fee Related CN208174065U (en) | 2018-03-20 | 2018-03-20 | A kind of new electric energy batch meter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208174065U (en) |
-
2018
- 2018-03-20 CN CN201820380235.1U patent/CN208174065U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208174065U (en) | A kind of new electric energy batch meter | |
CN205643545U (en) | A intelligent electricity inspection appearance that be used for electric power field based on USB | |
CN205826742U (en) | A kind of power information acquisition system | |
CN208874063U (en) | A kind of power compensation cabinet | |
CN213889708U (en) | Electromechanical positioning tool for electromechanical maintenance | |
CN206422417U (en) | A kind of distribution box of adjustable interior space construction | |
CN206180413U (en) | Distribution cabinet | |
CN206945271U (en) | A kind of portable connect-disconnect life experimental rig of batch meter | |
CN104236511A (en) | Visualized test rack for contact engagement of handcart type breaker | |
CN205720345U (en) | A kind of small indoor ammeter box | |
CN207098344U (en) | A kind of power transformation box for being easy to observation | |
CN208836013U (en) | A kind of photovoltaic DC-to-AC converter in photovoltaic generating system | |
CN208607352U (en) | A kind of single phase tracks formula detection device of electric energy meter | |
CN214473559U (en) | Three-phase multifunctional electric meter convenient to install | |
CN206908175U (en) | A kind of intelligent drawer switch cabinet | |
CN207586289U (en) | A kind of three-phase electricity meter box | |
CN210294901U (en) | Novel concrete intelligence control by temperature change device | |
CN208154053U (en) | A kind of building power monitoring power monitoring instrumentation | |
CN216779782U (en) | Cleaning tool for power equipment observation window | |
CN205857295U (en) | A kind of water tank door operator | |
CN206992530U (en) | A kind of Electric Appliance Cabinet of convenient maintenance | |
CN211293024U (en) | Nonmetal three-phase electric-energy metering box convenient to installation | |
CN210326535U (en) | Novel electrified infrared temperature measurement observation window of cubical switchboard | |
CN209313223U (en) | A kind of metering cabinet instrument door | |
CN209497743U (en) | A kind of cabinet interlayer revolving door |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181130 Termination date: 20200320 |
|
CF01 | Termination of patent right due to non-payment of annual fee |