CN208168508U - A kind of storage system for industrial residue stockyard - Google Patents

A kind of storage system for industrial residue stockyard Download PDF

Info

Publication number
CN208168508U
CN208168508U CN201820425899.5U CN201820425899U CN208168508U CN 208168508 U CN208168508 U CN 208168508U CN 201820425899 U CN201820425899 U CN 201820425899U CN 208168508 U CN208168508 U CN 208168508U
Authority
CN
China
Prior art keywords
industrial residue
pipe
storage system
water collection
enclosure wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820425899.5U
Other languages
Chinese (zh)
Inventor
师磊
单涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongye Northwest Engineering Technology Co., Ltd.
Original Assignee
Alex Hua Tian Baotou Design And Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alex Hua Tian Baotou Design And Research Institute Co Ltd filed Critical Alex Hua Tian Baotou Design And Research Institute Co Ltd
Priority to CN201820425899.5U priority Critical patent/CN208168508U/en
Application granted granted Critical
Publication of CN208168508U publication Critical patent/CN208168508U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model provides a kind of storage system for industrial residue stockyard comprising:Enclosure wall, the internal stacking space formed for accommodating industrial residue;Water collection agencies, set on the outside of enclosure wall;First drainage mechanism, it includes the first filter assemblies on the inner peripheral surface of enclosure wall and on enclosure wall and the infiltration pipe that partly or entirely buries of industrial residue that can be dumped in emptying, and is managed and delivery pipe group that the first filter assemblies are connected to water collection agencies for that will penetrate into.Water body in industrial residue can either sequentially enter in delivery pipe group and water collection agencies after through the first filter assemblies, also can be by sequentially entering in delivery pipe group and water collection agencies after penetrating into pipe.The storage system for industrial residue stockyard of the utility model can effectively drain industrial residue stockyard, thus be avoided as much as industrial residue stockyard inner product dilutional hyponatremia and caused by environmental pollution and enclosure wall the problems such as damaging.

Description

A kind of storage system for industrial residue stockyard
Technical field
The utility model relates to industrial residue stockpiling technical field more particularly to a kind of stockpilings for industrial residue stockyard System.
Background technique
Industrial residue is the waste in industrial production, and chemical component is complex, and the industrial residue largely discarded is Production and life to the mankind cause direct or indirect influence.Currently, all there is certain in industrial residue stockyard both domestic and external Defect, when encountering rainy season, industrial residue stockyard will appear the difficult problem of draining, the ponding in industrial residue stockyard It may overflow, and cause a large amount of contaminants earth's surfaces and underground water source remaining in industrial residue.In addition, Industry Waste slag muck Field ponding excessively even may also result in the enclosure wall damage in industrial residue stockyard, lead to biggish economic loss.
Utility model content
In order to solve the problems, such as above-mentioned all or part, the purpose of the utility model is to provide one kind to be used for industrial residue stockyard Storage system, industrial residue stockyard can effectively be drained, to be avoided as much as due to Industry Waste slag muck Inner product dilutional hyponatremia and caused by environmental pollution and enclosure wall the problems such as damaging.
The utility model provides a kind of storage system for industrial residue stockyard comprising:Enclosure wall, internal formed are used In the stacking space for accommodating industrial residue;Water collection agencies, set on the outside of the enclosure wall;First drainage mechanism comprising be set to The first filter assemblies on the inner peripheral surface of the enclosure wall and on the enclosure wall and can be by the Industry Waste in the stacking space Slag part or the infiltration pipe all buried, and for infiltration pipe and the first filter assemblies to be connected to the water collection agencies Delivery pipe group, wherein water body in the industrial residue can either sequentially enter after through first filter assemblies In the delivery pipe group and water collection agencies, the delivery pipe group can be also sequentially entered after through the infiltration pipe and is catchmented In mechanism.
It preferably, include at least one slope surface in the inner peripheral surface of the enclosure wall, so that the cross section face for stacking space Product is gradually reduced along top-down direction;It is equipped with matched in the slope surface of the enclosure wall and accommodates first filter assemblies Containing groove.
Preferably, which further includes the second drainage mechanism, second draught engine Structure includes set on second filter assemblies for stacking space bottom and for connecting second filter assemblies and water collection agencies Logical sand control guiding subassembly, wherein second filter assemblies include the sandy gravel stratum, metalling and sieve being successively laid with from the bottom to top Plate enables the water body in the industrial residue to sequentially enter after through the sieve plate, metalling and sandy gravel stratum described In sand control guiding subassembly and water collection agencies, wherein the rubble granularity in the metalling is greater than the gravel grain in the sandy gravel stratum Degree.
Preferably, the sand control guiding subassembly includes the sand control screen buried by the sandy gravel stratum and to by the sand control The diversion pipe that screen casing is connected with water collection agencies, and the first control valve on the diversion pipe.
Preferably, the infiltration pipe includes being located in the stackings space and tilting section with holes and in the enclosure wall And to connect the tilting section and delivery pipe group through section, wherein the bottom end of the tilting section is connected with through section, and its Top is set in the stacking space.
Preferably, which further includes being connected with the delivery pipe group and can be to it The flushing machine being rinsed.
Preferably, the delivery pipe group includes to manage the water collection agencies and to incite somebody to action with the main line that pipe is connect is penetrated into Manage the bypass duct being connected to first filter assemblies, and the second control valve on the main line pipe, institute in the main line Stating flushing machine includes pressure water tank, the first flushing pipe and the second flushing pipe, and first flushing pipe is used for the pressure water Case penetrates into being connected through section for pipe with described, and second flushing pipe is used to for the pressure water tank being connected with main line pipe.
Preferably, which further includes the mud that can be removed in the water collection agencies Dredging mechanism.
Preferably, the dredging mechanism includes removing sludge, dredging tube and rotating mechanism, the dredging tube have with it is described clear It becomes silted up and pumps connected connecting pin and the working end in the water collection agencies;The rotating mechanism includes cursor and can drive The ROTATING SOURCE that the cursor rotates in the horizontal direction, one end of the cursor is connected with the shaft of the ROTATING SOURCE and it is another One end is connected with the dredging tube so that the working end of the dredging tube can in the cursor under effect in the collection It is moved in water dispenser structure.
Preferably, the water collection agencies are collecting-tank, and the bottom of the collecting-tank is lower than the bottom for stacking space;Institute Stating industrial residue is red mud.
Storage system according to the present utility model for industrial residue stockyard, the first drainage mechanism provide two drainings Path, wherein the first filter assemblies on the inner peripheral surface of enclosure wall are mainly used for receiving the water body spilt into outside industrial residue, And the water body gathered in the stacking space of industrial residue by rainfall, it can be filtered out in water body by the first filter assemblies Industrial residue particle, and filtered water body will be discharged into water collection agencies by delivery pipe group and be stored;Pipe is penetrated into be mainly used for The water body inside Industry Waste slag muck is exported, the water body in industrial residue, which can penetrate into, to penetrate into pipe, penetrates into the water collected in pipe Body will be also discharged into water collection agencies by delivery pipe group and be stored.It can be from the industrial residue of stockpiling by above-mentioned first drainage mechanism It is inside and outside drained respectively, so as to improve drainage efficiency, be avoided as much as industrial residue stockyard inner product dilutional hyponatremia, most The problems such as avoiding thus bring environmental pollution and enclosure wall to damage eventually.In addition, the utility model for industrial residue stockyard The structure of storage system is simple, safe and reliable, convenient for widely promoting and applying.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described.In all the appended drawings, similar Element or part are generally identified by similar appended drawing reference.In attached drawing, each element or part might not be according to actual ratios It draws.
Fig. 1 is the structural schematic diagram of the storage system for industrial residue stockyard of the utility model embodiment;
Fig. 2 is the structural representation of the dredging mechanism of the storage system for industrial residue stockyard of the utility model embodiment Figure.
Specific embodiment
It is described in detail below in conjunction with embodiment of the attached drawing to technical solutions of the utility model.Following embodiment is only For clearly illustrating the technical solution of the utility model, therefore it is only used as example, and it is originally practical to cannot be used as a limitation limitation Novel protection scope.
Fig. 1 is the structural schematic diagram of the storage system for industrial residue stockyard of the utility model embodiment, such as Fig. 1 institute Show, which includes enclosure wall 1, water collection agencies 2 and the first drainage mechanism 3.Enclosure wall 1 it is interior Portion forms the stacking space for accommodating industrial residue, and water collection agencies 2 are set to the outside of enclosure wall 1, that is to say, that 2 He of water collection agencies Stack the two sides that space is located at enclosure wall 1.First drainage mechanism 3 includes the first filtering group on the inner peripheral surface of enclosure wall 1 Part 31, on enclosure wall 1 and the infiltration pipe 32 that partly or entirely buries of industrial residue that can be dumped in emptying, and for will Penetrate into the delivery pipe group 33 that pipe 32 and the first filter assemblies 31 are connected to water collection agencies 2.Wherein, the water body in industrial residue can It is enough to be sequentially entered in delivery pipe group 33 and water collection agencies 2 after through the first filter assemblies 31, it also can be by penetrating into pipe It is sequentially entered in delivery pipe group 33 and water collection agencies 2 after 32.In order to reinforce drainage effect, the quantity of the first filter assemblies 31 can Be it is multiple, multiple first filter assemblies 31 are arranged along the circumferential direction of enclosure wall 1, and in each first filter assemblies 31, penetrate into The quantity of pipe 32 may be set to be multiple, and multiple infiltration pipes 32 are successively spaced apart along vertical direction, those skilled in the art The particular number for penetrating into pipe 32 can be determined according to the practical dewatering needs in industrial residue stockyard.
Storage system according to the present utility model for industrial residue stockyard, the first drainage mechanism 3 provide two rows Water route, wherein the first filter assemblies 31 on the inner peripheral surface of enclosure wall 1, which are mainly used for receiving, to be spilt into outside industrial residue Water body, and the water body gathered in the stacking space of industrial residue by rainfall can be filtered by the first filter assemblies 31 Fall the industrial residue particle in water body, and filtered water body will be discharged into water collection agencies 2 by delivery pipe group 33 and be stored;It penetrates into Pipe 32 is mainly used for exporting the water body inside Industry Waste slag muck, and the water body in industrial residue, which can penetrate into, to penetrate into pipe 32, seeps Enter the water body collected in pipe 32 and will also be discharged into water collection agencies 2 by delivery pipe group 33 to store.Pass through above-mentioned first drainage mechanism 3 It can be drained respectively inside and outside the industrial residue of stockpiling, so as to improve drainage efficiency, be avoided as much as industry The problems such as waste residue stockyard internal water accumulation is excessive, and thus bring environmental pollution and enclosure wall is finally avoided to damage.
It in the present embodiment, include at least one slope surface in the inner peripheral surface of enclosure wall 1, so that stacking the cross-sectional area in space It is gradually reduced along top-down direction.Preferably, the inner peripheral surface of enclosure wall 1 is slope surface.Matching is equipped in the slope surface of enclosure wall 1 Formula accommodates the containing groove 11 of the first filter assemblies 31.Containing groove 11 plays work that is fixed and accommodating the first filter assemblies 31 With, the first filter assemblies 31 are steadily arranged onto the slope surface of enclosure wall 1, meanwhile, the first filter assemblies 31 are set It sets in slope surface, the water body in industrial residue is enabled to more easily enter the first filter assemblies 31.In addition, above-mentioned first mistake Filter component 31 can be laid with by rubble or gravel, can also be directly disposed as filter cloth.
The storage system for industrial residue stockyard of the utility model further includes the second drainage mechanism 4, the second draught engine Structure 4 includes set on the second filter assemblies 41 for stacking space bottom and for being connected to the second filter assemblies 41 with water collection agencies 2 Sand control guiding subassembly 42.Wherein, the second filter assemblies 41 include sandy gravel stratum 41a, the metalling 41b being successively laid with from the bottom to top With sieve plate 41c, enable the water body in industrial residue after through sieve plate 41c, metalling 41b and sandy gravel stratum 41a successively Into in sand control guiding subassembly 42 and water collection agencies 2.Sandy gravel stratum 41a and metalling 41b can filter out the Industry Waste in water body Solid impurity particle, and the rubble granularity in metalling 41b is greater than the gravel granularity in sandy gravel stratum 41a, to realize the layering to water body Filter.It is mainly used for receiving set on the second filter assemblies 41 for stacking space bottom and filters due to gravity and from industrial residue In the water body that leaks down, and will be admitted in water collection agencies 2 by sand control guiding subassembly 42 by filtered water body.Above-mentioned sieve plate 41c plays the role of filtering out water body therein again while the industrial residue in space is stacked in support, and sieve plate 41c can be with It is the cement plate with through-hole, is also possible to be laid with by water-permeable brick.
Sand control guiding subassembly 42 include the sand control screen 42a buried by sandy gravel stratum 41a and to by sand control screen 42a and collection The diversion pipe 42b that water dispenser structure 2 is connected, and the first control valve 42c on diversion pipe 42b.Sand control screen 42a can be right The water body flowed down from sandy gravel stratum 41a is further filtered, and can reduce the Industry Waste in the diversion pipe 42b of entrance in this way Solid impurity particle is blocked to be avoided as much as diversion pipe 42b.In addition, the first control valve 42c can be controlled to water collection agencies 2 The middle drainage rates drained, therefore, the administrative staff of storage system can be according to the moisture storage capacity of water collection agencies 2 come the row of adjusting Water speed rate.
In the present embodiment, penetrating into pipe 32 includes being located to stack in space and tilting section 32a with holes and in the enclosure wall 1 And to connect tilting section 32a and delivery pipe group 33 through section 32b, wherein the bottom end of tilting section 32a with through section 32b phase Connect, and its top is set to and stacks in space.Setting in this way, firstly, the hole on tilting section 32a can filter it is larger in water Industrial residue particle, in addition, by penetrate into pipe 32 be located at stack space in part be set as inclined so that enter penetrate into pipe Water energy in 32 is enough discharged more quickly.
Preferably, delivery pipe group 33 include to by water collection agencies 2 with penetrate into the main line pipe 33a that connect of pipe 32 and to The bypass duct 33b that main line pipe 33a is connected to the first filter assemblies 31, and the second control valve on the pipe 33a of main line 33c.Since main line pipe 33a can receive the water body penetrated into pipe 32 and the first filter assemblies 31, the water flow in the pipe 33a of main line Water flow in generally higher than bypass duct 33b, therefore the internal diameter that main line pipe 33a can be set is greater than the internal diameter of bypass duct 33b.And The second control valve 33c on the pipe 33a of main line can control through the first filter assemblies 31 and by penetrating into pipe 32 Into the flow of the water body in water collection agencies 2, achieve the effect that control drainage rates.In addition, in order to avoid 33 quilt of delivery pipe group The tampers such as industrial residue particle and sludge blocking and influence draining, the storage system for being used for industrial residue stockyard further include with Delivery pipe group 33 is connected and can be to the flushing machine 6 that it is rinsed.In the present embodiment, flushing machine 6 includes pressure water Case 61, the first flushing pipe 62 and the second flushing pipe 63, the first flushing pipe 62 are used to run through pressure water tank 61 and infiltration pipe 32 Section 32b is connected, and the second flushing pipe 63 is for pressure water tank 61 to be connected with main line pipe 33a.The water stored in pressure water tank 61 Pressure it is higher so that the water sprayed out of the first flushing pipe 62 and the second flushing pipe 63 also pressure with higher, Neng Gouyou The tamper in section 32b and main line pipe 33a for penetrating into pipe 32 is rinsed out to effect, guarantees the storage system of the utility model Draining can be effectively performed always.
The storage system for being used for industrial residue stockyard further includes the dredging mechanism that can remove the mud in water collection agencies 2 5, in the present embodiment, for carrying out dredging blowdown to water collection agencies 2, Fig. 2 is the structural schematic diagram of the dredging mechanism 5.It is above-mentioned Mud includes industrial residue particle, rubbish and soil etc..As shown in Fig. 2, dredging mechanism 5 includes removing sludge 51 and dredging tube 52, Dredging tube 52 has the connecting pin 52a being connected with the removing sludge 51 and working end 52b in water collection agencies 2.In removing sludge 51 Under the action of, the mud in water collection agencies 2 is sucked out along dredging tube 52, so that a large amount of mud be avoided to occupy in water collection agencies 2 Water space.In addition, the dredging mechanism 5 further includes rotating mechanism 53, rotating mechanism 53 includes cursor 53b and can drive One end of the ROTATING SOURCE 53a that turn swing arm 53b rotates in the horizontal direction, cursor 53b are connected and it with the shaft of ROTATING SOURCE 53a The other end is connected with dredging tube 52, so that the working end 52b of dredging tube 52 can collect water dispenser under effect in cursor 53b It is moved horizontally in structure 2.Under the action of ROTATING SOURCE 53a and cursor 53b, collection more can be more effectively sucked out in dredging mechanism 5 Sludge in water dispenser structure 2.Above-mentioned ROTATING SOURCE 53a can directly be the combination of motor or motor and speed reducer, naturally it is also possible to be liquid Pressure motor or engine etc..
Preferably, water collection agencies 2 be collecting-tank, meanwhile, for the ease of by the discharge into water in industrial residue to collect water dispenser In structure 2, the bottom of collecting-tank is lower than the bottom for stacking space.Industrial residue is preferably red mud, and red mud is aluminum oxide industry production In waste, since its chemical component is extremely complex, largely discarded red mud can production to the mankind and life cause directly Or it indirectly influences.In addition, a large amount of salkali waste remaining in red mud penetrate into farmland nearby, cause alkalization of soils, polluted surface and Underground water source, therefore the stockpiling problem of red mud is a problem in current aluminum oxide industry production.By using above-mentioned heap Deposit system carries out the stockpiling of red mud, is conducive to the long-run development of aluminum oxide industry production.
It should be noted that unless otherwise indicated, technical term or scientific term used in this application should be this reality The ordinary meaning understood with novel one of ordinary skill in the art.
In this application, term " first ", " second " etc. are used for description purposes only, and are not understood to indicate or imply phase To importance or implicitly indicate the quantity of indicated technical characteristic.The meaning of " multiple " in the description of the present invention, It is two or more, unless otherwise specifically defined.
In this application unless specifically defined or limited otherwise, the terms such as term " connected ", " connection " should do broad sense reason Solution, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be mechanical connection, be also possible to electricity Connection;It can be directly connected, the connection inside two elements or two can also be can be indirectly connected through an intermediary The interaction relationship of element.For the ordinary skill in the art, above-mentioned term can be understood as the case may be Concrete meaning in the present invention.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model, rather than limits it System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand:It is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type, should all cover in the claim of the utility model and the range of specification. Especially, as long as structural conflict is not present, items technical characteristic mentioned in the various embodiments can combine in any way Get up.The utility model is not limited to specific embodiment disclosed herein, but including falling within the scope of the appended claims All technical solutions.

Claims (10)

1. a kind of storage system for industrial residue stockyard, which is characterized in that including:
Enclosure wall, the internal stacking space formed for accommodating industrial residue;
Water collection agencies, set on the outside of the enclosure wall;
First drainage mechanism comprising the first filter assemblies on the inner peripheral surface of the enclosure wall and be set on the enclosure wall and The infiltration pipe that can be partly or entirely buried by the industrial residue in the stacking space, and for managing and first the infiltration The delivery pipe group that filter assemblies are connected to the water collection agencies, wherein the water body in the industrial residue can either be passing through The first filter assemblies are stated to sequentially enter in the delivery pipe group and water collection agencies later, it also can be after through the infiltration pipe It sequentially enters in the delivery pipe group and water collection agencies.
2. storage system according to claim 1, which is characterized in that include at least one slope in the inner peripheral surface of the enclosure wall Face, so that the cross-sectional area for stacking space is gradually reduced along top-down direction;It is set in the slope surface of the enclosure wall There is matched to accommodate the containing groove of first filter assemblies.
3. storage system according to claim 1 or 2, which is characterized in that further include the second drainage mechanism, the second row Water dispenser structure includes set on second filter assemblies for stacking space bottom and being used for second filter assemblies and collection water dispenser The sand control guiding subassembly of structure connection, wherein second filter assemblies include the sandy gravel stratum being successively laid with from the bottom to top, metalling And sieve plate, the water body in the industrial residue is sequentially entered after through the sieve plate, metalling and sandy gravel stratum In the sand control guiding subassembly and water collection agencies, wherein the rubble granularity in the metalling is greater than the gravel in the sandy gravel stratum Granularity.
4. storage system according to claim 3, which is characterized in that the sand control guiding subassembly includes by the sandy gravel stratum The sand control screen and the diversion pipe the sand control screen to be connected with water collection agencies buried, and it is set to the diversion pipe On the first control valve.
5. storage system according to claim 1 or 2, which is characterized in that the infiltration pipe includes being located at the heap to be vented In and tilting section with holes and in the enclosure wall and to connect the tilting section and delivery pipe group through section, wherein The bottom end of the tilting section is connected with through section, and its top is set in the stacking space.
6. storage system according to claim 5, which is characterized in that further include being connected with the delivery pipe group and can be right Its flushing machine being rinsed.
7. storage system according to claim 6, which is characterized in that the delivery pipe group includes to by the collection water dispenser Structure is managed and with the main line that pipe is connect is penetrated into the bypass duct being connected to first filter assemblies, Yi Jishe are managed in the main line The second control valve on the main line pipe, the flushing machine include pressure water tank, the first flushing pipe and the second flushing pipe, institute The first flushing pipe is stated for penetrating into being connected through section for pipe the pressure water tank with described, second flushing pipe is used for institute Pressure water tank is stated to be connected with main line pipe.
8. storage system according to claim 1 or 2, which is characterized in that further include that can remove in the water collection agencies Mud dredging mechanism.
9. storage system according to claim 8, which is characterized in that the dredging mechanism include removing sludge, dredging tube and Rotating mechanism, the dredging tube have the connecting pin being connected with the removing sludge and the working end in the water collection agencies; The rotating mechanism includes cursor and ROTATING SOURCE that the cursor can be driven to rotate in the horizontal direction, the cursor One end is connected with the shaft of the ROTATING SOURCE and its other end is connected with the dredging tube, so that the working end of the dredging tube It can be moved in the water collection agencies under effect in the cursor.
10. storage system according to claim 1 or 2, which is characterized in that the water collection agencies are collecting-tank, the collection The bottom in pond is lower than the bottom for stacking space;The industrial residue is red mud.
CN201820425899.5U 2018-03-28 2018-03-28 A kind of storage system for industrial residue stockyard Active CN208168508U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820425899.5U CN208168508U (en) 2018-03-28 2018-03-28 A kind of storage system for industrial residue stockyard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820425899.5U CN208168508U (en) 2018-03-28 2018-03-28 A kind of storage system for industrial residue stockyard

Publications (1)

Publication Number Publication Date
CN208168508U true CN208168508U (en) 2018-11-30

Family

ID=64374567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820425899.5U Active CN208168508U (en) 2018-03-28 2018-03-28 A kind of storage system for industrial residue stockyard

Country Status (1)

Country Link
CN (1) CN208168508U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459552A (en) * 2020-09-08 2021-03-09 中国电建集团华东勘测设计研究院有限公司 Production waste residue protection structure of large sand aggregate processing system and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459552A (en) * 2020-09-08 2021-03-09 中国电建集团华东勘测设计研究院有限公司 Production waste residue protection structure of large sand aggregate processing system and construction method

Similar Documents

Publication Publication Date Title
CN206784757U (en) A kind of device for recycling rainwater
CN206680961U (en) A kind of Hydraulic and Hydro-Power Engineering priming device
CN207376794U (en) A kind of municipal rain collector with filtering function
CN104532947B (en) Underground open type storage pond
CN208168508U (en) A kind of storage system for industrial residue stockyard
CN110741910A (en) Water collecting and supplying system and method for mine refuse dump
CN218072854U (en) Hillside rainwater collection infiltrating irrigation device capable of improving rainwater utilization efficiency
CN211793411U (en) Water collecting and supplying system for mine refuse dump
CN209482442U (en) Underground sumping, exhaust system
CN208309746U (en) The rainwater recovery device of basement structure top plate
CN217678985U (en) Assembled foundation treatment device of soft soil foundation
CN215290210U (en) Foundation pit drainage device
CN206844201U (en) Riverway sludge clears up system
CN212052827U (en) Drainage device for building foundation
CN212866270U (en) Be used for district afforestation to irrigate and use rainwater cistern
CN212818612U (en) Sewage treatment plant is used in construction of ultra-deep foundation ditch
CN107313474A (en) Riverway sludge clears up system and method for cleaning
CN208201897U (en) A kind of filtering discharge structure applied to building lot
CN107542156A (en) A kind of sustainable collection and purification equipment of highway rainwater
CN211057828U (en) Interim drainage structures is dug to earthwork packing
CN208183777U (en) A kind of base pit dewatering system
CN211898827U (en) Environment-friendly rainwater well
CN211020012U (en) A rainwater collection device for in landscape garden
CN204401774U (en) Underground open type storage pond
CN207436120U (en) A kind of hydraulic engineering row's silt device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 014010 Steel Street, Kunqu District, Baotou, the Inner Mongolia Autonomous Region

Patentee after: Zhongye Northwest Engineering Technology Co., Ltd.

Address before: 014010 Steel Street, Kunqu District, Baotou, the Inner Mongolia Autonomous Region

Patentee before: Alex Hua Tian Baotou design and Research Institute Co., Ltd.