CN208168867U - Heavy caliber test well is layered bailing test device and layering pumping device - Google Patents

Heavy caliber test well is layered bailing test device and layering pumping device Download PDF

Info

Publication number
CN208168867U
CN208168867U CN201820501507.9U CN201820501507U CN208168867U CN 208168867 U CN208168867 U CN 208168867U CN 201820501507 U CN201820501507 U CN 201820501507U CN 208168867 U CN208168867 U CN 208168867U
Authority
CN
China
Prior art keywords
capsule
inner tube
water
aerated capsule
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820501507.9U
Other languages
Chinese (zh)
Inventor
王柏强
王启新
李龙泉
纪云静
王运来
佟浩
郭维维
李梦龙
李大乐
邓德龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Water Conservancy And Hydropower Survey And Design Institute (formerly Known As Liaoning Water Conservancy And Hydropower Survey And Design Institute) LLC
Original Assignee
Liaoning Water Conservancy And Hydropower Survey And Design Institute (formerly Known As Liaoning Water Conservancy And Hydropower Survey And Design Institute) LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Water Conservancy And Hydropower Survey And Design Institute (formerly Known As Liaoning Water Conservancy And Hydropower Survey And Design Institute) LLC filed Critical Liaoning Water Conservancy And Hydropower Survey And Design Institute (formerly Known As Liaoning Water Conservancy And Hydropower Survey And Design Institute) LLC
Priority to CN201820501507.9U priority Critical patent/CN208168867U/en
Application granted granted Critical
Publication of CN208168867U publication Critical patent/CN208168867U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses heavy caliber test well layering bailing test device and layering pumping devices,Device includes the wall casing being lowered into pumped well,The inner tube being lowered into wall casing,At least contain two layers of water-bearing layer in pumped well,Water-bearing layer is sealing material layer between any two,Annular space is formed between said inner tube outer wall and borehole wall inside pipe wall,Said inner tube upper port is opened wide,Lower port blocks,Said inner tube outer wall is set with aerated capsule,The aerated capsule includes upper aerated capsule,Lower aerated capsule,The upper aerated capsule,Radial through hole is uniformly opened up in this section of inner tube between lower aerated capsule,Form floral tube,The wall casing connects at least two filter pipes,The quantity of filter pipe and the number of plies in water-bearing layer are equal,Filter pipe and water-bearing layer correspond,The position height of the floral tube corresponds to the position height of one of filter pipe,Tripping in suction pump in said inner tube.The utility model may be implemented to be layered in same pumped well and draw water, and obtain the permeability parameters of different water cut layer.

Description

Heavy caliber test well is layered bailing test device and layering pumping device
Technical field
The utility model relates to Hydrogeologic Survey bailing test, specifically heavy caliber test well is layered bailing test Device and layering pumping device.
Background technique
Bailing test method is layered for huge thick aquifer at present, there are mainly two types of:
First method, be same place from top to bottom use variable diameter method be sequentially completed each water-bearing layer at well and pumping Water test is first completed the Cheng Jing in the top water-bearing layer with heavy caliber, and carries out this layer of bailing test;Continue in the well later Deepen the Cheng Jing in the next water-bearing layer of completion, and carries out the bailing test in the second water-bearing layer;It repeats the above process downwards, completes the Three, the bailing test in the water-bearing layers such as 4th.Between each water-bearing layer(I.e. between well casing)It needs to carry out good sealing, i.e., does not allow The water in portion water-bearing layer leaks into lower part and draws water in water-bearing layer and influence bailing test achievement.This kind of well drilling technology often water-stagnating effect It is bad, it is easy to appear disused well situation.It is reported that because sealing it is bad caused by the failure of second and third layer of bailing test the case where it is more.This Kind well drilling technology is complicated, and difficulty of construction is big, and variable diameter sealing is difficult in well, wastes tubing, and bailing test process lasts length, efficiency It is low.
Second method is to beat a well to each water-bearing layer in different parts respectively at well for each water-bearing layer, single Well is alone become, carries out bailing test respectively, every well will carry out sealing for water-bearing layer other than the target zone that draws water certainly.This side Method needs more well-diggings, and big at well casing material requirement, more at well quantity, construction cost is larger, and simple process is long in time limit.
Summary of the invention
The purpose of this utility model is to provide heavy caliber test well layering bailing test device and layering pumping devices, can be with Realization is layered in same pumped well draws water, and obtains the permeability parameters of different water cut layer, simple at well, saves tubing, sealing effect Fruit is ideal, determines that parameter is accurate, high-efficient, substantially reduces construction cost.
In order to achieve the above objectives, the utility model uses following technical solution, and heavy caliber test well is layered examination of drawing water Experiment device and layering pumping device, including the wall casing being lowered into pumped well, the inner tube being lowered into wall casing, in pumped well extremely Contain two layers of water-bearing layer less, water-bearing layer is sealing material layer between any two, is formed between said inner tube outer wall and borehole wall inside pipe wall Annular space, said inner tube upper port are opened wide, and lower port blocks, and said inner tube outer wall is set with aerated capsule, and the aerated capsule includes Upper aerated capsule, lower aerated capsule uniformly open up radial direction in this section of inner tube between the upper aerated capsule, lower aerated capsule Through hole forms floral tube, or directlys adopt the position that preset floral tube is welded between aerated capsule, lower aerated capsule, The wall casing connects at least two filter pipes, and the quantity of filter pipe and the number of plies in water-bearing layer are equal, filter pipe and water-bearing layer one One is corresponding, and the position height of the floral tube corresponds to the position height of one of filter pipe, tripping in suction pump in said inner tube.
Said inner tube outer wall also sets up two pairs of capsule protection rings, and one pair of them distinguish axial limiting in the two of upper aerated capsule End, another pair distinguish axial limiting in the both ends of lower aerated capsule.
The upper aerated capsule or lower aerated capsule include capsule ontology, and air inflation nozzle is arranged in capsule ontology, and air inflation nozzle passes through Gas tube connects the outer inflator pump of well.
In order to achieve the above objectives, the utility model uses following technical solution, and heavy caliber test well is layered pumping device, Including inner tube, said inner tube upper port is opened wide, and lower port blocks, and said inner tube outer wall is set with aerated capsule, the aerated capsule Including upper aerated capsule, lower aerated capsule, uniformly opened up in this section of inner tube between the upper aerated capsule, lower aerated capsule Radial through hole forms floral tube, or directlys adopt the position that preset floral tube is welded between aerated capsule, lower aerated capsule It sets, said inner tube outer wall also sets up two pairs of capsule protection rings, and one pair of them distinguish axial limiting in the both ends of upper aerated capsule, separately For axial limiting in the both ends of lower aerated capsule, the upper aerated capsule or lower aerated capsule include capsule ontology, glue to a pair respectively Air inflation nozzle is arranged in capsule ontology.
The utility model has the advantages that compared with prior art:
The device manufacturing is simple, and installation behaviour does conveniently, and equipment may be reused, simplify into well process, not only save Largely at well casing material, a large amount of filtrates and sealing material are also saved, the entire bailing test duration is especially shortened, improves effect Rate greatlys save construction investment and cost.The present apparatus is applied in the sub- reservoir bailing test of Inner Mongol East Platform, and effect is very It is ideal.
Detailed description of the invention
Fig. 1 is that structure of the heavy caliber test well layering bailing test device of the utility model in corresponding first water-bearing layer is shown It is intended to;
Fig. 2 is that structure of the heavy caliber test well layering bailing test device of the utility model in corresponding second water-bearing layer is shown It is intended to;
Fig. 3 is that structure of the heavy caliber test well layering bailing test device of the utility model in corresponding third water-bearing layer is shown It is intended to;
Fig. 4 is that the heavy caliber test well layering bailing test device of the utility model shows in the structure of corresponding the Fourth Aquifer It is intended to;
Vertical section structure schematic diagram when Fig. 5 is aerated capsule unaerated;
Cross-sectional structure schematic diagram when Fig. 6 is aerated capsule unaerated;
Fig. 7 is vertical section structure schematic diagram when aerated capsule is inflated;
Fig. 8 is cross-sectional structure schematic diagram when aerated capsule is inflated.
In figure:Upper aerated capsule 1, lower aerated capsule 2, floral tube 3, inner tube 4, the first water-bearing layer 5, the second water-bearing layer 6, third Water-bearing layer 7, the Fourth Aquifer 8, sealing material layer 9, wall casing 10, filter pipe 11, capsule protection ring 12, capsule protection ring 13, Aerated capsule ontology 101, capsule inner cavity 102.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
According to Fig. 1 to Fig. 8, heavy caliber test well is layered bailing test device, including the well being lowered into pumped well Wall pipe 10, the inner tube 4 being lowered into wall casing at least contain two layers of water-bearing layer in pumped well, and the embodiment in drawing uses 4 Layer water-bearing layer, respectively the first water-bearing layer 5, the second water-bearing layer 6, third water-bearing layer 7, the Fourth Aquifer 8, water-bearing layer is between any two For sealing material layer 9, annular space is formed between said inner tube outer wall and borehole wall inside pipe wall, said inner tube upper port is opened wide, lower port Block, said inner tube outer wall is set with aerated capsule, and the aerated capsule includes upper aerated capsule 1, lower aerated capsule 2, it is described on Radial through hole is uniformly opened up in this section of inner tube between aerated capsule, lower aerated capsule, forms floral tube 3, or directly adopt It is welded on the position between upper aerated capsule, lower aerated capsule with preset floral tube, the wall casing connects at least two drainages Pipe 11, the quantity of filter pipe and the number of plies in water-bearing layer are equal, and filter pipe and water-bearing layer correspond, the position height of the floral tube Correspond to the position height of one of filter pipe, tripping in suction pump in said inner tube.Said inner tube outer wall also sets up two pairs of capsules Protection ring, one pair of them distinguish axial limiting in the both ends of upper aerated capsule, and another pair distinguishes axial limiting in lower aerated capsule Both ends.For example capsule protection ring 12, capsule protection ring 13 constitute one pair of them, the upper aerated capsule or lower aerated capsule packet Capsule ontology 101 is included, air inflation nozzle is arranged in capsule ontology, and air inflation nozzle connects the outer inflator pump of well by gas tube, to capsule inner cavity 102 Middle inflation.
According to Fig. 1 to Fig. 8, heavy caliber test well is layered pumping device, including inner tube, and said inner tube upper port is opened wide, Lower port blocks, and said inner tube outer wall is set with aerated capsule, and the aerated capsule includes upper aerated capsule 1, lower aerated capsule 2, Radial through hole is uniformly opened up in this section of inner tube between the upper aerated capsule, lower aerated capsule, forms floral tube 3, or The position that preset floral tube is welded between aerated capsule, lower aerated capsule is directlyed adopt, said inner tube outer wall also sets up two To capsule protection ring, one pair of them distinguish axial limiting in the both ends of upper aerated capsule, and axial limiting fills another pair under respectively The both ends of gas capsule.For example capsule protection ring 12, capsule protection ring 13 constitute one pair of them, the upper aerated capsule or lower inflation Capsule includes capsule ontology 101, and air inflation nozzle is arranged in capsule ontology.
It realizes at a glance with completion layering bailing test in hole diameter well.Main device:Pumped well inner tube, sealing capsule, height Press inflator pump.The pumping in each water-bearing layer can be completed in the tripping in suction pump in pumped well inner tube, adjustment pumped well inner tube installation site Water test.
Using same hole diameter Cheng Jing.The well at a glance with hole diameter is completed in multiple water-bearing layers, and is layered feelings by water-bearing layer Condition design is drawn water layer position and length, and layering sealing position and length are designed, later by drawing water under layer and the installation of sealing position Filter pipe and wall casing are put, filtrate is successively put into(Drainage pipeline section)And sealing material.This process only at well process, with routine at Well technique is identical, only increases filtrate, sealing material gradation impressions, and monitored placement position accuracy.
Pumped well inner tube is designed, for being layered(Or segmentation)Extract target water-bearing layer underground water.Inner tube diameter will be according to pumping Well and bailing test water pump outer diameter are designed.Caliber is less than into well well casing internal diameter, and certain interval is reserved between well casing, Convenient for being sealed between well casing and inner tube.Inner tube uses seamless steel pipe, a length of non-perforated pipe of 70 ~ 100cm of bottom end(I.e. tube wall without Hole), and pipe end is blocked into welding tightly with iron plate.According to pumped well drainage length of tube and sealing fragment position, design in inner tube Floral tube length drills out circular hole in interior tube bottom end 80cm with upper section(3 ~ 4cm of aperture, 5 ~ 8cm of spacing), floral tube length should reach filter The 40 ~ 60% of length of pipe(It need to specifically be determined according to water yield, drainage length of tube, barrel hole size is estimated), the above are non-porous for floral tube Pipe, 4 ~ 6m of every section pipe range(It is determined according to boring tower height), screwed connection is used between pipe, guarantees that junction is sealed without water leakage.In addition, It is also designed to screwed connection between floral tube and non-perforated pipe, is easily installed.
Design specialized aerated capsule, for the hermetic seal between pumped well inner tube and well casing.Aerated capsule cross section is Round, internal diameter is slightly larger than pumped well inner tube outside diameter, is easily installed.Capsule outer diameter is less than into well well casing 7 ~ 8cm of internal diameter, and capsule is non-to be filled General 1.5 ~ the 2.0cm of thickness under the conditions of gas, 60 ~ 80cm of length inflate 1.0 ~ 1.5MPa of differential pressure requirements.
According to target water-bearing interval drainage length of tube and sealing position, water-stop glue is installed at the floral tube both ends of pumped well inner tube Capsule, it is therefore an objective to the floral tube section of the pumped well inner tube of tripping in is corresponding with pumped well filter pipe, and separate floral tube and other water-bearing layers Between connection, make the water pump being installed in pumped well inner tube be only capable of extract target water-bearing layer in underground water, complete this layer take out Water test.
It can be sequentially completed from top to bottom or from bottom to top and draw water according to the thickness in each water-bearing layer and filter pipe, sealing fragment position Test, such as each water-bearing layer filter pipe differ larger with sealing section interval, need to adjust aerated capsule position.Pumped well inner tube, inflation Capsule is reusable.High-pressure inflating pump is mainly used for the inflation of sealing capsule.
According to Fig. 1, Fig. 2, Fig. 3, Fig. 4, bailing test implementation process:
1, at well process:
1)Selected wells for pumping test well location carries out drilling well using Φ 600mm hole diameter drilling machine, disposably completes drilling well, well depth 118m.Same hole diameter completes pumped well, installs well casing by each water-bearing layer position and sealing section position, and launch each section of filter respectively Material, carries out each section of sealing.The well is essentially conventional well drilling technology, and journey is launched in the segmentation for only increasing filtrate and sealing material Sequence.
2)By draw water layer position and the length, relative water resisting layer and sealing position of design, tripping in wall casing and drainage are installed Pipe(Wall casing and drainage bore are Φ 300mm), filter pipe is more, respectively corresponds respective water-bearing layer.It is adopted between each section pipe It is attached with welding procedure.
3)By wall casing and drainage length of tube, sealing material and filter are successively put into outside wall casing and outside filter pipe Material, carries out the sealing between relative water resisting layer and wall casing, prevents the connection between adjacent aquifers.
4)Using air compressor machine well-flushing, bailing test can be carried out after water quality is limpid.
2, bailing test process:
1)Extract the first water-bearing layer underground water:Lower aerated capsule is inserted in pumped well inner tube lower end(Bore is Φ 220mm), this section of non-porous pipe range 12m.Upper end connects floral tube(Long 14m), 6m non-perforated pipe is connected later, and is inserted in and is filled at 27m Gas capsule, two capsules spacing about 26m, between with high-pressure plastic tubule connect, can simultaneously give two capsules inflation.Well head is reserved 0.5m, and fix pumped well inner tube with pipe clamp and prevent from falling into well.At this point, aerated capsule is located at the first water-bearing layer and the under lower end Relative water resisting layer i.e. sealing material layer position between two water-bearing layers.Then capsule is filled using high-pressure inflating pump Gas, control glue intraluminal pressure are greater than 0.3 ~ 0.5MPa of capsule external pressure(Consider the pressure of water), guarantee pumped well inner tube and well It is sealed without water leakage between wall pipe.Installation and tripping in deep well submerged pump carry out bailing test, completion first in pumped well inner tube later The bailing test in water-bearing layer works.See Fig. 1.It indicates pumped well inner tube first water-bearing layer of floral tube section tripping in position, it will be upper and lower Aerated capsule corresponds to sealing section gas-flow closure, later can in inner tube tripping in water pump complete first water-bearing layer examination of drawing water It tests.
2)Extract the second water-bearing layer underground water:Water pump is proposed first, aerated capsule is deflated release, and capsule retracts.It is taking out Well upper end of inner tube connects the non-porous pumped well inner tube of 30m long successively, and G.I.H, well head reserve 0.5m, fixes pumping with pipe clamp Well inner tube prevents from falling into well.At this point, water barrier portion of the lower aerated capsule between the second water-bearing layer and third water-bearing layer Position, water barrier position of the upper aerated capsule between the second water-bearing layer and the first water-bearing layer.Then high-pressure inflating pump pair is used Capsule is inflated, and control glue intraluminal pressure is greater than 0.3 ~ 0.5MPa of capsule external pressure(Consider the pressure of water), guarantee to draw water It is sealed without water leakage between well inner tube and wall casing.Simultaneously tripping in deep well submerged pump carries out examination of drawing water for installation in pumped well inner tube later It tests, completes the bailing test work in the second water-bearing layer.See Fig. 2.It indicates second water-bearing layer of pumped well inner tube floral tube section tripping in Upper and lower aerated capsule is corresponded to sealing section gas-flow closure by position, later can in inner tube tripping in water pump complete second it is aqueous The bailing test of layer.
3)Extract third water-bearing layer underground water:Water pump is proposed first, aerated capsule is deflated release, and capsule retracts.It is taking out Well upper end of inner tube connects the non-porous pumped well inner tube of 26m long successively, and G.I.H, well head reserve 0.5m, fixes pumping with pipe clamp Well inner tube prevents from falling into well.At this point, water barrier portion of the lower aerated capsule between third water-bearing layer and the Fourth Aquifer Position, water barrier position of the upper aerated capsule between third water-bearing layer and the second water-bearing layer.Then high-pressure inflating pump pair is used Capsule is inflated, and control glue intraluminal pressure is greater than 0.3 ~ 0.5MPa of capsule external pressure(Consider the pressure of water), guarantee to draw water It is sealed without water leakage between well inner tube and wall casing.Simultaneously tripping in deep well submerged pump carries out examination of drawing water for installation in pumped well inner tube later It tests, completes the bailing test work in third water-bearing layer.See Fig. 3.It indicates pumped well inner tube floral tube section tripping in third water-bearing layer Upper and lower aerated capsule is corresponded to sealing section gas-flow closure by position, later can to complete third aqueous for tripping in water pump in inner tube The bailing test of layer.
4)Extract the Fourth Aquifer underground water:If the thickness degree and top pervious bed consistency of thickness, repeat above-mentioned mistake This layer of bailing test can be completed in journey.See Fig. 4.It indicates the 4th water-bearing layer position of pumped well inner tube floral tube section tripping in, it will be upper Lower aerated capsule corresponds to sealing section gas-flow closure, can complete the examination of drawing water in the 4th water-bearing layer by tripping in water pump in inner tube later It tests.But if the Fourth Aquifer pervious bed thickness is smaller, do not had if aerated capsule in continuation tripping in pumped well inner tube in this way Impermeable role.Therefore, it need to propose pumped well inner tube, go to fall down aerated capsule section, stay certain length flower by the Fourth Aquifer thickness Pipe, upper aerated capsule is inserted in the pumped well inner tube of floral tube top, is sequentially connected pumped well inner tube and G.I.H, by design position It sets and capsule is mounted on water barrier position between third water-bearing layer and the Fourth Aquifer, later fix inner tube.Tripping in is installed The bailing test work of the Fourth Aquifer can be completed in water pump.
5)Explanation:Pumped well inner tube 4 ~ 6m of every section length can be combined connection according to each segment length.Aerated capsule according to The independent design customization of this equipment, effect are very good.
In the description of the present invention, it should be understood that temporald eixis or positional relationship are based on the figure Orientation or positional relationship is merely for convenience of description the utility model, rather than the device or element of indication or suggestion meaning must There must be specific orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. heavy caliber test well be layered bailing test device, including be lowered into pumped well wall casing, be lowered into wall casing Inner tube, two layers of water-bearing layer is at least contained in pumped well, water-bearing layer is sealing material layer between any two, which is characterized in that described Annular space is formed between outer wall of inner tube and borehole wall inside pipe wall, said inner tube upper port is opened wide, and lower port blocks, said inner tube outer wall set Fill aerated capsule, the aerated capsule includes upper aerated capsule, lower aerated capsule, the upper aerated capsule, lower aerated capsule it Between this section of inner tube on uniformly open up radial through hole, form floral tube, or directly adopt preset floral tube and be welded on and fill Position between gas capsule, lower aerated capsule, the wall casing connect at least two filter pipes, the quantity of filter pipe and water-bearing layer The number of plies it is equal, filter pipe and water-bearing layer correspond, and the position height of the floral tube corresponds to the position of one of filter pipe Highly, tripping in suction pump in said inner tube.
2. heavy caliber test well according to claim 1 is layered bailing test device, which is characterized in that said inner tube outer wall Two pairs of capsule protection rings are also set up, one pair of them distinguish axial limiting in the both ends of upper aerated capsule, and another pair is axial respectively to be limited Positioned at the both ends of lower aerated capsule.
3. heavy caliber test well according to claim 1 or 2 is layered bailing test device, which is characterized in that filled on described Gas capsule or lower aerated capsule include capsule ontology, and air inflation nozzle is arranged in capsule ontology, and air inflation nozzle is connected by gas tube to be filled outside well Air pump.
4. heavy caliber test well is layered pumping device, which is characterized in that including inner tube, said inner tube upper port is opened wide, lower port envelope Stifled, said inner tube outer wall is set with aerated capsule, and the aerated capsule includes upper aerated capsule, lower aerated capsule, the upper inflation Radial through hole is uniformly opened up in this section of inner tube between capsule, lower aerated capsule, forms floral tube, or directly adopt preset Floral tube be welded on the position between aerated capsule, lower aerated capsule, said inner tube outer wall also sets up two pairs of capsule protection rings, One pair of them distinguish axial limiting in the both ends of upper aerated capsule, and another pair distinguishes axial limiting in the both ends of lower aerated capsule, The upper aerated capsule or lower aerated capsule include capsule ontology, and air inflation nozzle is arranged in capsule ontology.
CN201820501507.9U 2018-04-10 2018-04-10 Heavy caliber test well is layered bailing test device and layering pumping device Active CN208168867U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820501507.9U CN208168867U (en) 2018-04-10 2018-04-10 Heavy caliber test well is layered bailing test device and layering pumping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820501507.9U CN208168867U (en) 2018-04-10 2018-04-10 Heavy caliber test well is layered bailing test device and layering pumping device

Publications (1)

Publication Number Publication Date
CN208168867U true CN208168867U (en) 2018-11-30

Family

ID=64374119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820501507.9U Active CN208168867U (en) 2018-04-10 2018-04-10 Heavy caliber test well is layered bailing test device and layering pumping device

Country Status (1)

Country Link
CN (1) CN208168867U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590644A (en) * 2018-04-10 2018-09-28 辽宁省水利水电勘测设计研究院有限责任公司(原名称为辽宁省水利水电勘测设计研究院) Heavy caliber test well is layered bailing test device and layering pumping device
CN110984965A (en) * 2019-11-19 2020-04-10 四川省蜀通岩土工程公司 Air bag type layered water pumping test system and method for drilling holes in same diameter

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590644A (en) * 2018-04-10 2018-09-28 辽宁省水利水电勘测设计研究院有限责任公司(原名称为辽宁省水利水电勘测设计研究院) Heavy caliber test well is layered bailing test device and layering pumping device
CN110984965A (en) * 2019-11-19 2020-04-10 四川省蜀通岩土工程公司 Air bag type layered water pumping test system and method for drilling holes in same diameter

Similar Documents

Publication Publication Date Title
CN108590644A (en) Heavy caliber test well is layered bailing test device and layering pumping device
CN103249908B (en) Method and apparatus in well
US8157007B2 (en) Method for casing using multiple expanded areas and using at least one inflatable bladder
CN101395339B (en) Method and apparatus to cement a perforated casing
CN208168867U (en) Heavy caliber test well is layered bailing test device and layering pumping device
CN103089182B (en) The completion method for tail of a kind of combined expanded sleeve pipe and expandable screen
CN110984900A (en) Device and method for stopping water in drilling
CN110984965A (en) Air bag type layered water pumping test system and method for drilling holes in same diameter
CN210948645U (en) Air bag type layered water pumping test system for drilling holes in same diameter
CN111188350A (en) Confined water dewatering well structure and dewatering method
CN203808896U (en) Long-section casing damage well expansion pipe double-card casing pipe layered packing repairing device
CN109750684B (en) Multipurpose dewatering well structure and manufacturing method thereof
CN103696718A (en) Method and device for repairing double-clamping-sleeve of expansion pipe of long section of casing damage well in layered partition manner
CN111980044B (en) Dewatering well structure for separating adjacent aquifers and method for backfilling outside well wall
CN203685094U (en) Layered sealing, separating and repairing device for expansion pipes with multiple clamped sleeves for long-segment casing damage well
EP2271819B1 (en) A tool for shutting off openings or leaks in a well bore
CN211898487U (en) Diving drainage well structure
CN109989726B (en) Divided downhole fixed-point injector and method for repairing water supply pipe well by using same
CN209761453U (en) TBM tunnel membrane bag cement slurry-stopping body structure
CN111218949A (en) Diving drainage well structure and drainage method
CN110805034A (en) Circumferential rotation swinging grouting reinforcement construction method for defected cast-in-place pile composite pipe combined pile
CN113027337B (en) Simple small pressure difference testing method with drilling, well completion and gas testing functions
CN113027338B (en) Simple small pressure difference testing device with well drilling, well completion and gas testing functions
CN218716630U (en) Well flushing device for in-situ leaching uranium mining mine process well
CN215857807U (en) Layered water pumping device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant